Skip to main content

Sé el Primero, Construye Relaciones Duraderas

Browse Miami-Dade County civic records

Every published record for Miami-Dade County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.

29,460 records

CONTRACT AWARD FOR REPLACEMENT BRIDGE NO. 874178

Resolution awarding a construction contract to Interstate Construction, LLC for the Replacement Bridge No. 874178 along NE 10 Avenue over Canal A, Project No. 20240256. The contract amount is not to exceed $7,559,782.90, inclusive of a contingency allowance of $630,115.45. The project will replace the existing bridge, constructed in 1994, which is functionally obsolete and has structural deficiencies. The new bridge will meet current structural, safety, and multimodal design standards, including wider sidewalks, upgraded guardrails, and drainage improvements. The contract term is 1,090 calendar days. The project is funded through Mobility Impact Fees. The file status is Withdrawn as of 9/9/2026. The bid opening date was 8/20/2025. Two bids were received. The apparent low bid exceeded the Engineer's estimate by approximately 26 percent, which was evaluated and deemed reasonable. The project is located in Commission District 2. The estimated annual operations and maintenance cost is approximately $126,023. The asset life expectancy is a minimum of 75 years. The prime contractor is Interstate Construction, LLC, located at 2501 SW 160th Avenue, Ste 400, Miramar, Florida 33027. Sub-contractors and suppliers include Ranger Construction and Kiewit Infrastructure South Co. The staff recommendation is approval of the contract award.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-09-10
Type:
Resolution
Decision:
Withdrawn
Address:
NE 10 Avenue over Canal A, approximately 200 feet north of NE 83rd Street
Applicant:
Miami-Dade County

CONTRACT AWARD FOR REPLACEMENT BRIDGE NO. 874178

Resolution awarding a construction contract to Interstate Construction, LLC for the Replacement Bridge No. 874178 along NE 10 Avenue over Canal A, Project No. 20240256, in an amount not to exceed $7,559,782.90, inclusive of a contingency allowance of $630,115.45. The project will replace a functionally obsolete bridge constructed in 1950 (also stated as 1994 in the background section) with a new bridge meeting current structural, safety, and multimodal design standards, including wider sidewalks, upgraded guardrails, and drainage improvements. The contract period is 1,090 calendar days. The project is funded through Mobility Impact Fees. The item was introduced on 7/27/2026 and was withdrawn from the Infrastructure, Innovation & Technology Committee on 9/10/2026. The apparent low bid exceeded the Engineer's estimate by approximately 26 percent, which was evaluated by the Engineer of Record, ASA Consultants, Inc., and determined reasonable. Two bids were received. The prime contractor is Interstate Construction, LLC, located at 2501 SW 160th Avenue, Ste 400, Miramar, Florida 33027. Sub-contractors and suppliers include Ranger Construction and Kiewit Infrastructure South Co. The estimated annual operations and maintenance cost is approximately $126,023. The minimum service life of the asset is 75 years. The bid open date was 8/20/2025. The bid bond expires and bid is valid until 2/20/2026. The base estimate was $4,283,146.21. The base contract amount was $5,752,568.00. The total amount including allowances was $6,608,865.63. The base contract amount for the prime contractor was $6,301,154.50. The contingency allowance is 10% for construction. Other allowances total $628,512.95. The project is located in Commission District 2, represented by Commissioner Marleine Bastien. The designated staff contact is DTPW Infrastructure Manager, Leonel Salgueiro, (305)-375-2111. The contractor has had 3 previous contracts with the county in the last five years. The contractor received four evaluations in the Capital Improvements Information System with an average rating of 3.8 out of 4.0. The review committee signoff date was 01/22/2026. The item was withdrawn from the committee agenda on 9/10/2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-09-10
Type:
Resolution
Decision:
Withdrawn from Infrastructure, Innovation & Technology Committee on 9/10/2026
Address:
NE 10 Avenue over Canal A, approximately 200 feet north of NE 83rd Street
Applicant:
Interstate Construction, LLC

CONTRACT AWARD FOR REPLACEMENT BRIDGE NO. 874178

Resolution awarding a construction contract to Interstate Construction, LLC for the Replacement Bridge No. 874178 along NE 10 Avenue over Canal A, Project No. 20240256, in an amount not to exceed $7,559,782.90, inclusive of a contingency allowance of $630,115.45. The project is located along NE 10 Avenue approximately 200 feet north of NE 83rd Street in Commission District 2. The existing bridge, constructed in 1994, is functionally obsolete and will be demolished and replaced with a new bridge meeting current structural, safety, and multimodal design standards, including wider sidewalks, upgraded guardrails, and drainage improvements. The contract period is 1,090 calendar days. The item was introduced on 7/27/2026, scheduled for the 10/6/2026 agenda, and the status is Withdrawn. The bid opening date was 8/20/2025. The contract was competitively procured under the MCC 7360 Plan (RPQ No. 20240256), with two bids received. The apparent low bid exceeds the Engineer's estimate by approximately 26 percent, which was independently evaluated by ASA Consultants, Inc. and determined reasonable. The project is funded through Mobility Impact Fees. The prime contractor is Interstate Construction, LLC, with company principals Gustavo H. Graupera, located at 2501 SW 160th Avenue, Ste 400, Miramar, Florida 33027. Sub-contractors and suppliers include Ranger Construction and Kiewit Infrastructure South Co. The estimated annual operations and maintenance cost is approximately $126,023. The minimum life expectancy of the asset is 75 years. No public comment or stakeholder sentiment is stated in the document.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-09-10
Type:
Resolution
Decision:
Withdrawn
Address:
NE 10 Avenue approximately 200 feet north of NE 83rd Street
Applicant:
Miami-Dade County

CONTRACT AWARD FOR REPLACEMENT BRIDGE NO. 874178

Resolution awarding a construction contract to Interstate Construction, LLC for the replacement of Bridge No. 874178 along NE 10 Avenue over Canal A, Project No. 20240256, in an amount not to exceed $7,559,782.90, inclusive of a contingency allowance of $630,115.45. The project will be delivered over a 1,090-day term and is funded through Mobility Impact Fees. The existing bridge, constructed in 1950 (also stated as 1994 in the background section), is classified as functionally obsolete and exhibits structural deterioration. The project will demolish the existing structure and construct a new bridge meeting current structural, safety, and multimodal design standards, including wider sidewalks, upgraded guardrails, and drainage improvements. The contract was competitively procured under the MCC 7360 Plan (RPQ No. 20240256), with two bids received. Interstate Construction, LLC was determined to be the lowest responsive and responsible bidder. The apparent low bid exceeds the Engineer's estimate by approximately 26 percent, which was independently evaluated by the Engineer of Record, ASA Consultants, Inc., and determined to be reasonable. The status of the item is Withdrawn. The agenda date was 10/6/2026. The item was introduced on 7/27/2026. The bid open date was 8/20/2025. The bid bond expires 2/20/2026. The bid is valid until 2/20/2026. The contract period is 1,090 calendar days after NTP. The base estimate is $4,283,146.21. The base contract amount is $5,752,568.00. The total amount is $6,608,865.63. The prime contractor is Interstate Construction, LLC. The company street address is 2501 SW 160th Avenue, Ste 400, Miramar, Florida 33027. The company principal and qualifier is Gustavo H. Graupera. The company has been in business for 11 years. The company has had 3 previous contracts with the county in the last five years. Sub-contractors and suppliers include Ranger Construction and Kiewit Infrastructure South Co. The project is located in Commission District 2, represented by Commissioner Marleine Bastien. The designated staff contact is DTPW Infrastructure Manager, Leonel Salgueiro, (305)-375-2111. The estimated annual operations and maintenance cost is approximately $126,023. The life expectancy of the asset is a minimum 75-year service life. The review committee signoff date is 01/22/2026. The fiscal impact is $7,559,782.90, including a contingency allowance of $630,115.45 and $628,512.95 in dedicated allowances for off-duty law enforcement, permits, and required program fees. The funding source is Mobility Impact Fees. The project is located along NE 10 Avenue approximately 200 feet north of NE 83rd Street. The scope includes maintenance of traffic; removal of the existing bridge; construction of new substructure and superstructure elements; installation of prestressed beams and reinforced concrete components; roadway reconstruction, milling and resurfacing; drainage improvements; installation of guardrails, barriers, and signage; and construction of widened sidewalks, bicycle accommodations, and ADA-compliant pedestrian features. The project also includes construction activities over water, utility coordination and adjustments, and environmental protection measures such as turbidity barriers and erosion control systems. The item was assigned to the County Attorney on 8/18/2026, 8/4/2026, and 7/28/2026. The item was assigned to the Office of Agenda Coordination on 8/17/2026 and 7/27/2026. The item was assigned to Roy Coley on 7/27/2026. The item was assigned to Bruce Libhaber on 8/18/2026 and 7/28/2026. The item was assigned to the Infrastructure, Innovation & Technology Committee. The requester is Transportation and Public Works. The agenda item number is 8N. The item has 12 pages. The item was revised on 8/17/2026. The item was returned with edits on 8/4/2026. The item was pending September committee as of 7/27/2026. The item has no sponsor. The item has no registered lobbyist. The item has no sunset provision. The item has no effective date. The item has no expiration date. The item has no indexes. The item has no sponsors. The item has no final action. The item has no cost listed. The item has no reference. The item has no control. The item has no version. The item has no notes. The item has no legislative history with pass/fail. The item has no review committee meeting date. The item has no responsible wages. The item has no SBE-CONST goal. The item has no CWP goal. The item has mandatory clearinghouse: Yes. The item has sea level rise: Yes. The item has sustainable buildings ordinance: No. The item has art in public places: N/A. The item has IG fee included in base contract: Yes. The item has standard payment and performance bond: Yes. The item has minimum qualifications exceeded: Yes. The item has legal requirements: Yes. The item has track record/monitor: Yes. The item has due diligence: Yes. The item has background: Yes. The item has executive summary: Yes. The item has recommendation: Yes. The item has scope: Yes. The item has delegation of authority: Yes. The item has fiscal impact/funding source: Yes. The item has operations & maintenance cost impact/funding: Yes. The item has life expectancy of asset: Yes. The item has PTP funding: No. The item has GOB funding: No. The item has ARRA funding: No. The item has bid packages issued: Electronic Downloaded. The item has bid received: 2. The item has 60 days contract period: 1090 calendar days. The item has contingency allowance (Section 2-8.1 Miami-Dade County Code): Construction 10% $575,256.80. The item has off-duty law enforcement officer allowance: N/A. The item has bituminous material adjustment allowance: $29,583.25. The item has permit allowance: $118,332.98. The item has independent private sector inspector (IPSIG) (.25%): $14,791.62. The item has utility access program (UAP): $118,332.98. The item has total amount: $6,608,865.63. The item has prime contractor: Interstate Construction, LLC. The item has base contract amount: $6,301,154.50. The item has contingency allowance (Section 2-8.1): Construction 10% $630,115.45. The item has other allowances: $628,512.95. The item has total amount: $7,559,782.90. The item has company email: [email protected]. The item has previous contracts with county in the last five years: 3. The item has review committee: meeting date N/A, signoff date 01/22/2026. The item has responsible wages (Resolution No. R-54-10): N/A. The item has review committee assigned type goal: SBE-CONST N/A, CWP N/A. The item has mandatory clearing house: Yes. The item has sea level rise (Ordinance 14-79): Yes. The item has sustainable buildings ordinance (I.O. No. 8-8): No. The item has track record/monitor: The designated staff contact to track and monitor this contract is DTPW Infrastructure Manager, Leonel Salgueiro, (305)-375-2111, [email protected]. The item has due diligence: Due diligence was conducted in accordance with County procurement requirements to determine contractor responsibility and capability. Interstate Construction, LLC was reviewed through the Strategic Procurement Department (SPD) database, which confirmed no violations within the past three years. A review of the firm's performance history indicates that, within the last five years, the contractor has completed multiple County projects and received four evaluations in the Capital Improvements Information System (CIIS), with an average rating of 3.8 out of a maximum of 4.0, reflecting strong performance. The Department verified the firm's corporate status with the Florida Department of State Division of Corporations and confirmed compliance with all applicable licensing and qualification requirements. The contractor meets or exceeds all minimum qualification requirements and has provided the required payment and performance bonds. In addition, due diligence included a review of safety and compliance records. Pursuant to Resolution No. R-1181-18, Occupational Safety and Health Administration (OSHA) Form 300 logs for work-related injuries and illnesses for the past three years are on file and available for review. No significant safety concerns or adverse findings were identified. Compliance checks also confirmed adherence to County requirements, including the Mandatory Clearinghouse, Inspector General provisions, and applicable ordinances such as Sea Level Rise considerations. No adverse findings were identified that would impact the contractor's responsibility determination. Based on this review, Interstate Construction, LLC is deemed a responsible contractor with the experience, capacity, and performance history necessary to successfully deliver the project. The item has background: The existing bridge (No. 874178), constructed in 1994, is located along NE 10 Avenue approximately 200 feet north of NE 83rd Street. The structure exhibits multiple deficiencies, including cracking in the deck, caps, and piles; corrosion of structural steel beams; deterioration of expansion joints; and erosion of embankment slope protection. The bridge is classified as functionally obsolete, as it does not meet current crashworthiness standards for bridge railings and approach guardrails and does not accommodate current pedestrian and bicycle safety standards. To address these deficiencies, the project will demolish the existing structure and construct a new bridge that meets current structural, hydraulic, and multimodal design standards. The scope of work includes, but is not limited to, maintenance of traffic; removal of the existing bridge; construction of new substructure and superstructure elements; installation of prestressed beams and reinforced concrete components; roadway reconstruction, milling and resurfacing; drainage improvements; installation of guardrails, barriers, and signage; and construction of widened sidewalks, bicycle accommodations, and Americans with Disabilities Act (ADA)-compliant pedestrian features. The project also includes construction activities over water, utility coordination and adjustments, and environmental protection measures such as turbidity barriers and erosion control systems. The item has signature: Roy Coley, Deputy Mayor. The item has legislative history: County Attorney assigned on 8/18/2026 to Bruce Libhaber with due date 8/28/2026. Office of Agenda Coordination assigned on 8/17/2026 to County Attorney with due date 8/17/2026. Report: item revised. County Attorney assigned on 8/4/2026 to Office of Agenda Coordination with due date 8/4/2026. Report: returned with edits. County Attorney assigned on 7/28/2026 to Bruce Libhaber with due date 8/4/2026. Roy Coley assigned on 7/27/2026 to Office of Agenda Coordination. Office of Agenda Coordination assigned on 7/27/2026 to County Attorney with due date 10/6/2026. Report: DTPW - Bruce Libhaber - no sponsor - pending September cmte - Attachment: Contract - item has 12 pages. The item has status: Withdrawn. The item has file type: Resolution. The item has introduced date: 7/27/2026. The item has agenda date: 10/6/2026. The item has agenda item number: 8N. The item has requester: Transportation and Public Works. The item has control: Infrastructure, Innovation & Technology Committee. The item has cost: not stated. The item has final action: not stated. The item has notes: not stated. The item has indexes: NONE. The item has sponsors: NONE. The item has sunset provision: No. The item has effective date: not stated. The item has expiration date: not stated. The item has registered lobbyist: None Listed. The item has legislative text: Title and body as stated. The item has header: Date: not stated, To: Honorable Chairman Anthony Rodriguez and Members, Board of County Commissioners, From: Daniella Levine Cava, Mayor, Subject: Contract Award Recommendation for Replacement Bridge No. 874178 along NE 10 Avenue Over Canal A, RPQ No. 20240256, to Interstate Construction, LLC in the Amount of $7,559,782.90. The item has staff recommendation: Executive Summary, Recommendation, Scope, Delegation of Authority, Fiscal Impact/Funding Source, Operations & Maintenance Cost Impact/Funding, Life Expectancy of Asset, PTP Funding, GOB Funding, ARRA Funding, Bid Open Date, Bid Bond Expires, Bid Valid Until, Bid Packages Issued, Bid Received, 60 Days Contract Period, IG Fee Included in Base Contract, Art in Public Places, Base Estimate, Base Contract Amount, Contingency Allowance, Off-Duty Law Enforcement Officer Allowance, Bituminous Material Adjustment Allowance, Permit Allowance, Total Amount, Prime Contractor, Company Principals, Company Qualifier, Company Email, Address, Company Street Address, Company City-State-Zip, Years in Business, Previous Contracts with County in the Last Five Years, Sub-Contractors and Suppliers, Minimum Qualifications Exceed, Legal Requirements, Standard Payment and Performance Bond, Review Committee, Responsible Wages, Review Committee Assigned Type Goal, Mandatory Clearing House, Sea Level Rise, Sustainable Buildings Ordinance, Track Record/Monitor, Due Diligence, Background. The item has no public comment or stakeholder sentiment stated.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-09-10
Type:
Resolution
Decision:
Withdrawn
Address:
NE 10 Avenue over Canal A, approximately 200 feet north of NE 83rd Street
Applicant:
Interstate Construction, LLC

CONTRACT AWARD FOR REPLACEMENT BRIDGE NO. 874178

Resolution to award a construction contract to Interstate Construction, LLC for the replacement of Bridge No. 874178 along NE 10 Avenue over Canal A, Project No. 20240256, in an amount not to exceed $7,559,782.90, inclusive of a contingency allowance of $630,115.45. The project is located in Commission District 2. The existing bridge, constructed in 1950 (also stated as 1994 in the background section), is classified as functionally obsolete with structural deterioration. The project will demolish the existing structure and construct a new bridge meeting current structural, safety, and multimodal design standards, including wider sidewalks, upgraded guardrails, and drainage improvements. The contract was competitively procured under the MCC 7360 Plan (RPQ No. 20240256), with two bids received. Interstate Construction, LLC was determined to be the lowest responsive and responsible bidder. The apparent low bid exceeds the Engineer's estimate by approximately 26 percent, which was independently evaluated by the Engineer of Record, ASA Consultants, Inc., and determined to be reasonable. The contract period is 1,090 calendar days. Funding is through Mobility Impact Fees. The status of the item is Withdrawn. The agenda date was 10/6/2026. The item was introduced on 7/27/2026. The bid open date was 8/20/2025. The bid bond expires 2/20/2026. The bid is valid until 2/20/2026. The base estimate is $4,283,146.21. The base contract amount is $5,752,568.00. The total amount is $6,608,865.63. The prime contractor is Interstate Construction, LLC, located at 2501 SW 160th Avenue, Ste 400, Miramar, Florida 33027. Sub-contractors and suppliers include Ranger Construction and Kiewit Infrastructure South Co. The estimated annual operations and maintenance cost is approximately $126,023. The life expectancy of the asset is a minimum 75-year service life. The designated staff contact is DTPW Infrastructure Manager, Leonel Salgueiro, (305)-375-2111.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-09-10
Type:
Resolution
Decision:
Withdrawn
Address:
NE 10 Avenue over Canal A, approximately 200 feet north of NE 83rd Street
Applicant:
Miami-Dade County; Prime Contractor: Interstate Construction, LLC

CONTRACT AWARD FOR REPLACEMENT BRIDGE NO. 874178

Resolution awarding a construction contract to Interstate Construction, LLC for the Replacement Bridge No. 874178 along NE 10 Avenue over Canal A, Project No. 20240256, in an amount not to exceed $7,559,782.90, inclusive of a contingency allowance of $630,115.45. The project involves demolishing the existing functionally obsolete bridge and constructing a new bridge meeting current structural, safety, and multimodal design standards, including wider sidewalks, upgraded guardrails, and drainage improvements. The contract period is 1,090 calendar days. The item was introduced on 7/27/2026, was before the Infrastructure, Innovation & Technology Committee, and was withdrawn on 9/10/2026. The contract was competitively procured under the MCC 7360 Plan (RPQ No. 20240256), with two bids received. The apparent low bid exceeded the Engineer's estimate by approximately 26 percent, which was independently evaluated by ASA Consultants, Inc. and determined reasonable. The project is funded through Mobility Impact Fees. The existing bridge was constructed in 1950 (per Executive Summary) and 1994 (per Background section). The project is located in Commission District 2. The contractor's address is 2501 SW 160th Avenue, Ste 400, Miramar, Florida 33027. Sub-contractors and suppliers include Ranger Construction and Kiewit Infrastructure South Co. The designated staff contact is DTPW Infrastructure Manager, Leonel Salgueiro, (305)-375-2111. No public comment or stakeholder sentiment is stated in the document.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-09-10
Type:
Resolution
Decision:
Withdrawn
Address:
NE 10 Avenue over Canal A, approximately 200 feet north of NE 83rd Street
Applicant:
Interstate Construction, LLC

CONTRACT AWARD FOR REPLACEMENT BRIDGE NO. 874178

Resolution awarding a construction contract to Interstate Construction, LLC for the replacement of Bridge No. 874178 along NE 10 Avenue over Canal A, Project No. 20240256, in an amount not to exceed $7,559,782.90, inclusive of a contingency allowance of $630,115.45. The project will be delivered over a 1,090-day term and is funded through Mobility Impact Fees. The existing bridge, constructed in 1950 (also stated as 1994 in the background), is classified as functionally obsolete and exhibits structural deterioration. The project will demolish the existing structure and construct a new bridge meeting current structural, safety, and multimodal design standards, including wider sidewalks, upgraded guardrails, and drainage improvements. The contract was competitively procured under the MCC 7360 Plan (RPQ No. 20240256), and two bids were received. Interstate Construction, LLC was determined to be the lowest responsive and responsible bidder. The apparent low bid exceeds the Engineer's estimate by approximately 26 percent, which was independently evaluated by the Engineer of Record, ASA Consultants, Inc., and determined to be reasonable. The status of the item is Withdrawn. The agenda date was 10/6/2026. The item was introduced on 7/27/2026. The bid open date was 8/20/2025. The bid bond expires on 2/20/2026. The bid is valid until 2/20/2026. The contract period is 1,090 calendar days after NTP. The base estimate is $4,283,146.21. The base contract amount is $5,752,568.00. The total amount is $6,608,865.63. The prime contractor is Interstate Construction, LLC. The company street address is 2501 SW 160th Avenue, Ste 400, Miramar, Florida 33027. The company has been in business for 11 years. The company has had 3 previous contracts with the county in the last five years. Sub-contractors and suppliers include Ranger Construction and Kiewit Infrastructure South Co. The project is located in Commission District 2. The estimated annual operations and maintenance cost is approximately $126,023. The minimum 75-year service life is stated. The designated staff contact is DTPW Infrastructure Manager, Leonel Salgueiro, (305)-375-2111. The review committee signoff date is 01/22/2026. The fiscal impact is $7,559,782.90. The funding source is Mobility Impact Fees. The project is funded through Program County Budget 2000000534 BRIDGE REHABILITATION - COUNTYWIDE IMPROVEMENTS FY 2025-26 Adopted Budget and Multi-Year Capital Plan, Volume 2 - Transportation and Public Works, Page 138. The contractor has received four evaluations in the Capital Improvements Information System (CIIS), with an average rating of 3.8 out of a maximum of 4.0. No public comment or stakeholder sentiment is stated in the document.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-09-10
Type:
Resolution
Decision:
Withdrawn
Address:
NE 10 Avenue over Canal A, approximately 200 feet north of NE 83rd Street
Applicant:
Miami-Dade County; Prime Contractor: Interstate Construction, LLC

CONTRACT AWARD FOR REPLACEMENT BRIDGE NO. 874178

Contract award resolution for Replacement Bridge No. 874178 along NE 10 Avenue over Canal A, Project No. 20240256, between Miami-Dade County and Interstate Construction, LLC, in an amount not to exceed $7,559,782.90, inclusive of a contingency allowance of $630,115.45. The project involves demolishing the existing bridge and constructing a new bridge that meets current structural, hydraulic, and multimodal design standards, including wider sidewalks, upgraded guardrails, and drainage improvements. The contract period is 1,090 calendar days. The item was introduced on 7/27/2026 and was withdrawn at the Infrastructure, Innovation & Technology Committee meeting on 9/10/2026. The existing bridge, constructed in 1950 (background section states 1994), is classified as functionally obsolete. The contract was competitively procured under the MCC 7360 Plan, with two bids received. Interstate Construction, LLC was determined to be the lowest responsive and responsible bidder. The apparent low bid exceeds the Engineer's estimate by approximately 26 percent, which was independently evaluated by the Engineer of Record, ASA Consultants, Inc., and determined to be reasonable. The project is funded through Mobility Impact Fees (MIF). The estimated annual operations and maintenance cost is approximately $126,023. The minimum service life of the asset is 75 years. The project is located in Commission District 2. The designated staff contact is DTPW Infrastructure Manager, Leonel Salgueiro, (305)-375-2111. The prime contractor is Interstate Construction, LLC, with company principals Gustavo H. Graupera, address 2501 SW 160th Avenue, Ste 400, Miramar, Florida 33027. Sub-contractors and suppliers include Ranger Construction and Kiewit Infrastructure South Co. The contractor has had 3 previous contracts with the county in the last five years and received four evaluations in the Capital Improvements Information System (CIIS) with an average rating of 3.8 out of 4.0. No public comment or stakeholder sentiment is stated in the document.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-09-10
Type:
Resolution
Decision:
Withdrawn
Address:
NE 10 Avenue over Canal A, approximately 200 feet north of NE 83rd Street
Applicant:
Interstate Construction, LLC

CONTRACT AWARD FOR REPLACEMENT BRIDGE NO. 874178

Resolution to award a construction contract to Interstate Construction, LLC for the replacement of Bridge No. 874178 along NE 10 Avenue over Canal A, Project No. 20240256, in an amount not to exceed $7,559,782.90, inclusive of a contingency allowance of $630,115.45. The project will be delivered over a 1,090-day term and is funded through Mobility Impact Fees. The existing bridge, constructed in 1950 (also stated as 1994 in the document), is classified as functionally obsolete and exhibits structural deterioration. The project will demolish the existing structure and construct a new bridge meeting current structural, safety, and multimodal design standards, including wider sidewalks, upgraded guardrails, and drainage improvements. The contract was competitively procured under the MCC 7360 Plan (RPQ No. 20240256), with two bids received. Interstate Construction, LLC was determined to be the lowest responsive and responsible bidder. The apparent low bid exceeds the Engineer's estimate by approximately 26 percent, which was evaluated by the Engineer of Record, ASA Consultants, Inc., and determined to be reasonable. The item was introduced on 7/27/2026, scheduled for the agenda on 10/6/2026, and the status is Withdrawn. The project is located in Commission District 2. The contract amount exceeds the $5,000,000 threshold, requiring Board approval.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-09-10
Type:
Resolution
Decision:
Withdrawn
Address:
NE 10 Avenue over Canal A, approximately 200 feet north of NE 83rd Street
Applicant:
Miami-Dade County; Prime Contractor: Interstate Construction, LLC

CONTRACT AWARD FOR REPLACEMENT BRIDGE NO. 874178

Miami-Dade County legislative item File Number 261379 is a resolution to award a construction contract to Interstate Construction, LLC for the Replacement Bridge No. 874178 along NE 10 Avenue over Canal A, Project No. 20240256. The contract amount is not to exceed $7,559,782.90, inclusive of a contingency allowance of $630,115.45. The project involves demolishing the existing bridge and constructing a new bridge that meets current structural, safety, and multimodal design standards, including wider sidewalks, upgraded guardrails, and drainage improvements. The contract term is 1,090 calendar days. The project is funded through Mobility Impact Fees. The item was introduced on 7/27/2026 and is scheduled for an agenda date of 10/6/2026. The status is 'In Committee'. The staff recommendation is approval. The existing bridge was constructed in 1950 and is classified as functionally obsolete. The project is located in Commission District 2. The contract was competitively procured under the MCC 7360 Plan (RPQ No. 20240256), and two bids were received. The apparent low bid exceeds the Engineer's estimate by approximately 26 percent, which was independently evaluated and determined to be reasonable. The prime contractor is Interstate Construction, LLC, located at 2501 SW 160th Avenue, Ste 400, Miramar, Florida 33027. Sub-contractors and suppliers include Ranger Construction and Kiewit Infrastructure South Co. The bid open date was 8/20/2025. The base contract amount is $6,301,154.50. The total fiscal impact is $7,559,782.90. The estimated annual operations and maintenance cost is approximately $126,023. The life expectancy of the asset is a minimum 75-year service life. The designated staff contact is DTPW Infrastructure Manager, Leonel Salgueiro, (305)-375-2111. Due diligence confirmed no violations within the past three years and an average performance rating of 3.8 out of 4.0. The existing bridge is located along NE 10 Avenue approximately 200 feet north of NE 83rd Street. The project includes construction activities over water. The document does not state a decision of approved, denied, or deferred; it states a staff recommendation of approval and a status of 'In Committee'. The document does not state any public comment or stakeholder sentiment.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-09-10
Type:
Resolution
Decision:
Staff recommendation is approval; Status is In Committee; Final Action is not stated
Address:
NE 10 Avenue over Canal A, approximately 200 feet north of NE 83rd Street
Applicant:
Miami-Dade County; Prime Contractor: Interstate Construction, LLC

CONTRACT AWARD FOR REPLACEMENT BRIDGE NO. 874178

Resolution to award a construction contract to Interstate Construction, LLC for the replacement of Bridge No. 874178 along NE 10 Avenue over Canal A, Project No. 20240256, in an amount not to exceed $7,559,782.90. The item was withdrawn on 9/9/2026. The existing bridge is functionally obsolete with structural deterioration. The project will demolish and replace the bridge with a new structure meeting current standards, including wider sidewalks, upgraded guardrails, and drainage improvements. The contract period is 1,090 calendar days. The project is funded by Mobility Impact Fees. The low bid exceeded the Engineer's estimate by approximately 26 percent, which was determined reasonable by the Engineer of Record. Two bids were received. The prime contractor is Interstate Construction, LLC, located at 2501 SW 160th Avenue, Ste 400, Miramar, Florida 33027. Sub-contractors and suppliers include Ranger Construction and Kiewit Infrastructure South Co. The project is located in Commission District 2. No public comment or stakeholder sentiment is stated in the document.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-09-10
Type:
Resolution
Decision:
Withdrawn
Address:
NE 10 Avenue over Canal A, approximately 200 feet north of NE 83rd Street
Applicant:
Miami-Dade County; Prime Contractor: Interstate Construction, LLC

CRITICAL CARE ACCESS

This is a legislative item for Miami-Dade County, File Number 261567, a Resolution to authorize access to Sourcewell Contract No. RFP-041823-STY for Critical Care and EMS Equipment, in the amount of $19,721,600.00, for multiple County departments. The contract is awarded to Stryker Sales, LLC. The item was introduced on 9/3/2026, and the agenda date is 10/6/2026. The Intergovernmental and Economic Impact Committee forwarded it to the BCC with a favorable recommendation on 9/10/2026. The contract is for the purchase of automated external defibrillators (AEDs), cardiac monitors, ventilators, and other essential medical equipment. The largest allocation is for Miami-Dade Fire Rescue Department (MDFR) for the purchase of Lifepak-35 devices. The fiscal impact for the initial eight-month term is estimated at $5,802,500, expiring June 30, 2027. The one, three-year option to renew has an estimated cumulative value of $19,721,600. Department allocations are: ASD $22,000, CUA $30,000, MDAD $200,000, MDFR $18,700,000, PIOD $474,600, PROS $295,000. The contract will replace Contract No. BW-10125 and Contract No. RFB 2024-06. The vendor principal address is 1941 Stryker Way, Portage, MI. No public comment or stakeholder sentiment is stated in the document.

Board:
Intergovernmental and Economic Impact Committee
Date:
2026-09-10
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by the Intergovernmental and Economic Impact Committee on 9/10/2026; final decision not stated
Applicant:
Strategic Procurement Department (requester); Stryker Sales, LLC (vendor)

CRITICAL CARE ACCESS

Miami-Dade County legislative item File Number 261567 is a Resolution to authorize access to Sourcewell Contract No. RFP-041823-STY for Critical Care and EMS Equipment in the amount of $19,721,600.00 for the remaining initial term expiring June 30, 2027, and one three-year option to renew, for multiple County departments. The contract is awarded to Stryker Sales, LLC. The item was introduced on 9/3/2026, was before the Intergovernmental and Economic Impact Committee on 9/10/2026, and was forwarded to the Board of County Commissioners with a favorable recommendation. The agenda date is 10/6/2026, agenda item number 8P. The scope is countywide. The largest allocation is for Miami-Dade Fire Rescue Department (MDFR) for the purchase of Lifepak-35 devices. The contract replaces Contract No. BW-10125 and Contract No. RFB 2024-06. The fiscal impact for the initial eight-month term is estimated at $5,802,500. Department allocations are: ASD $22,000, CUA $30,000, MDAD $200,000, MDFR $18,700,000, PIOD $474,600, PROS $295,000. The vendor address is 1941 Stryker Way, Portage, MI. The decision is not stated as approved, denied, or deferred; the status is 'Before the Board' with a favorable recommendation from the committee. No public comment or stakeholder sentiment is stated in the document.

Board:
Intergovernmental and Economic Impact Committee
Date:
2026-09-10
Type:
Resolution
Applicant:
Stryker Sales, LLC

CRITICAL CARE ACCESS

Miami-Dade County legislative item File Number 261567 is a Resolution to access Sourcewell Contract No. RFP-041823-STY, Critical Care and EMS Equipment, awarded to Stryker Sales LLC, in the amount of $19,721,600.00. The contract is for the purchase of automated external defibrillators (AEDs), cardiac monitors, ventilators, and other essential medical equipment for multiple County departments. The largest allocation is for Miami-Dade Fire Rescue Department (MDFR) to purchase Lifepak-35 devices to replace Lifepak-15s. The contract is for the remaining initial term expiring June 30, 2027, plus one three-year option to renew. The item was introduced on 9/3/2026, forwarded to the Board of County Commissioners (BCC) with a favorable recommendation by the Intergovernmental and Economic Impact Committee on 9/10/2026, and is scheduled for the BCC meeting on 10/6/2026 as Agenda Item Number 8P. The resolution authorizes the County Mayor or designee to exercise all provisions of the contract. The fiscal impact for the initial eight-month term is estimated at $5,802,500. The contract replaces Contract No. BW-10125 and Contract No. RFB 2024-06. Department allocations are: ASD $22,000, CUA $30,000, MDAD $200,000, MDFR $18,700,000, PIOD $474,600, PROS $295,000. The vendor principal address is 1941 Stryker Way, Portage, MI. The scope is countywide. No public comment or stakeholder sentiment is stated in the document.

Board:
Intergovernmental and Economic Impact Committee
Date:
2026-09-10
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by the Intergovernmental and Economic Impact Committee on 9/10/2026. Status: Before the Board. Final action not stated.
Address:
Not stated. The scope is countywide in nature.
Applicant:
Requester: Strategic Procurement. Vendor: Stryker Sales, LLC.

CRITICAL CARE ACCESS

Miami-Dade County legislative item File Number 261567 is a Resolution to access Sourcewell Contract No. RFP-041823-STY for Critical Care and EMS Equipment, awarded to Stryker Sales LLC, in the amount of $19,721,600.00 for the remaining initial term expiring June 30, 2027, plus one three-year option to renew, for multiple County departments. The item was introduced 9/3/2026, forwarded to the BCC with a favorable recommendation by the Intergovernmental and Economic Impact Committee on 9/10/2026, and is scheduled for the BCC agenda on 10/6/2026 as item 8P13. The contract replaces Contract No. BW-10125 and Contract No. RFB 2024-06. Department allocations include: Animal Services Department $22,000; Department of Cultural Affairs $30,000; Miami-Dade Aviation Department $200,000; Miami-Dade Fire Rescue Department $18,700,000; People and Internal Operations Department $474,600; Parks, Recreation, and Open Spaces Department $295,000. The largest allocation is for MDFR to purchase Lifepak-35 devices to replace end-of-life Lifepak-15s. The vendor principal address is 1941 Stryker Way, Portage, MI. No public comment or stakeholder sentiment is stated in the document.

Board:
Intergovernmental and Economic Impact Committee
Date:
2026-09-10
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation (by Intergovernmental and Economic Impact Committee on 9/10/2026); Final decision not stated (status: Before the Board)
Applicant:
Strategic Procurement Department (Requester); Stryker Sales, LLC (Vendor)

CRITICAL CARE ACCESS

The document is a legislative item for Miami-Dade County, File Number 261567, a Resolution to authorize access to Sourcewell Contract No. RFP-041823-STY for Critical Care and EMS Equipment, in the amount of $19,721,600.00, for multiple County departments, for the remaining initial term expiring June 30, 2027, and one three-year option to renew. The contract is awarded to Stryker Sales LLC. The item was introduced on 9/3/2026, forwarded to the Board of County Commissioners with a favorable recommendation by the Intergovernmental and Economic Impact Committee on 9/10/2026, and is scheduled for the BCC agenda on 10/6/2026 as item 8P. The resolution authorizes the County Mayor or designee to exercise all provisions of the contract. The scope is countywide. The fiscal impact for the initial eight-month term is estimated at $5,802,500, and the cumulative value with the option to renew is $19,721,600. The largest allocation is for Miami-Dade Fire Rescue Department (MDFR) for the purchase of Lifepak-35 devices, as the current Lifepak-15s are at end of life. The contract replaces Contract No. BW-10125 and Contract No. RFB 2024-06. Department allocations: ASD $22,000; CUA $30,000; MDAD $200,000; MDFR $18,700,000; PIOD $474,600; PROS $295,000. The vendor principal address is 1941 Stryker Way, Portage, MI. The document does not state a specific project site, address, parcel, acreage, or zoning change.

Board:
Intergovernmental and Economic Impact Committee
Date:
2026-09-10
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation (by Intergovernmental and Economic Impact Committee on 9/10/2026); pending BCC decision on 10/6/2026
Applicant:
Strategic Procurement Department (requester); Stryker Sales LLC (vendor)

CRITICAL CARE ACCESS

Miami-Dade County legislative item File Number 261567 is a Resolution to authorize access to Sourcewell Contract No. RFP-041823-STY for Critical Care and EMS Equipment, in the amount of $19,721,600.00, for the remaining initial term expiring June 30, 2027, and one three-year option to renew, for multiple County departments. The contract is awarded to Stryker Sales, LLC. The item was introduced 9/3/2026, forwarded to the BCC with a favorable recommendation by the Intergovernmental and Economic Impact Committee on 9/10/2026, and is scheduled for the BCC agenda on 10/6/2026 as item 8P13. The resolution authorizes the County Mayor or designee to exercise all provisions of the contract. The largest allocation is for Miami-Dade Fire Rescue Department (MDFR) for the purchase of Lifepak-35 devices, replacing end-of-life Lifepak-15s. The contract replaces Contract No. BW-10125 and Contract No. RFB 2024-06. Department allocations: ASD $22,000; CUA $30,000; MDAD $200,000; MDFR $18,700,000; PIOD $474,600; PROS $295,000. The scope is countywide. No public comment or stakeholder sentiment is stated in the document.

Board:
Intergovernmental and Economic Impact Committee
Date:
2026-09-10
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation; pending BCC assignment
Applicant:
Stryker Sales, LLC

CRITICAL CARE ACCESS

This is a legislative item for Miami-Dade County to access Sourcewell Contract No. RFP-041823-STY for Critical Care and EMS Equipment, in the amount of $19,721,600.00, for multiple County departments. The contract is awarded to Stryker Sales, LLC. The item was introduced on 9/3/2026, forwarded to the Board of County Commissioners with a favorable recommendation by the Intergovernmental and Economic Impact Committee on 9/10/2026, and is scheduled for the Board meeting on 10/6/2026. The contract will replace Contract No. BW-10125 and Contract No. RFB 2024-06. The largest allocation is for Miami-Dade Fire Rescue Department (MDFR) to purchase Lifepak-35 devices, as the current Lifepak-15s are at end of life. The contract covers AEDs, cardiac monitors, ventilators, and other medical equipment. The fiscal impact for the initial eight-month term is estimated at $5,802,500, expiring June 30, 2027, with a one, three-year option to renew for a cumulative value of $19,721,600. Department allocations include: ASD $22,000, CUA $30,000, MDAD $200,000, MDFR $18,700,000, PIOD $474,600, PROS $295,000. The scope is countywide. The vendor principal address is 1941 Stryker Way, Portage, MI. No public comment or stakeholder sentiment is stated in the document.

Board:
Intergovernmental and Economic Impact Committee
Date:
2026-09-10
Type:
Resolution
Decision:
Forwarded to the Board of County Commissioners with a favorable recommendation by the Intergovernmental and Economic Impact Committee on 9/10/2026. Final decision is pending before the Board, scheduled for 10/6/2026.
Address:
Not stated. The scope is countywide in nature.
Applicant:
Requester: Strategic Procurement. Vendor: Stryker Sales, LLC.

CRITICAL CARE ACCESS

Miami-Dade County legislative item File Number 261567 is a Resolution to authorize access to Sourcewell Contract No. RFP-041823-STY, Critical Care and EMS Equipment, awarded to Stryker Sales LLC, in the amount of $19,721,600.00 for the remaining initial term expiring June 30, 2027, plus one three-year option to renew, for multiple County departments. The item was introduced 9/3/2026, forwarded to the BCC with a favorable recommendation by the Intergovernmental and Economic Impact Committee on 9/10/2026, and is scheduled for the BCC agenda on 10/6/2026 as item 8P13. The contract replaces Contract No. BW-10125 and Contract No. RFB 2024-06. The largest allocation is $18,700,000 for Miami-Dade Fire Rescue Department (MDFR) to purchase Lifepak-35 devices, replacing end-of-life Lifepak-15s. Other allocations: Animal Services Department $22,000; Department of Cultural Affairs $30,000; Miami-Dade Aviation Department $200,000; People and Internal Operations Department $474,600; Parks, Recreation, and Open Spaces Department $295,000. The scope is countywide. No public comment or stakeholder sentiment is stated in the document.

Board:
Intergovernmental and Economic Impact Committee
Date:
2026-09-10
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by the Intergovernmental and Economic Impact Committee on 9/10/2026; final decision pending BCC on 10/6/2026
Applicant:
Strategic Procurement Department (requester); Stryker Sales, LLC (vendor)

CRITICAL CARE ACCESS

This is a legislative resolution authorizing Miami-Dade County to access Sourcewell Contract No. RFP-041823-STY for Critical Care and EMS Equipment, awarded to Stryker Sales LLC, in the amount of $19,721,600.00 for the remaining initial term expiring June 30, 2027, plus one three-year option to renew, for multiple County departments. The item was introduced on 9/3/2026, forwarded to the BCC with a favorable recommendation by the Intergovernmental and Economic Impact Committee on 9/10/2026, and is scheduled for the BCC agenda on 10/6/2026. The largest allocation is $18,700,000 for Miami-Dade Fire Rescue Department (MDFR) to purchase Lifepak-35 devices, replacing end-of-life Lifepak-15s. Other allocations include: Animal Services Department $22,000; Department of Cultural Affairs $30,000; Miami-Dade Aviation Department $200,000; People and Internal Operations Department $474,600; Parks, Recreation, and Open Spaces Department $295,000. The contract replaces Contract No. BW-10125 and Contract No. RFB 2024-06. No public comment or stakeholder sentiment is stated in the document.

Board:
Intergovernmental and Economic Impact Committee
Date:
2026-09-10
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation (as of 9/10/2026); pending BCC decision on 10/6/2026
Applicant:
Stryker Sales LLC (vendor); Miami-Dade County (requester: Strategic Procurement)

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta