Board of County Commissioners: julio de 2026
Miami-Dade County
CDMP20230013
This legislative item, File Number 260046, concerns supplemental information for a Comprehensive Development Master Plan (CDMP) amendment application, CDMP20230013, from the May 2023 cycle. The Board of County Commissioners deferred the item multiple times, with the last recorded action being a deferral on June 2, 2026, with an agenda date of July 21, 2026. No specific project details like address, size, or zoning change are provided in this document, only that it is supplemental information for a previously introduced application.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
- Decision:
- Deferred
CDMP20230013
This legislative item concerns a second supplemental information filing for a May 2023 cycle application (CDMP20230013) to amend the Comprehensive Development Master Plan. The Board of County Commissioners has deferred action on this supplement multiple times. The next agenda date is July 21, 2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
- Decision:
- Deferred
CDMP20230013
Board of County Commissioners in Miami-Dade County posted this record to its public file. The posted document carries a title and no readable project detail, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official document link above and watch for the fuller record the body posts later.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
CDMP20230013
This legislative item, File Number 260046, concerns supplemental information for a Comprehensive Development Master Plan (CDMP) amendment application, CDMP20230013, from the May 2023 cycle. The Board of County Commissioners deferred action on this matter multiple times. The final recommendation report is Exhibit 1. The matter was presented on January 22, 2026, and subsequently deferred on April 23, 2026, May 5, 2026, and June 2, 2026. The next agenda date is September 1, 2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
- Decision:
- Deferred (multiple dates)
CDMP20230013
This legislative item concerns an ordinance for Miami-Dade County Comprehensive Development Master Plan (CDMP) Application No. CDMP20230013, filed by Kelly Tractor Company. The application, located west of NW 137 Avenue and SR-836 Interchange, and north side of theoretical NW 6 Street, proposed amendments to the CDMP text, specifically to create the 'MIA Equipment and Supportive Services Area' within the 'Open Land Subarea 3' category. The applicant also initially sought to redesignate the Land Use map and expand the Urban Expansion Area, but these requests were revised or withdrawn. The project spans 246.07 gross/net acres. The Board of County Commissioners adopted the ordinance on first reading on 7/17/2025. It was subsequently reconsidered and adopted with changes on 1/22/2026, assigned Ordinance No. 26-4, but then vetoed by the Mayor on 2/1/2026. The veto was overridden, and the item was deferred multiple times, with a final action of 'Adopted As Transmitted With Further Changes' with acceptance of a revised Proffered Declaration of Restrictions, and specific conditions including the submission of executed documents within 10 days, opening NW/SW 139 Avenue to traffic, and wetland mitigation requirements. Public comment is not detailed in this document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Ordinance
- Decision:
- Adopted As Transmitted With Further Changes (with acceptance of Revised Proffered Declaration of Restrictions and specific conditions)
- Address:
- West of NW 137 Avenue and SR-836 Interchange, and north side of theoretical NW 6 Street
- Applicant:
- Kelly Tractor Company
CDMP20230013
This legislative item concerns supplemental information for an application to amend the Comprehensive Development Master Plan (CDMP) for May 2023. The application number is CDMP20230013. The Board of County Commissioners has deferred action on this supplement multiple times. The next agenda date is July 21, 2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
- Decision:
- Deferred (multiple instances)
CDMP20230013
Board of County Commissioners in Miami-Dade County posted this record to its public file. The posted document carries a title and no readable project detail, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official document link above and watch for the fuller record the body posts later.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
CDMP20230013
Board of County Commissioners in Miami-Dade County posted this record to its public file. The posted document carries a title and no readable project detail, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official document link above and watch for the fuller record the body posts later.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
CDMP20230013
This legislative matter concerns a second supplemental information filing for a May 2023 cycle application (CDMP20230013) to amend the Comprehensive Development Master Plan. The Board of County Commissioners has deferred action on this supplement multiple times. The next agenda date is September 1, 2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
- Decision:
- Deferred (multiple instances)
CDMP20230013
Board of County Commissioners in Miami-Dade County posted this record to its public file. The posted document carries a title and no readable project detail, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official document link above and watch for the fuller record the body posts later.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
CDMP20230013
Board of County Commissioners in Miami-Dade County posted this record to its public file. The posted document carries a title and no readable project detail, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official document link above and watch for the fuller record the body posts later.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
CDMP20230013
Board of County Commissioners in Miami-Dade County posted this record to its public file. The posted document carries a title and no readable project detail, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official document link above and watch for the fuller record the body posts later.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
CDMP20230013
Board of County Commissioners in Miami-Dade County posted this record to its public file. The posted document carries a title and no readable project detail, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official document link above and watch for the fuller record the body posts later.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
CDMP20230013
Ordinance for CDMP Application No. CDMP20230013, filed by Kelly Tractor Company, located west of NW 137 Avenue and SR-836 Interchange, north side of theoretical NW 6 Street, 246.07 gross/net acres. Requested amendments: 1) Amend 'Open Land Subarea 3' land use category text to create 'MIA Equipment and Supportive Services Area'; 2) Add proffered Declaration of Restrictions in Restrictions Table in Appendix A of CDMP Land Use Element; 3) Amend CDMP Capital Improvements Element, Table 10A to include developer funded roadway project. Applicant withdrew requests to redesignate site on Land Use map from 'Open Land' (244.37 acres) and 'Industrial and Office' (1.70 acres) to 'Terminals' (244.37 acres) and 'Industrial and Office' (1.70 acres), and to expand Urban Expansion Area. Final action: Adopted as transmitted with further changes, with acceptance of revised proffered Declaration of Restrictions (Covenant) and condition that applicant submit fully executed, revised, legally sufficient Covenant, Opinion of Title, and any joinders within 10 days or application deemed withdrawn. Further changes include deleting word 'supportive' from text, replacing 'Freight Rail Terminals' with 'Freight Rail Connection', and covenant revisions including requiring Administrative Site Plan Review, opening NW/SW 139 Avenue from NW 6 Street to SW 8 Street prior to first temporary certificate of occupancy, wetland mitigation requirements, and wildlife habitat corridor connection. Key dates: Introduced 7/8/2025; Adopted on first reading 7/17/2025; Adopted with change and assigned Ordinance No. 26-4 on 1/22/2026; Vetoed by Mayor on 2/1/2026; Veto considered 2/18/2026, motion to reconsider passed 9-4; Deferred 5/5/2026; Deferred 6/2/2026; Deferred 7/21/2026; Agenda date 9/1/2026. Public comment sentiment: not stated.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Ordinance
- Decision:
- Adopted as transmitted with further changes, with acceptance of revised proffered Declaration of Restrictions (Covenant) and condition that applicant submit fully executed, revised, legally sufficient Covenant, Opinion of Title, and any joinders within 10 days or application deemed withdrawn. Mayor vetoed on 2/1/2026; veto considered 2/18/2026, motion to reconsider passed 9-4. Deferred multiple times; agenda date 9/1/2026.
- Address:
- West of NW 137 Avenue and SR-836 Interchange, and north side of theoretical NW 6 Street
- Applicant:
- Kelly Tractor Company
CDMP20230013
This ordinance relates to the Miami-Dade County Comprehensive Development Master Plan (CDMP) and addresses Application No. CDMP20230013, filed by Kelly Tractor Company. The project is located west of NW 137 Avenue and SR-836 Interchange, and north side of theoretical NW 6 Street, covering approximately 246.07 acres. The requested amendments involved changing the CDMP text for the 'Open Land Subarea 3' to create the 'MIA Equipment and Supportive Services Area', adding a proffered Declaration of Restrictions, and amending the Capital Improvements Element. The applicant initially sought to redesignate land use from 'Open Land' and 'Industrial and Office' to 'Terminals' and 'Industrial and Office', and expand the Urban Expansion Area, but these requests were revised or withdrawn. The application was adopted on first reading on 7/17/2025. It was subsequently vetoed by the Mayor on 2/1/2026, but this veto was overridden by the Board of County Commissioners on 1/22/2026 with a 9-2 vote, assigning it Ordinance No. 26-4. The item was deferred multiple times in 2026, with the last recorded deferral on 6/2/2026. The final action stated is 'ADOPT AS TRANSMITTED WITH FURTHER CHANGES' with acceptance of a revised Declaration of Restrictions and specific conditions regarding covenant execution, NW/SW 139 Avenue opening, wetland mitigation, and wildlife habitat corridor. The document does not state public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Ordinance
- Decision:
- ADOPT AS TRANSMITTED WITH FURTHER CHANGES (with acceptance of revised proffered Declaration of Restrictions and specific conditions)
- Address:
- West of NW 137 Avenue and SR-836 Interchange, and north side of theoretical NW 6 Street
- Applicant:
- Kelly Tractor Company
CDMP20230013
This legislative item concerns an amendment to the Miami-Dade County Comprehensive Development Master Plan (CDMP) for Application No. CDMP20230013, filed by Kelly Tractor Company. The project is located west of NW 137 Avenue and the SR-836 interchange, and north of theoretical NW 6 Street, encompassing 246.07 gross/net acres. The requested amendments included changing the land use category text for 'Open Land Subarea 3' to create the 'MIA Equipment and Supportive Services Area', adding a Declaration of Restrictions, and amending the Capital Improvements Element. The applicant revised the original application to withdraw requests to redesignate the land use map from 'Open Land' and 'Industrial and Office' to 'Terminals' and 'Industrial and Office', and to expand the Urban Expansion Area. The application was ultimately adopted as transmitted with further changes, including revisions to the proposed text and a Declaration of Restrictions. Key conditions were imposed, such as the submission of executed documents within 10 days, opening NW/SW 139 Avenue to traffic, specific wetland mitigation requirements, and the provision of a wildlife habitat corridor. The legislative process involved multiple deferrals and a mayoral veto, with the final action being 'Adopted as Transmitted with Further Changes'.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Ordinance
- Decision:
- Adopted as Transmitted with Further Changes
- Address:
- West of NW 137 Avenue and SR-836 Interchange, and north side of theoretical NW 6 Street
- Applicant:
- Kelly Tractor Company
CDMP20230013
This legislative matter concerns Application No. CDMP20230013, filed by Kelly Tractor Company, to amend the Miami-Dade County Comprehensive Development Master Plan (CDMP). The application is located west of NW 137 Avenue and SR-836 Interchange, and north side of theoretical NW 6 Street, encompassing 246.07 gross/net acres. The requested amendments include modifying the 'Open Land Subarea 3' land use category text to create the 'MIA Equipment and Supportive Services Area', adding a Declaration of Restrictions, and amending the CDMP Capital Improvements Element to include a developer-funded roadway project. The applicant revised the original application to withdraw requests for land use map redesignation and expansion of the Urban Expansion Area, and to change the proposed land use text amendment from 'Terminals' to 'Open Land Subarea 3' for the 'MIA Equipment and Supportive Services Area'. The Board of County Commissioners adopted the ordinance with further changes, including revisions to the proposed text and the proffered Declaration of Restrictions, and specific conditions related to NW/SW 139 Avenue opening, wetland mitigation, and wildlife habitat corridor. The item has a complex legislative history involving multiple deferrals, a mayoral veto, and reconsideration, with final action being 'Adopted as Transmitted with Further Changes'.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Ordinance
- Decision:
- Adopted as Transmitted with Further Changes
- Address:
- West of NW 137 Avenue and SR-836 Interchange, and north side of theoretical NW 6 Street
- Applicant:
- Kelly Tractor Company
CDMP20230013
This legislative item, File Number 260046, concerns supplemental information for a Comprehensive Development Master Plan (CDMP) amendment application, CDMP20230013, from the May 2023 cycle. The Board of County Commissioners deferred the item on multiple occasions, including May 5, 2026, and June 2, 2026, with a final agenda date of July 21, 2026. The specific details of the CDMP amendment, including the exact zoning/use change, project size, or applicant, are not stated in this document, only that it is supplemental information for a prior application.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
- Decision:
- Deferred
CDMP20230013
Ordinance for CDMP Application No. CDMP20230013, filed by Kelly Tractor Company, located west of NW 137 Avenue and SR-836 Interchange, and north side of theoretical NW 6 Street, 246.07 gross/net acres. Requested amendments to the CDMP Land Use Plan Map or Text: 1) Amend the 'Open Land Subarea 3' land use category text to create the 'MIA Equipment and Supportive Services Area'; 2) Add the proffered Declaration of Restrictions in the Restrictions Table in Appendix A of the CDMP Land Use Element; 3) Amend the CDMP Capital Improvements Element, Table 10A Projects with Developer Responsibility to Construct or Cause to Construct to include developer funded roadway project. The applicant revised the original application to withdraw requests to redesignate the site on the Land Use map from 'Open Land' (244.37 acres) and 'Industrial and Office' (1.70 acres) to 'Terminals' (244.37 acres) and 'Industrial and Office' (1.70 acres), and to expand the Urban Expansion Area (UEA) to include the application site. Final action: Adopted as transmitted with further changes, with acceptance of the revised proffered Declaration of Restrictions (Covenant) and with the condition that the Applicant submit the fully executed, revised, legally sufficient Covenant, Opinion of Title, and any joinders within 10 days or the application shall be deemed withdrawn. The item was adopted on first reading on 7/17/2025, vetoed by the Mayor on 2/1/2026, reconsidered on 1/22/2026 and assigned Ordinance No. 26-4, and deferred multiple times, with the final deferral to the 9/1/2026 Board meeting. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Ordinance
- Decision:
- Adopted as transmitted with further changes, with acceptance of the revised proffered Declaration of Restrictions (Covenant) and with the condition that the Applicant submit the fully executed, revised, legally sufficient Covenant, Opinion of Title, and any joinders within 10 days or the application shall be deemed withdrawn.
- Address:
- West of NW 137 Avenue and SR-836 Interchange, and north side of theoretical NW 6 Street
- Applicant:
- Kelly Tractor Company
CDMP20230013
Ordinance for CDMP Application No. CDMP20230013, filed by Kelly Tractor Company, located west of NW 137 Avenue and SR-836 Interchange, and north side of theoretical NW 6 Street, 246.07 gross/net acres. Requested amendments: 1) Amend 'Open Land Subarea 3' land use category text to create 'MIA Equipment and Supportive Services Area'; 2) Add proffered Declaration of Restrictions in the Restrictions Table in Appendix A of the CDMP Land Use Element; 3) Amend CDMP Capital Improvements Element, Table 10A to include developer funded roadway project. Applicant revised original application to withdraw requests to redesignate land use from 'Open Land' (244.37 acres) and 'Industrial and Office' (1.70 acres) to 'Terminals' (244.37 acres) and 'Industrial and Office' (1.70 acres), and to expand the Urban Expansion Area. Final action: Adopted as transmitted with further changes, with acceptance of revised proffered Declaration of Restrictions (Covenant) and condition that applicant submit fully executed, revised, legally sufficient Covenant, Opinion of Title, and any joinders within 10 days or application deemed withdrawn. Further changes include deleting word 'supportive' from text, replacing 'Freight Rail Terminals' with 'Freight Rail Connection', and covenant revisions including requiring Administrative Site Plan Review, opening NW/SW 139 Avenue from NW 6 Street to SW 8 Street prior to first temporary certificate of occupancy, wetland mitigation requirements, and wildlife habitat corridor connection. History: Adopted on first reading 7/17/2025; Vetoed by Mayor on 2/1/2026; Reconsidered and adopted with change as Ordinance No. 26-4 on 1/22/2026; Deferred multiple times; Final action on 9/1/2026. Public comment sentiment: Not stated.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Ordinance
- Decision:
- Adopted as transmitted with further changes, with acceptance of revised proffered Declaration of Restrictions (Covenant) and condition that applicant submit fully executed, revised, legally sufficient Covenant, Opinion of Title, and any joinders within 10 days or application deemed withdrawn.
- Address:
- West of NW 137 Avenue and SR-836 Interchange, and north side of theoretical NW 6 Street
- Applicant:
- Kelly Tractor Company
CDMP20230013
This legislative matter concerns a second supplemental information filing for the May 2023 Cycle Application No. CDMP20230013, which aims to amend the Comprehensive Development Master Plan. The Board of County Commissioners has deferred action on this supplement multiple times. The next agenda date is July 21, 2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
- Decision:
- Deferred (multiple instances)
CDMP20230013
This legislative item, File Number 260046, concerns supplemental information for a Comprehensive Development Master Plan (CDMP) amendment application, CDMP20230013, from the May 2023 cycle. The Board of County Commissioners deferred action on this matter multiple times. The final recommendation report is Exhibit 1. The matter was presented on January 22, 2026, and subsequently deferred on March 19, 2026 (meeting cancelled), April 23, 2026, May 5, 2026, and June 2, 2026. The agenda date was September 1, 2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
- Decision:
- Deferred (multiple instances)
CDMP20230013
Ordinance for CDMP Application No. CDMP20230013, filed by Kelly Tractor Company, located west of NW 137 Avenue and SR-836 Interchange, north side of theoretical NW 6 Street, 246.07 gross/net acres. Requested amendments: 1) Amend 'Open Land Subarea 3' land use category text to create 'MIA Equipment and Supportive Services Area'; 2) Add proffered Declaration of Restrictions in Restrictions Table in Appendix A of CDMP Land Use Element; 3) Amend CDMP Capital Improvements Element, Table 10A to include developer funded roadway project. Applicant withdrew requests to redesignate land use from 'Open Land' (244.37 acres) and 'Industrial and Office' (1.70 acres) to 'Terminals' (244.37 acres) and 'Industrial and Office' (1.70 acres), and to expand Urban Expansion Area. Final action: Adopted as transmitted with further changes, with acceptance of revised proffered Declaration of Restrictions (Covenant) and condition that applicant submit fully executed, revised, legally sufficient Covenant, Opinion of Title, and any joinders within 10 days or application deemed withdrawn. Further changes include deleting word 'supportive' from proposed text, replacing 'Freight Rail Terminals' with 'Freight Rail Connection', and revisions to Covenant including conditions on accessory uses, Administrative Site Plan Review, opening NW/SW 139 Avenue from NW 6 Street to SW 8 Street prior to first temporary certificate of occupancy, wetland mitigation within Miami-Dade County, and wildlife habitat corridor connection. Key dates: Introduced 7/8/2025; Adopted on first reading 7/17/2025; Adopted with change and assigned Ordinance No. 26-4 on 1/22/2026; Vetoed by Mayor on 2/1/2026; Veto considered 2/18/2026, motion to reconsider passed 9-4; Deferred 3/19/2026 (meeting cancelled); Deferred 4/23/2026; Deferred 5/5/2026; Deferred 6/2/2026; Deferred 7/21/2026; Agenda date 9/1/2026, Agenda item 7F. No public comment sentiment stated in document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Ordinance
- Decision:
- Adopted as transmitted with further changes, with acceptance of revised proffered Declaration of Restrictions (Covenant) and condition that applicant submit fully executed, revised, legally sufficient Covenant, Opinion of Title, and any joinders within 10 days or application deemed withdrawn. Vetoed by Mayor on 2/1/2026; reconsidered and advertised for 3/19/2026; deferred multiple times; agenda date 9/1/2026.
- Address:
- West of NW 137 Avenue and SR-836 Interchange, and north side of theoretical NW 6 Street
- Applicant:
- Kelly Tractor Company
CDMP20230013
This is supplemental information regarding a May 2023 cycle application (CDMP20230013) to amend the Comprehensive Development Master Plan (CDMP). The Board of County Commissioners deferred the item on 5/5/2026 and again on 6/2/2026, with a final action date of 7/21/2026. No specific project details like address, size, or zoning change are provided in this document, only that it is supplemental information for a CDMP amendment application.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
- Decision:
- Deferred (on 5/5/2026 and 6/2/2026)
CDMP20230013
This legislative item, File Number 260046, concerns supplemental information for a Comprehensive Development Master Plan (CDMP) amendment application, CDMP20230013, from the May 2023 cycle. The Board of County Commissioners deferred the item multiple times, with the last recorded action being a deferral on June 2, 2026, with an agenda date of July 21, 2026. No specific project details like address, size, or zoning change are provided in this document, only that it is supplemental information for a CDMP amendment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
- Decision:
- Deferred (multiple instances)
CDMP20230013
This legislative matter concerns supplemental information for a Comprehensive Development Master Plan (CDMP) amendment application, CDMP20230013, from the May 2023 cycle. The Board of County Commissioners deferred the item on multiple occasions, with the latest deferral on July 21, 2026. The specific details of the amendment, including the exact zoning/use change, project size, or applicant, are not stated in this document, only that supplemental information is being provided. The document indicates a final recommendation report (Exhibit 1) is included.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
- Decision:
- Deferred (multiple instances)
CDMP20230013
This legislative item, File Number 260046, concerns supplemental information for a Comprehensive Development Master Plan (CDMP) amendment application, CDMP20230013, from the May 2023 cycle. The Board of County Commissioners deferred the item multiple times, with the last recorded action being a deferral on June 2, 2026, with an agenda date of July 21, 2026. No specific project details like address, size, or zoning change are provided in this document, only that it is supplemental information for a previously introduced application.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
- Decision:
- Deferred
CDMP20230013
Ordinance relating to Miami-Dade County Comprehensive Development Master Plan; providing disposition of Application No. CDMP20230013, located west of NW 137 Avenue and SR-836 interchange, and north side of theoretical NW 6 Street, filed by Kelly Tractor Company in the May 2023 cycle to amend the County's Comprehensive Development Master Plan. The application is for 246.07 gross/net acres. The requested amendment is to amend the 'Open Land Subarea 3' land use category text to create the 'MIA Equipment and Supportive Services Area'; add the proffered Declaration of Restrictions in the Restrictions Table in Appendix A of the CDMP Land Use Element, if accepted by the Board; and amend the CDMP Capital Improvements Element, Table 10A Projects with Developer Responsibility to Construct or Cause to Construct to include developer funded roadway project. The applicant revised the original application to withdraw the following requests: 1) Redesignate the application site on the Land Use map; From: 'Open Land' (244.37 acres) and 'Industrial and Office' (1.70 acres), To: 'Terminals' (244.37 acres) and 'Industrial and Office' (1.70 acres); 2) Expand the Urban Expansion Area (UEA) to include the application site. In addition, the applicant revised the application to change the proposed land use text amendment from the 'Terminals' category in the Land Use Element to the 'Open Land Subarea 3' in order to establish the 'MIA Equipment and Supportive Services Area'. Final action: Standard Amendment ADOPT AS TRANSMITTED WITH FURTHER CHANGES with Acceptance of the Revised Proffered Declaration of Restrictions (Covenant) and with the condition that the Applicant submit the fully executed, revised, legally sufficient Covenant, Opinion of Title, and any joinders within 10 days or the application shall be deemed withdrawn. The further changes include the following: (1) revise the text proposed for 'Open Land Subarea 3' to delete the word 'supportive' and add 'MIA Equipment and Supportive Services Area' and make other changes as indicated in the staff handout; and (2) amend the proposed text to replace 'Freight Rail Terminals' with 'Freight Rail Connection'. Revisions to the Covenant are to (1) revise condition 1A to provide that 'the accessory and ancillary uses must be consistent with the CDMP' and deleting 'supportive of the MIA Equipment and Supportive Services Area'; (2) revise Condition 2 to require an Administrative Site Plan Review (ASPR) and deleting language related to establishing land development regulations; (3) add a condition that prior to the issuance of the first temporary certificate of occupancy for any portion of the proposed development, the Owner agrees to have open to traffic or cause to have open to traffic NW/SW 139 Avenue from NW 6 Street to SW 8 Street.; (4) add a condition that any wetland mitigation for the areas on the Property that are, as of January 21, 2026, under either of the existing covenants, shall be done via (1) on-site mitigation or (2) permittee responsible mitigation within Miami-Dade County (which may include permittee responsible mitigation within County parks to the extent permissible), except to the extent that there are wetland mitigation bank credits available at banks in Miami-Dade County and mitigation is done via such credits from within Miami-Dade County; (5) add a condition that the Owner commits to provide and maintain a wildlife habitat corridor connection between the Preservation Areas on the Property (identified in the Restrictive Covenant recorded in Official Records Book 28488, Pages 2722-2731 of the Public Records of Miami-Dade County, Florida), which shall continue to be preserved. Connection may be provided, to the extent permissible, by using stormwater management areas, vegetative open space, or other on-site wetland mitigation areas. Key dates: Introduced 7/8/2025; Adopted on first reading 7/17/2025; Reconsidered item and to be advertised for March 19, 2026 CDMP and Zoning meeting on 1/22/2026; Vetoed by Mayor on 2/1/2026; Meeting cancelled 3/19/2026; Deferred to the BCC following a public hearing 4/23/2026; Deferred 5/5/2026; Deferred 6/2/2026; Deferred 7/21/2026; Agenda Date 9/1/2026. Public comment sentiment: not stated.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Ordinance
- Decision:
- Standard Amendment ADOPT AS TRANSMITTED WITH FURTHER CHANGES with Acceptance of the Revised Proffered Declaration of Restrictions (Covenant) and with the condition that the Applicant submit the fully executed, revised, legally sufficient Covenant, Opinion of Title, and any joinders within 10 days or the application shall be deemed withdrawn.
- Address:
- West of NW 137 Avenue and SR-836 interchange, and north side of theoretical NW 6 Street
- Applicant:
- Kelly Tractor Company
CDMP20230013
This legislative item, File Number 260046, concerns supplemental information for a Comprehensive Development Master Plan (CDMP) amendment application, CDMP20230013, from the May 2023 cycle. The Board of County Commissioners deferred the item on multiple occasions, including May 5, 2026, and June 2, 2026, with a final agenda date of July 21, 2026. The specific details of the CDMP amendment, including the exact zoning/use change, project size, or location, are not stated in this document, only that it is supplemental information for a prior application.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
- Decision:
- Deferred (multiple dates)
CDMP20230013
The document is a legislative item file for Miami-Dade County Commission File Number 260753, a second supplemental information item for Comprehensive Development Master Plan (CDMP) amendment application CDMP20230013 from the May 2023 cycle. The item was introduced on 4/22/2026 and has been deferred multiple times, with the next scheduled agenda date of 9/1/2026. The document does not state the specific location, size, zoning change, applicant, or decision details for the underlying CDMP application.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
- Decision:
- Deferred (multiple times, most recently on 7/21/2026, with next agenda date 9/1/2026)
CDMP20230013
This legislative item concerns an amendment to the Miami-Dade County Comprehensive Development Master Plan (CDMP) for Application No. CDMP20230013, filed by Kelly Tractor Company. The project is located west of NW 137 Avenue and the SR-836 interchange, and north of theoretical NW 6 Street, encompassing 246.07 gross/net acres. The proposed amendments include modifying the 'Open Land Subarea 3' land use category text to create the 'MIA Equipment and Supportive Services Area', adding a Declaration of Restrictions, and amending the Capital Improvements Element to include a developer-funded roadway project. The applicant revised the original application to withdraw requests for redesignating the land use map from 'Open Land' and 'Industrial and Office' to 'Terminals' and 'Industrial and Office', and to expand the Urban Expansion Area. The applicant also revised the proposed land use text amendment from the 'Terminals' category to 'Open Land Subarea 3' to establish the 'MIA Equipment and Supportive Services Area'. The application was adopted as transmitted with further changes, including revisions to the text and a proffered Declaration of Restrictions. Key conditions include the submission of executed documents within 10 days, revisions to the covenant regarding accessory uses and site plan review, opening NW/SW 139 Avenue to traffic, and provisions for wetland mitigation and wildlife habitat corridors. The item has a complex legislative history involving multiple deferrals, a mayoral veto, and reconsideration by the Board of County Commissioners.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Ordinance
- Decision:
- Adopted as transmitted with further changes, with acceptance of the revised proffered Declaration of Restrictions and with the condition that the Applicant submit the fully executed, revised, legally sufficient Covenant, Opinion of Title, and any joinders within 10 days or the application shall be deemed withdrawn.
- Address:
- West of NW 137 Avenue and SR-836 Interchange, and north side of theoretical NW 6 Street
- Applicant:
- Kelly Tractor Company
CDMP20230013
Board of County Commissioners in Miami-Dade County posted this record to its public file. The posted document carries a title and no readable project detail, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official document link above and watch for the fuller record the body posts later.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
CDMP20230013
Board of County Commissioners in Miami-Dade County posted this record to its public file. The posted document carries a title and no readable project detail, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official document link above and watch for the fuller record the body posts later.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
CDMP20230013
This legislative item concerns a second supplemental information filing for a May 2023 cycle application (CDMP20230013) to amend the Comprehensive Development Master Plan. The Board of County Commissioners has deferred action on this supplement multiple times. The next agenda date is July 21, 2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
- Decision:
- Deferred
CDMP20230013
This legislative item, File Number 260046, concerns supplemental information for a Comprehensive Development Master Plan (CDMP) amendment application, CDMP20230013, from the May 2023 cycle. The Board of County Commissioners has deferred action on this supplement multiple times, with the latest deferral on 7/21/2026, setting a new due date of 9/1/2026. The item was presented on 1/22/2026 and assigned on 1/14/2026. No specific project details like address, size, or zoning change are provided in this document, only that it relates to a CDMP amendment application.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
- Decision:
- Deferred (multiple instances)
CDMP20230013
This legislative item, File Number 260046, concerns supplemental information for a Comprehensive Development Master Plan (CDMP) amendment application, CDMP20230013, from the May 2023 cycle. The Board of County Commissioners deferred the item on multiple occasions, including May 5, 2026, and June 2, 2026, with a final agenda date of July 21, 2026. The specific details of the CDMP amendment, including the exact zoning/use change, project size, or location, are not stated in this document, only that it is supplemental information.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Legislation
- Decision:
- Deferred
CDMP20230013
This legislative matter concerns Miami-Dade County Comprehensive Development Master Plan (CDMP) Application No. CDMP20230013, filed by Kelly Tractor Company. The application, located west of NW 137 Avenue and SR-836 Interchange, and north side of theoretical NW 6 Street, proposed amendments to the CDMP text. Specifically, it aimed to amend the 'Open Land Subarea 3' land use category text to create the 'MIA Equipment and Supportive Services Area', add a Declaration of Restrictions, and amend the Capital Improvements Element. The applicant revised the original application to withdraw requests for land use map redesignations and expansion of the Urban Expansion Area, and changed the proposed land use text amendment. The Board of County Commissioners adopted the ordinance with further changes, including revisions to the text and a proffered Declaration of Restrictions, with conditions. The process involved multiple deferrals and a mayoral veto. Public comment is not explicitly detailed, but the legislative history indicates commissioner votes and the Mayor's veto.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Ordinance
- Decision:
- Adopted as transmitted with further changes and acceptance of revised proffered Declaration of Restrictions, with conditions.
- Address:
- West of NW 137 Avenue and SR-836 Interchange, and north side of theoretical NW 6 Street
- Applicant:
- Kelly Tractor Company
CEI SERVICES CONTRACT FOR THE UNDERLINE
The Miami-Dade County Board of County Commissioners adopted Resolution R-641-26 (File Number 260966) on July 21, 2026, authorizing Supplemental Agreement No. 1 with Calvin, Giordano & Associates, Inc. for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The agreement increases the maximum contract value to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system, located within Districts 5 and 7. The original contract was valued at $6,000,000. The supplemental agreement is funded by Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The project includes bicycle and pedestrian paths, bridges, landscaping, lighting, drainage, wayfinding, and related infrastructure improvements. The additional CEI services support enhanced quality assurance through expanded materials testing, including a dedicated materials laboratory; increased inspection and coordination for added project elements such as corridor-wide Wi-Fi and amenities; and extended construction oversight due to schedule impacts, including utility-related delays. The item was forwarded to the BCC with a favorable recommendation by the Transportation Committee on July 14, 2026, and adopted by the Board on July 21, 2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Calvin, Giordano & Associates, Inc.
CEI SERVICES CONTRACT FOR THE UNDERLINE
Miami-Dade County Board of County Commissioners approved Supplemental Agreement No. 1 for professional services for The Underline Phase 3 – Segments 3 to 9. This agreement increases the contract value for construction, engineering, and inspection (CEI) services with Calvin, Giordano & Associates, Inc. by $2,252,721.83, bringing the total contract value to $8,252,721.83. The contract term is extended by 270 non-compensable calendar days, for a total of 1,654 calendar days. The additional services are needed to support expanded scope and schedule adjustments, including enhanced quality assurance, increased inspection for new elements like Wi-Fi, and extended oversight due to schedule impacts. The project is a 7.36-mile multimodal corridor beneath the Metrorail system.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Approved
- Applicant:
- Calvin, Giordano & Associates, Inc.
CEI SERVICES CONTRACT FOR THE UNDERLINE
Miami-Dade County Commission approved Supplemental Agreement No. 1 for construction, engineering, and inspection services for The Underline Phase 3 – Segments 3 to 9. The agreement increases the maximum contract value to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. This is to ensure continuous and adequate construction oversight due to an expanded scope and extended schedule approved previously. The additional services will support enhanced quality assurance, increased inspection and coordination for added project elements like corridor-wide Wi-Fi, and extended construction oversight. The original contract was approved on April 4, 2023. The project is a 7.36-mile multimodal corridor beneath the Metrorail system.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Approved
- Applicant:
- Calvin, Giordano & Associates, Inc.
CEI SERVICES CONTRACT FOR THE UNDERLINE
The document is a legislative item for a resolution authorizing a supplemental agreement for construction, engineering, and inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The contract is with Calvin, Giordano & Associates, Inc. and Miami-Dade County. The resolution increases the maximum contract value to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system. The final action was adoption on 7/21/2026. The project is located within Districts 5 and 7. The original contract was valued at $6,000,000. The supplemental agreement increases the contract amount by $2,252,721.83 and extends the term by 270 non-compensable calendar days. The funding source is Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The CEI contract was originally approved on April 4, 2023, pursuant to Resolution No. R-294-23. The design-build contract was modified on December 16, 2025, pursuant to Resolution No. R-1235-25. The additional CEI services will support enhanced quality assurance through expanded materials testing, including a dedicated materials laboratory; increased inspection and coordination for added project elements such as corridor-wide Wi-Fi and amenities; and extended construction oversight resulting from schedule impacts, including utility-related delays. The staff recommendation is to approve the supplemental agreement. The document does not state a specific street address, parcel number, or acreage. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Calvin, Giordano & Associates, Inc.
CEI SERVICES CONTRACT FOR THE UNDERLINE
The Miami-Dade County Board of County Commissioners adopted Resolution R-641-26 (File Number 260966) on July 21, 2026, authorizing Supplemental Agreement No. 1 with Calvin, Giordano & Associates, Inc. for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The agreement increases the maximum contract value to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system, located within Districts 5 and 7. The supplemental agreement is required to support expanded scope and extended schedule previously approved on December 16, 2025, under Resolution No. R-1235-25. The additional CEI services will support enhanced quality assurance through expanded materials testing, including a dedicated materials laboratory; increased inspection and coordination for added project elements such as corridor-wide Wi-Fi and amenities; and extended construction oversight resulting from schedule impacts, including utility-related delays. The original contract was valued at $6,000,000. The supplemental agreement increases the contract amount by $2,252,721.83 and extends the contract term by 270 non-compensable calendar days. Funding is from Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The CEI contract was originally approved on April 4, 2023, pursuant to Resolution No. R-294-23. The design-build contract is with NV2A Central Joint Venture. Due diligence was conducted with no adverse findings. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Calvin, Giordano & Associates, Inc.
CEI SERVICES CONTRACT FOR THE UNDERLINE
The Board of County Commissioners adopted Resolution R-641-26 (Legislative Item File Number 260966) on July 21, 2026, authorizing the County Mayor to execute Supplemental Agreement No. 1 with Calvin, Giordano & Associates, Inc. for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The supplemental agreement increases the maximum contract value to $8,252,721.83 and increases the contract term to 1,654 non-compensable calendar days. The original contract was valued at $6,000,000. The increase is $2,252,721.83 and the term extension is 270 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system, including bicycle and pedestrian paths, bridges, landscaping, lighting, drainage, wayfinding, and related infrastructure improvements. The project is located within Districts 5 and 7. The funding source is Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The item was forwarded to the Board with a favorable recommendation by the Transportation Committee on July 14, 2026. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Calvin, Giordano & Associates, Inc.
CEI SERVICES CONTRACT FOR THE UNDERLINE
The Miami-Dade Board of County Commissioners adopted Resolution R-641-26 (File Number 260966) on July 21, 2026, authorizing Supplemental Agreement No. 1 with Calvin, Giordano & Associates, Inc. for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The agreement increases the maximum contract value to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system, located within Districts 5 and 7. The original CEI contract was approved on April 4, 2023, via Resolution R-294-23. The supplemental agreement is required due to expanded scope and extended schedule previously approved on December 16, 2025, under Resolution R-1235-25, with the design-build contractor NV2A Central Joint Venture. The additional CEI services support enhanced quality assurance, increased inspection for added elements like corridor-wide Wi-Fi and amenities, and extended oversight due to schedule impacts. The funding source is Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The staff recommendation was to approve the supplemental agreement, increasing the contract amount by $2,252,721.83 and extending the term by 270 non-compensable calendar days. The Transportation Committee forwarded the item to the BCC with a favorable recommendation on July 14, 2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Calvin, Giordano & Associates, Inc.
CEI SERVICES CONTRACT FOR THE UNDERLINE
The document is a Miami-Dade County legislative item (File Number 260966, Resolution R-641-26) that was adopted on 7/21/2026. It authorizes Supplemental Agreement No. 1 to the Construction, Engineering, and Inspection (CEI) services contract with Calvin, Giordano & Associates, Inc. for The Underline Phase 3, Segments 3 to 9. The agreement increases the maximum contract value to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system. The document does not state a specific street address, parcel, or folio number. The project is located within Miami-Dade County Districts 5 and 7. The original contract was valued at $6,000,000. The supplemental agreement increases the amount by $2,252,721.83 and extends the term by 270 non-compensable calendar days. The project includes bicycle and pedestrian paths, bridges, landscaping, lighting, drainage, wayfinding, and related infrastructure improvements. The funding source is Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Calvin, Giordano & Associates, Inc.
CEI SERVICES CONTRACT FOR THE UNDERLINE
The Miami-Dade County Board of County Commissioners adopted Resolution R-641-26 (File Number 260966) on July 21, 2026, authorizing Supplemental Agreement No. 1 to the Construction, Engineering, and Inspection (CEI) services contract with Calvin, Giordano & Associates, Inc. for The Underline Phase 3, Segments 3 to 9. The agreement increases the contract maximum value to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system, located within Miami-Dade County Districts 5 and 7. The supplemental agreement is required to support the expanded scope and extended schedule of the design-build contract with NV2A Central Joint Venture, previously approved on December 16, 2025, pursuant to Resolution No. R-1235-25. The additional CEI services will support enhanced quality assurance through expanded materials testing, including a dedicated materials laboratory; increased inspection and coordination for added project elements such as corridor-wide Wi-Fi and amenities; and extended construction oversight due to schedule impacts, including utility-related delays. The original contract was valued at $6,000,000, and the increase is $2,252,721.83. The contract term extension is 270 non-compensable calendar days. Funding is from Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The original CEI contract was approved on April 4, 2023, pursuant to Resolution No. R-294-23. The project includes bicycle and pedestrian paths, bridges, landscaping, lighting, drainage, wayfinding, and related infrastructure improvements. Due diligence was conducted with no adverse findings. The staff recommendation was to approve the supplemental agreement. The item was forwarded to the Board with a favorable recommendation by the Transportation Committee on July 14, 2026, and adopted by the Board on July 21, 2026. The document does not state a specific street address, parcel, or folio number for the project.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Calvin, Giordano & Associates, Inc.
CEI SERVICES CONTRACT FOR THE UNDERLINE
Miami-Dade County Commissioners approved Supplemental Agreement No. 1 for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3 – Segments 3 to 9. This agreement increases the maximum contract value to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The additional services are needed to support an expanded scope and extended schedule of the design-build contract, including enhanced quality assurance, increased inspection for added project elements like Wi-Fi, and extended oversight due to schedule impacts. The original CEI contract was approved on April 4, 2023, for a 7.36-mile multimodal corridor project. The supplemental agreement is funded by Mobility Impact Fees.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Approved
- Address:
- The Underline Phase 3 – Segments 3 to 9
- Applicant:
- Calvin, Giordano & Associates, Inc.
CEI SERVICES CONTRACT FOR THE UNDERLINE
The Miami-Dade County Board of County Commissioners adopted Resolution R-641-26 (File Number 260966) on July 21, 2026, authorizing Supplemental Agreement No. 1 with Calvin, Giordano & Associates, Inc. for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The agreement increases the maximum contract value to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system, located within Districts 5 and 7. The original contract was valued at $6,000,000. The supplemental agreement is funded by Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The project includes bicycle and pedestrian paths, bridges, landscaping, lighting, drainage, wayfinding, and related infrastructure improvements. The additional CEI services support enhanced quality assurance through expanded materials testing, including a dedicated materials laboratory; increased inspection and coordination for added project elements such as corridor-wide Wi-Fi and amenities; and extended construction oversight due to schedule impacts, including utility-related delays. The item was forwarded to the Board with a favorable recommendation by the Transportation Committee on July 14, 2026, and adopted on July 21, 2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Calvin, Giordano & Associates, Inc.
CEI SERVICES CONTRACT FOR THE UNDERLINE
The Miami-Dade Board of County Commissioners adopted Resolution R-641-26 (File Number 260966) on July 21, 2026, authorizing Supplemental Agreement No. 1 with Calvin, Giordano & Associates, Inc. for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The agreement increases the maximum contract value from $6,000,000 to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system, including bicycle and pedestrian paths, bridges, landscaping, lighting, drainage, wayfinding, and related infrastructure improvements. The project is located within Districts 5 and 7. The original CEI contract was approved on April 4, 2023, pursuant to Resolution No. R-294-23. The supplemental agreement is required due to expanded scope and extended schedule previously approved on December 16, 2025, pursuant to Resolution No. R-1235-25, under the design-build contract with NV2A Central Joint Venture. The additional CEI services support enhanced quality assurance through expanded materials testing, including a dedicated materials laboratory; increased inspection and coordination for added project elements such as corridor-wide Wi-Fi and amenities; and extended construction oversight due to schedule impacts, including utility-related delays. Funding is from Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The Transportation Committee forwarded the item to the Board with a favorable recommendation on July 14, 2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Calvin, Giordano & Associates, Inc.
CEI SERVICES CONTRACT FOR THE UNDERLINE
Miami-Dade County Commission approved Supplemental Agreement No. 1 for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3 – Segments 3 to 9. The agreement with Calvin, Giordano & Associates, Inc. increases the maximum contract value by $2,252,721.83 to a total of $8,252,721.83 and extends the contract term by 270 days to 1,654 non-compensable calendar days. This is to ensure continuous and adequate construction oversight due to expanded scope and extended schedule approved on December 16, 2025, which incorporated stakeholder-driven enhancements, technical refinements, and additional construction duration. The additional CEI services will support enhanced quality assurance, increased inspection and coordination for added project elements like corridor-wide Wi-Fi, and extended construction oversight. The project is a 7.36-mile multimodal corridor beneath the Metrorail system.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Approved
- Applicant:
- Calvin, Giordano & Associates, Inc.
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta