10. Traffic Circulation: The site will be accessed from 5th Place SW via an existing, full-movement,
Planning & Zoning Commission (PZC) Meeting · 2026-05-14 · agenda_item
This item concerns traffic circulation for a planned project at 5th Place SW. The project will use an existing driveway for access. Traffic Engineering and Fire Prevention have reviewed and approved the proposed driveway connections and traffic circulation plan. A traffic impact study was not needed for Phase 1 as it will not create more than 400 daily car trips. No road work outside the property is required. This project is currently under review. The work will involve site access and traffic flow planning. Early engagement with contractors, suppliers, and service providers is advised before final plans and permits are set.
- average daily trips
- 400
Industries that could win this work
- Engineering & Architecture
- Site Prep, Grading & Hardscape
Follow this across meetings
Locations
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta