Minutes
Titusville Environmental Commission · 2026-04-15 · minutes
The Titusville Environmental Commission (TEC) met on April 15, 2026. A motion was made and seconded to recommend to City Council to move forward with a brackish water study and to consider looking into a study on Aquifer Storage and Recovery (ASR) as well as wellfield recharge. The motion passed with a unanimous roll call vote. Stan Johnston commented on his family history in military service and expressed concerns about sewage spray. Mary Sphar provided an in-depth review of wetlands policies and strategies, discussing Policy 1.1.1, 1.1.3, 1.1.6, and 1.1.8. Discussions included critical habitats, partnering with Brevard County, environmental surveys, land donations, and mitigation. The commission suggested adding 'and respective watershed' to Strategy 1.1.3.1. Member Tucker suggested adding 'mitigation' to the last sentence of Policy 1.1.6. Assistant City Attorney Melito clarified that Policy 1.1.6 is for property purchase and land donations might need a separate section. Future agenda items include Wetland Conservation, Outreach efforts, Flooding, Sustainability Action Plan, and Stormwater.
Agenda items
- 1. 03.26.26 TEC Minutes Draft LG
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Real Estate Development
- General Contractor
- Building & Industrial Supply
- 1. Alternative Water Supply Staff Report
- 1. April 15th Brackish Water Presentation and Wetlands
- 1. Seawater and Brackish Ground Water
- Utilities (Sub)
- General Contractor
- Site Prep, Grading & Hardscape
- Plumbing
- HVAC & Climate Control
- Electrical
- Concrete & Masonry
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- Waste Management
- Business Consulting
- 1. Wetlands Confusion and Clarification -- FLUE 1-07-26
- 2. April 30th Urban Forestry Management Presentation and Wetlands
- Legal Services
- Engineering & Architecture
- 2. Brackish Water Source Feasibility Study Scope of Work
- 2. Reclaimed Water/Potable Reuse
- Utilities (Sub)
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- 2. TEC Edits and Motions 3.26.26
- Engineering & Architecture
- Business Consulting
- Legal Services
- Site Prep, Grading & Hardscape
- 3. Aquifer Storage and Recovery (ASR)
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Construction (Other)
- Engineering & Architecture
- 3. DETERMINATION OF A QUORUM
- 3. DETERMINATION OF A QUORUM
- 3. Titusville Water Source Feasibility Study Scope
- Engineering & Architecture
- Utilities (Sub)
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- 4. Stormwater Capture/Surface Water Reservoirs:
- Engineering & Architecture
- Business Consulting
- Utilities (Sub)
- Building & Industrial Supply
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Plumbing
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Drywall & Insulation
- Carpentry & Cabinetry
- Restoration & Waterproofing
- 6. PETITIONS AND REQUESTS FROM THE PUBLIC PRESENT (NON-AGENDA
- 6. PETITIONS AND REQUESTS FROM THE PUBLIC PRESENT (NON-AGENDA
- 7. OLD BUSINESS
- 7. OLD BUSINESS
- 9. PETITIONS AND REQUESTS FROM THE PUBLIC PRESENT
- 9. PETITIONS AND REQUESTS FROM THE PUBLIC PRESENT
- A. Alternative Water Supply
- A. Alternative Water Supply
- Utilities (Sub)
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Business Consulting
- Building & Industrial Supply
- A. Minutes March 26, 2026
- A. Minutes March 26, 2026
- A. Wetlands
- A. Wetlands
Follow this across meetings
Locations
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta