PRC Agenda Packet
Project Review Committee · 2026-05-12 · agenda_packet
[100 N Main Street, Wildwood, FL 34785 (Commission Conference Room 124)] Project Review Committee agenda for May 12, 2026, including four new business items: Northern Pine Subdivision Improvement Plat (117 single-family lots on 24 acres), conversion of an 8,288 SF commercial building to a laundromat, a minor modification for a 1,222 SF commercial building, and a master plan for 2,000 dwelling units on 641.30 acres. Staff recommends approval for all items, contingent on resolution of outstanding comments for the Northern Pine Subdivision. [Generally located approximately 0.38 miles west of the N US 301 and CR 222 intersection, south along CR 222.; case 25-3061 (PLAT)] Northern Pine Subdivision Improvement Plat seeking a favorable recommendation for an improvement plan with 117 single-family lots and associated infrastructure, including a 6" force main along CR 222, on 24 acres. Amenities include a tot lot, dog park, and pickleball court. Staff recommends approval contingent on resolution of outstanding comments from the city attorney, utility department, and city engineer. A Tree Variance for 41 heritage trees was approved separately. [Northeast corner of the intersection of N Old Wire Rd and Missouri Ave.; case 25-4838 SPM] The Wash Saloon project seeks approval for the conversion of an existing 8,288 SF commercial building to a laundromat with infrastructure improvements on 0.59 acres. A technical waiver was approved to reduce required parking from 33 to 9 spaces. Staff recommends approval. [Southeast corner of the intersection of N Main Street and Maddox Street.; case 26-0689 (SP)] 708 N Main Modification project seeks a favorable recommendation for a minor modification to a previously approved site plan for a 1,222 square foot commercial building. The modification includes relocating the utility connection from US HWY 301 to Maddox Street and using two 3/4" meters for water service and irrigation instead of a 2" meter. Staff recommends approval, pending resolution of a City Attorney comment regarding an Illicit Discharge and Connection Stormwater Affidavit. [Approximately 5 miles west of Florida's Turnpike and approximately 4.21 miles east of SR 471, off the Bexley Trl and Landstone Blvd roundabout.; case 26-1168 (SP)] VOSO Phase 31YZ Master Plan seeks a favorable recommendation for a master plan consisting of residential areas (not to exceed 2,000 dwelling units) and non-residential areas on 641.30 acres. Staff recommends approval.
Agenda items
- 1. 25-3061 (PLAT) Northern Pine Subdivision Improvement Plat
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Plumbing
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Drywall & Insulation
- Roofing
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. 25-3061 (PLAT) Northern Pine Subdivision Improvement Plat
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Plumbing
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. LDR 4.4(D)(10) – Please provide an Illicit Discharge and Connection Stormwater Affidavit.
- 1. Please confirm the City of Wildwood has agreed in writing to accept the following from the developer
- 1. Please provide a 6-inch stub out with valve and cap from PT11 outside the limits of the road for the City of
- General Contractor
- Plumbing
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Building & Industrial Supply
- Engineering & Architecture
- 1. Project Review Committee Regular Meeting April 14, 2026, at 10:00 AM.
- 1. Project Review Committee Regular Meeting April 14, 2026, at 10:00 AM.
- 1. The connection to the existing force main is to be a wet tap with a stainless-steel sleeve and gate valve as
- 2. 25-4838 SPM - The Wash Saloon
- General Contractor
- Plumbing
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- 2. 25-4838 SPM - The Wash Saloon
- General Contractor
- Plumbing
- Electrical
- HVAC & Climate Control
- Building & Industrial Supply
- Engineering & Architecture
- 2. City Attorney reserves the right to make further comments upon resubmittal.
- 2. LDR 5.5(D)(13) – Please provide a surety for performance bond for lift station and roadways, if roadways
- 2. Please provide confirmation that the ARV is being installed at the highest point on the force main.
- 3. 26-0689 (SP) 708 N Main Modification
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Building & Industrial Supply
- Engineering & Architecture
- 3. 26-0689 (SP) 708 N Main Modification
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Building & Industrial Supply
- Engineering & Architecture
- 3. City Attorney reserves the right to make further comments upon resubmittal.
- 4. 26-1168 (SP) VOSO Phase 31YZ Master Plan
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 4. 26-1168 (SP) VOSO Phase 31YZ Master Plan
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- A. RESPONSE: Acknowledged.
- A. RESPONSE: Please see attached.
- A. Response: Acknowledged.
- A. Response: The City of Wildwood has not yet agreed in writing to accept the roadways from the
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- A. Response: This should be a standing comment. Surety for performance bond shall be provided
- I. Acknowledged, comment remains until confirmation received from the City of
- I. Partially Satisfied; Please change the Registered Property Owner to
- I. Standing Comment.
- I. Standing comment.
- I. Standing comment.
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- III. APPROVAL OF SUMMARY MINUTES
- III. APPROVAL OF SUMMARY MINUTES
Follow this across meetings
Applicants and firms
Locations
- 100 N Main Street, Wildwood, FL 34785 (Commission Conference Room 124)
- Generally located approximately 0.38 miles west of the N US 301 and CR 222 intersection, south along CR 222.
- Northeast corner of the intersection of N Old Wire Rd and Missouri Ave.
- Southeast corner of the intersection of N Main Street and Maddox Street.
- Approximately 5 miles west of Florida's Turnpike and approximately 4.21 miles east of SR 471, off the Bexley Trl and Landstone Blvd roundabout.
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta