LANDFILL GAS CONVERSION

Miami-Dade County Board of County Commissioners (BCC) is recommended to approve the rejection of all proposals for the Landfill Gas Conversion Project (RFP No. EVN0019329) for the Department of Solid Waste Management. All five proposals received were deemed non-responsive by the County Attorney's Office. The project aimed to design, build, finance, operate, and maintain Renewable Natural Gas (RNG) systems at the South Dade Landfill and North Dade Landfill. The rejection allows the County to update the solicitation, potentially focusing solely on the South Dade Landfill site due to viability concerns with the North Dade Landfill. The estimated cost for developers to design and build each facility was over $30,000,000. The County plans to seek market feedback before resoliciting. Multiple vendors are reportedly interested in resubmitting.

Board:
Policy Council
Date:
2026-07-13
Type:
Resolution
Decision:
Recommended to reject all proposals
Address:
South Dade Landfill: 23707 SW 97th Avenue, Homestead, FL; North Dade Landfill: 21500 NW 47th Avenue, Miami, FL
Applicant:
Department of Solid Waste Management (DSWM)

LANDFILL GAS CONVERSION

Miami-Dade County Board of County Commissioners rejected all proposals for the Landfill Gas Conversion Project (RFP No. EVN0019329) for the Department of Solid Waste Management. The rejection was due to all submitted proposals being deemed non-responsive by the County Attorney's Office. The County plans to resolicit, likely focusing only on the South Dade Landfill site due to viability concerns with the North Dade Landfill. The project involves designing, building, financing, operating, and maintaining a Renewable Natural Gas (RNG) system to utilize landfill gas. Estimated cost for developers to design and build each facility was over $30,000,000. The County will seek market feedback before reissuing the solicitation.

Board:
Policy Council
Date:
2026-07-13
Type:
Resolution
Decision:
Rejected all proposals
Address:
South Dade Landfill: 23707 SW 97th Avenue, Homestead, FL; North Dade Landfill: 21500 NW 47th Avenue, Miami, FL
Applicant:
Strategic Procurement (Requester)

LANDFILL GAS CONVERSION

Resolution rejecting all proposals received under RFP No. EVN0019329 for the Development of Landfill Gas Conversion Project for the Department of Solid Waste Management. The project was to design, build, finance, operate and maintain a Renewable Natural Gas (RNG) system at the South Dade Landfill and North Dade Landfill sites. All five proposals were deemed non-responsive by the County Attorney's Office. The rejection allows the County to update and resolicit, likely for the South Dade Landfill site only, as proposals indicated the North Dade Landfill is not viable. The cost to the developer to design and build each facility was estimated to be over $30,000,000. The item was amended at the Policy Council on 7/13/2026, with the amended version in Legislative File No. 261339. The resolution was introduced on 3/23/2026 and is pending BCC assignment. The five vendors who submitted proposals were Apex One Home Inspections Corp., Mobius Fuels, LLC, Nopetro Energy, Sagepoint Energy Landfill Holdco, and Waga Energy, Inc. No public comment sentiment is stated in the document.

Board:
Policy Council
Date:
2026-07-13
Type:
Resolution
Decision:
Rejection of all proposals recommended; item amended at Policy Council on 7/13/2026; pending BCC assignment
Address:
South Dade Landfill: 23707 SW 97th Avenue, Homestead, FL; North Dade Landfill: 21500 NW 47th Avenue, Miami, FL
Applicant:
Miami-Dade County Department of Solid Waste Management; Mayor Daniella Levine Cava; Negotiator Saba Musleh

LANDFILL GAS CONVERSION

Resolution rejecting all proposals received in response to Request for Proposals No. EVN0019329, Development of Landfill Gas Conversion Project, for the Department of Solid Waste Management. The project was to design, build, finance, operate and maintain a Renewable Natural Gas (RNG) system to clean and utilize landfill gas at the South Dade Landfill and North Dade Landfill sites. All proposals were deemed non-responsive by the County Attorney's Office. The rejection allows the County to update the solicitation and resolicit under full and open competition. The new solicitation will likely be issued for the South Dade Landfill site only, as proposals indicated the North Dade Landfill is not viable. The cost to the developer to design and build each facility was estimated to be over $30,000,000. Five proposals were received. The resolution was amended at the Policy Council meeting on 7/13/2026, with the amended version in Legislative File No. 261339. The item was introduced on 3/23/2026. The RFP was issued on July 8, 2025. The closing date for proposals was October 15, 2025. Issues in proposals were submitted to the County Attorney's Office on November 17, 2025. The County Attorney's Office deemed all proposals non-responsive on December 29, 2025. The vendors not recommended for award were Apex One Home Inspections Corp., Mobius Fuels, LLC, Nopetro Energy, Sagepoint Energy Landfill Holdco, and Waga Energy, Inc. The staff recommendation is to approve the rejection. The final action by the Board of County Commissioners is not stated. The agenda date and agenda item number are 8P, with the date not stated. The status is Amended. The requester is Strategic Procurement. The negotiator is Saba Musleh of the Strategic Procurement Department. The Chief Utilities and Regulatory Services Officer is Roy Coley. The Mayor is Daniella Levine Cava. The Board Chair is Anthony Rodriguez. The South Dade Landfill is in District 8, represented by Commissioner Danielle Cohen Higgins. The North Dade Landfill is in District 1, represented by Commissioner Oliver G. Gilbert, III. The impact is countywide. There is no fiscal impact to the County for the rejection. The two percent User Access Program would not have applied. The Small Business Enterprise Selection Factor and Local Preference would have been applicable. The Living Wage Ordinance would not have applied. Public comment sentiment is not stated.

Board:
Policy Council
Date:
2026-07-13
Type:
Resolution
Decision:
Amended; staff recommendation is to approve rejection of all proposals; final Board action not stated
Address:
South Dade Landfill: 23707 SW 97th Avenue, Homestead, FL; North Dade Landfill: 21500 NW 47th Avenue, Miami, FL
Applicant:
Miami-Dade County Department of Solid Waste Management; Strategic Procurement Department

LANDFILL GAS CONVERSION

Resolution rejecting all proposals received in response to RFP No. EVN0019329 for the Development of Landfill Gas Conversion Project for the Department of Solid Waste Management. The project was to design, build, finance, operate and maintain a Renewable Natural Gas (RNG) system at the South Dade Landfill and North Dade Landfill sites. All proposals were deemed non-responsive by the County Attorney's Office. The Board will resolicit under full and open competition, likely for the South Dade Landfill site only, as proposals indicated the North Dade Landfill is not viable. The cost to the developer to design and build each facility was estimated to be over $30,000,000. The resolution was amended at the Policy Council on 7/13/2026, with the amended version in Legislative File No. 261339. The item was introduced on 3/23/2026. The five proposers were Apex One Home Inspections Corp., Mobius Fuels, LLC, Nopetro Energy, Sagepoint Energy Landfill Holdco, and Waga Energy, Inc. There is no fiscal impact to the County for the rejection. The RFP was issued on July 8, 2025, with a closing date of October 15, 2025, and the CAO deemed all proposals non-responsive on December 29, 2025.

Board:
Policy Council
Date:
2026-07-13
Type:
Resolution
Decision:
Amended; recommendation to reject all proposals
Address:
South Dade Landfill: 23707 SW 97th Avenue, Homestead, FL; North Dade Landfill: 21500 NW 47th Avenue, Miami, FL
Applicant:
Miami-Dade County Department of Solid Waste Management (DSWM); Mayor Daniella Levine Cava; Negotiator Saba Musleh

LANDFILL GAS CONVERSION

Resolution rejecting all proposals received in response to RFP No. EVN0019329 for the Development of Landfill Gas Conversion Project for the Department of Solid Waste Management. The project was to design, build, finance, operate and maintain a Renewable Natural Gas (RNG) system at the South Dade Landfill and North Dade Landfill sites. All five proposals were deemed non-responsive by the County Attorney's Office. The rejection allows the County to update the solicitation and resolicit under full and open competition. The new solicitation will likely be for the South Dade Landfill site only, as proposals indicated the North Dade Landfill is not viable. The cost to the developer to design and build each facility was estimated to be over $30,000,000. The item was amended at the Policy Council on 7/13/2026, with the amended version in Legislative File No. 261339. The resolution was introduced on 3/23/2026. The RFP was issued on July 8, 2025. Proposals were received on October 15, 2025. Issues were submitted to the County Attorney's Office on November 17, 2025. The County Attorney deemed all proposals non-responsive on December 29, 2025. The vendors not recommended for award were Apex One Home Inspections Corp., Mobius Fuels, LLC, Nopetro Energy, Sagepoint Energy Landfill Holdco, and Waga Energy, Inc. The Negotiator is Saba Musleh of the Strategic Procurement Department. The Chief Utilities and Regulatory Services Officer is Roy Coley. The Mayor is Daniella Levine Cava. The Board of County Commissioners Chairman is Anthony Rodriguez. The South Dade Landfill is in District 8, represented by Commissioner Danielle Cohen Higgins. The North Dade Landfill is in District 1, represented by Commissioner Oliver G. Gilbert, III. The impact is countywide. There is no fiscal impact to the County for the rejection. The two percent User Access Program would not have applied. The Small Business Enterprise Selection Factor and Local Preference would have been applicable. The Living Wage Ordinance would not have applied. The County will seek feedback from proposers and the market. It is anticipated that at least four proposers would be able to amend their proposals to resubmit. The County will continue to explore what type of project may be feasible for the North Dade Landfill gas.

Board:
Policy Council
Date:
2026-07-13
Type:
Resolution
Decision:
Amended; recommendation to reject all proposals
Address:
South Dade Landfill: 23707 SW 97th Avenue, Homestead, FL; North Dade Landfill: 21500 NW 47th Avenue, Miami, FL
Applicant:
Miami-Dade County Department of Solid Waste Management; Mayor Daniella Levine Cava; Chief Utilities and Regulatory Services Officer Roy Coley; Negotiator Saba Musleh

LANDFILL GAS CONVERSION

Miami-Dade County Board of County Commissioners (BCC) rejected all proposals for the Landfill Gas Conversion Project (RFP No. EVN0019329) for the Department of Solid Waste Management. All five proposals received were deemed non-responsive by the County Attorney's Office. The project aimed to design, build, finance, operate, and maintain a Renewable Natural Gas (RNG) system at the South Dade Landfill and North Dade Landfill. The County plans to resolicit, likely focusing only on the South Dade Landfill site due to viability concerns with the North Dade Landfill. The estimated cost for developers to design and build each facility was over $30,000,000. The County will seek market feedback before issuing a new solicitation. Five vendors submitted proposals: Apex One Home Inspections Corp., Mobius Fuels, LLC, Nopetro Energy, Sagepoint Energy Landfill Holdco, and Waga Energy, Inc.

Board:
Policy Council
Date:
2026-07-13
Type:
Resolution
Decision:
Rejected all proposals
Address:
South Dade Landfill: 23707 SW 97th Avenue, Homestead, FL; North Dade Landfill: 21500 NW 47th Avenue, Miami, FL
Applicant:
Department of Solid Waste Management (DSWM)

LANDFILL GAS CONVERSION

The document is a legislative item for a resolution to reject all proposals received in response to Request for Proposals No. EVN0019329 for the Development of Landfill Gas Conversion Project for the Department of Solid Waste Management. The project was to design, build, finance, operate and maintain a Renewable Natural Gas (RNG) system at the South Dade Landfill and North Dade Landfill sites. All proposals were deemed non-responsive by the County Attorney's Office. The recommendation is to reject all proposals and resolicit under full and open competition, likely for the South Dade Landfill site only, as proposals indicated the North Dade Landfill is not a viable site. The cost to the developer to design and build each facility was estimated to be over $30,000,000. The item was amended at the Policy Council meeting on 7/13/2026, with the amended version in Legislative File No. 261339. The final action by the Board of County Commissioners is not stated. The five vendors who submitted proposals are listed as not recommended for award: Apex One Home Inspections Corp., Mobius Fuels, LLC, Nopetro Energy, Sagepoint Energy Landfill Holdco, and Waga Energy, Inc. Public comment sentiment is not stated.

Board:
Policy Council
Date:
2026-07-13
Type:
Resolution
Decision:
Amended; recommendation to reject all proposals
Address:
South Dade Landfill: 23707 SW 97th Avenue, Homestead, FL; North Dade Landfill: 21500 NW 47th Avenue, Miami, FL
Applicant:
Miami-Dade County Department of Solid Waste Management

LANDFILL GAS CONVERSION

Miami-Dade County Board of County Commissioners is rejecting all proposals for the Landfill Gas Conversion Project, RFP No. EVN0019329, for the Department of Solid Waste Management. All five proposals received were deemed non-responsive by the County Attorney's Office. The county plans to resolicit, likely focusing only on the South Dade Landfill site as the North Dade Landfill was found not viable. The project involves designing, building, financing, operating, and maintaining a Renewable Natural Gas (RNG) system. The estimated cost for developers to design and build each facility was over $30,000,000. The county will seek market feedback before reissuing the solicitation.

Board:
Policy Council
Date:
2026-07-13
Type:
Resolution
Decision:
All proposals rejected
Address:
South Dade Landfill: 23707 SW 97th Avenue, Homestead, FL; North Dade Landfill: 21500 NW 47th Avenue, Miami, FL
Applicant:
Department of Solid Waste Management (DSWM)

LANDFILL GAS CONVERSION

Miami-Dade County Board of County Commissioners rejected all proposals for the Development of Landfill Gas Conversion Project (RFP No. EVN0019329) for the Department of Solid Waste Management. The rejection was due to all submitted proposals being deemed non-responsive by the County Attorney's Office. The County plans to resolicit, likely focusing only on the South Dade Landfill site as the North Dade Landfill was found to be not viable. The estimated cost for developers to design and build each facility was over $30,000,000. The County will seek market feedback before reissuing the solicitation. Five proposals were received by the October 15, 2025 deadline.

Board:
Policy Council
Date:
2026-07-13
Type:
Resolution
Decision:
All proposals rejected
Address:
South Dade Landfill: 23707 SW 97th Avenue, Homestead, FL; North Dade Landfill: 21500 NW 47th Avenue, Miami, FL
Applicant:
Department of Solid Waste Management (DSWM)

LANDFILL GAS CONVERSION

Miami-Dade County Board of County Commissioners rejected all proposals for the Development of Landfill Gas Conversion Project (RFP No. EVN0019329) for the Department of Solid Waste Management. The rejection was due to all submitted proposals being deemed non-responsive by the County Attorney's Office. The County intends to resolicit, likely focusing only on the South Dade Landfill site due to viability concerns with the North Dade Landfill. The project involves designing, building, financing, operating, and maintaining facilities to clean and utilize landfill gas for Renewable Natural Gas (RNG) production or other beneficial uses, with revenue sharing. Estimated development cost per facility was over $30,000,000. The County will seek market feedback before reissuing the solicitation.

Board:
Policy Council
Date:
2026-07-13
Type:
Resolution
Decision:
All proposals rejected
Address:
South Dade Landfill: 23707 SW 97th Avenue, Homestead, FL; North Dade Landfill: 21500 NW 47th Avenue, Miami, FL
Applicant:
Department of Solid Waste Management (DSWM)

LANDFILL GAS CONVERSION

Miami-Dade County Board of County Commissioners is rejecting all proposals for the Landfill Gas Conversion Project. The project aimed to design, build, finance, operate, and maintain Renewable Natural Gas (RNG) systems at the South Dade Landfill and North Dade Landfill. All five proposals received were deemed non-responsive by the County Attorney's Office. The county plans to resolicit, likely focusing only on the South Dade Landfill site as the North Dade Landfill was found not viable. The estimated cost for developers to design and build each facility was over $30,000,000. The county will seek market feedback before reissuing the solicitation. Five vendors submitted proposals: Apex One Home Inspections Corp., Mobius Fuels, LLC, Nopetro Energy, Sagepoint Energy Landfill Holdco, and Waga Energy, Inc.

Board:
Policy Council
Date:
2026-07-13
Type:
Resolution
Decision:
All proposals rejected
Address:
South Dade Landfill: 23707 SW 97th Avenue, Homestead, FL; North Dade Landfill: 21500 NW 47th Avenue, Miami, FL
Applicant:
Department of Solid Waste Management (DSWM)

LANDFILL GAS CONVERSION

Miami-Dade County Board of County Commissioners is rejecting all proposals for the Landfill Gas Conversion Project (RFP No. EVN0019329) for the Department of Solid Waste Management. The reason for rejection is that all five proposals received were deemed non-responsive by the County Attorney's Office. The County plans to resolicit, likely focusing only on the South Dade Landfill site due to viability concerns with the North Dade Landfill. The estimated cost for developers to design and build each facility was over $30,000,000. The County will seek market feedback before reissuing the solicitation. At least four vendors are expected to resubmit.

Board:
Policy Council
Date:
2026-07-13
Type:
Resolution
Decision:
Rejected all proposals
Address:
South Dade Landfill: 23707 SW 97th Avenue, Homestead, FL; North Dade Landfill: 21500 NW 47th Avenue, Miami, FL
Applicant:
Department of Solid Waste Management

LANDFILL GAS CONVERSION

Miami-Dade County Board of County Commissioners rejected all proposals for the Landfill Gas Conversion Project (RFP No. EVN0019329) for the Department of Solid Waste Management. All five proposals received were deemed non-responsive by the County Attorney's Office. The County plans to resolicit, likely focusing only on the South Dade Landfill site due to viability concerns with the North Dade Landfill. The project involves designing, building, financing, operating, and maintaining facilities to convert landfill gas into Renewable Natural Gas (RNG) or Compressed Natural Gas (CNG). The estimated cost for developers to design and build each facility was over $30,000,000. The County will seek market feedback before reissuing the solicitation.

Board:
Policy Council
Date:
2026-07-13
Type:
Resolution
Decision:
All proposals rejected
Address:
South Dade Landfill: 23707 SW 97th Avenue, Homestead, FL; North Dade Landfill: 21500 NW 47th Avenue, Miami, FL
Applicant:
Department of Solid Waste Management (DSWM)

LANDFILL GAS CONVERSION

Miami-Dade County Board of County Commissioners (BCC) rejected all proposals for the Landfill Gas Conversion Project, identified by RFP No. EVN0019329. The project aimed to design, build, finance, operate, and maintain a Renewable Natural Gas (RNG) system at the South Dade Landfill (23707 SW 97th Avenue, Homestead, FL) and North Dade Landfill (21500 NW 47th Avenue, Miami, FL). All five proposals received were deemed non-responsive by the County Attorney’s Office. The County plans to resolicit, likely focusing only on the South Dade Landfill site due to viability concerns at North Dade. The estimated cost for developers to design and build each facility was over $30,000,000. The County will seek market feedback before reissuing the solicitation, anticipating at least four proposers will resubmit.

Board:
Policy Council
Date:
2026-07-13
Type:
Resolution
Decision:
All proposals rejected
Address:
South Dade Landfill: 23707 SW 97th Avenue, Homestead, FL; North Dade Landfill: 21500 NW 47th Avenue, Miami, FL
Applicant:
Strategic Procurement (Requester), Department of Solid Waste Management (Department)

LANDFILL GAS CONVERSION

Miami-Dade County Board of County Commissioners (BCC) rejected all proposals for the Landfill Gas Conversion Project, identified by RFP No. EVN0019329. The rejection was due to all submitted proposals being deemed non-responsive by the County Attorney's Office (CAO). The project aimed to design, build, finance, operate, and maintain a Renewable Natural Gas (RNG) system at the South Dade Landfill (23707 SW 97th Avenue, Homestead, FL) and North Dade Landfill (21500 NW 47th Avenue, Miami, FL). The estimated cost for developers to design and build each facility was over $30,000,000. The county plans to resolicit, likely focusing only on the South Dade Landfill due to viability concerns with the North Dade Landfill. The county will seek market feedback before reissuing the solicitation. Five proposals were received by the October 15, 2025 deadline. The Policy Council amended and forwarded the resolution to the BCC on July 13, 2026. The BCC agenda date was September 1, 2026.

Board:
Policy Council
Date:
2026-07-13
Type:
Resolution
Decision:
All proposals rejected
Address:
23707 SW 97th Avenue, Homestead, FL (South Dade Landfill) and 21500 NW 47th Avenue, Miami, FL (North Dade Landfill)
Applicant:
Strategic Procurement (Requester), Department of Solid Waste Management (Department)

LANDFILL GAS CONVERSION

The Miami-Dade Board of County Commissioners is considering a resolution to reject all proposals received in response to Request for Proposals (RFP) No. EVN0019329 for the Development of Landfill Gas Conversion Project for the Department of Solid Waste Management. The project was to design, build, finance, operate and maintain a Renewable Natural Gas (RNG) system at the South Dade Landfill and North Dade Landfill sites. All five proposals received were deemed non-responsive by the County Attorney's Office. The resolution was introduced on 3/23/2026, amended by the Policy Council on 7/13/2026, and the amended version is in Legislative File No. 261339. The staff recommendation is to approve the rejection and resolicit, likely for the South Dade Landfill site only, as proposals indicated the North Dade Landfill is not viable. The estimated cost to the developer to design and build each facility was over $30,000,000. The five vendors who submitted proposals were Apex One Home Inspections Corp., Mobius Fuels, LLC, Nopetro Energy, Sagepoint Energy Landfill Holdco, and Waga Energy, Inc. The South Dade Landfill is located at 23707 SW 97th Avenue, Homestead, FL. The North Dade Landfill is located at 21500 NW 47th Avenue, Miami, FL. The RFP was issued on July 8, 2025, the closing date was October 15, 2025, and the County Attorney deemed all proposals non-responsive on December 29, 2025. The resolution has no fiscal impact to the County for the rejection.

Board:
Policy Council
Date:
2026-07-13
Type:
Resolution
Decision:
Resolution to reject all proposals; status is Amended; staff recommendation is to approve the rejection; final action by the Board of County Commissioners is not stated
Address:
South Dade Landfill: 23707 SW 97th Avenue, Homestead, FL; North Dade Landfill: 21500 NW 47th Avenue, Miami, FL
Applicant:
Miami-Dade County Department of Solid Waste Management (DSWM); Mayor Daniella Levine Cava; Negotiator Saba Musleh

LANDFILL GAS CONVERSION

Miami-Dade County Board of County Commissioners (BCC) rejected all proposals for the Landfill Gas Conversion Project. The project aimed to design, build, finance, operate, and maintain a Renewable Natural Gas (RNG) system at the South Dade Landfill and North Dade Landfill. All five proposals received were deemed non-responsive by the County Attorney's Office. The County plans to resolicit, likely focusing only on the South Dade Landfill site due to viability concerns with the North Dade Landfill. The estimated cost for developers to design and build each facility was over $30,000,000. The BCC amended the resolution and forwarded it for final action. Public comment is not stated.

Board:
Policy Council
Date:
2026-07-13
Type:
Resolution
Decision:
All proposals rejected
Address:
South Dade Landfill: 23707 SW 97th Avenue, Homestead, FL; North Dade Landfill: 21500 NW 47th Avenue, Miami, FL
Applicant:
Strategic Procurement (Requester), Department of Solid Waste Management (DSWM)

LANDFILL GAS CONVERSION

Miami-Dade County Board of County Commissioners rejected all proposals for the Development of Landfill Gas Conversion Project (RFP No. EVN0019329) for the Department of Solid Waste Management. The rejection was due to all submitted proposals being deemed non-responsive by the County Attorney's Office. The County intends to resolicit, likely focusing only on the South Dade Landfill site due to viability concerns with the North Dade Landfill. The project involves designing, building, financing, operating, and maintaining facilities to clean and utilize landfill gas for Renewable Natural Gas (RNG) production or other beneficial uses, with revenue sharing. The estimated cost for developers to design and build each facility was over $30,000,000. The County plans to seek market feedback before reissuing the solicitation.

Board:
Policy Council
Date:
2026-07-13
Type:
Resolution
Decision:
All proposals rejected
Address:
South Dade Landfill: 23707 SW 97th Avenue, Homestead, FL; North Dade Landfill: 21500 NW 47th Avenue, Miami, FL
Applicant:
Department of Solid Waste Management (DSWM)

LANDFILL GAS CONVERSION

Resolution rejecting all proposals received in response to RFP No. EVN0019329 for the Development of Landfill Gas Conversion Project for the Department of Solid Waste Management. The project would have involved designing, building, financing, operating, and maintaining a Renewable Natural Gas (RNG) system at the South Dade Landfill and North Dade Landfill sites. All proposals were deemed non-responsive by the County Attorney's Office. The rejection allows the County to update the solicitation and resolicit under full and open competition. The new solicitation will likely be for the South Dade Landfill site only, as proposals indicated the North Dade Landfill is not viable. The cost to the developer to design and build each facility was estimated to be over $30,000,000. Five proposals were received. The vendors not recommended for award were Apex One Home Inspections Corp., Mobius Fuels, LLC, Nopetro Energy, Sagepoint Energy Landfill Holdco, and Waga Energy, Inc. The item was amended at the Policy Council on 7/13/2026, with the amended version in Legislative File No. 261339. The status is Amended and pending BCC assignment. The resolution was introduced on 3/23/2026. The agenda date and final action are not stated. The RFP was issued on July 8, 2025. The closing date for proposals was October 15, 2025. Issues were submitted to the County Attorney's Office on November 17, 2025. The County Attorney deemed all proposals non-responsive on December 29, 2025. The Board directive to issue the RFP was at the July 1, 2025 meeting. The staff recommendation is to approve the rejection. The final decision by the Board is not stated. The impact is countywide. The South Dade Landfill is in District 8, represented by Commissioner Danielle Cohen Higgins. The North Dade Landfill is in District 1, represented by Commissioner Oliver G. Gilbert, III. There is no fiscal impact to the County for the rejection. The Negotiator is Saba Musleh of the Strategic Procurement Department. The County will seek feedback from proposers and the market before issuing the new solicitation. It is anticipated that at least four proposers would be able to amend their proposals to resubmit. The County will continue to explore feasible projects for the North Dade Landfill gas. No public comment or stakeholder sentiment is stated in the document.

Board:
Policy Council
Date:
2026-07-13
Type:
Resolution
Decision:
Amended; pending BCC assignment; staff recommendation is to approve rejection of all proposals; final Board decision not stated
Address:
South Dade Landfill: 23707 SW 97th Avenue, Homestead, FL; North Dade Landfill: 21500 NW 47th Avenue, Miami, FL
Applicant:
Miami-Dade County Department of Solid Waste Management; Mayor Daniella Levine Cava; Strategic Procurement Department

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.

Comienza tu prueba gratis