5/28/2026 Signed Minutes
Planning Commission Meeting · 2026-05-28 · minutes
The Planning Commission considered an LDC Amendment to Chapter 17, Section 29 for the Planned Commercial-Agriculture (PC-A) zoning district. The motion to approve was made by Commissioner Maria Mills-Benat and seconded by Commissioner Thomas Jordan. The motion carried unanimously by roll call vote. The meeting adjourned at 6:22 p.m.
Agenda items
- 1. Towers, widow's walks, parapet walls and rooftop equipment screening may extend a maximum of five feet above the
- 1. Towers, widow's walks, parapet walls and rooftop equipment screening may extend a maximum of five feet above the
- 2. Front porch steps may encroach into the setback. Residential developments with parking in front of structure must comply
- General Contractor
- Real Estate Development
- Engineering & Architecture
- 2. If required landscaping can be met through provision of landscape planters, street trees, etc., then the building coverage may
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- 3. Consideration of Minutes
- 3. For individual single-family residential lots, open space = 35%
- 3. Residential developments with parking in front of structure must comply with parking design requirements in Chapter 12,
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Roofing
- Drywall & Insulation
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 4. APPLICATION: LDC Amendment/ Chapter 17, Section 29
- Legal Services
- Engineering & Architecture
- Real Estate Development
- 4. APPLICATION: VARIANCE/5968 Shady Creek Lane
- Site Prep, Grading & Hardscape
- Legal Services
- Engineering & Architecture
- 4. The overall subdivision open space of 40% may be met through conveyed open space outside of a specific property, subject to
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- Utilities (Sub)
- 5. Commissioner Comments
Follow this across meetings
Applicants and firms
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta