Skip to main content

Sé el Primero, Construye Relaciones Duraderas

Browse Miami-Dade County civic records

Every published record for Miami-Dade County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.

29,678 records

FIRST AMENDMENT TO OFF-SYSTEM AGREEMENT WITH FDOT

Resolution approving a First Amendment to an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation (FDOT) for local roadway improvements on State Road 5 (SR 5/Biscayne Boulevard) from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street. The amendment revises project limits and expands the scope of local roadway improvements on NE 151st Street. Original project cost was approximately $94,220.21; additional improvements estimated at approximately $21,726.86, increasing total estimated project cost to $115,947.07. Project fully funded and constructed by FDOT. Construction anticipated to begin July 2028. Transportation Cmte forwarded to BCC with favorable recommendation on 9/9/2026. Agenda date 10/6/2026, agenda item number 8N. Introduced 7/30/2026. Requester: Transportation and Public Works. Project in District 4, represented by Commissioner Micky Steinberg. Improvements include sidewalk replacement, signage installation, signalization pull boxes, signalization conduits, signalization controller cabinet modification, pedestrian signals, lighting pole retrofit, and installation of lighting poles, pull boxes, and conduits. Expanded scope includes additional sidewalk replacement, signalization conduit installation, and retrofitting of existing lighting poles. Upon completion, County assumes maintenance responsibilities for improvements within County right-of-way. DTPW overseeing project; monitor is Maria D. Molina, P.E., Chief, Right-of-Way Division. Original agreement approved by Resolution No. R-952-25 on October 9, 2025. If additional right-of-way required, FDOT will acquire property at no cost to County. No public comment sentiment stated.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Transportation Cmte forwarded to BCC with a favorable recommendation on 9/9/2026; pending BCC assignment; agenda date 10/6/2026
Address:
SR 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street, Miami-Dade County, Florida
Applicant:
Miami-Dade County and Florida Department of Transportation (FDOT)

FIRST AMENDMENT TO OFF-SYSTEM AGREEMENT WITH FDOT

Resolution approving a First Amendment to an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements on State Road 5 (SR 5/Biscayne Boulevard) from NE 123rd Street to NE 163rd Street, including work on a portion of NE 151st Street. The original agreement was approved by Resolution No. R-952-25 on October 9, 2025. The amendment revises project limits and expands the scope of local roadway improvements on NE 151st Street. Original project cost was approximately $94,220.21; additional improvements estimated at approximately $21,726.86; total estimated project cost is $115,947.07. Project is fully funded and constructed by FDOT. Construction anticipated to begin in July 2028. The Transportation Cmte forwarded to BCC with a favorable recommendation on 9/9/2026. Agenda date is 10/6/2026, agenda item number 8N7. File number is 261382. Status is Before the Board. Introduced 7/30/2026. Requester is Transportation and Public Works. No public comment or stakeholder sentiment is stated in the document.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Cmte on 9/9/2026; pending BCC assignment; agenda date 10/6/2026
Address:
SR 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, including a portion of NE 151st Street, Miami-Dade County, Florida
Applicant:
Miami-Dade County and Florida Department of Transportation

FIRST AMENDMENT TO OFF-SYSTEM AGREEMENT WITH FDOT

Resolution approving a First Amendment to an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements on State Road 5 (Biscayne Boulevard) from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street. The original agreement was approved by Resolution No. R-952-25 on October 9, 2025. The amendment revises project limits and expands the scope of local roadway improvements on NE 151st Street. Original project cost was approximately $94,220.21; additional improvements estimated at approximately $21,726.86, increasing total estimated project cost to $115,947.07. Project fully funded and constructed by FDOT. Construction anticipated to begin in July 2028. Status: In Committee. Introduced 7/30/2026. Agenda Date 6/1/2026, Agenda Item Number 8N. File Number: 261382. Requester: Transportation and Public Works. Staff recommendation is to approve. Improvements include sidewalk replacement, signage installation, signalization pull boxes, signalization conduits, signalization controller cabinet modification, pedestrian signals, retrofit of existing lighting poles, and installation of lighting poles, pull boxes, and conduits. Expanded scope includes additional sidewalk replacement, signalization conduit installation, and retrofitting of existing lighting poles. If additional right-of-way is required, FDOT will acquire necessary property at no cost to the County. Upon completion, County will assume maintenance responsibilities for improvements within County right-of-way. Project is in District 4, represented by Commissioner Micky Steinberg. DTPW is overseeing project; monitor is Ms. Maria D. Molina, P.E., Chief, Right-of-Way Division. Legislative history: County Attorney assigned 8/5/2026; Roy Coley assigned 7/30/2026; Office of Agenda Coordination assigned 7/30/2026; report by DTPW - Annery Pulgar Alfonso - no sponsor - pending September cmte - Attachment: Agreement - item has 57 pages.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
In Committee; staff recommendation is to approve
Address:
State Road 5 (Biscayne Boulevard) from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street, Miami-Dade County, Florida
Applicant:
Miami-Dade County and Florida Department of Transportation

FIRST AMENDMENT TO OFF-SYSTEM AGREEMENT WITH FDOT

Resolution approving a First Amendment to an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements on State Road 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street. The original agreement was approved by Resolution No. R-952-25 on October 9, 2025. The amendment revises project limits and expands the scope of local roadway improvements on NE 151st Street. Original project cost was approximately $94,220.21; additional improvements estimated at approximately $21,726.86; total estimated project cost is $115,947.07. Project fully funded and constructed by FDOT. Construction anticipated to begin in July 2028. The Transportation Committee forwarded to the BCC with a favorable recommendation on 9/9/2026. Agenda date is 10/6/2026. Status is Before the Board. File Number: 261382. Requester: Transportation and Public Works. Introduced: 7/30/2026. Agenda Item Number: 8N7. Project is in District 4, represented by Commissioner Micky Steinberg. DTPW is the overseeing entity; monitor is Ms. Maria D. Molina, P.E., Chief, Right-of-Way Division. Improvements include replacement of sidewalk, installation of signage, installation of signalization pull boxes, installation of signalization conduits, modification of signalization controller cabinet, installation of pedestrian signals, retrofit of existing lighting poles, and installation of lighting poles, pull boxes, and conduits. Expanded scope includes additional sidewalk replacement, signalization conduit installation, and retrofitting of existing lighting poles. If additional right-of-way is required, FDOT will acquire the necessary property at no cost to the County. Upon completion, the County will assume maintenance responsibilities for those improvements within the County right-of-way assigned to the County under the Agreement, funded through DTPW's General Fund allocation.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Cmte on 9/9/2026; status is Before the Board; agenda date 10/6/2026
Address:
State Road 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street, Miami-Dade County, Florida
Applicant:
Miami-Dade County and Florida Department of Transportation

FIRST AMENDMENT TO OFF-SYSTEM AGREEMENT WITH FDOT

Resolution approving a First Amendment to an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements on State Road 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street. The original agreement was approved by Resolution No. R-952-25 on October 9, 2025. The amendment revises project limits and expands the scope of local roadway improvements on NE 151st Street. Original project cost was approximately $94,220.21; additional improvements estimated at approximately $21,726.86, increasing total estimated project cost to $115,947.07. Project fully funded and constructed by FDOT. Construction anticipated to begin in July 2028. Status: In Committee. Introduced 7/30/2026. Agenda Date 6/1/2026, Agenda Item Number 8N. Requester: Transportation and Public Works. File Number: 261382. Improvements include sidewalk replacement, signage installation, signalization pull boxes, signalization conduits, signalization controller cabinet modification, pedestrian signals, lighting pole retrofit, and lighting poles, pull boxes, and conduits. Expanded scope includes additional sidewalk replacement, signalization conduit installation, and retrofitting of existing lighting poles. If additional right-of-way is required, FDOT will acquire necessary property at no cost to the County. Upon completion, County will assume maintenance responsibilities for improvements within County right-of-way. Project in District 4, represented by Commissioner Micky Steinberg. DTPW overseeing project; monitor is Maria D. Molina, P.E., Chief, Right-of-Way Division. No public comment sentiment stated.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
In Committee
Address:
State Road 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street, Miami-Dade County, Florida
Applicant:
Miami-Dade County and Florida Department of Transportation

FIRST AMENDMENT TO OFF-SYSTEM AGREEMENT WITH FDOT

Resolution approving a First Amendment to an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements on State Road 5 (SR 5/Biscayne Boulevard) from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street. The original agreement was approved by Resolution No. R-952-25 on October 9, 2025. The amendment revises project limits and expands the scope of local roadway improvements on NE 151st Street. Original project cost was approximately $94,220.21; additional improvements estimated at approximately $21,726.86, increasing total estimated project cost to $115,947.07. Project fully funded and constructed by FDOT. Construction anticipated to begin in July 2028. Transportation Cmte forwarded to BCC with favorable recommendation on 9/9/2026. Agenda date 10/6/2026, agenda item number 8N. File number 261382. Introduced 7/30/2026. Requester: Transportation and Public Works. Project in District 4, represented by Commissioner Micky Steinberg. DTPW overseeing project; monitor is Ms. Maria D. Molina, P.E., Chief, Right-of-Way Division. Improvements include replacement of sidewalk, installation of signage, installation of signalization pull boxes, installation of signalization conduits, modification of signalization controller cabinet, installation of pedestrian signals, retrofit of existing lighting poles, and installation of lighting poles, pull boxes, and conduits. Expanded scope includes additional sidewalk replacement, signalization conduit installation, and retrofitting of existing lighting poles. If additional right-of-way is required, FDOT will acquire necessary property at no cost to County. Upon completion, County will assume maintenance responsibilities for improvements within County right-of-way assigned to County under Agreement, funded through General Fund allocation. No public comment or stakeholder sentiment is stated in the document.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Cmte on 9/9/2026; pending BCC assignment; agenda date 10/6/2026
Address:
SR 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street, Miami-Dade County, Florida
Applicant:
Miami-Dade County and Florida Department of Transportation

FIRST AMENDMENT TO OFF-SYSTEM AGREEMENT WITH FDOT

Resolution approving a First Amendment to an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation (FDOT) for local roadway improvements on State Road 5 (SR 5/Biscayne Boulevard) from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street. The original agreement was approved by Resolution No. R-952-25 on October 9, 2025. The Amendment revises project limits and expands the scope of local roadway improvements on NE 151st Street. Original project cost was approximately $94,220.21; additional improvements estimated at approximately $21,726.86, increasing total estimated project cost to $115,947.07. Project fully funded and constructed by FDOT. Construction anticipated to begin in July 2028. Status: In Committee. Introduced: 7/30/2026. Agenda Date: 6/1/2026. Agenda Item Number: 8N. File Number: 261382. Improvements include sidewalk replacement, signage installation, signalization pull boxes, signalization conduits, signalization controller cabinet modification, pedestrian signals, lighting pole retrofit, and installation of lighting poles, pull boxes, and conduits. County will assume maintenance responsibilities for improvements within County right-of-way upon completion. DTPW is overseeing project; monitor is Maria D. Molina, P.E., Chief, Right-of-Way Division. Project is in District 4, represented by Commissioner Micky Steinberg. No public comment or stakeholder sentiment is stated in the document.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
In Committee
Address:
SR 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street, Miami-Dade County, Florida
Applicant:
Miami-Dade County and Florida Department of Transportation (FDOT)

FIRST AMENDMENT TO OFF-SYSTEM AGREEMENT WITH FDOT

Resolution approving a First Amendment to an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements on State Road 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street. The amendment revises project limits and expands the scope of local roadway improvements on NE 151st Street. The original project cost was approximately $94,220.21; additional improvements cost approximately $21,726.86, increasing total estimated project cost to $115,947.07. The project is fully funded and constructed by FDOT. Construction anticipated to begin July 2028. The Transportation Cmte forwarded to BCC with a favorable recommendation on 9/9/2026. Status is Before the Board. Introduced 7/30/2026. Agenda Date 6/1/2026, Agenda Item Number 8N. File Number 261382. Requester: Transportation and Public Works. Staff recommendation is approval. No public comment sentiment is stated in the document.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Transportation Cmte forwarded to BCC with a favorable recommendation; status Before the Board; staff recommendation is approval
Address:
State Road 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street, Miami-Dade County, Florida
Applicant:
Miami-Dade County and Florida Department of Transportation

FIRST AMENDMENT TO OFF-SYSTEM AGREEMENT WITH FDOT

Resolution approving a First Amendment to an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements on State Road 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street. The original agreement was approved by Resolution No. R-952-25 on October 9, 2025. The amendment revises project limits and expands scope of local roadway improvements on NE 151st Street. Original project cost estimated at approximately $94,220.21; additional improvements estimated at approximately $21,726.86; total estimated project cost $115,947.07. Project fully funded and constructed by FDOT. Construction anticipated to begin in July 2028. Status: In Committee. Introduced 7/30/2026. Agenda Date 6/1/2026, Agenda Item Number 8N. Requester: Transportation and Public Works. File Number: 261382. No public comment sentiment stated.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
In Committee
Address:
State Road 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street, Miami-Dade County, Florida
Applicant:
Miami-Dade County and Florida Department of Transportation

FIRST AMENDMENT TO OFF-SYSTEM AGREEMENT WITH FDOT

Resolution approving a First Amendment to an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements on State Road 5 (SR 5/Biscayne Boulevard) from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street. The original agreement was approved by Resolution No. R-952-25 on October 9, 2025. The amendment revises project limits and expands scope of local roadway improvements on NE 151st Street. Original project cost was approximately $94,220.21; additional improvements estimated at approximately $21,726.86, increasing total estimated project cost to $115,947.07. Project fully funded and constructed by FDOT. Construction anticipated to begin in July 2028. Transportation Cmte forwarded to BCC with favorable recommendation on 9/9/2026. Agenda date 10/6/2026, agenda item number 8N. Status: Before the Board. Introduced 7/30/2026. Requester: Transportation and Public Works. File Number: 261382. Project in District 4, represented by Commissioner Micky Steinberg. DTPW overseeing; monitor is Ms. Maria D. Molina, P.E., Chief, Right-of-Way Division. Improvements include replacement of sidewalk, installation of signage, signalization pull boxes, signalization conduits, modification of signalization controller cabinet, installation of pedestrian signals, retrofit of existing lighting poles, installation of lighting poles, pull boxes, and conduits. Expanded scope includes additional sidewalk replacement, signalization conduit installation, and retrofitting of existing lighting poles. If additional right-of-way required, FDOT will acquire at no cost to County. Upon completion, County assumes maintenance responsibilities for improvements within County right-of-way assigned to County under Agreement, funded through General Fund allocation.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Transportation Cmte forwarded to BCC with a favorable recommendation on 9/9/2026; pending BCC assignment; agenda date 10/6/2026
Address:
SR 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street, Miami-Dade County, Florida
Applicant:
Miami-Dade County and Florida Department of Transportation (FDOT)

FIRST AMENDMENT TO OFF-SYSTEM AGREEMENT WITH FDOT

Resolution approving a First Amendment to an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements on State Road 5 (SR 5/Biscayne Boulevard) from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street. The original agreement was approved by Resolution No. R-952-25 on October 9, 2025. The amendment revises project limits and expands the scope of local roadway improvements on NE 151st Street. Original project cost was approximately $94,220.21; additional improvements estimated at approximately $21,726.86, increasing total estimated project cost to $115,947.07. Project fully funded and constructed by FDOT. Construction anticipated to begin in July 2028. Transportation Cmte forwarded to BCC with a favorable recommendation on 9/9/2026. Agenda date 10/6/2026, agenda item number 8N. File number 261382. Introduced 7/30/2026. Requester: Transportation and Public Works. No public comment or stakeholder sentiment stated.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Cmte on 9/9/2026; pending BCC assignment; agenda date 10/6/2026
Address:
SR 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street, Miami-Dade County, Florida
Applicant:
Miami-Dade County and Florida Department of Transportation

FIRST AMENDMENT TO OFF-SYSTEM AGREEMENT WITH FDOT

Resolution approving a First Amendment to an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements on State Road 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street. The original agreement was approved by Resolution No. R-952-25 on October 9, 2025. The amendment revises project limits and expands the scope of local roadway improvements on NE 151st Street. Original project cost was approximately $94,220.21; additional improvements estimated at approximately $21,726.86, increasing total estimated project cost to $115,947.07. Project fully funded and constructed by FDOT. Construction anticipated to begin in July 2028. Transportation Cmte forwarded to BCC with favorable recommendation on 9/9/2026. Agenda date 10/6/2026, agenda item number 8N7. File number 261382. Introduced 7/30/2026. Requester: Transportation and Public Works. No public comment sentiment stated.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Transportation Cmte forwarded to BCC with a favorable recommendation on 9/9/2026; pending BCC assignment, agenda date 10/6/2026
Address:
SR 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street, Miami-Dade County, Florida
Applicant:
Miami-Dade County and Florida Department of Transportation

FIRST AMENDMENT TO OFF-SYSTEM AGREEMENT WITH FDOT

Resolution approving a First Amendment to an Off-System Construction and Maintenance Agreement between Miami-Dade County and FDOT for local roadway improvements on SR 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street. The original agreement was approved by Resolution R-952-25 on October 9, 2025. The amendment revises project limits and expands scope of local roadway improvements on NE 151st Street. Original project cost was approximately $94,220.21; additional improvements estimated at approximately $21,726.86; total estimated project cost increased to $115,947.07. Project fully funded and constructed by FDOT. Construction anticipated to begin July 2028. File Number 261382. Introduced 7/30/2026. Agenda Date 10/6/2026, Agenda Item Number 8N7. Transportation Cmte forwarded to BCC with favorable recommendation on 9/9/2026. Status: Before the Board. Requester: Transportation and Public Works. Staff recommendation is to approve. Final action not stated. Scope includes replacement of sidewalk, installation of signage, signalization pull boxes, signalization conduits, modification of signalization controller cabinet, installation of pedestrian signals, retrofit of existing lighting poles, installation of lighting poles, pull boxes, and conduits. Expanded scope includes additional sidewalk replacement, signalization conduit installation, and retrofitting of existing lighting poles. Upon completion, County will assume maintenance responsibilities for improvements within County right-of-way. If additional right-of-way is required, FDOT will acquire necessary property at no cost to County. Project is in District 4, represented by Commissioner Micky Steinberg. Monitor: Ms. Maria D. Molina, P.E., Chief, Right-of-Way Division. No public comment or stakeholder sentiment stated.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Transportation Cmte forwarded to BCC with a favorable recommendation on 9/9/2026; final action not stated
Address:
SR 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street, Miami-Dade County, Florida
Applicant:
Miami-Dade County and Florida Department of Transportation

FIRST AMENDMENT TO OFF-SYSTEM AGREEMENT WITH FDOT

Resolution approving a First Amendment to an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements on State Road 5 (Biscayne Boulevard) from NE 123rd Street to NE 163rd Street, including work on a portion of NE 151st Street. The original agreement was approved by Resolution No. R-952-25 on October 9, 2025. The amendment revises project limits and expands scope of work on NE 151st Street. Original project cost was approximately $94,220.21; additional improvements estimated at approximately $21,726.86; total estimated project cost is $115,947.07. Project fully funded and constructed by FDOT. Construction anticipated to begin July 2028. Status: In Committee. Introduced 7/30/2026. Agenda date 6/1/2026, agenda item number 8N. Requester: Transportation and Public Works. File Number: 261382.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
In Committee
Address:
State Road 5 (Biscayne Boulevard) from NE 123rd Street to NE 163rd Street, including a portion of NE 151st Street, Miami-Dade County, Florida
Applicant:
Miami-Dade County and Florida Department of Transportation

FIRST AMENDMENT TO OFF-SYSTEM AGREEMENT WITH FDOT

Resolution approving a First Amendment to an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation (FDOT) for local roadway improvements on State Road 5 (SR 5/Biscayne Boulevard) from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street. The original agreement (Resolution No. R-952-25, approved October 9, 2025) authorized FDOT to construct local roadway improvements on NE 151st Street. This Amendment revises project limits and expands the scope of work on NE 151st Street to address constructability considerations. The original project cost was approximately $94,220.21; additional improvements are estimated at approximately $21,726.86, increasing total estimated project cost to $115,947.07. The project is fully funded and constructed by FDOT. Construction anticipated to begin July 2028. The Transportation Cmte forwarded to BCC with a favorable recommendation on 9/9/2026. Agenda date 10/6/2026, agenda item number 8N7. File number 261382. Introduced 7/30/2026. Requester: Transportation and Public Works. No public comment or stakeholder sentiment is stated in the document.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Transportation Cmte forwarded to BCC with a favorable recommendation on 9/9/2026; pending BCC assignment; agenda date 10/6/2026
Address:
SR 5/Biscayne Boulevard from NE 123rd Street to NE 163rd Street, a portion of which includes work on a portion of NE 151st Street, Miami-Dade County, Florida
Applicant:
Miami-Dade County and Florida Department of Transportation (FDOT); County Mayor Daniella Levine Cava; Deputy Mayor Roy Coley; DTPW - Annery Pulgar Alfonso; monitor Maria D. Molina, P.E., Chief, Right-of-Way Division

GENETIC ANALYSES

Miami-Dade County legislative item File Number 261142 is a Resolution to authorize an additional two years for Contract No. SS-10099, Genetic Analyses in Waters, for the Department of Environmental Resources Management (DERM), and to authorize the County Mayor or designee to execute Supplemental Agreement No. 2. The contract is with LuminUltra Technologies, Inc. for genetic analysis services using microbial source tracking to identify pollution sources in Biscayne Bay. The extension is for time only with no additional expenditure authority; the cumulative allocation remains $1,250,000. The contract expires on October 31, 2026, and would expire on October 31, 2028 if approved. The item was introduced on 6/23/2026, was before the Recreation, Tourism, and Resiliency Committee on 9/9/2026 with a favorable recommendation, and is scheduled for the Board of County Commissioners on 10/6/2026 as Agenda Item 8P. The sponsor is Raquel A. Regalado. The requester is Strategic Procurement. The vendor address is 805 Pinnacle Drive Suite M, Linthicum Heights, MD, with a local address at 15280 NW 79 Court Suite 107, Miami Lakes, FL. The vendor principal is Pat Whalen. The procurement contracting manager is Manuel Jimenez. The item is countywide in scope. No public comment or stakeholder sentiment is stated in the document.

Board:
Recreation, Tourism, and Resiliency Committee
Date:
2026-09-09
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by the Recreation, Tourism, and Resiliency Committee on 9/9/2026; final decision pending before the Board of County Commissioners on 10/6/2026

GENETIC ANALYSES

Resolution authorizing a two-year time extension for Contract No. SS-10099, Genetic Analyses in Waters, for the Department of Environmental Resources Management (DERM), with LuminUltra Technologies, Inc. The extension is for time only, with no additional expenditure authority. The contract has a cumulative allocation of $1,250,000 and would expire on October 31, 2028, instead of October 31, 2026. The item was forwarded to the Board of County Commissioners with a favorable recommendation by the Recreation, Tourism, and Resiliency Committee on 9/9/2026. The agenda date is 10/6/2026. The vendor is LuminUltra Technologies, Inc., located at 805 Pinnacle Drive Suite M, Linthicum Heights, MD, with a local address at 15280 NW 79 Court Suite 107, Miami Lakes, FL. The Prime Sponsor is Raquel A. Regalado. The resolution authorizes the County Mayor or designee to execute Supplemental Agreement No. 2. The service is for microbial source tracking to identify pollution sources in Biscayne Bay. The County has begun transitioning complementary services to FIU and the University of Miami. No public comment or stakeholder sentiment is stated in the document.

Board:
Recreation, Tourism, and Resiliency Committee
Date:
2026-09-09
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation (by Recreation, Tourism, and Resiliency Committee on 9/9/2026); final decision not stated
Applicant:
Strategic Procurement Department; LuminUltra Technologies, Inc. (vendor)

GENETIC ANALYSES

Resolution authorizing a two-year time extension for Contract No. SS-10099, Genetic Analyses in Waters, for the Department of Environmental Resources Management (DERM), with LuminUltra Technologies, Inc. The extension is time only, with no additional expenditure authority; the cumulative allocation remains $1,250,000. The contract expires October 31, 2026, and would expire October 31, 2028 if approved. The service is countywide in impact. The resolution was introduced 6/23/2026, forwarded to the BCC with a favorable recommendation by the Recreation, Tourism, and Resiliency Committee on 9/9/2026, and is scheduled for the BCC agenda on 10/6/2026 as item 8P. The vendor is LuminUltra Technologies, Inc., with principal address 805 Pinnacle Drive Suite M, Linthicum Heights, MD, and local address 15280 NW 79 Court Suite 107, Miami Lakes, FL. The Prime Sponsor is Raquel A. Regalado. The staff recommendation is approval. The document does not state any public comment or stakeholder sentiment.

Board:
Recreation, Tourism, and Resiliency Committee
Date:
2026-09-09
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation; pending BCC approval
Applicant:
LuminUltra Technologies, Inc.

GENETIC ANALYSES

The document is a legislative item for Miami-Dade County File Number 261142, a Resolution to authorize a two-year time extension for Contract No. SS-10099, Genetic Analyses in Waters, for the Department of Environmental Resources Management (DERM). The contract is with LuminUltra Technologies, Inc. The extension is for time only, with no additional expenditure authority requested; the cumulative allocation remains $1,250,000. The contract currently expires on October 31, 2026, and would expire on October 31, 2028, if approved. The item was introduced on 6/23/2026, was forwarded to the Board of County Commissioners (BCC) with a favorable recommendation by the Recreation, Tourism, and Resiliency Committee on 9/9/2026, and is scheduled for the BCC agenda on 10/6/2026 as item 8P. The services are for microbial source tracking to identify pollution sources in Biscayne Bay and surrounding waterbodies. The document does not state a specific project site, address, parcel, acreage, or zoning change. No public comment or stakeholder sentiment is stated in the document.

Board:
Recreation, Tourism, and Resiliency Committee
Date:
2026-09-09
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by the Recreation, Tourism, and Resiliency Committee on 9/9/2026; pending BCC decision on 10/6/2026
Applicant:
Miami-Dade County Department of Environmental Resources Management (DERM); vendor is LuminUltra Technologies, Inc.

GENETIC ANALYSES

This is a legislative item for a resolution authorizing a two-year extension of Contract No. SS-10099, Genetic Analyses in Waters, for the Department of Environmental Resources Management (DERM). The contract is with LuminUltra Technologies, Inc. The extension is for time only, with no additional expenditure authority requested. The cumulative allocation remains $1,250,000. The contract expires on October 31, 2026, and would expire on October 31, 2028, if approved. The item was introduced on 6/23/2026, has an agenda date of 10/6/2026, and was forwarded to the Board of County Commissioners with a favorable recommendation by the Recreation, Tourism, and Resiliency Committee on 9/9/2026. The sponsor is Raquel A. Regalado. The resolution authorizes the County Mayor or designee to execute Supplemental Agreement No. 2. The services are for microbial source tracking to identify pollution sources in Biscayne Bay. The document does not state a specific project site, address, parcel, acreage, or zoning change. The document states the impact is countywide. The vendor address is 805 Pinnacle Drive Suite M, Linthicum Heights, MD, with a local address of 15280 NW 79 Court Suite 107, Miami Lakes, FL. The document does not state any public comment or stakeholder sentiment.

Board:
Recreation, Tourism, and Resiliency Committee
Date:
2026-09-09
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta