July 6, 2026 Planning and Zoning Special Master Meeting Agenda
Planning and Zoning Special Master · 2026-07-06 · agenda
This document is an agenda for the Sumter County Planning and Zoning Special Master meeting on July 6, 2026, at 5:00 PM. It includes minutes for approval from June 15, 2026, and a case file for STU26-000031 Matos. The agenda also lists documents related to the Matos case, including staff reports, applications, public input, proof of publication, and an approval letter. The meeting will adjourn after these items. Contact information for administrative services is provided.
Agenda items
- 1. The Special Use Permit is issued Gulfstream Towers for a one hundred ninety-nine-foot
- General Contractor
- Concrete & Masonry
- Electrical
- Lighting & Low-Voltage Systems
- Engineering & Architecture
- Building & Industrial Supply
- Waste Management
- Government Authority
- 1. This minor special use permit is issued to Samuel David Garcia Matos. The permit allows
- Site Prep, Grading & Hardscape
- Landscaping & Lawn Service
- Building & Industrial Supply
- 1. This minor special use permit is issued to Samuel David Garcia Matos. The permit allows
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- 2. Any development of the approved use will follow the site and building permitting
- 2. Any development of the approved use will follow the site and building permitting process.
- 2. The tower and associated site improvements shall be developed in accordance with the site
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Construction (Other)
- Engineering & Architecture
- 3. The tower lease area development must meet Land Development Code requirements of
- Site Prep, Grading & Hardscape
- Security & Fire Systems Installation
- General Contractor
- 4. Tent site rentals shall be limited to (5) consecutive days within any sixty (60) day period.
- 4. Tent site rentals shall be limited to (5) consecutive days within any sixty (60) day period.
- 4. This special use permit shall expire in two (2) years if a site development permit application
- 5. Occupation of the tent site shall not include occupation of recreation vehicles , as defined
- 5. Occupation of the tent site shall not include occupation of recreation vehicles, as defined
- 5. This special use permit is contingent upon the tower owner/operator maintaining all required
- Site Prep, Grading & Hardscape
- Construction (Other)
- Landscaping & Lawn Service
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 6. Sewage disposal systems shall be approved by Sumter County Department of Health
- 6. Sewage disposal systems shall be approved by Sumter County Department of Health
- 7. County personnel shall be allowed to access the site during operating hours to perform
- 7. County personnel shall be allowed to access the site during operating hours to perform
- 8. Suspension, expiration, or revocation of any other Sumter County permit shall result in
- 8. Suspension, expiration, or revocation of any other Sumter County permit shall result in the
- 9. This special use permit may be suspended or revoked by the Board of County
- Site Prep, Grading & Hardscape
- Legal Services
- Engineering & Architecture
- 9. This special use permit may be suspended or revoked by the Board of County
- FLAG SALUTE
- MEETING IS CALLED TO ORDER BY SPECIAL MASTER
- a. The use must be in harmony with the purpose and intent of this chapter.
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Plumbing
- Electrical
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- a. The use must not be detrimental to the neighborhood environment or unduly infringe on
- b. A vehicular parking or traffic problem must not be created, and the vehicular average
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- Real Estate Development
- b. The use must be compatible with surrounding existing and anticipated uses.
- c. Screening and buffering sufficient to minimize interference with the enjoyment of
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- c. The use must not adversely affect the public interest. Adequate traffic circulation,
- d. The site must be suitable for the proposed use, considering flood hazard, drainage, soils,
- e. The development of the use shall have no more than a minimal adverse effect on the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Engineering & Architecture
- Business Consulting
- Government Authority
- f. Proposed improvements and the level of cooperation by the developer shall be
- General Contractor
- Real Estate Development
- Engineering & Architecture
- Building & Industrial Supply
- g. Unless specifically provided otherwise, the use shall comply with this code.
- h. The rights of the applicant are balanced with the impact of the proposed changes on the
Follow this across meetings
Applicants and firms
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta