Skip to main content

Sé el Primero, Construye Relaciones Duraderas

BOA 260616 Agenda

Board of Adjustment · 2026-06-16 · agenda

[123 S 30th Ave Lot 3; 123 S 30th Ave Lot 4; 1526 N 7th St; 816 N 15th Ave; case BOA#26-100034; BOA#26-100035; BOA#26-100036; BOA#26-100037] Project A: Construction of a new single-family home at 123 S 30th Ave, Lot 3, requiring variances for front yard setback (20 ft in lieu of 25 ft), side yard setback (5 ft in lieu of 10 ft), rear yard setback (25 ft in lieu of 30 ft), and lot coverage (39% in lieu of 35%). Project B: Construction of a new single-family home at 123 S 30th Ave, Lot 4, requiring identical variances for setbacks and lot coverage as Project A. Project C: Addition to an existing nonconforming structure at 1526 N 7th St, requiring a variance for rear accessory structure setback (13 inches in lieu of 5 ft). Project D: Addition to an existing nonconforming structure at 816 N 15th Ave, requiring a variance for accessory structure setback (3 ft in lieu of 5 ft) on the eastern portion of the property.

Follow this across meetings

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.

Comienza tu prueba gratis