CHANGE ORDER #1 POOLE & KENT (S-931)
This is a legislative item for a resolution ratifying Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-day time extension with no additional fiscal impact. The project is located at the South District Wastewater Treatment Plant in Commission District 8. The project increases the permitted average annual daily flow from 112.5 to 131 million gallons per day and the peak flow capacity from 285 MGD to 305 MGD. The contract was awarded on May 11, 2021, with a total amount not to exceed $107,605,400.00. The Notice to Proceed was issued on August 30, 2021. The change order extends the Substantial Completion Date from November 19, 2023 to October 18, 2025, and the Final Completion Date from January 18, 2024 to December 17, 2025. The item is scheduled for the Board of County Commissioners meeting on September 1, 2026, as agenda item 8O3. The file number is 261435. The resolution ratifies the action of the County Mayor or designee. The project has been successfully completed and the change order serves as final contract closeout. The document does not state a specific street address or parcel number. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Pending before the Board; recommendation is to ratify Change Order No. 1
- Applicant:
- Miami-Dade County Water & Sewer Department; Contractor: Poole & Kent Company of Florida
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution R-751-26, File Number 261435, adopted September 1, 2026, ratifies Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. Change Order No. 1 grants a 699-calendar day time extension with no additional fiscal impact. The project was completed. The project increases permitted average annual daily flow from 112.5 to 131 million gallons per day and peak flow capacity from 285 MGD to 305 MGD. The project includes construction of headworks, two oxygenation trains, odor control facilities, and installation of large diameter pipelines including a connection to an existing 72-inch force main at SW 232nd Street. The contract was awarded May 11, 2021 for $107,605,400.00 with a duration of 792 calendar days. Notice to Proceed was issued August 30, 2021. Substantial Completion Date was extended from November 19, 2023 to October 18, 2025 and Final Completion Date from January 18, 2024 to December 17, 2025. The project is located at WASD's South District Wastewater Treatment Plant in Commission District 8. The project is necessary to meet State-mandated Ocean Outfall Legislation requirements. The document does not state a street address, parcel number, or acreage. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water and Sewer Department; Contractor: Poole & Kent Company of Florida
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution R-751-26, File Number 261435, adopted 9/1/2026, ratifies Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar day time extension with no additional fiscal impact. The project was performed at WASD's South District Wastewater Treatment Plant, located in Commission District 8. The project allows for an increase of the permitted average annual daily flow from 112.5 to 131 million gallons per day and an increase of peak flow capacity from 285 MGD to 305 MGD. The project consists of construction of headworks, two oxygenation trains and odor control facilities, and includes installation of large diameter pipelines, including a connection to an existing 72-inch force main at SW 232nd Street. The contract was awarded on May 11, 2021, with a total amount not to exceed $107,605,400.00. The Notice to Proceed was issued on August 30, 2021. The change order extends the Substantial Completion Date from November 19, 2023 to October 18, 2025 and the Final Completion Date from January 18, 2024 to December 17, 2025. The project has been successfully completed. Public comment sentiment is not stated.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water & Sewer Department; Poole & Kent Company of Florida
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution R-751-26 (File Number 261435) ratifies Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar day time extension with no additional fiscal impact. The project increased the permitted average annual daily flow from 112.5 to 131 million gallons per day (MGD) and peak flow capacity from 285 MGD to 305 MGD at the South District Wastewater Treatment Plant. The project was successfully completed. The resolution was adopted on 9/1/2026. The project is located in Commission District 8. The contract was awarded on May 11, 2021, with a total amount not to exceed $107,605,400.00. The Notice to Proceed was issued on August 30, 2021. The project includes construction of headworks, two oxygenation trains, odor control facilities, and installation of large diameter pipelines including a connection to an existing 72-inch force main at SW 232nd Street. Delays were caused by third-party manufacturing issues, field coordination conflicts with adjacent Ocean Outfall Legislation (OOL) projects, and late design and startup-related issues. The project is necessary to meet State-mandated OOL requirements pursuant to section 403.086(9) of the Florida Statutes.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- South District Wastewater Treatment Plant, located in Commission District 8; connection to an existing 72-inch force main at SW 232nd Street
- Applicant:
- Miami-Dade County Water and Sewer Department; Contractor: Poole & Kent Company of Florida
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26, adopted September 1, 2026, ratifies Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. The change order is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, extending the Final Completion Date from September 28, 2025 to October 10, 2025. The project is completed. The work includes upsizing motors and VFDs to 1,750 horsepower, switchgear manufacturer modifications, and extended guarantees. The project is located in District 6, represented by Commissioner Natalie Milian Orbis. The original contract award was $15,007,598.00 on April 24, 2023, ratified by Resolution R-417-23 on May 2, 2023. Change Order No. 1 was ratified on June 4, 2024 via Resolution R-495-24. The remaining electrical installation work will be completed under a new competitively procured Phase II contract.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- TGSV Enterprises Inc.
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26, File Number 261438, adopted by the Miami-Dade County Commission on 9/1/2026, ratifies Change Order No. 2 to Contract No. W-949 with TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. The change order is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, extending the Final Completion Date from September 28, 2025 to October 10, 2025. The project is completed. The change order funds manufacturer-required modifications to electrical equipment, including upsizing motors and VFDs from 1,500 to 1,750 horsepower ($1,554,818.10), switchgear manufacturer modifications ($1,112,470.26), and extended guarantees ($86,838.40). A water infiltration issue led to a 12-calendar-day time extension. The remaining electrical installation work will be completed under a new competitively procured Phase II contract. The original contract award was $15,007,598.00, awarded on April 24, 2023, with Notice to Proceed on July 24, 2023. Change Order No. 1 was ratified on June 4, 2024 via Resolution R-495-24. The project is located in District 6, represented by Commissioner Natalie Milian Orbis. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- TGSV Enterprises Inc.
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26 (File 261438) ratifies Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. Change Order No. 2 is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, extending the Final Completion Date from September 28, 2025 to October 10, 2025. The resolution was adopted on September 1, 2026. The project is located in District 6, represented by Commissioner Natalie Milian Orbis. The total original contract award was $15,007,598.00 with a Contingency Allowance of $1,329,135.00. The work includes upsizing motors and VFDs from 1,500 to 1,750 horsepower, switchgear manufacturer modifications, and extended guarantees. The project has been completed, with remaining activity limited to procurement of equipment for a future Phase II contract. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- TGSV Enterprises Inc. (Contractor); Miami-Dade County (Owner); Miami-Dade Water and Sewer Department (WASD, Requester)
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26, File Number 261438, adopted September 1, 2026, ratifies Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. Change Order No. 2 is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, revising the Final Completion Date from September 28, 2025 to October 10, 2025. The project is completed. The reallocation funds manufacturer-required modifications to electrical equipment, including upsized motors and switchgear changes. Remaining electrical work will be completed under a new competitively procured Phase II contract. The Contract was awarded April 24, 2023, ratified May 2, 2023 via Resolution R-417-23, with a total award of $15,007,598.00. Change Order No. 1 was ratified June 4, 2024 via Resolution R-495-24. The plant is located in District 6, represented by Commissioner Natalie Milian Orbis. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- TGSV Enterprises Inc.
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26, File Number 261438, adopted September 1, 2026, ratifies Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. Change Order No. 2 is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, extending the Final Completion Date from September 28, 2025 to October 10, 2025. The project is complete. The reallocation funds manufacturer-required modifications to critical electrical equipment, including upsized motors and switchgear changes. Work includes medium voltage motors and VFDs ($1,554,818.10), switchgear manufacturer modifications ($1,112,470.26), and reduced voltage soft starter extended guarantees ($86,838.40). A water infiltration issue led to a 12-calendar-day time extension. Remaining electrical installation work is deferred to a future Phase II contract. The original contract award was $15,007,598.00 on April 24, 2023, with a Contingency Allowance of $1,329,135.00. Change Order No. 1 was ratified June 4, 2024 via Resolution No. R-495-24. The project is located in District 6, represented by Commissioner Natalie Milian Orbis. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water and Sewer Department; TGSV Enterprises Inc. (Contractor)
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26 ratified Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. The change order is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, revising the Final Completion Date from September 28, 2025 to October 10, 2025. The project is completed. The work included upsizing motors and VFDs to 1,750 horsepower, switchgear manufacturer modifications, and extended guarantees. A future Phase II contract will complete remaining electrical work. The resolution was adopted on September 1, 2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- TGSV Enterprises Inc.
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26, File Number 261438, adopted September 1, 2026, ratifies Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. Change Order No. 2 is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, extending the Final Completion Date from September 28, 2025 to October 10, 2025. The project is located in District 6, represented by Commissioner Natalie Milian Orbis. The original contract award was $15,007,598.00, awarded April 24, 2023, ratified May 2, 2023 via Resolution R-417-23. Change Order No. 1 was ratified June 4, 2024 via Resolution R-495-24. The project included upgrading electrical and control systems, replacing obsolete equipment, upsizing motors and VFDs from 1,500 to 1,750 horsepower, and modifying gas-insulated switchgear. Work was descoped, with remaining electrical installation deferred to a future Phase II contract. The project has been completed. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- TGSV Enterprises Inc.
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26, File Number 261438, adopted September 1, 2026, ratifies Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. The change order is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, extending the Final Completion Date from September 28, 2025 to October 10, 2025. The project is completed. The work includes upsizing motors and VFDs to 1,750 horsepower, switchgear manufacturer modifications, extended guarantees, and a water infiltration corrective work time extension. The remaining electrical installation work will be completed under a future Phase II contract. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- TGSV Enterprises Inc.
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26, File Number 261438, adopted 9/1/2026, ratifies Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. Change Order No. 2 is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, extending the Final Completion Date from September 28, 2025 to October 10, 2025. The project is located in District 6, represented by Commissioner Natalie Milian Orbis. The total Contract award was $15,007,598.00. The project involved upgrading electrical and control systems, including upsizing motors and VFDs from 1,500 to 1,750 horsepower, switchgear manufacturer modifications, and extended guarantees. The remaining electrical installation work will be completed under a future Phase II contract. The project has been completed. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- TGSV Enterprises Inc.
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26, adopted September 1, 2026, ratifies Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. Change Order No. 2 is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, revising the Final Completion Date from September 28, 2025 to October 10, 2025. The project is completed. The reallocation funds manufacturer-required modifications to electrical equipment, including upsizing motors and VFDs from 1,500 to 1,750 horsepower, switchgear reconfiguration, and extended guarantees. Remaining electrical installation work is deferred to a future Phase II contract. The project is located in District 6, represented by Commissioner Natalie Milian Orbis. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade Water and Sewer Department; Contractor: TGSV Enterprises Inc.
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26, File Number 261438, adopted September 1, 2026, ratifies Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. Change Order No. 2 is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, extending the Final Completion Date from September 28, 2025 to October 10, 2025. The project is located in District 6, represented by Commissioner Natalie Milian Orbis. The original contract award was $15,007,598.00 with a Contingency Allowance of $1,329,135.00, awarded April 24, 2023, ratified May 2, 2023 via Resolution R-417-23. Change Order No. 1 was ratified June 4, 2024 via Resolution R-495-24. The work includes upsizing motors and VFDs to 1,750 horsepower, switchgear manufacturer modifications, extended guarantees, and water infiltration corrective work. A phased approach defers remaining electrical installation to a future Phase II contract. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- TGSV Enterprises Inc.
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26, adopted September 1, 2026, ratifies Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. The change order is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, revising the Final Completion Date from September 28, 2025 to October 10, 2025. The project is completed. The work includes upsizing motors and VFDs to 1,750 horsepower, switchgear manufacturer modifications, extended guarantees, and water infiltration corrective work. A phased approach defers remaining electrical installation to a future Phase II contract. The change order has no additional fiscal impact to the County. Public comment sentiment is not stated.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- John E. Preston Water Treatment Plant, District 6, Miami-Dade County
- Applicant:
- TGSV Enterprises Inc.
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26, File Number 261438, adopted September 1, 2026, ratifies Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. Change Order No. 2 is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, extending the Final Completion Date from September 28, 2025 to October 10, 2025. The project is completed. The work includes upsizing motors and VFDs to 1,750 horsepower, switchgear manufacturer modifications, and extended guarantees. The remaining electrical installation work is deferred to a future Phase II contract. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted (ratified) on September 1, 2026.
- Address:
- Not stated. The project is at the John E. Preston Water Treatment Plant, located in District 6, represented by Commissioner Natalie Milian Orbis.
- Applicant:
- Miami-Dade County Water & Sewer Department; Contractor: TGSV Enterprises Inc.
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26, File Number 261438, adopted September 1, 2026, ratifies Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. Change Order No. 2 is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, extending the Final Completion Date from September 28, 2025 to October 10, 2025. The project is completed. The reallocation funds manufacturer-required modifications to electrical equipment, including upsizing motors and VFDs from 1,500 to 1,750 horsepower, switchgear reconfiguration, and extended warranties. Remaining electrical installation work is deferred to a future Phase II contract. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- John E. Preston Water Treatment Plant, District 6, Miami-Dade County
- Applicant:
- Miami-Dade County Water & Sewer Department; Contractor: TGSV Enterprises Inc.
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26, File Number 261438, adopted September 1, 2026, ratifies Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. Change Order No. 2 is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, extending the Final Completion Date from September 28, 2025 to October 10, 2025. The project is located in District 6, represented by Commissioner Natalie Milian Orbis. The original contract award was $15,007,598.00, awarded April 24, 2023, ratified May 2, 2023 via Resolution R-417-23. Change Order No. 1 was ratified June 4, 2024 via Resolution R-495-24. The project consisted of upgrading electrical and control systems, including upsizing motors and VFDs from 1,500 to 1,750 horsepower, switchgear modifications, and extended guarantees. The work is completed; remaining activity is procurement of equipment for Phase II. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- TGSV Enterprises Inc.
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26 ratifies Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. The change order is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, extending the Final Completion Date from September 28, 2025 to October 10, 2025. The project is located in District 6, represented by Commissioner Natalie Milian Orbis. The total Contract award was $15,007,598.00. The change order funds modifications to motors, variable frequency drives, switchgear, and related electrical components. The project has been completed. Adopted on 9/1/2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- TGSV Enterprises Inc.
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta