Skip to main content

Sé el Primero, Construye Relaciones Duraderas

Board of County Commissioners: julio de 2026

Miami-Dade County

CEI SERVICES CONTRACT FOR THE UNDERLINE

Miami-Dade County Commission approved Supplemental Agreement No. 1 for professional services related to The Underline Phase 3 – Segments 3 to 9. This agreement increases the contract value for Construction, Engineering, and Inspection (CEI) services provided by Calvin, Giordano & Associates, Inc. The increase is $2,252,721.83, bringing the total contract value to $8,252,721.83. The contract term is extended by 270 non-compensable calendar days, for a total of 1,654 calendar days. The additional services are needed to support an expanded scope and extended schedule for the project, including enhanced quality assurance, increased inspection for new elements like Wi-Fi, and extended oversight due to schedule impacts. The original CEI contract was approved on April 4, 2023. The project involves a 7.36-mile multimodal corridor with paths, bridges, landscaping, lighting, drainage, and wayfinding.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

Miami-Dade County Board of County Commissioners approved Supplemental Agreement No. 1 for professional services for The Underline Phase 3 – Segments 3 to 9. This agreement increases the maximum contract value for Construction, Engineering, and Inspection (CEI) services provided by Calvin, Giordano & Associates, Inc. to $8,252,721.83 and extends the contract term by 270 calendar days to a total of 1,654 calendar days. The increase is to ensure continuous and adequate construction oversight due to an expanded scope and extended schedule, including enhanced quality assurance, increased inspection for added project elements like Wi-Fi and amenities, and extended oversight due to schedule impacts. The original contract was approved on April 4, 2023. The supplemental agreement was recommended favorably by the Transportation Committee and approved by the Board of County Commissioners.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

The document is a resolution authorizing Supplemental Agreement No. 1 to increase the contract value and term for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The project is a 7.36-mile multimodal corridor beneath the Metrorail system. The contract with Calvin, Giordano & Associates, Inc. is increased by $2,252,721.83 to a new maximum of $8,252,721.83, and the term is extended by 270 non-compensable calendar days to a total of 1,654 calendar days. The resolution was adopted on July 21, 2026. The project is located within Districts 5 and 7. The document does not state a specific street address, parcel, or folio number. The document does not state any public comment or stakeholder sentiment.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

Resolution adopted on 7/21/2026 authorizing Supplemental Agreement No. 1 with Calvin, Giordano & Associates, Inc. for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The agreement increases the maximum contract value to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system. The original contract was valued at $6,000,000. The increase is $2,252,721.83 and the term extension is 270 non-compensable calendar days. The project is located within Districts 5 and 7. The design-build contract is with NV2A Central Joint Venture. The CEI contract was originally approved on April 4, 2023, pursuant to Resolution No. R-294-23. The design-build contract was modified on December 16, 2025, pursuant to Resolution No. R-1235-25. Funding is from Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The item was forwarded to the Board with a favorable recommendation by the Transportation Committee on 7/14/2026. The final action was adoption on 7/21/2026.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

Miami-Dade County Board of County Commissioners adopted Resolution R-641-26 (File No. 260966) on July 21, 2026, authorizing Supplemental Agreement No. 1 with Calvin, Giordano & Associates, Inc. for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The agreement increases the maximum contract value from $6,000,000 to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system, located within Miami-Dade County Districts 5 and 7. The supplemental agreement is required due to expanded scope and extended schedule previously approved on December 16, 2025, under Resolution No. R-1235-25, with the design-build contractor NV2A Central Joint Venture. Additional CEI services support enhanced quality assurance, expanded materials testing including a dedicated materials laboratory, increased inspection for added elements such as corridor-wide Wi-Fi and amenities, and extended oversight due to schedule impacts including utility-related delays. Funding is from Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The original CEI contract was approved April 4, 2023, pursuant to Resolution No. R-294-23. Due diligence confirmed no adverse findings. Public comment or stakeholder sentiment is not stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

Resolution R-641-26, adopted by the Miami-Dade Board of County Commissioners on 7/21/2026, authorizes the County Mayor to execute Supplemental Agreement No. 1 with Calvin, Giordano & Associates, Inc. for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The agreement increases the maximum contract value to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system, located within Districts 5 and 7. The original contract was valued at $6,000,000. The supplemental agreement is required to support expanded scope and extended schedule previously approved on December 16, 2025, pursuant to Resolution No. R-1235-25, under the design-build contract with NV2A Central Joint Venture. The additional CEI services will support enhanced quality assurance through expanded materials testing, including a dedicated materials laboratory; increased inspection and coordination for added project elements such as corridor-wide Wi-Fi and amenities; and extended construction oversight due to schedule impacts, including utility-related delays. The funding source is Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The CEI contract was originally approved on April 4, 2023, pursuant to Resolution No. R-294-23. The project includes bicycle and pedestrian paths, bridges, landscaping, lighting, drainage, wayfinding, and related infrastructure improvements. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

The Miami-Dade Board of County Commissioners adopted Resolution R-641-26, File Number 260966, authorizing the County Mayor to execute Supplemental Agreement No. 1 with Calvin, Giordano & Associates, Inc. for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The agreement increases the maximum contract value to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system, located within Districts 5 and 7. The supplemental agreement is required to support the expanded scope and extended schedule of the design-build contract with NV2A Central Joint Venture, previously approved on December 16, 2025, pursuant to Resolution No. R-1235-25. The additional CEI services will support enhanced quality assurance through expanded materials testing, including a dedicated materials laboratory; increased inspection and coordination for added project elements such as corridor-wide Wi-Fi and amenities; and extended construction oversight due to schedule impacts, including utility-related delays. The original contract was valued at $6,000,000. The funding source is Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The item was introduced on 5/22/2026, forwarded to the BCC with a favorable recommendation by the Transportation Committee on 7/14/2026, and adopted by the Board of County Commissioners on 7/21/2026.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

The Miami-Dade Board of County Commissioners adopted Resolution R-641-26 (File Number 260966) on July 21, 2026, authorizing Supplemental Agreement No. 1 with Calvin, Giordano & Associates, Inc. for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The agreement increases the maximum contract value to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system, located within Miami-Dade County Districts 5 and 7. The original contract was valued at $6,000,000. The supplemental agreement is funded by Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The CEI contract was originally approved on April 4, 2023, pursuant to Resolution No. R-294-23. The design-build contract with NV2A Central Joint Venture was previously modified on December 16, 2025, pursuant to Resolution No. R-1235-25. The additional CEI services support enhanced quality assurance, expanded materials testing, a dedicated materials laboratory, increased inspection for corridor-wide Wi-Fi and amenities, and extended construction oversight due to schedule impacts including utility-related delays. The Transportation Committee forwarded the item to the Board with a favorable recommendation on July 14, 2026. The item was introduced on May 22, 2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

The Miami-Dade Board of County Commissioners adopted Resolution R-641-26 (File Number 260966) on July 21, 2026, authorizing Supplemental Agreement No. 1 with Calvin, Giordano & Associates, Inc. for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The agreement increases the maximum contract value from $6,000,000 to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system, located within Districts 5 and 7. The supplemental agreement is required to support expanded scope and extended schedule previously approved on December 16, 2025, under Resolution No. R-1235-25, for the design-build contract with NV2A Central Joint Venture. The additional CEI services support enhanced quality assurance through expanded materials testing, increased inspection and coordination for added project elements such as corridor-wide Wi-Fi and amenities, and extended construction oversight due to schedule impacts including utility-related delays. The item was forwarded to the Board with a favorable recommendation by the Transportation Committee on July 14, 2026, and adopted by the Board on July 21, 2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

Miami-Dade County Board of County Commissioners approved Supplemental Agreement No. 1 for professional services for The Underline Phase 3 – Segments 3 to 9. This agreement increases the maximum contract value for construction, engineering, and inspection (CEI) services provided by Calvin, Giordano & Associates, Inc. to $8,252,721.83 and extends the contract term by 270 non-compensable calendar days, for a total term of 1,654 days. The increase is to ensure continuous and adequate construction oversight due to an expanded scope and extended schedule, including enhanced quality assurance, increased inspection for added project elements like Wi-Fi, and extended oversight due to schedule impacts. The original contract was approved on April 4, 2023. The project is a 7.36-mile multimodal corridor beneath the Metrorail system.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

The document is a legislative item for Miami-Dade County, File Number 260966, a Resolution (R-641-26) adopted on 7/21/2026. It authorizes Supplemental Agreement No. 1 with Calvin, Giordano & Associates, Inc. for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The contract value is increased to $8,252,721.83 and the term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system, located within Districts 5 and 7. The original contract was $6,000,000. The increase is $2,252,721.83 and the term extension is 270 non-compensable calendar days. The project includes bicycle and pedestrian paths, bridges, landscaping, lighting, drainage, wayfinding, and related infrastructure improvements. The additional services support enhanced quality assurance, expanded materials testing, a dedicated materials laboratory, increased inspection for corridor-wide Wi-Fi and amenities, and extended oversight due to schedule impacts including utility-related delays. The funding source is Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The staff recommendation is approval. The Board adopted the resolution. The document does not state a specific street address, parcel, or acreage for the project. The document does not state any public comment or stakeholder sentiment.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

Resolution authorizing Supplemental Agreement No. 1 for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9, increasing the contract maximum value to $8,252,721.83 and extending the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system. The original contract was valued at $6,000,000. The supplemental agreement increases the contract by $2,252,721.83 and extends the term by 270 non-compensable calendar days. The project is located within Districts 5 and 7. Adopted by the Board of County Commissioners on 7/21/2026.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

Resolution authorizing Supplemental Agreement No. 1 with Calvin, Giordano & Associates, Inc. for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The agreement increases the maximum contract value to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system. The item was forwarded to the Board of County Commissioners with a favorable recommendation from the Transportation Committee on 7/14/2026 and was placed on the 7/21/2026 Board agenda. The original contract was valued at $6,000,000. The increase is $2,252,721.83 and the term extension is 270 non-compensable calendar days. The project is located within Districts 5 and 7. The funding source is Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The design-build contract is with NV2A Central Joint Venture. The original CEI contract was approved on April 4, 2023, pursuant to Resolution No. R-294-23. A prior modification to the design-build contract was approved on December 16, 2025, pursuant to Resolution No. R-1235-25.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Cmte on 7/14/2026; placed on 7/21/2026 Board agenda; final action not stated
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

Miami-Dade County Commissioners approved Supplemental Agreement No. 1 for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3 – Segments 3 to 9. The agreement increases the maximum contract value to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. This is to ensure continuous and adequate construction oversight due to an expanded scope and extended schedule approved previously. The additional services will support enhanced quality assurance, increased inspection and coordination for added project elements like corridor-wide Wi-Fi, and extended construction oversight. The original contract was approved on April 4, 2023. The supplemental agreement is funded by Mobility Impact Fees.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Address:
The Underline Phase 3 – Segments 3 to 9
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

Resolution authorizing Supplemental Agreement No. 1 for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The agreement increases the contract maximum value to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system. The original contract was valued at $6,000,000. The supplemental agreement increases the amount by $2,252,721.83 and extends the term by 270 non-compensable calendar days. The project is located within Districts 5 and 7. The resolution was adopted on 7/21/2026.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

Miami-Dade County Board of County Commissioners adopted Resolution R-641-26 (File Number 260966) on July 21, 2026, authorizing Supplemental Agreement No. 1 with Calvin, Giordano & Associates, Inc. for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The agreement increases the maximum contract value to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system, located within Districts 5 and 7. The original contract was valued at $6,000,000. The supplemental agreement increases the amount by $2,252,721.83 and extends the term by 270 non-compensable calendar days. The project includes bicycle and pedestrian paths, bridges, landscaping, lighting, drainage, wayfinding, and related infrastructure improvements. The additional CEI services support enhanced quality assurance through expanded materials testing, including a dedicated materials laboratory; increased inspection and coordination for added elements such as corridor-wide Wi-Fi and amenities; and extended construction oversight due to schedule impacts, including utility-related delays. The funding source is Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The design-build contract is with NV2A Central Joint Venture. The CEI contract was originally approved on April 4, 2023, pursuant to Resolution No. R-294-23. The design-build contract was previously modified on December 16, 2025, pursuant to Resolution No. R-1235-25. The staff recommendation was to approve the supplemental agreement. The Transportation Committee forwarded the item to the Board with a favorable recommendation on July 14, 2026. The Board adopted the resolution on July 21, 2026. The document does not state a specific street address, parcel/folio number, or acreage. The document does not state any public comment or stakeholder sentiment.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

Miami-Dade County Commissioners approved Supplemental Agreement No. 1 for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3 – Segments 3 to 9. This agreement increases the maximum contract value to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The original contract was for $6,000,000 and was approved on April 4, 2023. The supplemental agreement is necessary to align CEI services with an expanded scope and extended schedule of the design-build contract, which was modified to incorporate community-driven enhancements, safety improvements, and additional amenities. The additional CEI services will support enhanced quality assurance, increased inspection and coordination for added project elements, and extended construction oversight. The project is a 7.36-mile multimodal corridor beneath the Metrorail system. Funding for the supplemental agreement comes from Mobility Impact Fees. Calvin, Giordano & Associates, Inc. is the contractor. The project is located within Districts 5 and 7 but provides countywide benefits.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

The Miami-Dade County Board of County Commissioners adopted Resolution R-641-26 (File Number 260966) on July 21, 2026, authorizing Supplemental Agreement No. 1 with Calvin, Giordano & Associates, Inc. for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The agreement increases the maximum contract value from $6,000,000 to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system, including bicycle and pedestrian paths, bridges, landscaping, lighting, drainage, wayfinding, and related infrastructure improvements. The project is located within Districts 5 and 7. The supplemental agreement is funded by Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The original CEI contract was approved on April 4, 2023, pursuant to Resolution No. R-294-23. The design-build contract was previously modified on December 16, 2025, pursuant to Resolution No. R-1235-25, to incorporate stakeholder-driven enhancements, technical refinements, and additional construction duration. The additional CEI services support enhanced quality assurance through expanded materials testing, including a dedicated materials laboratory; increased inspection and coordination for added project elements such as corridor-wide Wi-Fi and amenities; and extended construction oversight due to schedule impacts, including utility-related delays. Due diligence confirmed no adverse findings. The item was forwarded to the Board with a favorable recommendation by the Transportation Committee on July 14, 2026, and adopted on July 21, 2026.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

The Miami-Dade County Board of County Commissioners adopted Resolution R-641-26 (File Number 260966) on July 21, 2026, authorizing Supplemental Agreement No. 1 to the Construction, Engineering, and Inspection (CEI) services contract with Calvin, Giordano & Associates, Inc. for The Underline Phase 3, Segments 3 to 9. The agreement increases the maximum contract value to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system. The original contract was valued at $6,000,000. The supplemental agreement is funded by Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The project is located within Districts 5 and 7, represented by Commissioners Vicki L. Lopez and Raquel A. Regalado, respectively. The CEI contract was originally approved on April 4, 2023, pursuant to Resolution No. R-294-23. The design-build contract with NV2A Central Joint Venture was previously modified on December 16, 2025, pursuant to Resolution No. R-1235-25. The additional CEI services support enhanced quality assurance through expanded materials testing, including a dedicated materials laboratory; increased inspection and coordination for added project elements such as corridor-wide Wi-Fi and amenities; and extended construction oversight due to schedule impacts, including utility-related delays. The staff recommendation was to approve the supplemental agreement. The item was forwarded to the Board with a favorable recommendation by the Transportation Committee on July 14, 2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

The Miami-Dade County Board of County Commissioners adopted Resolution R-641-26 (File Number 260966) on July 21, 2026, authorizing Supplemental Agreement No. 1 with Calvin, Giordano & Associates, Inc. for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The agreement increases the maximum contract value to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system, located within Districts 5 and 7. The original contract was valued at $6,000,000. The supplemental agreement is required to support expanded scope and extended schedule previously approved on December 16, 2025, under Resolution No. R-1235-25, with the design-build contractor NV2A Central Joint Venture. The additional CEI services support enhanced quality assurance, increased inspection for added elements such as corridor-wide Wi-Fi and amenities, and extended oversight due to schedule impacts including utility-related delays. Funding is from Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The item was forwarded to the Board with a favorable recommendation by the Transportation Committee on July 14, 2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

Miami-Dade County Board of County Commissioners adopted Resolution R-641-26 (File Number 260966) on July 21, 2026, authorizing Supplemental Agreement No. 1 with Calvin, Giordano & Associates, Inc. for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The agreement increases the contract maximum value to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system, located within Districts 5 and 7. The supplemental agreement is required to support expanded scope and extended schedule previously approved on December 16, 2025, under Resolution No. R-1235-25, with the design-build contractor NV2A Central Joint Venture. The additional CEI services support enhanced quality assurance, expanded materials testing including a dedicated materials laboratory, increased inspection for added elements such as corridor-wide Wi-Fi and amenities, and extended oversight due to schedule impacts including utility-related delays. The original contract was valued at $6,000,000. The increase is $2,252,721.83, and the term extension is 270 non-compensable calendar days. Funding is from Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The original CEI contract was approved April 4, 2023, pursuant to Resolution No. R-294-23. The project includes bicycle and pedestrian paths, bridges, landscaping, lighting, drainage, wayfinding, and related infrastructure improvements. The Transportation Committee forwarded the item to the BCC with a favorable recommendation on July 14, 2026. The item was introduced May 22, 2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

The Miami-Dade County Board of County Commissioners adopted Resolution R-641-26 (File Number 260966) on July 21, 2026, authorizing Supplemental Agreement No. 1 to the Construction, Engineering, and Inspection (CEI) services contract with Calvin, Giordano & Associates, Inc. for The Underline Phase 3, Segments 3 to 9. The agreement increases the maximum contract value to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system, located within Miami-Dade County Districts 5 and 7. The original contract was valued at $6,000,000. The supplemental agreement increases the contract amount by $2,252,721.83 and extends the term by 270 non-compensable calendar days. The additional CEI services support enhanced quality assurance through expanded materials testing, including a dedicated materials laboratory; increased inspection and coordination for added project elements such as corridor-wide Wi-Fi and amenities; and extended construction oversight due to schedule impacts, including utility-related delays. The funding source is Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The project was previously approved on December 16, 2025, pursuant to Resolution No. R-1235-25, under the design-build contract with NV2A Central Joint Venture. The CEI contract was originally approved on April 4, 2023, pursuant to Resolution No. R-294-23. The item was introduced on May 22, 2026, forwarded to the Board of County Commissioners with a favorable recommendation by the Transportation Committee on July 14, 2026, and adopted on July 21, 2026. The document does not state a specific street address, parcel/folio number, or acreage for the project. The document does not state any public comment or stakeholder sentiment.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

The document is a resolution authorizing Supplemental Agreement No. 1 to increase the contract value and term for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The contract is with Calvin, Giordano & Associates, Inc. The maximum contract value is increased to $8,252,721.83 and the contract term is increased to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system. The resolution was adopted on 7/21/2026. The document does not state a specific street address, parcel/folio, or legal location. The project is located within Districts 5 and 7. The original contract was valued at $6,000,000. The increase is $2,252,721.83. The contract term is extended by 270 non-compensable calendar days. The project includes bicycle and pedestrian paths, bridges, landscaping, lighting, drainage, wayfinding, and related infrastructure improvements. The funding source is Mobility Impact Fees (MIF), Program No. 2000000133. The document does not state any public comment or stakeholder sentiment.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

The Miami-Dade County Board of County Commissioners adopted Resolution R-641-26 (File Number 260966) on July 21, 2026, authorizing Supplemental Agreement No. 1 with Calvin, Giordano & Associates, Inc. for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The agreement increases the maximum contract value from $6,000,000 to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system, located within Districts 5 and 7. The additional services support enhanced quality assurance, expanded materials testing, a dedicated materials laboratory, increased inspection for added elements like corridor-wide Wi-Fi and amenities, and extended oversight due to schedule impacts including utility-related delays. The item was forwarded to the Board with a favorable recommendation by the Transportation Committee on July 14, 2026, and adopted on July 21, 2026. The funding source is Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The document does not state a specific street address, parcel/folio, or legal location for the project.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

The Miami-Dade Board of County Commissioners adopted Resolution R-641-26 (File Number 260966) on July 21, 2026, authorizing Supplemental Agreement No. 1 with Calvin, Giordano & Associates, Inc. for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The agreement increases the maximum contract value from $6,000,000 to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system, including bicycle and pedestrian paths, bridges, landscaping, lighting, drainage, wayfinding, and related infrastructure improvements. The project is located within Districts 5 and 7. The additional CEI services support enhanced quality assurance, expanded materials testing, a dedicated materials laboratory, increased inspection and coordination for added elements such as corridor-wide Wi-Fi and amenities, and extended construction oversight due to schedule impacts including utility-related delays. The funding source is Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The original CEI contract was approved on April 4, 2023, pursuant to Resolution No. R-294-23. The design-build contract with NV2A Central Joint Venture was previously modified on December 16, 2025, pursuant to Resolution No. R-1235-25. The item was forwarded to the Board with a favorable recommendation by the Transportation Committee on July 14, 2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

Miami-Dade County Board of County Commissioners adopted Resolution R-641-26 (File Number 260966) on July 21, 2026, authorizing Supplemental Agreement No. 1 with Calvin, Giordano & Associates, Inc. for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The agreement increases the maximum contract value from $6,000,000 to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system, located within Districts 5 and 7. The additional CEI services support enhanced quality assurance, expanded materials testing including a dedicated materials laboratory, increased inspection for added elements such as corridor-wide Wi-Fi and amenities, and extended oversight due to schedule impacts including utility-related delays. The supplemental agreement is funded by Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The original CEI contract was approved April 4, 2023, pursuant to Resolution No. R-294-23. The design-build contract with NV2A Central Joint Venture was previously modified on December 16, 2025, pursuant to Resolution No. R-1235-25. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

The Miami-Dade Board of County Commissioners adopted Resolution R-641-26 (File Number 260966) on July 21, 2026, authorizing Supplemental Agreement No. 1 with Calvin, Giordano & Associates, Inc. for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The agreement increases the maximum contract value from $6,000,000 to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system, including bicycle and pedestrian paths, bridges, landscaping, lighting, drainage, wayfinding, and related infrastructure improvements. The project is located within Miami-Dade County Districts 5 and 7. The original CEI contract was approved on April 4, 2023, pursuant to Resolution No. R-294-23. The supplemental agreement is required due to an expanded scope and extended schedule previously approved on December 16, 2025, under Resolution No. R-1235-25, for the design-build contract with NV2A Central Joint Venture. Additional CEI services support enhanced quality assurance, expanded materials testing, a dedicated materials laboratory, increased inspection for corridor-wide Wi-Fi and amenities, and extended oversight due to utility-related delays. Funding is from Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The Transportation Committee forwarded the item to the Board with a favorable recommendation on July 14, 2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

The Miami-Dade County Board of County Commissioners adopted Resolution R-641-26 (File Number 260966) on July 21, 2026, authorizing Supplemental Agreement No. 1 to the Construction, Engineering, and Inspection (CEI) services contract with Calvin, Giordano & Associates, Inc. for The Underline Phase 3, Segments 3 to 9. The agreement increases the contract maximum value by $2,252,721.83 to a total of $8,252,721.83 and extends the contract term by 270 non-compensable calendar days to a total of 1,654 calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system, located within Miami-Dade County Districts 5 and 7. The additional CEI services support enhanced quality assurance, expanded materials testing, increased inspection for added elements such as corridor-wide Wi-Fi and amenities, and extended oversight due to schedule impacts. The funding source is Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The original CEI contract was approved on April 4, 2023, pursuant to Resolution No. R-294-23. The design-build contract with NV2A Central Joint Venture was previously modified on December 16, 2025, pursuant to Resolution No. R-1235-25. The Transportation Committee forwarded the item to the Board with a favorable recommendation on July 14, 2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

Miami-Dade County Commission approved Supplemental Agreement No. 1 for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3 – Segments 3 to 9. The agreement increases the maximum contract value to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. This is to ensure continuous and adequate construction oversight due to an expanded scope and extended schedule approved previously, incorporating community-driven enhancements, safety improvements, and additional amenities. The additional CEI services will support enhanced quality assurance, increased inspection and coordination for added project elements, and extended construction oversight. The original contract was approved on April 4, 2023. The supplemental agreement was recommended favorably by the Transportation Committee and approved by the Board of County Commissioners.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Address:
The Underline Phase 3 – Segments 3 to 9
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

The Miami-Dade County Board of County Commissioners adopted Resolution R-641-26 (File Number 260966) on July 21, 2026, authorizing Supplemental Agreement No. 1 with Calvin, Giordano & Associates, Inc. for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The agreement increases the maximum contract value to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system, located within Districts 5 and 7. The original contract was valued at $6,000,000. The supplemental agreement is funded by Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The additional CEI services support enhanced quality assurance, increased inspection for added elements like corridor-wide Wi-Fi and amenities, and extended oversight due to schedule impacts. The item was forwarded to the BCC with a favorable recommendation by the Transportation Committee on July 14, 2026, and adopted on July 21, 2026.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Calvin, Giordano & Associates, Inc.

CEI SERVICES CONTRACT FOR THE UNDERLINE

The Miami-Dade Board of County Commissioners adopted Resolution R-641-26 (File Number 260966) on July 21, 2026, authorizing Supplemental Agreement No. 1 with Calvin, Giordano & Associates, Inc. for Construction, Engineering, and Inspection (CEI) services for The Underline Phase 3, Segments 3 to 9. The agreement increases the maximum contract value from $6,000,000 to $8,252,721.83 and extends the contract term to 1,654 non-compensable calendar days. The project is a 7.36-mile multimodal corridor beneath the Metrorail system, including bicycle and pedestrian paths, bridges, landscaping, lighting, drainage, wayfinding, and related infrastructure improvements. The supplemental agreement is required to support expanded scope and extended schedule previously approved on December 16, 2025, under Resolution No. R-1235-25, with the design-build contractor NV2A Central Joint Venture. The additional CEI services support enhanced quality assurance through expanded materials testing, including a dedicated materials laboratory; increased inspection and coordination for added elements such as corridor-wide Wi-Fi and amenities; and extended construction oversight due to schedule impacts, including utility-related delays. The project is located within Districts 5 and 7, represented by Commissioners Vicki L. Lopez and Raquel A. Regalado. Funding is from Mobility Impact Fees (MIF), Program No. 2000000133, Fiscal Year 2025-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 164. The original CEI contract was approved on April 4, 2023, pursuant to Resolution No. R-294-23. Due diligence confirmed no adverse findings. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Calvin, Giordano & Associates, Inc.

CELEBRATING 30 YEARS OF EXCELLENCE

This legislative item, File Number 261282, titled 'CELEBRATING 30 YEARS OF EXCELLENCE IN CREDIT RATINGS AND SECURITIES AND EXCHANGE COMMISSION COMPLIANCE', was introduced on 7/10/2026 and is pending Board of County Commissioners (BCC) assignment. The agenda date is 7/21/2026, with agenda item numbers 2B14 and 2B35. No specific project details, zoning changes, or applicant information are provided in this legislative report.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Report
Decision:
Pending BCC Assignment
Applicant:
Mayor

CELEBRATING 30 YEARS OF EXCELLENCE

This legislative item, File Number 261282, titled 'CELEBRATING 30 YEARS OF EXCELLENCE IN CREDIT RATINGS AND SECURITIES AND EXCHANGE COMMISSION COMPLIANCE', was introduced on 7/10/2026 and was before the Board on 7/21/2026 as Agenda Item 2B14. The requester was the Mayor. No specific project details, zoning changes, or applicant information are provided. There is no legislative text available online.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Report
Decision:
Before the Board
Applicant:
Mayor

CELEBRATING 30 YEARS OF EXCELLENCE

This legislative item, File Number 261282, titled 'CELEBRATING 30 YEARS OF EXCELLENCE IN CREDIT RATINGS AND SECURITIES AND EXCHANGE COMMISSION COMPLIANCE', was introduced on 7/10/2026 and is pending Board of County Commissioners (BCC) assignment. The agenda date is 7/21/2026 with Agenda Item Number 2B14. No specific project details, zoning changes, or business opportunities are stated in this legislative matter.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Report
Decision:
Pending BCC Assignment
Applicant:
Mayor

CELEBRATING 30 YEARS OF EXCELLENCE

This legislative item, File Number 261282, titled 'CELEBRATING 30 YEARS OF EXCELLENCE IN CREDIT RATINGS AND SECURITIES AND EXCHANGE COMMISSION COMPLIANCE,' was introduced on 7/10/2026 and is pending Board of County Commissioners (BCC) assignment. The agenda date is 7/21/2026, with agenda item numbers 2B14 and 2B35. No specific development project details, applicant, or decision are stated.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Report
Decision:
Pending BCC Assignment
Applicant:
Mayor

CELEBRATING 30 YEARS OF EXCELLENCE

This legislative item, File Number 261282, titled 'CELEBRATING 30 YEARS OF EXCELLENCE IN CREDIT RATINGS AND SECURITIES AND EXCHANGE COMMISSION COMPLIANCE,' was introduced on 7/10/2026 and is pending BCC assignment. The agenda date is 7/21/2026 with agenda item number 2B14. No specific project details, applicant, or decision are stated.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Report
Decision:
Pending BCC Assignment

CELEBRATING 30 YEARS OF EXCELLENCE

Board of County Commissioners in Miami-Dade County posted this record to its public file. The posted document carries a title and no readable project detail, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official document link above and watch for the fuller record the body posts later.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Report

CELEBRATING 30 YEARS OF EXCELLENCE

This legislative item, File Number 261282, is a report titled 'CELEBRATING 30 YEARS OF EXCELLENCE IN CREDIT RATINGS AND SECURITIES AND EXCHANGE COMMISSION COMPLIANCE'. It was introduced on 7/10/2026 and is before the Miami-Dade County Commission, with an agenda date of 7/21/2026. No specific project details, applicant, or decision are stated.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Report
Decision:
Before the Board
Applicant:
Mayor

CELEBRATING 30 YEARS OF EXCELLENCE

Board of County Commissioners in Miami-Dade County posted this record to its public file. The posted document carries a title and no readable project detail, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official document link above and watch for the fuller record the body posts later.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Report

CELEBRATING 30 YEARS OF EXCELLENCE

This legislative item, File Number 261282, titled 'CELEBRATING 30 YEARS OF EXCELLENCE IN CREDIT RATINGS AND SECURITIES AND EXCHANGE COMMISSION COMPLIANCE', was accepted by the Board of County Commissioners on July 21, 2026. The item was introduced on July 10, 2026, and was requested by the Mayor. There is no specific project or development information detailed in this record.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Report
Decision:
Accepted
Applicant:
Mayor

CELEBRATING 30 YEARS OF EXCELLENCE

Board of County Commissioners in Miami-Dade County posted this record to its public file. The posted document carries a title and no readable project detail, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official document link above and watch for the fuller record the body posts later.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Report

CELEBRATING 30 YEARS OF EXCELLENCE

Board of County Commissioners in Miami-Dade County posted this record to its public file. The posted document carries a title and no readable project detail, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official document link above and watch for the fuller record the body posts later.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Report

CELEBRATING 30 YEARS OF EXCELLENCE

This legislative item, File Number 261282, titled 'CELEBRATING 30 YEARS OF EXCELLENCE IN CREDIT RATINGS AND SECURITIES AND EXCHANGE COMMISSION COMPLIANCE,' was introduced on 7/10/2026 and was before the Board on 7/21/2026 as Agenda Item 2B14. The requester is the Mayor. No specific project details, zoning changes, or public comments are stated in the provided text.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Report
Decision:
Before the Board
Applicant:
Mayor

CELEBRATING 30 YEARS OF EXCELLENCE

This legislative item, File Number 261282, titled 'CELEBRATING 30 YEARS OF EXCELLENCE IN CREDIT RATINGS AND SECURITIES AND EXCHANGE COMMISSION COMPLIANCE', was introduced on 7/10/2026 and is pending BCC assignment, with an agenda date of 7/21/2026. No specific project details, zoning changes, or physical locations are provided.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Report
Decision:
Pending BCC Assignment
Applicant:
Mayor

CELEBRATING 30 YEARS OF EXCELLENCE

Board of County Commissioners in Miami-Dade County posted this record to its public file. The posted document carries a title and no readable project detail, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official document link above and watch for the fuller record the body posts later.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Report

CELEBRATING 30 YEARS OF EXCELLENCE

Board of County Commissioners in Miami-Dade County posted this record to its public file. The posted document carries a title and no readable project detail, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official document link above and watch for the fuller record the body posts later.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Report

CELEBRATING 30 YEARS OF EXCELLENCE

Board of County Commissioners in Miami-Dade County posted this record to its public file. The posted document carries a title and no readable project detail, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official document link above and watch for the fuller record the body posts later.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Report

CELEBRATING 30 YEARS OF EXCELLENCE

Board of County Commissioners in Miami-Dade County posted this record to its public file. The posted document carries a title and no readable project detail, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official document link above and watch for the fuller record the body posts later.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Report

CELEBRATING 30 YEARS OF EXCELLENCE

Board of County Commissioners in Miami-Dade County posted this record to its public file. The posted document carries a title and no readable project detail, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official document link above and watch for the fuller record the body posts later.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Report

CELEBRATING 30 YEARS OF EXCELLENCE

Board of County Commissioners in Miami-Dade County posted this record to its public file. The posted document carries a title and no readable project detail, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official document link above and watch for the fuller record the body posts later.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Report

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta