Skip to main content

Sé el Primero, Construye Relaciones Duraderas

2. A vegetated and functional littoral zone shall be established as part of the Flow Way

Planning & Zoning Commission Meeting · 2026-07-16 · agenda_item

A proposed revision to the Flow Way System is currently under review by the Planning & Zoning Commission. This project involves establishing a vegetated and functional littoral zone along the shoreline, with specific requirements for area, width, and depth. A native upland vegetative buffer is also required around the system. The current plans do not meet these standards and need revision. This review process indicates that site plans, permitting, and construction documents are still in development. Work could involve site preparation, grading, planting native vegetation, and establishing water management features. Contractors specializing in site preparation, grading, landscaping, and environmental services may find opportunities as the project moves forward. Early engagement could be beneficial before final plans and bids are established.

littoral zone per linear foot of shoreline
20 sq. ft.
minimum percentage of total shoreline buffered by littoral zone habitat
50 %
minimum width of littoral zone habitat
20 feet
minimum percentage of shoreline designed as wide littoral zone habitat
25 %
minimum width of wide littoral zone habitat
60 feet
average water depth over littoral shelf
2 to 18 inches
water depth in shallow depressions
2 to 6 inches
edge habitat per linear foot of shoreline
20 sq. ft.
minimum width of upland habitat buffer
20 feet

Industries that could win this work

  • Site Prep, Grading & Hardscape
  • Landscaping & Lawn Service
  • Engineering & Architecture

Follow this across meetings

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta