Skip to main content

Sé el Primero, Construye Relaciones Duraderas

32. If the adjacent property to the west and east has an approved PDP/PSP or is built -out,

Planning Commission · 2026-04-16 · agenda_item

This item concerns a planned development known as LOL 52-41 MPUD. The developer must coordinate with adjacent property owners and their engineers or surveyors. This coordination is required before approval of the development's plans. The goal is to identify and locate any necessary connecting roads. These connecting roads are separate from the main collector or arterial roads shown on the master plan. The developer must show specific details for these connecting roads on all future plans. These details include location, right-of-way width, cross-section, elevation, grade, and geometry. This work will involve site planning, engineering, and surveying. Contractors and suppliers involved in road construction, site preparation, and civil engineering could be involved. Early engagement may provide an advantage as plans are developed.

Industries that could win this work

  • Engineering & Architecture
  • Professional Services (Other)
  • Site Prep, Grading & Hardscape
  • Construction (Other)
  • Building & Industrial Supply
  • Real Estate Development

Follow this across meetings

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta