Browse Pasco County civic records
Every published record for Pasco County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.
3,317 records
27. D
This item concerns a proposed credit for right-of-way dedication for Bulloch Boulevard. The developer would receive credits against mobility fees for dedicating 1.33 acres of right-of-way. This credit is valued at $449,660 per acre, totaling $598,047.98. This matter is currently under review by the Planning Commission. If approved, this could lead to future development projects requiring site clearing, grading, utility work, paving, and construction. Contractors, suppliers, and service providers should consider reaching out to understand potential future needs as this project moves through the review process.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
- Address:
- Bulloch Boulevard
28. To t
This item concerns a development project that has been submitted for review. The applicant or owner has agreed to conditions related to potential monetary or property exactions, acknowledging their connection to the project's impacts. This agreement is part of the approval process for a new development. The project is currently under review by the Planning Commission. The next steps would involve detailed site plans, construction specifications, and permitting, which will set in motion work such as site clearing, grading, utility installation, and building construction. Contractors, suppliers, and service providers should consider reaching out early to understand the project's scope and potential needs before formal bidding begins.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
29. Approval of the LOL 52-41 MPUD satisfies the County’s collector and arterial design and
This item concerns the potential approval of the LOL 52-41 MPUD, which is planned to satisfy county standards for collector and arterial roads. The proposal is currently under review by the Planning Commission. If approved, this project could lead to future development requiring site preparation, grading, and potentially utility work. It may also involve road construction and paving. Local contractors, suppliers, and service providers are encouraged to monitor this item's progress. Early engagement before final site plans, bids, and permits are issued could provide a competitive advantage for securing future work related to this development.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
3. If during construction activities any evidence of the presence of State or Federally
This item concerns construction activities where evidence of protected plant or animal species might be discovered. If found during construction, Pasco County and other agencies must be notified within two working days. Work in the affected area must stop until permits are secured and written authorization is given by agencies, or if state and federal guidelines are met. This is a planned item under review by the Planning Commission. The project scope involves site work and construction where environmental monitoring and permitting will be critical. Contractors, suppliers, and service providers involved in site preparation, environmental consulting, and construction trades should monitor this item. Early engagement could be beneficial as plans and permits are developed.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
3. NO INSTRUMENTS OF RECORD REFLECTING EASEMENTS, RIGHTS-OF-WAY, AND/OR OWNERSHIP WERE
Planning Commission listed this item on its agenda for 2026-04-16 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
3. PDE26-7892: School Impact Analysis
Planning Commission listed this item on its agenda for 2026-04-16 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
3. Pasco Sheriff’s Office (PSO): The PSO did not provide any comments regarding the proposed
Planning Commission listed this item on its agenda for 2026-04-16 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
3. RIGHTS OR CLAIMS OF PARTIES IN POSSESSION.
Planning Commission listed this item on its agenda for 2026-04-16 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
3. This proposal includes the standard Live Local provision in condition number 52.
Planning Commission listed this item on its agenda for 2026-04-16 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
30. P
A project is planned that requires the design, permitting, and construction of Bulloch Boulevard. This road is a key component of the MPUD Master Plan. The work must be completed before the first residential building can receive its certificate of occupancy. If not built as depicted, Bulloch Boulevard will be constructed as needed to support future development within the project area. This project will likely involve site clearing and grading, underground utility work, and road paving. Contractors, suppliers, and service providers interested in this work should reach out early. Engaging before final site plans, bids, and permits are settled offers an advantage in securing future opportunities.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
31. If, during construction activities, any evidence of historic resources including, but not
This item concerns a requirement for construction projects in Pasco County. If historic resources like pottery, stone tools, or building foundations are found during construction, work must stop immediately. The Florida Department of Historic Resources and Pasco County must be notified within two working days. This requirement is currently under review as part of the planning commission's agenda. The scope of work involves site preparation, construction, and potential discovery and reporting of historic artifacts. This early stage means contractors, suppliers, and service providers can engage to understand potential project needs and timelines. Reaching out now allows businesses to be considered before final plans and permits are set.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
32. If the adjacent property to the west and east has an approved PDP/PSP or is built -out,
This item concerns a planned development known as LOL 52-41 MPUD. The developer must coordinate with adjacent property owners and their engineers or surveyors. This coordination is required before approval of the development's plans. The goal is to identify and locate any necessary connecting roads. These connecting roads are separate from the main collector or arterial roads shown on the master plan. The developer must show specific details for these connecting roads on all future plans. These details include location, right-of-way width, cross-section, elevation, grade, and geometry. This work will involve site planning, engineering, and surveying. Contractors and suppliers involved in road construction, site preparation, and civil engineering could be involved. Early engagement may provide an advantage as plans are developed.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
33. The developers shall comply with the County and Pasco County Public Transportation
This item concerns requirements for accommodating mass transit service within a planned development. Developers must create a detailed plan for bus routes, bus stops, benches, shelters, lighting, walkways, and landscaping. This plan needs approval from Pasco County Public Transportation before the preliminary development plan or site plan for the first unit or phase is approved. The transit accommodations must be built with other infrastructure improvements for each phase, unless a different construction schedule is approved. This review process is currently underway, indicating an early stage for potential contractors. The project will involve site preparation, construction of transit facilities like shelters and walkways, and landscaping. Local contractors, suppliers, and service providers in site prep, grading, concrete, electrical, plumbing, HVAC, painting, flooring, roofing, and landscaping could find opportunities. Reaching out early, before final plans and permits are set, offers a chance to compete for this work.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
34. The developer(s) may submit an overall pedestrian/bike path plan to the PDD for approval
A pedestrian and bike path plan is under review for a development project. This plan must show how paths will circulate within the development and meet Pasco County Land Development Code requirements. A sidewalk along the project's frontage on SR 52 will be required to be 8 feet wide. This item is currently under review by the Planning Commission. The project will likely involve site clearing, grading, and the installation of pathways and sidewalks. Future phases may include underground utilities and paving. Contractors specializing in site preparation, grading, concrete work, paving, and landscaping may find opportunities as this project moves forward. Early engagement could be beneficial before final site plans and permits are established.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
- Address:
- SR 52
35. All sidewalks, bike paths, multi-use trails, and other non-vehicular pathways within the LOL
A review is underway regarding maintenance responsibilities for non-vehicular pathways within the LOL 52-41 MPUD in Pasco County. The proposal states that most sidewalks, bike paths, and multi-use trails within this area will not be maintained by the County. However, pathways along Bulloch Boulevard are an exception and will be maintained by the County after a defect guarantee period ends. This review is currently under consideration by the Planning Commission. The project involves defining future maintenance obligations for public pathways, which could lead to work related to site preparation, grading, and potentially landscaping for these specific areas. Local contractors, suppliers, and service providers in site preparation, grading, and landscaping may find opportunities as these maintenance responsibilities are clarified. Engaging early before final decisions are made could provide an advantage in understanding future needs.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
- Address:
- LOL 52-41 MPUD
36. A M
A Master Utility Plan is planned for review by the Utilities Services Branch in Pasco County. This plan will cover the entire development and must be submitted before or at the same time as the first construction plan. The plan will detail the necessary utility infrastructure for the development. This early stage means that contractors, suppliers, and service providers can engage now to understand the upcoming needs. The project will likely involve site clearing and grading, underground utility work, and potentially paving. Businesses specializing in utility infrastructure, site preparation, and construction materials could find opportunities by connecting with the project stakeholders early. Early engagement allows businesses to prepare bids and secure their role as plans are finalized.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
37. P
This item concerns a planned Utilities Service Agreement between the developer and Pasco County. This agreement must be finalized before any construction plans or site plans can be approved. The agreement will cover utility services for a future development. The scope of work will likely involve the installation and connection of water, sewer, and possibly stormwater management systems. This early stage in the process means that contractors, suppliers, and service providers can engage with the developer and the county to understand the project's needs. Early involvement can provide an advantage in securing future work related to utility infrastructure and related construction trades.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
38. The developer(s) shall construct all water and wastewater facilities within the development
Pasco County's Planning Commission is reviewing plans that require developers to build all water and wastewater systems within a new development to meet current county standards. Detailed instructions for these requirements are available from the Utilities Services Branch. This project is currently under review, indicating an early stage in the development process. The work will involve the installation of underground utilities, including water mains and sewer lines, and potentially connections to existing infrastructure. This scope of work will likely require site preparation, trenching, pipe laying, and system testing. Local contractors, utility suppliers, and service providers should reach out to the Utilities Services Branch to understand the specific requirements and potential opportunities as the project moves forward. Early engagement can provide a competitive advantage before bid processes begin.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
39. In consideration of Pasco County's agreement to provide potable water and/or reclaimed
This item concerns a proposed agreement for Pasco County to provide potable and reclaimed water to a subject property. The developer(s)/owner(s) and their successors would agree to terms related to this water service. The Planning Commission is considering this agreement. This early stage means that potential contractors, suppliers, and service providers can engage with the developer(s)/owner(s) to understand future needs. As the project moves forward, there will be opportunities for site preparation, utility connections, and potentially construction related to water infrastructure. Businesses involved in water systems, site development, and general contracting should consider reaching out now to be part of the planning process before bids and permits are finalized.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
4. CONSTRUCTION, MECHANIC'S, CONTRACTORS, OR MATERIALMEN'S LIEN CLAIMS, IF ANY, WHERE NO
Planning Commission listed this item on its agenda for 2026-04-16 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta