PRC Agenda
Project Review Committee · 2026-06-09 · agenda
The Project Review Committee meeting on June 9, 2026, will consider two new business items. The first is for Indian Oaks Self Storage (Case Number 25-3741-SP) on Parcel K09A020, proposing a 120,000 SF self-storage facility with infrastructure improvements. The applicant requests two technical waivers: reducing parking from 51 to 15 spaces and substituting canopy trees with understory trees due to a transmission line easement. Staff recommends approval. The second item is for Preston Place Commercial Site (Case Number 25-1500) on Parcel D17M002, proposing a 5,200 SF medical office with infrastructure improvements on 1.10 acres MOL. Staff also recommends approval for this project.
Agenda items
- 1) ALL DIMENSIONS MEASURED TO THE EDGE OF PAVEMENT.
- 1) WATER AND IRRIGATION METERS WILL BE CONSTRUCTED
- Utilities (Sub)
- Plumbing
- Site Prep, Grading & Hardscape
- 1. 25-3061 (PLAT) Northern Pines Subdivision Improvement Plat
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. 25-3741- SP - Indian Oaks Self Storage
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Electrical
- Plumbing
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 1. 25-3741- SP - Indian Oaks Self Storage
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. ALL EXISTING UTILITIES, INCLUDING
- 1. ALL GRADES ARE TO THE EDGE OF PAVEMENT UNLESS OTHERWISE
- 1. Briefly describe your waiver request.
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. Project Review Committee Regular Meeting April 14, 2026, at 10:00 AM.
- 1. Project Review Committee Regular Meeting May 12, 2026, at 10:00 AM.
- 1. Project Review Committee Regular Meeting May 12, 2026, at 10:00 AM.
- 1. REPRODUCTION OF THESE PLANS IS NOT VALID UNLESS SIGNED BY
- 2) ALL RADIUS IS 5 FEET, UNLESS OTHERWISE NOTED.
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Plumbing
- Lighting & Low-Voltage Systems
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 2) WATER IS PRIVATE UP UNTIL THE METER. SEWER IS PRIVATE
- 2. 25-1500 Preston Place Commercial Site
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Drywall & Insulation
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- 2. 25-1500 Preston Place Commercial Site
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- 2. 25-4838 SPM - The Wash Saloon
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- Engineering & Architecture
- Legal Services
- 2. ALL SIDEWALK CONSTRUCTION SHALL HAVE A MAXIMUM CROSS SLOPE OF
- 2. COPIES OF THESE PLANS AS DESIGNED BY THE PROFESSIONAL
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- 2. Please cite the subsection of the Land Development Regulations of which you
- 2. REFER TO THE TOPOGRAPHIC SURVEY FOR
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Construction (Other)
- Building & Industrial Supply
- Waste Management
- Engineering & Architecture
- 3) NO TREE SHALL BE PLANTED IN A LOCATION WHERE THE
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- 3. 26-0689 (SP) 708 N Main Modification
- Engineering & Architecture
- Government Authority
- 3. Please provide the justification for your waiver request.
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- 3. UNLESS SPECIFICALLY NOTED STORM PIPE MATERIALS SHALL BE A-2000
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Building & Industrial Supply
- 4. 26-1168 (SP) VOSO Phase 31YZ Master Plan
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Government Authority
- 4. ALL FINAL STORM DRAIN MATERIALS SHALL BE APPROVED BY THE ENGINEER
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- 5. ALL DISTURBED AREAS IN THE RIGHT-OF-WAY TO BE SODDED WITH BAHIA
- Site Prep, Grading & Hardscape
- Landscaping & Lawn Service
- 6. ROOF DRAIN CONNECTION SERVICE PIPES TO MAINTAIN 1.00% MINIMUM
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Plumbing
- Concrete & Masonry
- Engineering & Architecture
- III. APPROVAL OF SUMMARY MINUTES
- III. APPROVAL OF SUMMARY MINUTES
- III. APPROVAL OF SUMMARY MINUTES
- LLC. FOR BEARINGS & DISTANCES, MONUMENTATION,
Follow this across meetings
Applicants and firms
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta