Browse Miami-Dade County civic records
Every published record for Miami-Dade County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.
29,678 records
DECLARATION OF RESTRICTIVE COVENANTS FOR ARSHT
Resolution approving a Declaration of Restrictive Covenant on the Adrienne Arsht Center for the Performing Arts of Miami-Dade County, located at 1300 Biscayne Boulevard, Miami, Florida 33132, in favor of the State of Florida Department of State, Division of Arts and Culture, for a term of five years in exchange for a $250,000.00 grant to upgrade the building management system. The County Mayor or designee is authorized to execute and record the declaration. The Recreation, Tourism, and Resiliency Committee forwarded it to the BCC with a favorable recommendation on 9/9/2026; the BCC agenda date is 10/6/2026. The property is in County Commission District 3, represented by Commissioner Keon Hardemon. The grant requires matching funds of $250,000.00 provided by the Adrienne Arsht Center Trust, Inc. The Trust will oversee implementation, compliance, and use of grant funds. The Miami-Dade County Department of Cultural Affairs is managing the allocations. The building management system is described as twenty-year-old. The Arsht Center includes the 2,400-seat Sanford and Dolores Ziff Ballet Opera House; the 2,200-seat John S. and James L. Knight Concert Hall; the 200-seat Carnival Studio Theater; the Peacock Education Center; the restored Carnival Art Deco Tower; and the Thomson Plaza for the Arts. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Recreation, Tourism, and Resiliency Committee
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Recreation, Tourism, and Resiliency Committee forwarded to BCC with a favorable recommendation on 9/9/2026; status is Before the Board; final action not stated
- Address:
- 1300 Biscayne Boulevard, Miami, Florida 33132
- Applicant:
- Adrienne Arsht Center Trust, Inc. (Trust) applied for and received the grant; the County Mayor is Daniella Levine Cava; the sponsor is Commissioner Keon Hardemon
DECLARATION OF RESTRICTIVE COVENANTS FOR ARSHT
Miami-Dade County legislative item File Number 261553 is a Resolution approving a Declaration of Restrictive Covenant on the Adrienne Arsht Center for the Performing Arts of Miami-Dade County, located at 1300 Biscayne Boulevard, Miami, Florida 33132, in favor of the State of Florida Department of State, Division of Arts and Culture, for a term of five years in exchange for a grant of $250,000.00 for upgrading the building management system. The item was introduced on 9/1/2026, was forwarded to the Board of County Commissioners with a favorable recommendation by the Recreation, Tourism, and Resiliency Committee on 9/9/2026, and is scheduled for the Board agenda on 10/6/2026 as item 8C. The applicant is the Department of Cultural Affairs, with Commissioner Keon Hardemon as prime sponsor. The decision is pending before the Board. The grant funds are matched by the Adrienne Arsht Center Trust, Inc. The project is countywide in impact and located in County Commission District 3. The building includes the 2,400-seat Sanford and Dolores Ziff Ballet Opera House, the 2,200-seat John S. and James L. Knight Concert Hall, the 200-seat Carnival Studio Theater, the Peacock Education Center, the restored Carnival Art Deco Tower, and Thomson Plaza for the Arts. The Building Management System is a computer-based control system centralizing monitoring and management of mechanical and electrical equipment such as HVAC, lighting, and security. The Trust will oversee implementation, compliance, and use of grant funds. The Miami-Dade County Department of Cultural Affairs, led by Director Ashlee Thomas, is managing the CIIP allocations. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Recreation, Tourism, and Resiliency Committee
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Pending before the Board; forwarded to the Board of County Commissioners with a favorable recommendation by the Recreation, Tourism, and Resiliency Committee on 9/9/2026
- Address:
- 1300 Biscayne Boulevard, Miami, Florida 33132
- Applicant:
- Department of Cultural Affairs; Prime Sponsor: Commissioner Keon Hardemon
DECLARATION OF RESTRICTIVE COVENANTS FOR ARSHT
Resolution approving terms of a Declaration of Restrictive Covenant on the Adrienne Arsht Center for the Performing Arts of Miami-Dade County, located at 1300 Biscayne Boulevard, Miami, Florida 33132, in favor of the State of Florida Department of State, Division of Arts and Culture, for a term of five years in exchange for a grant of $250,000.00 for upgrading the building management system. The County Mayor or designee is authorized to execute and record the Declaration. The item was forwarded to the BCC with a favorable recommendation by the Recreation, Tourism, and Resiliency Committee on 9/9/2026. The agenda date is 10/6/2026. The grant funds are matched by the Adrienne Arsht Center Trust, Inc. The facility must be used for cultural purposes for five years. The project is countywide in impact. The Trust will oversee implementation. The building management system is a computer-based control system for mechanical and electrical equipment. The Arsht Center includes the 2,400-seat Sanford and Dolores Ziff Ballet Opera House, the 2,200-seat John S. and James L. Knight Concert Hall, the 200-seat Carnival Studio Theater, the Peacock Education Center, the restored Carnival Art Deco Tower, and Thomson Plaza for the Arts.
- Board:
- Recreation, Tourism, and Resiliency Committee
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Recreation, Tourism, and Resiliency Committee on 9/9/2026; final decision not stated
- Address:
- 1300 Biscayne Boulevard, Miami, Florida 33132
- Applicant:
- Department of Cultural Affairs; Adrienne Arsht Center Trust, Inc. applied for and received the grant
DECLARATION OF RESTRICTIVE COVENANTS FOR ARSHT
Resolution approving a Declaration of Restrictive Covenant on the Adrienne Arsht Center for the Performing Arts of Miami-Dade County, located at 1300 Biscayne Boulevard, Miami, Florida 33132, in favor of the State of Florida Department of State, Division of Arts and Culture, for a term of five years in exchange for a grant of $250,000.00 to upgrade the building management system. The item was forwarded to the Board of County Commissioners with a favorable recommendation by the Recreation, Tourism, and Resiliency Committee on 9/9/2026. The agenda date is 10/6/2026. The applicant is the Department of Cultural Affairs, with Commissioner Keon Hardemon as prime sponsor. The grant funds are matched by the Adrienne Arsht Center Trust, Inc. The facility must be used for cultural purposes for five years following the execution of the grant award agreement.
- Board:
- Recreation, Tourism, and Resiliency Committee
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Forwarded to the Board of County Commissioners with a favorable recommendation by the Recreation, Tourism, and Resiliency Committee on 9/9/2026; pending before the Board of County Commissioners
- Address:
- 1300 Biscayne Boulevard, Miami, Florida 33132
- Applicant:
- Department of Cultural Affairs
DECLARATION OF RESTRICTIVE COVENANTS FOR ARSHT
Resolution approving a Declaration of Restrictive Covenant on the Adrienne Arsht Center for the Performing Arts of Miami-Dade County, located at 1300 Biscayne Boulevard, Miami, Florida 33132, in favor of the State of Florida Department of State, Division of Arts and Culture, for a term of five years in exchange for a grant of $250,000.00 to upgrade the building management system. The County Mayor or designee is authorized to execute and record the Declaration. The Recreation, Tourism, and Resiliency Committee forwarded the item to the Board of County Commissioners with a favorable recommendation on 9/9/2026. The agenda date is 10/6/2026. The applicant is the Department of Cultural Affairs, with Commissioner Keon Hardemon as prime sponsor. The project is countywide in impact. The grant funds are matched by the Adrienne Arsht Center Trust, Inc. The Trust will oversee implementation, compliance, and use of grant funds. The building management system is described as twenty years old. The facility includes the 2,400-seat Sanford and Dolores Ziff Ballet Opera House; the 2,200-seat John S. and James L. Knight Concert Hall; the 200-seat Carnival Studio Theater; the Peacock Education Center; the restored Carnival Art Deco Tower; and the Thomson Plaza for the Arts. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Recreation, Tourism, and Resiliency Committee
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Forwarded to the Board of County Commissioners with a favorable recommendation by the Recreation, Tourism, and Resiliency Committee on 9/9/2026; final decision not stated (status: Before the Board).
- Address:
- 1300 Biscayne Boulevard, Miami, Florida 33132
- Applicant:
- Department of Cultural Affairs; Prime Sponsor: Commissioner Keon Hardemon
EMERGENCY GENERATORS INSTEAD OF EQCB
Ordinance amending Miami-Dade County Code sections 24-5, 24-18, and 24-43 to allow administrative approval of emergency generators for healthcare facilities and food stores within wellfield protection areas, subject to conditions. The ordinance was adopted on first reading on 7/21/2026 and forwarded to the Board of County Commissioners with a favorable recommendation following a public hearing on 9/9/2026. The scope is countywide. No specific project site is identified. Public comment sentiment is not stated.
- Board:
- Recreation, Tourism, and Resiliency Committee
- Date:
- 2026-09-09
- Type:
- Ordinance
- Decision:
- Adopted on first reading on 7/21/2026; forwarded to the Board of County Commissioners with a favorable recommendation following a public hearing on 9/9/2026. Second reading scheduled for 10/6/2026.
EMERGENCY GENERATORS INSTEAD OF EQCB
This is a Miami-Dade County ordinance (File Number 261214) amending the Code to allow administrative approval of emergency generators for healthcare facilities and food stores within wellfield protection areas, instead of requiring a public hearing before the Environmental Quality Control Board (EQCB). The ordinance was adopted on first reading on 7/21/2026 and forwarded with a favorable recommendation following a public hearing on 9/9/2026. It is scheduled for a second reading at the Board of County Commissioners on 10/6/2026. The ordinance applies countywide. It revises definitions and adds conditions for fuel storage for emergency generators, including requirements for the property to be served by utility water and sewer, located more than 30 days travel time from any utility water supply well, not within the Northwest or West Wellfield Interim protection areas, within the Urban Development Boundary, and with fuel storage limits (1,500 gallons for food stores). The applicant is the County, with Commissioner Juan Carlos Bermudez as Prime Sponsor. The ordinance is intended to streamline regulations and reduce permitting timeframes. No specific project site is identified.
- Board:
- Recreation, Tourism, and Resiliency Committee
- Date:
- 2026-09-09
- Type:
- Ordinance
- Decision:
- Adopted on first reading on 7/21/2026; forwarded to BCC with a favorable recommendation following a public hearing on 9/9/2026; scheduled for second reading on 10/6/2026.
- Applicant:
- Miami-Dade County (Requester: Regulatory and Economic Resources; Prime Sponsor: Juan Carlos Bermudez)
EMERGENCY GENERATORS INSTEAD OF EQCB
Ordinance amending Miami-Dade County Code sections 24-5, 24-18, and 24-43 to allow administrative approval of emergency generators for healthcare facilities and food stores within wellfield protection areas, subject to conditions, instead of requiring a public hearing before the Environmental Quality Control Board (EQCB). The ordinance was adopted on first reading on 7/21/2026, forwarded with a favorable recommendation following a public hearing by the Recreation, Tourism, and Resiliency Committee on 9/9/2026, and is scheduled for second reading at the Board of County Commissioners on 10/6/2026. The scope is countywide. No specific project site is identified.
- Board:
- Recreation, Tourism, and Resiliency Committee
- Date:
- 2026-09-09
- Type:
- Ordinance
- Decision:
- Adopted on first reading (7/21/2026); forwarded to BCC with favorable recommendation following public hearing (9/9/2026); pending second reading (10/6/2026)
- Applicant:
- Requester: Regulatory and Economic Resources; Prime Sponsor: Juan Carlos Bermudez
EMERGENCY GENERATORS INSTEAD OF EQCB
This is a Miami-Dade County ordinance (File Number 261214) that amends Sections 24-5, 24-18, and 24-43 of the Code of Miami-Dade County, Florida. The ordinance revises a definition and authorizes administrative approval of emergency generators for healthcare facilities and food stores within a wellfield protection area, subject to certain conditions. The scope is countywide. The ordinance was introduced on 6/30/2026, adopted on first reading on 7/21/2026, and forwarded to the Board of County Commissioners with a favorable recommendation following a public hearing on 9/9/2026. The agenda date is 10/6/2026. The prime sponsor is Juan Carlos Bermudez. The ordinance allows administrative approval in lieu of a public hearing before the Environmental Quality Control Board (EQCB). The ordinance specifies conditions for fuel storage for emergency generators, including that the property is served by utility water and sanitary sewers, is located more than 30 days travel time from any utility potable water supply well, is not within the Northwest Wellfield protection area or West Wellfield Interim protection area, is within the Urban Development Boundary, and that fuel is contained in an approved above-ground storage facility with secondary containment. For food stores, fuel shall not exceed 1,500 gallons per facility. A groundwater monitoring plan approved by the Director is required for certain tanks. An operating permit is required. The ordinance is expected to benefit property owners and applicants by reducing development costs. A review of EQCB cases from 2020 to 2025 indicated approximately eight variances were granted related to emergency generators for healthcare facilities within wellfield protection areas. No public comment sentiment is stated in the document.
- Board:
- Recreation, Tourism, and Resiliency Committee
- Date:
- 2026-09-09
- Type:
- Ordinance
- Decision:
- Adopted on first reading on 7/21/2026; forwarded to the Board of County Commissioners with a favorable recommendation following a public hearing on 9/9/2026; agenda date 10/6/2026.
EMERGENCY GENERATORS INSTEAD OF EQCB
Ordinance amending Miami-Dade County Code sections 24-5, 24-18, and 24-43 to authorize administrative approval of emergency generators for healthcare facilities and food stores within wellfield protection areas, subject to conditions. The ordinance is countywide in scope. It was adopted on first reading on 7/21/2026, forwarded with a favorable recommendation following a public hearing on 9/9/2026, and is scheduled for second reading on 10/6/2026. No specific project site, address, parcel, acreage, or applicant is stated.
- Board:
- Recreation, Tourism, and Resiliency Committee
- Date:
- 2026-09-09
- Type:
- Ordinance
- Decision:
- Adopted on first reading on 7/21/2026; forwarded to BCC with a favorable recommendation following a public hearing on 9/9/2026; scheduled for second reading on 10/6/2026.
EMERGENCY GENERATORS INSTEAD OF EQCB
Ordinance amending Miami-Dade County Code sections 24-5, 24-18, and 24-43 to authorize administrative approval of emergency generators for healthcare facilities and food stores within wellfield protection areas, subject to conditions. The ordinance is countywide in scope. It was adopted on first reading on 7/21/2026 and forwarded to the Board of County Commissioners with a favorable recommendation following a public hearing on 9/9/2026. The ordinance is scheduled for second reading on 10/6/2026. No specific project site, address, parcel, acreage, or applicant is stated. The document is a legislative matter, not a site-specific development application. Public comment sentiment is not stated in the document.
- Board:
- Recreation, Tourism, and Resiliency Committee
- Date:
- 2026-09-09
- Type:
- Ordinance
- Decision:
- Adopted on first reading on 7/21/2026; forwarded to the Board of County Commissioners with a favorable recommendation following a public hearing on 9/9/2026; scheduled for second reading on 10/6/2026.
EMERGENCY GENERATORS INSTEAD OF EQCB
Ordinance amending Miami-Dade County Code sections 24-5, 24-18, and 24-43 to authorize administrative approval of emergency generators for healthcare facilities and food stores within wellfield protection areas, subject to conditions, instead of requiring a public hearing before the Environmental Quality Control Board. The ordinance was adopted on first reading on 7/21/2026 and forwarded to the Board of County Commissioners with a favorable recommendation following a public hearing on 9/9/2026. The scope is countywide. No negative fiscal impact to the County is anticipated. The ordinance is part of efforts to streamline regulations and reduce permitting timeframes. The State of Florida Agency for Health Care Administration requires hospitals, nursing homes, assisted living facilities, and ambulatory surgery centers to have a Level 1 Emergency Power Supply System. Section 8B-17 of the Code requires food stores containing more than 40,000 square feet of floor area to provide an alternate source of power. The ordinance allows fuels for emergency generators for health care facilities or food stores on a property within the basic wellfield protection area provided conditions are met, including: property served by utility water and utility sanitary sewers; property located more than 30 days travel time from any utility potable water supply well; property not located within the Northwest Wellfield protection area and West Wellfield Interim protection area; property located within the Urban Development Boundary; fuels contained within an above-ground storage facility approved pursuant to section 24-15(5); secondary containment system consisting of double-walled tanks and double-walled piping; for food stores, fuels shall not exceed 1,500 gallons per facility; for health care facilities, volume of fuel shall not exceed volume required to comply with emergency power supply system requirements; a groundwater monitoring plan approved by the Director required for any storage tank in which secondary containment is exposed to the environment and will accumulate stormwater; and an operating permit obtained pursuant to section 24-18. A review of EQCB cases from 2020 to 2025 indicated approximately eight variances were granted related to placement of emergency generators for healthcare facilities within wellfield protection areas. RER and DERM have consistently recommended granting requested variances for all EQCB cases related to emergency generators for healthcare facilities and food stores, provided applicants comply with specific operating criteria. The ordinance will become effective ten days after the date of enactment unless vetoed by the Mayor.
- Board:
- Recreation, Tourism, and Resiliency Committee
- Date:
- 2026-09-09
- Type:
- Ordinance
- Decision:
- Adopted on first reading on 7/21/2026; forwarded to the Board of County Commissioners with a favorable recommendation following a public hearing on 9/9/2026; status is Second Reading.
FIRST AMENDMENT TO OFF-SYSTEM AGREEMENT WITH FDOT
Resolution approving a First Amendment to an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements on State Road 5 (Biscayne Boulevard) from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street. The original agreement was approved by Resolution No. R-952-25 on October 9, 2025. The amendment revises project limits and expands the scope of local roadway improvements on NE 151st Street, including additional sidewalk replacement, signalization conduit installation, and retrofitting of existing lighting poles. Original project cost was approximately $94,220.21; additional improvements estimated at approximately $21,726.86, increasing total estimated project cost to $115,947.07. The project will be fully funded and constructed by FDOT. Construction anticipated to begin in July 2028. The Transportation Committee forwarded to the BCC with a favorable recommendation on 9/9/2026. Agenda date is 10/6/2026. Status is Before the Board. File Number: 261382. Project No. FM 451123-1-52-01. The County will assume maintenance responsibilities for improvements within County right-of-way upon completion. No public comment sentiment is stated in the document.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by Transportation Cmte on 9/9/2026; pending BCC assignment; agenda date 10/6/2026
- Address:
- State Road 5 (Biscayne Boulevard) from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street, Miami-Dade County, Florida
- Applicant:
- Miami-Dade County and Florida Department of Transportation
FIRST AMENDMENT TO OFF-SYSTEM AGREEMENT WITH FDOT
Resolution approving a First Amendment to an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements on State Road 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street. The original agreement was approved by Resolution No. R-952-25 on October 9, 2025. The amendment revises project limits and expands the scope of local roadway improvements on NE 151st Street. Original project cost was approximately $94,220.21; additional improvements estimated at approximately $21,726.86, increasing total estimated project cost to $115,947.07. Project fully funded and constructed by FDOT. Construction anticipated to begin in July 2028. Status: In Committee. Introduced 7/30/2026. Agenda Date 6/1/2026, Agenda Item Number 8N. Requester: Transportation and Public Works. File Number: 261382.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- In Committee
- Address:
- State Road 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street, Miami-Dade County, Florida
- Applicant:
- Miami-Dade County and Florida Department of Transportation
FIRST AMENDMENT TO OFF-SYSTEM AGREEMENT WITH FDOT
Resolution approving a First Amendment to an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements on State Road 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street. The original agreement was approved by Resolution No. R-952-25 on October 9, 2025. The Amendment revises project limits and expands the scope of local roadway improvements on NE 151st Street. Original project cost was approximately $94,220.21; additional improvements estimated at approximately $21,726.86; total estimated project cost is $115,947.07. Project fully funded and constructed by FDOT. Construction anticipated to begin in July 2028. Transportation Cmte forwarded to BCC with a favorable recommendation on 9/9/2026. Agenda date 10/6/2026. File Number: 261382. Project No. FM 451123-1-52-01. Improvements include sidewalk replacement, signage installation, signalization pull boxes, signalization conduits, modification of signalization controller cabinet, pedestrian signals, retrofit of existing lighting poles, and installation of lighting poles, pull boxes, and conduits. Expanded scope includes additional sidewalk replacement, signalization conduit installation, and retrofitting of existing lighting poles. If additional right-of-way is required, FDOT will acquire necessary property at no cost to the County. Upon completion, County will assume maintenance responsibilities for improvements within County right-of-way assigned to County under the Agreement. DTPW is the entity overseeing the project; monitor is Ms. Maria D. Molina, P.E., Chief, Right-of-Way Division. Project is in District 4, represented by Commissioner Micky Steinberg. Introduced 7/30/2026. Requester: Transportation and Public Works. No public comment sentiment is stated in the document.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Transportation Cmte forwarded to BCC with a favorable recommendation on 9/9/2026; pending BCC assignment; agenda date 10/6/2026
- Address:
- State Road 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street, Miami-Dade County, Florida
- Applicant:
- Miami-Dade County and Florida Department of Transportation
FIRST AMENDMENT TO OFF-SYSTEM AGREEMENT WITH FDOT
Resolution approving a First Amendment to an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation (FDOT) for local roadway improvements on State Road 5 (SR 5/Biscayne Boulevard) from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street. The original agreement was approved by Resolution No. R-952-25 on October 9, 2025. The amendment revises project limits and expands the scope of local roadway improvements on NE 151st Street. Original project cost was approximately $94,220.21; additional improvements estimated at approximately $21,726.86, increasing total estimated project cost to $115,947.07. Project fully funded and constructed by FDOT. Construction anticipated to begin in July 2028. The Transportation Cmte forwarded to BCC with a favorable recommendation on 9/9/2026. Agenda date is 10/6/2026. File Number: 261382. Introduced: 7/30/2026. Requester: Transportation and Public Works. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by Transportation Cmte on 9/9/2026; pending BCC assignment; agenda date 10/6/2026
- Address:
- SR 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street, Miami-Dade County, Florida
- Applicant:
- Miami-Dade County and Florida Department of Transportation (FDOT)
FIRST AMENDMENT TO OFF-SYSTEM AGREEMENT WITH FDOT
Resolution approving a First Amendment to an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements on State Road 5 (SR 5/Biscayne Boulevard) from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street. The original agreement was approved by Resolution No. R-952-25 on October 9, 2025. The Amendment revises project limits and expands the scope of local roadway improvements on NE 151st Street. Original project cost was approximately $94,220.21; additional improvements estimated at approximately $21,726.86, increasing total estimated project cost to $115,947.07. Project fully funded and constructed by FDOT. Construction anticipated to begin in July 2028. Transportation Cmte forwarded to BCC with a favorable recommendation on 9/9/2026. Agenda date 10/6/2026, agenda item number 8N7. File Number: 261382. Introduced 7/30/2026. Requester: Transportation and Public Works. Project is in District 4, represented by Commissioner Micky Steinberg. DTPW is the overseeing entity; monitor is Ms. Maria D. Molina, P.E., Chief, Right-of-Way Division. Improvements include replacement of sidewalk, installation of signage, installation of signalization pull boxes, installation of signalization conduits, modification of signalization controller cabinet, installation of pedestrian signals, retrofit of existing lighting poles, and installation of lighting poles, pull boxes, and conduits. Expanded scope includes additional sidewalk replacement, signalization conduit installation, and retrofitting of existing lighting poles. If additional right-of-way is required, FDOT will acquire the necessary property at no cost to the County. Upon completion, the County will assume maintenance responsibilities for those improvements within the County right-of-way assigned to the County under the Agreement, funded through DTPW's General Fund allocation.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Transportation Cmte forwarded to BCC with a favorable recommendation on 9/9/2026; pending BCC assignment, agenda date 10/6/2026
- Address:
- SR 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street, Miami-Dade County, Florida
- Applicant:
- Miami-Dade County and Florida Department of Transportation
FIRST AMENDMENT TO OFF-SYSTEM AGREEMENT WITH FDOT
Resolution approving a First Amendment to an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements on State Road 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street. The original agreement was approved by Resolution No. R-952-25 on October 9, 2025. The amendment revises project limits and expands the scope of local roadway improvements on NE 151st Street. Original project cost was approximately $94,220.21; additional improvements estimated at approximately $21,726.86; total estimated project cost is $115,947.07. Project fully funded and constructed by FDOT. Construction anticipated to begin in July 2028. Status: In Committee. Introduced 7/30/2026. Agenda Date 6/1/2026, Agenda Item Number 8N. Requester: Transportation and Public Works. Staff recommendation is to approve. No public comment sentiment is stated in the document.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- In Committee; staff recommendation is to approve; no final action stated
- Address:
- SR 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street, Miami-Dade County, Florida
- Applicant:
- Miami-Dade County and Florida Department of Transportation
FIRST AMENDMENT TO OFF-SYSTEM AGREEMENT WITH FDOT
Resolution approving a First Amendment to an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements on State Road 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street. The original agreement was approved by Resolution No. R-952-25 on October 9, 2025. The amendment revises project limits and expands the scope of local roadway improvements on NE 151st Street. Original project cost was approximately $94,220.21; additional improvements estimated at approximately $21,726.86; total estimated project cost is $115,947.07. The project is fully funded and constructed by FDOT. Construction anticipated to begin in July 2028. The Transportation Committee forwarded to the BCC with a favorable recommendation on 9/9/2026. Agenda date is 10/6/2026, agenda item number 8N7. File number 261382. Introduced 7/30/2026. Requester: Transportation and Public Works. Status: Before the Board. The County will assume maintenance responsibilities for improvements within County right-of-way upon completion. Improvements include replacement of sidewalk, installation of signage, signalization pull boxes, signalization conduits, modification of signalization controller cabinet, installation of pedestrian signals, retrofit of existing lighting poles, and installation of lighting poles, pull boxes, and conduits. Expanded scope includes additional sidewalk replacement, signalization conduit installation, and retrofitting of existing lighting poles. If additional right-of-way is required, FDOT will acquire the property at no cost to the County. Project is in District 4, represented by Commissioner Micky Steinberg. DTPW is the overseeing entity; monitor is Ms. Maria D. Molina, P.E., Chief, Right-of-Way Division. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by Transportation Cmte on 9/9/2026; pending BCC assignment; agenda date 10/6/2026
- Address:
- State Road 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street, Miami-Dade County, Florida
- Applicant:
- Miami-Dade County and Florida Department of Transportation
FIRST AMENDMENT TO OFF-SYSTEM AGREEMENT WITH FDOT
Resolution approving a First Amendment to an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements on State Road 5 (SR 5/Biscayne Boulevard) from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street. The original agreement was approved by Resolution No. R-952-25 on October 9, 2025. The amendment revises project limits and expands the scope of local roadway improvements on NE 151st Street. Original project cost was approximately $94,220.21; additional improvements estimated at approximately $21,726.86, increasing total estimated project cost to $115,947.07. Project fully funded and constructed by FDOT. Construction anticipated to begin July 2028. Transportation Cmte forwarded to BCC with favorable recommendation on 9/9/2026. Agenda date 10/6/2026, agenda item number 8N. File number 261382. Introduced 7/30/2026. Requester: Transportation and Public Works. Status: Before the Board. No public comment sentiment stated.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by Transportation Cmte on 9/9/2026; pending before the Board with agenda date 10/6/2026
- Address:
- SR 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street, Miami-Dade County, Florida
- Applicant:
- Miami-Dade County and Florida Department of Transportation
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta