Agenda Packet
Technical Review Committee · 2026-07-09 · agenda_packet
[700 Airport Rd (2440 Jamestown Rd); case TRC-2026-0003] Technical Review Committee (TRC) approved the formal site plan review for an aircraft hangar. The project was previously continued from the June 11, 2026 meeting. The approval is contingent upon the City Commission's approval of the lease agreement. [309 S. 3rd Street; case TRC-2026-0004] Technical Review Committee (TRC) approved the formal site plan review for the construction of a duplex and one single-family home. The project was previously continued from the June 11, 2026 meeting. [1750 S. 14th Street; case TRC 2025-0010] Technical Review Committee (TRC) approved the formal site plan review for a commercial flex space. This case was continued from the June 25, 2026 meeting to July 9, 2026. The approval is subject to a letter modification filing with the St. Johns River Water Management District. [3220 Amelia Road, Unit 3] First-Step Review for a personal training facility. [1740 South 14th Street; case TRC 2025-0010] Site plan review for a proposed development of six flex space units, each approximately 1,250 sq. ft., totaling 7,500 sq. ft. The project is located in an area zoned C-1 (Community Commercial). The applicant is Tom Miller, representing 1750 South 14th Street Partners LLC. The case number is TRC 2025-0010. The Technical Review Committee (TRC) has addressed all comments, and the project is approved for a Local Development Order (LDO) sign-off. Key dates include the submittal on June 23rd, 2026, and the TRC meeting for sign-off on July 9th, 2026. The Planning Department approved on June 15th, 2026, Building Department on June 9th, 2026, Utilities and Stormwater Department on June 30th, 2026, Public Works Department on June 30th, 2026, Code Enforcement Department on June 10th, 2026, and Fire Department on June 26th, 2026. The project involves retaining 38 existing trees and planting 6 new native shade trees, meeting landscaping requirements. It also includes a Buffer Type C on the eastern side. Utilities comments noted a need for a letter modification with SJRWMD regarding impervious area calculations and verification of an existing 6-inch service line. Pedestrian circulation, dumpster enclosure, and bike racks were also addressed. The project is within the maximum impervious coverage of 60% at 37% proposed, with a variance to 53.1%. [109 Readdick Avenue, Kingsland, GA 31548; case 88790] This document contains construction details and specifications for various utility infrastructure components, including thrust blocks, pipe restraints, locating wire systems, valve boxes, manholes, and related appurtenances. It specifies materials, dimensions, installation methods, and testing requirements for water, sewer, and reclaimed water systems. Specific details are provided for thrust block sizing based on pipe diameter and bend angles, mechanical restraint details for PVC pipe joints, locating wire installation for water mains and services, valve box and sewer valve installations, and manhole connections. The document also includes details for concrete pads, bollards, gates, and dumpster enclosures. No specific project or development application is detailed, but rather general construction standards.
Follow this across meetings
Applicants and firms
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.
Comienza tu prueba gratis