GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County is seeking to ratify the submission of a grant application and authorize the execution of a grant agreement for the Venetian Causeway Bridge Replacement Project. The project involves replacing 11 bridges built in 1926 with newer infrastructure designed to last 50 years. The total estimated construction cost is $201,094,080, with a federal grant of up to $100,547,040 from the US Department of Transportation Federal Highway Administration under the Bridge Investment Program. A local match of at least $50,273,520 and a Florida Department of Transportation match of up to $50,273,520 are required. The project aims to increase safety and resiliency, maintain aesthetics, and enhance bicycle and pedestrian facilities. The bridges, located on the Venetian Causeway, are deteriorated due to age and marine environment exposure, and do not meet current design standards.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying grant application submission and authorizing execution of grant agreement
Address:
Venetian Causeway
Applicant:
Miami-Dade County (Transportation and Public Works)

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County is seeking to ratify the submission of a grant application and authorize the execution of a grant agreement with the U.S. Department of Transportation Federal Highway Administration (FHWA) for the Venetian Causeway Bridge Replacement Project. The project aims to replace 11 bridges built in 1926 with newer, more resilient infrastructure, improving safety, meeting current design codes, and enhancing bicycle and pedestrian facilities. The total estimated project construction cost is $201,094,080, with a federal grant of up to $100,547,040, a local match of at least $50,273,520 (from Toll Revenue and Mobility Impact Fees), and a Florida Department of Transportation (FDOT) match of up to $50,273,520. The grant funds are pending execution of the grant agreement.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying actions and authorizing execution of grant agreement
Address:
Venetian Causeway
Applicant:
Miami-Dade County (Transportation and Public Works)

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County Board of County Commissioners adopted Resolution R-692-26 (Legislative Item File Number 261322) on 7/21/2026, ratifying the County Mayor's submission of a grant application to the USDOT FHWA under the Bridge Investment Program, Large Bridge Project category, for up to $100,547,040.00 for the Venetian Causeway Bridge Replacement Project. The resolution authorizes the County Mayor to execute the grant agreement, amendments, and receive and expend funds. The project involves replacing 11 Venetian Causeway bridges originally built in 1926, with an estimated total construction cost of $201,094,080, including a required local match of at least $50,273,520 and an FDOT match of up to $50,273,520. The project spans Commission Districts 3 and 4. The grant was awarded by USDOT FHWA on 7/17/2024. The resolution was introduced on 7/14/2026 and adopted on 7/21/2026. Senator Rene Garcia is the prime sponsor. The grant manager is Paola Baez, P.E., Chief, Multimodal Development, DTPW. The project will replace 11 bridges (Bridges 2 through 12) that do not meet current geometric or safety design standards and exhibit severe deterioration. The work includes replacing the bridges with infrastructure anticipated to last 50 years, improving safety, maintaining aesthetics, and enhancing bicycle and pedestrian facilities. The project is funded by federal funds ($100,547,040), County funds via Toll Revenue and Mobility Impact Fees (at least $50,273,520), and FDOT funds (up to $50,273,520). The document does not state a specific street address, parcel/folio, or acreage for the project. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County (County Mayor or designee)

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

The document is a legislative item for a resolution ratifying actions of the County Mayor in submitting a grant application to the USDOT FHWA under the Bridge Investment Program, Large Bridge Project category, for the Venetian Causeway Bridge Replacement Project. The grant amount is up to $100,547,040. The resolution was adopted on 7/21/2026. The project involves replacing 11 Venetian Causeway bridges originally built in 1926. The total estimated project construction cost is $201,094,080, with a required local match of at least $50,273,520 and an FDOT match of up to $50,273,520. The project spans Commission Districts 3 and 4. The grant was awarded on July 17, 2024. The resolution also authorizes executing the grant agreement and related agreements. Public comment sentiment is not stated.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County Board of County Commissioners adopted Resolution R-692-26 (File Number 261322) on July 21, 2026, ratifying the County Mayor's submission of a grant application to the U.S. Department of Transportation Federal Highway Administration under the Bridge Investment Program, Large Bridge Project category, for the Venetian Causeway Bridge Replacement Project. The grant amount is up to $100,547,040. The project involves replacing 11 Venetian Causeway bridges originally built in 1926, with newer infrastructure anticipated to last 50 years. The total estimated project construction cost is $201,094,080, with a required local match of at least $50,273,520 and an FDOT match of up to $50,273,520. The project spans Commission Districts 3 and 4. The resolution also authorizes the County Mayor to execute the grant agreement and related Local Agency Program agreements with the Florida Department of Transportation. The grant was awarded by USDOT FHWA on July 17, 2024. The grant manager is Paola Baez, P.E., Chief, Multimodal Development, Department of Transportation and Public Works. The item was introduced on July 14, 2026, and adopted on July 21, 2026. Senator Rene Garcia is the prime sponsor. The document does not state a specific street address, parcel/folio, or acreage for the project.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County (County Mayor or County Mayor's designee)

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County Commissioners adopted a resolution ratifying the submission of a grant application and authorizing the execution of a grant agreement with the United States Department of Transportation Federal Highway Administration (FHWA) for the Venetian Causeway Bridge Replacement Project. The project aims to replace 11 bridges built in 1926 with newer, more resilient infrastructure. The federal grant amount is up to $100,547,040. The total estimated project construction cost is $201,094,080, with Miami-Dade County providing a local match of at least $50,273,520 and the Florida Department of Transportation (FDOT) providing up to $50,273,520. The project will improve safety, resiliency, aesthetics, and bicycle and pedestrian facilities. Public comment is not stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
Venetian Causeway
Applicant:
Miami-Dade County

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County Board of County Commissioners adopted Resolution R-692-26 (Legislative Item File Number 261322) on 7/21/2026, ratifying the County Mayor's submission of a grant application to the USDOT FHWA Bridge Investment Program, Large Bridge Project category, for up to $100,547,040.00 for the Venetian Causeway Bridge Replacement Project. The resolution authorizes the County Mayor or designee to execute the grant agreement, amendments, and to receive and expend funds. The project involves replacing 11 Venetian Causeway bridges originally built in 1926, with a total estimated construction cost of $201,094,080, including a required County match of at least $50,273,520 and an FDOT match of up to $50,273,520. The project spans Commission Districts 3 and 4. The grant was awarded by USDOT FHWA on 7/17/2024. The resolution was introduced on 7/14/2026 and adopted on 7/21/2026. Senator Rene Garcia is listed as prime sponsor. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County (County Mayor or designee)

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County Board of County Commissioners adopted Resolution R-692-26 (Legislative Item File Number 261322) on July 21, 2026, ratifying the County Mayor's submission of a grant application to the U.S. Department of Transportation Federal Highway Administration under the Bridge Investment Program, Large Bridge Project category, for up to $100,547,040.00 for the Venetian Causeway Bridge Replacement Project. The resolution authorizes the County Mayor or designee to execute the grant agreement, amendments, and to receive and expend funds. The project involves replacing 11 Venetian Causeway bridges originally built in 1926, with newer infrastructure anticipated to last 50 years, meeting updated design codes and improving safety. The total estimated project construction cost is $201,094,080, with a required County match of at least $50,273,520 and an FDOT match of up to $50,273,520. The project spans Commission Districts 3 and 4. The grant was awarded by USDOT FHWA on July 17, 2024. The item was introduced on July 14, 2026, and adopted on July 21, 2026. Senator Rene Garcia is listed as prime sponsor. The Grant Manager is Paola Baez, P.E., Chief, Multimodal Development, Department of Transportation and Public Works.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County Board of County Commissioners adopted Resolution R-692-26 (File Number 261322) on 7/21/2026, ratifying the County Mayor's submission of a grant application to the USDOT FHWA under the Bridge Investment Program, Large Bridge Project category, for up to $100,547,040 for the Venetian Causeway Bridge Replacement Project. The resolution authorizes the County Mayor to execute the grant agreement, amendments, and to receive and expend funds. The project involves replacing 11 Venetian Causeway bridges originally built in 1926, with newer infrastructure anticipated to last 50 years. The total estimated project construction cost is $201,094,080, including a required local match of at least $50,273,520 and an FDOT match of up to $50,273,520. The project spans Commission Districts 3 and 4. The grant was awarded by USDOT FHWA on 7/17/2024. The resolution was introduced on 7/14/2026 and adopted on 7/21/2026. Prime sponsor: Sen. Rene Garcia. Staff recommendation: retroactive authorization and execution of the grant agreement.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County (County Mayor or designee)

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County is seeking to ratify the submission of a grant application and authorize the execution of a grant agreement for the Venetian Causeway Bridge Replacement Project. The project involves replacing 11 bridges built in 1926 with newer infrastructure. The total estimated construction cost is $201,094,080. The grant application is for up to $100,547,040 from the U.S. Department of Transportation Federal Highway Administration under the Bridge Investment Program, Large Bridge Project category. A local match of at least $50,273,520 is required, with Florida Department of Transportation potentially contributing up to $50,273,520. The project aims to increase safety and resiliency, maintain aesthetics, and enhance bicycle and pedestrian facilities. The bridges exhibit severe deterioration due to age and marine environment exposure, and do not meet current design standards.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying actions and authorizing execution of grant agreement
Address:
Venetian Causeway
Applicant:
Miami-Dade County (Transportation and Public Works)

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County Board of County Commissioners adopted Resolution R-692-26 (File Number 261322) on 7/21/2026, ratifying the County Mayor's submission of a grant application to the U.S. Department of Transportation Federal Highway Administration under the Bridge Investment Program, Large Bridge Project category, for up to $100,547,040 for the Venetian Causeway Bridge Replacement Project. The project involves replacing 11 Venetian Causeway bridges originally built in 1926, with a total estimated construction cost of $201,094,080. The required local match is at least $50,273,520 (25 percent) funded via Toll Revenue and Mobility Impact Fees, with FDOT funding up to $50,273,520 (25 percent). The project spans Commission Districts 3 and 4. The grant was awarded by USDOT FHWA on 7/17/2024. The resolution authorizes the County Mayor to execute the grant agreement and related Local Agency Program agreements with FDOT. The grant manager is Paola Baez, P.E., Chief, Multimodal Development, Department of Transportation and Public Works. Senator Rene Garcia is listed as prime sponsor. The document does not state a specific street address, parcel/folio, or acreage for the project.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County (County Mayor Daniella Levine Cava)

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

The Board of County Commissioners adopted Resolution R-692-26, File Number 261322, ratifying the County Mayor's submission of a grant application to the USDOT FHWA under the Bridge Investment Program, Large Bridge Project category, for up to $100,547,040 for the Venetian Causeway Bridge Replacement Project. The resolution authorizes the County Mayor to execute the grant agreement, amendments, and to receive and expend funds. The project involves replacing 11 Venetian Causeway bridges originally built in 1926, with an estimated total construction cost of $201,094,080. The required local match is at least $50,273,520, with FDOT funding up to $50,273,520. The project spans Commission Districts 3 and 4. The grant was awarded on July 17, 2024. The resolution was introduced on July 14, 2026, and adopted on July 21, 2026. The grant manager is Paola Baez, P.E., Chief, Multimodal Development, DTPW. The project will replace bridges to meet updated design codes, improve safety, maintain aesthetics, and enhance bicycle and pedestrian facilities. The bridges are located on the Venetian Causeway, which crosses Biscayne Bay, connecting mainland Miami to Miami Beach through six man-made residential barrier islands connected by 10 fixed bridges and two movable bridges. The document does not state a specific street address, parcel/folio, or acreage. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County Mayor or designee

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County Board of County Commissioners adopted Resolution R-692-26 (File Number 261322) on 7/21/2026, ratifying the County Mayor's submission of a grant application to the USDOT FHWA under the Bridge Investment Program, Large Bridge Project category, for up to $100,547,040 for the Venetian Causeway Bridge Replacement Project. The project involves replacing 11 Venetian Causeway bridges originally built in 1926, with a total estimated construction cost of $201,094,080, including a required local match of at least $50,273,520 and an FDOT match of up to $50,273,520. The resolution authorizes the County Mayor to execute the grant agreement and related LAP agreements with FDOT, and to receive and expend funds. The project spans Commission Districts 3 and 4. The grant was awarded by USDOT FHWA on 7/17/2024. The grant application was submitted in response to a NOFO published on 9/27/2023. The project will replace bridges with infrastructure anticipated to last 50 years, meeting updated design codes, improving safety, maintaining aesthetics, and enhancing bicycle and pedestrian facilities. The bridges exhibit severe deterioration and none of the 11 bridges meet current geometric or safety design standards. The Causeway crosses Biscayne Bay, connecting mainland Miami to Miami Beach through six man-made residential barrier islands connected by 10 fixed bridges and two movable bridges. Funding sources include Toll Revenue, Mobility Impact Fees, and FDOT funds. The Grant Manager is Paola Baez, P.E., Chief, Multimodal Development, DTPW. Senator Rene Garcia is listed as prime sponsor. The item was introduced on 7/14/2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County (County Mayor or County Mayor's designee)

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Resolution adopted on 7/21/2026 ratifying the County Mayor's submission of a grant application to the USDOT FHWA under the Bridge Investment Program, Large Bridge Project category, for up to $100,547,040 for the Venetian Causeway Bridge Replacement Project. The project replaces 11 Venetian Causeway bridges originally built in 1926, with newer infrastructure anticipated to last 50 years. Total estimated project construction cost is $201,094,080, including a required local match of at least $50,273,520 and an FDOT match of up to $50,273,520. The resolution also authorizes the County Mayor to execute the grant agreement and related LAP agreements. The project spans Commission Districts 3 and 4. The grant was awarded on 7/17/2024. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County (County Mayor Daniella Levine Cava; Department of Transportation and Public Works)

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County Board of County Commissioners adopted Resolution R-692-26 (File Number 261322) on 7/21/2026, ratifying the County Mayor's submission of a grant application to the USDOT FHWA under the Bridge Investment Program, Large Bridge Project category, for the Venetian Causeway Bridge Replacement Project. The grant amount is up to $100,547,040.00. The resolution authorizes the County Mayor to execute the grant agreement, amendments, and to receive and expend funds. The project involves replacing 11 Venetian Causeway bridges originally built in 1926, with newer infrastructure anticipated to last 50 years. The total estimated project construction cost is $201,094,080, including a required local match of at least $50,273,520 and an FDOT match of up to $50,273,520. The project spans Commission Districts 3 and 4. The grant was awarded by USDOT FHWA on July 17, 2024. The resolution was introduced on 7/14/2026 and adopted on 7/21/2026. Senator Rene Garcia is the prime sponsor. The grant manager is Paola Baez, P.E., Chief, Multimodal Development, Department of Transportation and Public Works. The project will increase safety and resiliency of the bridges, maintain the aesthetics of the Causeway, and enhance bicycle and pedestrian facilities. The bridges (Bridges 2 through 12) exhibit severe deterioration and do not meet current geometric or safety design standards, creating a safety and hurricane evacuation concern. The Causeway crosses Biscayne Bay, connecting mainland Miami to Miami Beach through a series of six man-made residential barrier islands connected by 10 fixed bridges and two movable bridges. The project is funded by Toll Revenue and Mobility Impact Fees (MIF) for the County match. The resolution was adopted with a pass vote. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County Mayor or County Mayor's designee

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Resolution adopted on 7/21/2026 ratifying the County Mayor's submission of a grant application to the USDOT FHWA under the Bridge Investment Program, Large Bridge Project category, for the Venetian Causeway Bridge Replacement Project, in an amount up to $100,547,040. The project involves replacing 11 Venetian Causeway bridges originally built in 1926, with a total estimated construction cost of $201,094,080, including a required County match of at least $50,273,520 and an FDOT match of up to $50,273,520. The resolution authorizes the County Mayor to execute the grant agreement and related LAP agreements. The project spans Commission Districts 3 and 4. The grant was awarded on July 17, 2024. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County (County Mayor or designee)

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

The Miami-Dade Board of County Commissioners adopted Resolution R-692-26 (File Number 261322) on July 21, 2026, ratifying the County Mayor's submission of a grant application to the U.S. Department of Transportation Federal Highway Administration under the Bridge Investment Program, Large Bridge Project category, for up to $100,547,040 for the Venetian Causeway Bridge Replacement Project. The project involves replacing 11 Venetian Causeway bridges originally built in 1926, with newer infrastructure anticipated to last 50 years. The total estimated project construction cost is $201,094,080, including a required local match of at least $50,273,520 from the County via Toll Revenue and Mobility Impact Fees, and up to $50,273,520 from FDOT. The resolution authorizes the County Mayor to execute the grant agreement and related Local Agency Program agreements with FDOT, and to receive and expend funds. The project spans Commission Districts 3 and 4. The grant was awarded by USDOT FHWA on July 17, 2024. The grant manager is Paola Baez, P.E., Chief, Multimodal Development, Department of Transportation and Public Works. Senator Rene Garcia is listed as prime sponsor. The document does not state a specific street address, parcel/folio, or acreage for the project.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County Mayor or County Mayor's designee

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County Board of County Commissioners adopted Resolution R-692-26 (File Number 261322) on July 21, 2026, ratifying the County Mayor's submission of a grant application to the U.S. Department of Transportation Federal Highway Administration under the Bridge Investment Program, Large Bridge Project category, for the Venetian Causeway Bridge Replacement Project. The grant amount is up to $100,547,040, with a required County match of at least $50,273,520 and a FDOT match of up to $50,273,520. The total estimated project construction cost is $201,094,080. The project involves replacing 11 Venetian Causeway bridges originally built in 1926, with newer infrastructure anticipated to last 50 years. The project spans Commission Districts 3 and 4. The grant was awarded by USDOT FHWA on July 17, 2024. The resolution authorizes the County Mayor or designee to execute the grant agreement and related Local Agency Program agreements with FDOT, and to receive and expend funds. The grant manager is Paola Baez, P.E., Chief, Multimodal Development, Department of Transportation and Public Works. The funding source includes Causeway Toll Revenue, FDOT Funds, and Mobility Impact Fees. The document does not state a specific street address, parcel or folio number, or acreage for the project. The document does not state any public comment or stakeholder sentiment.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County (County Mayor or designee)

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County is seeking to ratify the submission of a grant application and authorize the execution of a grant agreement with the U.S. Department of Transportation Federal Highway Administration (FHWA) for the Venetian Causeway Bridge Replacement Project. The project aims to replace 11 bridges built in 1926 with newer, more resilient infrastructure, improving safety, meeting current design codes, and enhancing bicycle and pedestrian facilities. The total estimated project construction cost is $201,094,080, with a federal grant of up to $100,547,040, a local match of at least $50,273,520 (funded by Toll Revenue and Mobility Impact Fees), and a Florida Department of Transportation (FDOT) match of up to $50,273,520. The grant funds are pending execution of the grant agreement.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying actions and authorizing execution of grant agreement
Address:
Venetian Causeway
Applicant:
Miami-Dade County (Transportation and Public Works)

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

The Miami-Dade Board of County Commissioners adopted Resolution R-692-26 (File Number 261322) on July 21, 2026, ratifying the County Mayor's submission of a grant application to the U.S. Department of Transportation Federal Highway Administration under the Bridge Investment Program, Large Bridge Project category, for the Venetian Causeway Bridge Replacement Project. The grant amount is up to $100,547,040.00. The resolution authorizes the County Mayor or designee to execute the grant agreement, amendments, and to receive and expend funds. The project involves replacing 11 Venetian Causeway bridges originally built in 1926, with an anticipated lifespan of 50 years. The total estimated project construction cost is $201,094,080, which includes a required local match of at least $50,273,520 and a FDOT match of up to $50,273,520. The project spans Commission Districts 3 and 4. The grant was awarded by USDOT FHWA on July 17, 2024. The resolution was introduced on July 14, 2026, and adopted on July 21, 2026. Senator Rene Garcia is the prime sponsor. The grant manager is Paola Baez, P.E., Chief, Multimodal Development, Department of Transportation and Public Works.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County Mayor or designee

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County is seeking to ratify the submission of a grant application and authorize the execution of a grant agreement for the Venetian Causeway Bridge Replacement Project. The project aims to replace 11 bridges, originally built in 1926, with newer, more resilient infrastructure designed to last 50 years. The project will improve safety, meet updated design codes, enhance bicycle and pedestrian facilities, and address deterioration due to age and marine environment. The total estimated construction cost is $201,094,080, with federal funding of up to $100,547,040 from the U.S. Department of Transportation's Federal Highway Administration (FHWA) under the Bridge Investment Program. The County will provide a local match of at least $50,273,520, and the Florida Department of Transportation (FDOT) may contribute up to $50,273,520.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying actions and authorizing execution of grant agreement
Address:
Venetian Causeway
Applicant:
Miami-Dade County (Transportation and Public Works)

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

The document is a resolution ratifying the County Mayor's submission of a grant application to the USDOT FHWA under the Bridge Investment Program, Large Bridge Project category, for the Venetian Causeway Bridge Replacement Project. The grant amount is up to $100,547,040, with a required County match of at least $50,273,520. The project involves replacing 11 Venetian Causeway bridges originally built in 1926, with a total estimated construction cost of $201,094,080. The resolution was adopted by the Board of County Commissioners on 7/21/2026. The project spans Commission Districts 3 and 4. The grant was awarded on 7/17/2024. The project will increase safety and resiliency, maintain aesthetics, and enhance bicycle and pedestrian facilities. The document does not state a specific street address, parcel, or acreage. It does not state any public comment or stakeholder sentiment.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County Mayor or designee

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County Board of County Commissioners adopted Resolution R-692-26 (File Number 261322) on July 21, 2026, ratifying the County Mayor's submission of a grant application to the U.S. Department of Transportation Federal Highway Administration under the Bridge Investment Program, Large Bridge Project category, for up to $100,547,040 for the Venetian Causeway Bridge Replacement Project. The project replaces 11 Venetian Causeway bridges originally built in 1926, with a total estimated construction cost of $201,094,080, including a required local match of at least $50,273,520 and an FDOT match of up to $50,273,520. The grant was awarded by USDOT FHWA on July 17, 2024. The project spans Commission Districts 3 and 4. The resolution authorizes the County Mayor to execute the grant agreement and related Local Agency Program agreements with FDOT, and to receive and expend funds. The grant manager is Paola Baez, P.E., Chief, Multimodal Development, Department of Transportation and Public Works. The project will increase safety and resiliency, maintain aesthetics, and enhance bicycle and pedestrian facilities. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County (County Mayor or designee)

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

The document is a legislative item for Miami-Dade County, File Number 261322, a Resolution (R-692-26) adopted on 7/21/2026. It ratifies the County Mayor's actions in submitting a grant application to the USDOT FHWA under the Bridge Investment Program, Large Bridge Project category, for the Venetian Causeway Bridge Replacement Project. The grant amount is up to $100,547,040. The project involves replacing 11 Venetian Causeway bridges originally built in 1926, with a total estimated construction cost of $201,094,080. The required local match is at least $50,273,520, with FDOT funding up to $50,273,520. The project spans Commission Districts 3 and 4. The resolution authorizes the County Mayor to execute the grant agreement and related agreements. The grant was awarded on July 17, 2024. The project will increase safety and resiliency, maintain aesthetics, and enhance bicycle and pedestrian facilities. The document does not state a specific street address, parcel or folio number, acreage, or number of units or lots. It does not state any public comment or stakeholder sentiment.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County (County Mayor or County Mayor's designee)

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County Board of County Commissioners adopted Resolution R-692-26 (File Number 261322) on 7/21/2026, ratifying the County Mayor's submission of a grant application to the U.S. Department of Transportation Federal Highway Administration under the Bridge Investment Program, Large Bridge Project category, for the Venetian Causeway Bridge Replacement Project. The grant amount is up to $100,547,040. The project involves replacing 11 Venetian Causeway bridges originally built in 1926, with newer infrastructure anticipated to last 50 years. The total estimated project construction cost is $201,094,080, including a required local match of at least $50,273,520 and an FDOT match of up to $50,273,520. The project spans Commission Districts 3 and 4. The resolution also authorizes the County Mayor to execute the grant agreement, amendments, and receive and expend funds. The grant was awarded by USDOT FHWA on 7/17/2024. The item was introduced on 7/14/2026 and adopted on 7/21/2026. Senator Rene Garcia is listed as prime sponsor. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County (County Mayor or designee)

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County Board of County Commissioners adopted Resolution R-692-26 (File Number 261322) on July 21, 2026, ratifying the County Mayor's submission of a grant application to the USDOT FHWA under the Bridge Investment Program, Large Bridge Project category, for the Venetian Causeway Bridge Replacement Project. The grant amount is up to $100,547,040. The project involves replacing 11 Venetian Causeway bridges originally built in 1926, with a total estimated construction cost of $201,094,080. The required local match is at least $50,273,520, with FDOT funding up to $50,273,520. The project spans Commission Districts 3 and 4. The resolution also authorizes the County Mayor to execute the grant agreement and related LAP agreements with FDOT. The grant was awarded by USDOT FHWA on July 17, 2024. The grant manager is Paola Baez, P.E., Chief, Multimodal Development, DTPW. The project will replace 11 bridges (Bridges 2 through 12) that do not meet current geometric or safety design standards and exhibit severe deterioration. The work includes replacing the bridges with infrastructure anticipated to last 50 years, improving safety, maintaining aesthetics, and enhancing bicycle and pedestrian facilities. The project is funded by Toll Revenue and Mobility Impact Fees (MIF). The resolution was introduced on July 14, 2026, and adopted on July 21, 2026. Senator Rene Garcia is the prime sponsor. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County Mayor or County Mayor's designee

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County Board of County Commissioners adopted Resolution R-692-26 (Legislative Item File Number 261322) on 7/21/2026, ratifying the County Mayor's submission of a grant application to the USDOT FHWA Bridge Investment Program, Large Bridge Project category, for up to $100,547,040 for the Venetian Causeway Bridge Replacement Project. The resolution authorizes the County Mayor to execute the grant agreement, amendments, and receive and expend funds. The project involves replacing 11 Venetian Causeway bridges originally built in 1926, with a total estimated construction cost of $201,094,080, including a required local match of at least $50,273,520 and an FDOT match of up to $50,273,520. The project spans Commission Districts 3 and 4. The grant was awarded on 7/17/2024. The document does not state a specific street address, parcel/folio, acreage, or number of units/lots. Public comment sentiment is not stated.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County (County Mayor or designee)

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County Board of County Commissioners adopted Resolution R-692-26 (File Number 261322) on July 21, 2026, ratifying the County Mayor's submission of a grant application to the U.S. Department of Transportation Federal Highway Administration under the Bridge Investment Program, Large Bridge Project category, for up to $100,547,040 for the Venetian Causeway Bridge Replacement Project. The project involves replacing 11 Venetian Causeway bridges originally built in 1926, with a total estimated construction cost of $201,094,080. The required local match is at least $50,273,520 (25 percent) funded via Toll Revenue and Mobility Impact Fees, with FDOT funding up to $50,273,520 (25 percent). The project spans Commission Districts 3 and 4. The grant was awarded by USDOT FHWA on July 17, 2024. The resolution authorizes the County Mayor to execute the grant agreement and related Local Agency Program agreements with FDOT, and to receive and expend funds. The grant manager is Paola Baez, P.E., Chief, Multimodal Development, Department of Transportation and Public Works. The project will increase safety and resiliency, maintain aesthetics, and enhance bicycle and pedestrian facilities. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County (County Mayor Daniella Levine Cava)

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County Board of County Commissioners adopted Resolution R-692-26 (File Number 261322) on 7/21/2026, ratifying the County Mayor's submission of a grant application to the USDOT FHWA under the Bridge Investment Program, Large Bridge Project category, for up to $100,547,040 for the Venetian Causeway Bridge Replacement Project. The resolution authorizes the County Mayor to execute the grant agreement, amendments, and to receive and expend funds. The project involves replacing 11 Venetian Causeway bridges originally built in 1926, with an estimated total construction cost of $201,094,080. The required local match is at least $50,273,520, with FDOT funding up to $50,273,520. The project spans Commission Districts 3 and 4. The grant was awarded on 7/17/2024. The resolution was introduced on 7/14/2026 and adopted on 7/21/2026. Senator Rene Garcia is the prime sponsor. The grant manager is Paola Baez, P.E., Chief, Multimodal Development, DTPW. The project will replace bridges to meet updated design codes, improve safety, maintain aesthetics, and enhance bicycle and pedestrian facilities. The bridges are in poor condition due to age and marine environment, creating safety and hurricane evacuation concerns. The project is funded by Toll Revenue and Mobility Impact Fees (MIF).

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County Board of County Commissioners adopted Resolution R-692-26 (File Number 261322) on 7/21/2026, ratifying the County Mayor's submission of a grant application to the U.S. Department of Transportation Federal Highway Administration under the Bridge Investment Program, Large Bridge Project category, for up to $100,547,040 for the Venetian Causeway Bridge Replacement Project. The resolution authorizes the County Mayor to execute the grant agreement, amendments, and receive and expend funds. The project involves replacing 11 Venetian Causeway bridges originally built in 1926, with a total estimated construction cost of $201,094,080, including a required County match of at least $50,273,520 and an FDOT match of up to $50,273,520. The project spans Commission Districts 3 and 4. The grant was awarded by USDOT FHWA on July 17, 2024. The resolution was introduced on 7/14/2026 and adopted on 7/21/2026. Senator Garcia asked to be listed as a prime sponsor. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County (County Mayor or designee)

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County is seeking to ratify the submission of a grant application and authorize the execution of a grant agreement for the Venetian Causeway Bridge Replacement Project. The project aims to replace 11 bridges, originally built in 1926, with newer, more resilient infrastructure designed to last 50 years. The project will improve safety, meet updated design codes, enhance bicycle and pedestrian facilities, and address deterioration due to age and marine environment. The total estimated project construction cost is $201,094,080, with a federal grant of up to $100,547,040 from the USDOT Federal Highway Administration's Bridge Investment Program. The county will provide a local match of at least $50,273,520, and the Florida Department of Transportation will contribute up to $50,273,520.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying actions and authorizing execution of grant agreement
Address:
Venetian Causeway
Applicant:
Miami-Dade County Transportation and Public Works

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County is seeking to ratify the submission of a grant application and authorize the execution of a grant agreement for the Venetian Causeway Bridge Replacement Project. The project involves replacing 11 bridges, originally built in 1926, with newer, more resilient infrastructure. The total estimated project construction cost is $201,094,080. The grant application is for up to $100,547,040 from the U.S. Department of Transportation Federal Highway Administration under the Bridge Investment Program, Large Bridge Project category. A local match of at least $50,273,520 is required, with Florida Department of Transportation potentially contributing up to $50,273,520. The project aims to increase safety and resiliency, maintain aesthetics, and enhance bicycle and pedestrian facilities. The bridges, located on the Venetian Causeway connecting mainland Miami to Miami Beach, exhibit severe deterioration and do not meet current design standards.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying actions and authorizing execution of grant agreement
Address:
Venetian Causeway
Applicant:
Miami-Dade County (Transportation and Public Works)

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County Board of County Commissioners adopted Resolution R-692-26 (File Number 261322) on July 21, 2026, ratifying the County Mayor's submission of a grant application to the U.S. Department of Transportation Federal Highway Administration under the Bridge Investment Program, Large Bridge Project category, for up to $100,547,040 for the Venetian Causeway Bridge Replacement Project. The resolution authorizes the County Mayor to execute the grant agreement, amendments, and related Local Agency Program agreements with the Florida Department of Transportation, and to receive and expend funds. The project involves replacing 11 Venetian Causeway bridges originally built in 1926, with a total estimated construction cost of $201,094,080, including a required local match of at least $50,273,520 from the County and up to $50,273,520 from FDOT. The project spans Commission Districts 3 and 4. The grant was awarded by USDOT FHWA on July 17, 2024. The grant manager is Paola Baez, P.E., Chief, Multimodal Development, Department of Transportation and Public Works. Senator Rene Garcia is listed as prime sponsor. The resolution was introduced on July 14, 2026, and adopted on July 21, 2026.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County Mayor or County Mayor's designee

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

The Miami-Dade Board of County Commissioners adopted Resolution R-692-26 (File Number 261322) on July 21, 2026, ratifying the County Mayor's submission of a grant application to the U.S. Department of Transportation Federal Highway Administration under the Bridge Investment Program, Large Bridge Project category, for the Venetian Causeway Bridge Replacement Project. The grant amount is up to $100,547,040. The project involves replacing 11 Venetian Causeway bridges originally built in 1926, with a total estimated construction cost of $201,094,080. The required local match is at least $50,273,520 (25 percent) funded via Toll Revenue and Mobility Impact Fees, with FDOT funding up to $50,273,520 (25 percent). The project spans Commission Districts 3 and 4. The grant was awarded by USDOT FHWA on July 17, 2024. The resolution authorizes the County Mayor to execute the grant agreement and any amendments, and to receive and expend funds. Senator Rene Garcia is listed as prime sponsor. The grant manager is Paola Baez, P.E., Chief, Multimodal Development, Department of Transportation and Public Works.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County Mayor or designee

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County Board of County Commissioners adopted Resolution R-692-26 (File Number 261322) on July 21, 2026, ratifying the County Mayor's submission of a grant application to the U.S. Department of Transportation Federal Highway Administration under the Bridge Investment Program, Large Bridge Project category, for the Venetian Causeway Bridge Replacement Project. The grant amount is up to $100,547,040. The project involves replacing 11 Venetian Causeway bridges originally built in 1926, with newer infrastructure anticipated to last 50 years. The total estimated project construction cost is $201,094,080, including a required local match of at least $50,273,520 and an FDOT match of up to $50,273,520. The project spans Commission Districts 3 and 4. The resolution authorizes the County Mayor or designee to execute the grant agreement, amendments, and to receive and expend funds. The grant was awarded by USDOT FHWA on July 17, 2024. The resolution was introduced on July 14, 2026, and adopted on July 21, 2026. Prime sponsor: Senator Rene Garcia. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County Mayor or designee

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Miami-Dade County Board of County Commissioners is considering a resolution to ratify the submission of a grant application and authorize the execution of a grant agreement with the U.S. Department of Transportation Federal Highway Administration (FHWA) for the Venetian Causeway Bridge Replacement Project. The grant application is for an amount up to $100,547,040.00 under the Bridge Investment Program, Large Bridge Project category. The project involves replacing 11 bridges on the Venetian Causeway, originally built in 1926, with newer, more resilient infrastructure. The total estimated project construction cost is $201,094,080, which includes a required local match of at least $50,273,520 and a Florida Department of Transportation (FDOT) match of up to $50,273,520. The project aims to increase safety and resiliency, maintain aesthetics, and enhance bicycle and pedestrian facilities. The grant funds are pending execution of the grant agreement.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying actions and authorizing execution of grant agreement
Address:
Venetian Causeway
Applicant:
Miami-Dade County (Transportation and Public Works)

GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00

Resolution adopted on 7/21/2026 ratifying the County Mayor's submission of a grant application to the USDOT FHWA under the Bridge Investment Program, Large Bridge Project category, for up to $100,547,040 for the Venetian Causeway Bridge Replacement Project. The project replaces 11 Venetian Causeway bridges originally built in 1926, with a total estimated construction cost of $201,094,080, including a required County match of at least $50,273,520 and an FDOT match of up to $50,273,520. The work includes replacing 11 bridges with infrastructure anticipated to last 50 years, meeting updated design codes, improving safety, maintaining aesthetics, and enhancing bicycle and pedestrian facilities. The project spans Commission Districts 3 and 4. The grant was awarded by USDOT FHWA on July 17, 2024. Grant disbursement is pending grant agreement execution under this resolution. The resolution also authorizes the County Mayor to execute the grant agreement and related LAP agreements with FDOT. The grant manager is Paola Baez, P.E., Chief, Multimodal Development, Department of Transportation and Public Works. The funding source includes Toll Revenue and Mobility Impact Fees. The resolution was sponsored by Sen. Rene Garcia. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County

GREEN TECH CORRIDOR (S-16113)

Miami-Dade County Board of County Commissioners awarded Contract No. S-16113 to All Construction & Plumbing, Inc. for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract amount is $12,506,147.00 for a period of 627 calendar days. The project involves extending the sanitary sewer system along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including approximately 12,000 linear feet of sewer pipe, manholes, and laterals. It also includes the replacement of approximately 4,000 linear feet of aging water mains, fire hydrants, and reconnections. This project is part of the Connect to Protect initiative to transition properties from septic systems to the County's sanitary sewer system. Funding will come from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded the item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Awarded
Address:
N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
Applicant:
Water & Sewer Department

GREEN TECH CORRIDOR (S-16113)

Miami-Dade County Board of County Commissioners is awarding Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract is awarded to All Construction & Plumbing, Inc. for $12,506,147.00 with a period of 627 calendar days. The project involves extending the sanitary sewer system and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative is part of the Connect to Protect initiative to transition properties from septic systems to the county's sanitary sewer system, aiming to improve water quality, public health, and support economic growth. The project is funded in part by the Building Better Communities General Obligation Bond (GOB) Program. The Infrastructure, Innovation & Technology Committee forwarded the item to the BCC with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Awarded
Address:
N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
Applicant:
Water & Sewer Department (Requester), All Construction & Plumbing, Inc. (Contractor)

GREEN TECH CORRIDOR (S-16113)

Miami-Dade County Board of County Commissioners adopted Resolution R-644-26 (File Number 260947) on July 21, 2026, awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties – Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for a total contract amount of $12,506,147.00 and a contract period of 627 calendar days. The project extends the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, in Commission District 2. The project installs approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and replaces approximately 4,000 linear feet of aging and undersized water mains, including fire hydrants and reconnections to existing meters. The project transitions properties currently served by septic systems to the County's sanitary sewer system as part of the Connect to Protect initiative. Funding sources include BBC GOB Financing, Fire Hydrant Fund, Future WASD Revenue Bonds, WASD Revenue Bonds Sold, Water Connection Charges, and Water Renewal and Replacement Fund. The Infrastructure, Innovation & Technology Committee forwarded the item to the Board with a favorable recommendation on June 10, 2026. The contract was introduced on May 20, 2026. The contract manager is Paul Adams (786-863-9425), and the project manager is Doralba Vargas (786-552-4445).

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
Applicant:
All Construction & Plumbing, Inc.

GREEN TECH CORRIDOR (S-16113)

Miami-Dade County Board of County Commissioners awarded Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract, valued at $12,506,147.00, will be performed by All Construction & Plumbing, Inc. over 627 calendar days. The project involves installing approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and laterals, and replacing approximately 4,000 linear feet of aging water mains, including fire hydrants. This initiative aims to transition properties from septic systems to the County's sanitary sewer system as part of the Connect to Protect initiative, supporting economic growth and environmental health. Funding will come from the Building Better Communities General Obligation Bond Program and other WASD funds. The Infrastructure, Innovation & Technology Committee forwarded the item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Awarded
Address:
N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
Applicant:
All Construction & Plumbing, Inc.

GREEN TECH CORRIDOR (S-16113)

Miami-Dade County Board of County Commissioners (BCC) is set to award Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract, valued at $12,506,147.00, will be awarded to All Construction & Plumbing, Inc. for a period of 627 calendar days. The project involves extending the sanitary sewer system and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative is part of the 'Connect to Protect' program, aiming to transition properties from septic systems to the county's sanitary sewer system, thereby enhancing property values, redevelopment potential, and supporting economic growth. Funding will come from the Building Better Communities General Obligation Bond (GOB) Program and other WASD funds. The Infrastructure, Innovation & Technology Committee forwarded this item to the BCC with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation (Infrastructure, Innovation & Technology Committee); Recommendation to Award Contract (Staff Recommendation)
Address:
N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
Applicant:
Water & Sewer Department (Requester), All Construction & Plumbing, Inc. (Contractor)

GREEN TECH CORRIDOR (S-16113)

Miami-Dade County Board of County Commissioners awarded Contract No. S-16113 to All Construction & Plumbing, Inc. for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The project involves extending sanitary sewer systems and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative aims to transition properties from septic systems to the county sewer, enhancing property values, redevelopment potential, and supporting economic growth. The contract duration is 627 calendar days, with a total amount of $12,506,147.00. Funding is provided by the Building Better Communities General Obligation Bond Program and other WASD funds. The Infrastructure, Innovation & Technology Committee forwarded the item with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Awarded
Address:
N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
Applicant:
All Construction & Plumbing, Inc.

GREEN TECH CORRIDOR (S-16113)

Miami-Dade County Board of County Commissioners adopted Resolution R-644-26 (Legislative Item File Number 260947) on 7/21/2026, awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties – Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for a total contract amount of $12,506,147.00 and a contract period of 627 calendar days. The project will extend the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, and will provide for the renewal/replacement of aging and undersized water mains throughout the area. The project will install approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and replace approximately 4,000 LF of aging and undersized water mains, including fire hydrants and reconnections to existing meters. The project will transition properties currently served by septic systems to the County's sanitary sewer system. The project is located within Commission District 2, represented by Commissioner Marleine Bastien. The contract was awarded to the lowest responsive and responsible bidder, All Construction & Plumbing, Inc. The fiscal impact to the County is $12,506,147.00, inclusive of the Inspector General Fee. The funding sources include BBC GOB Financing, Fire Hydrant Fund, Future WASD Revenue Bonds, WASD Revenue Bonds Sold, Water Connection Charges, and Water Renewal and Replacement Fund. The project is in WASD's FY 2025-2026 Adopted Budget and Multi-Year Capital Plan under Program #967090, Commercial and Industrial Corridors – Extension of Sewer System (Connect to Protect), and Program #2000000072, Water Reset Program – Small Diameter Water Mains Replacement. The project does not include Art in Public Places. The life expectancy of the Project is 50 years. Annual Operations Cost Impact / Funding: $10,000. Annual Maintenance Cost Impact / Funding: $10,000. The Board also authorized the County Mayor or County Mayor's designee to use the Miami-Dade Water and Sewer Department's Consent Decree and Capital Improvement Programs Acceleration Ordinance, section 2-8.2.12 of the Code of Miami-Dade County, Florida, to manage the Contract, and to use funds from the Building Better Communities General Obligation Bond (GOB) Program No. 17–Countywide Water and Sewer System Enhancements–to pay in part for the extension of wastewater service to the area. The item was introduced on 5/20/2026, forwarded to the BCC with a favorable recommendation by the Infrastructure, Innovation & Technology Committee on 6/10/2026, and adopted by the Board of County Commissioners on 7/21/2026. The document does not state any public comment or stakeholder sentiment.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
Applicant:
All Construction & Plumbing, Inc.

GREEN TECH CORRIDOR (S-16113)

Miami-Dade County Board of County Commissioners adopted Resolution R-644-26 (Legislative Item File Number 260947) on 7/21/2026, awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties – Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for a total contract amount of $12,506,147.00 and a contract period of 627 calendar days. The project will extend the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, and will provide for the renewal/replacement of aging and undersized water mains throughout the area. The project will install approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and replace approximately 4,000 LF of aging and undersized water mains, including fire hydrants and reconnections to existing meters. The project will transition properties currently served by septic systems to the County's sanitary sewer system as part of the Connect to Protect initiative. The project is located within Commission District 2, represented by Commissioner Marleine Bastien. The contract was competitively solicited, with bids opened on July 31, 2025, and All Construction & Plumbing, Inc. was the lowest responsive and responsible bidder. The project is funded in part by Building Better Communities General Obligation Bond (GOB) Program No. 17–Countywide Water and Sewer System Enhancements. The Infrastructure, Innovation & Technology Committee forwarded the item to the Board of County Commissioners with a favorable recommendation on 6/10/2026. The item was introduced on 5/20/2026. The contract period includes 540 days to Substantial Completion, 570 days to Final Completion, and a 57-day Contingency Time Allowance. The fiscal impact to the County is $12,506,147.00, inclusive of the Inspector General (IG) Fee. The project is in WASD's FY 2025-2026 Adopted Budget and Multi-Year Capital Plan under Program #967090, Commercial and Industrial Corridors – Extension of Sewer System (Connect to Protect), and Program #2000000072, Water Reset Program – Small Diameter Water Mains Replacement. There is no impact to the General Fund. The life expectancy of the Project is 50 years. Annual Operations Cost Impact / Funding: $10,000. Annual Maintenance Cost Impact / Funding: $10,000. The Project does not include Art in Public Places. Five bids were received. The other bidders were Acosta Tractors, Inc. ($13,111,136.74 total bid), Lanzo Construction Co. Florida ($13,761,190.93 total bid), David Mancini and Sons Inc. ($14,918,343.03 total bid), and Pabon Engineering Inc. ($16,499,252.35 total bid). All Construction submitted a total bid of $12,506,147.00, which is 19% above the EOR's pre-bid estimate (June 2025). Against an updated Bid Analysis, All Construction's bid would only be 1% higher. There are no protests to this award. The contract manager is Paul Adams / 786-863-9425 / [email protected]. The project manager is Doralba Vargas / 786-552-4445 / [email protected].

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
Applicant:
All Construction & Plumbing, Inc.

GREEN TECH CORRIDOR (S-16113)

Miami-Dade County Board of County Commissioners awarded Contract No. S-16113 to All Construction & Plumbing, Inc. for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract amount is $12,506,147.00 for a period of 627 calendar days. The project involves extending the sanitary sewer system and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative is part of the Connect to Protect initiative to transition properties from septic systems to the County's sanitary sewer system, aiming to improve water quality and support economic growth. The project is funded in part by the Building Better Communities General Obligation Bond (GOB) Program. The Infrastructure, Innovation & Technology Committee forwarded the item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Awarded
Address:
N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street
Applicant:
All Construction & Plumbing, Inc.

GREEN TECH CORRIDOR (S-16113)

Miami-Dade County Board of County Commissioners awarded Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North area. The contract, valued at $12,506,147.00, was awarded to All Construction & Plumbing, Inc. for a period of 627 calendar days. The project involves extending the sanitary sewer system and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative is part of the Connect to Protect initiative to transition properties from septic systems to the County's sanitary sewer system, aiming to improve water quality and support economic growth. Funding will come from the Building Better Communities General Obligation Bond Program and other WASD funds. The Infrastructure, Innovation & Technology Committee forwarded the item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Awarded
Address:
N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
Applicant:
All Construction & Plumbing, Inc.

GREEN TECH CORRIDOR (S-16113)

Miami-Dade County Board of County Commissioners is awarding Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract is awarded to All Construction & Plumbing, Inc. for $12,506,147.00 and a period of 627 calendar days. The project involves installing approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and laterals, and replacing approximately 4,000 linear feet of aging water mains, including fire hydrants. This project is part of the Connect to Protect initiative to transition properties from septic systems to the county's sanitary sewer system. The Infrastructure, Innovation & Technology Committee forwarded this item to the BCC with a favorable recommendation. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Awarded
Address:
N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
Applicant:
Water & Sewer Department

GREEN TECH CORRIDOR (S-16113)

Miami-Dade County Board of County Commissioners adopted Resolution R-644-26 (Legislative Item File Number 260947) on 7/21/2026, awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties – Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for a total contract amount of $12,506,147.00 and a contract period of 627 calendar days. The project will extend the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, within Commission District 2. The project will install approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and replace approximately 4,000 linear feet of aging and undersized water mains, including fire hydrants and reconnections to existing meters. The project is part of the Connect to Protect initiative, transitioning properties currently served by septic systems to the County's sanitary sewer system. Funding sources include Building Better Communities General Obligation Bond (GOB) Program No. 17–Countywide Water and Sewer System Enhancements, Fire Hydrant Fund, Future WASD Revenue Bonds, WASD Revenue Bonds Sold, Water Connection Charges, and Water Renewal and Replacement Fund. The contract was competitively solicited, with bids opened on July 31, 2025, in response to a June 18, 2025 advertisement. Five bids were received. The Engineer of Record determined on October 1, 2025, that the low bid was acceptable and that All Construction satisfied the requirements. There are no protests to this award. The Infrastructure, Innovation & Technology Committee forwarded the item to the Board of County Commissioners with a favorable recommendation on 6/10/2026. The item was introduced on 5/20/2026. The contract manager is Paul Adams, and the project manager is Doralba Vargas. The fiscal impact to the County is $12,506,147.00, inclusive of the Inspector General Fee. The life expectancy of the project is 50 years. Annual operations cost impact is $10,000, and annual maintenance cost impact is $10,000. The project does not include Art in Public Places. The project is in WASD's FY 2025-2026 Adopted Budget and Multi-Year Capital Plan under Program #967090, Commercial and Industrial Corridors – Extension of Sewer System (Connect to Protect), and Program #2000000072, Water Reset Program – Small Diameter Water Mains Replacement. The project resulted from the adoption of Resolution No. R-597-13. The Connect to Protect Initiative was launched in January 2022. Approximately 120,000 septic tank systems are still in use in Miami-Dade County, with 9,000 vulnerable to compromise or failure. The project will reduce the risk of groundwater contamination and nutrient loading to Biscayne Bay. The project will lay the foundation for long-term community benefits, including enhanced property values, increased redevelopment potential, and infrastructure needed to support economic growth. The contract period is 627 days: 540 days to Substantial Completion, 570 days to Final Completion, and a 57-day Contingency Time Allowance. The County Mayor or County Mayor's designee may manage the contract pursuant to section 2-8.2.12 of the Code of Miami-Dade County, Florida, which delegates authority to negotiate and settle claims and execute change orders that do not exceed ten percent of the base contract amount, subject to ratification by the Board. The apparent low bidder's price is 19% above the Engineer of Record's pre-bid estimate (June 2025). Against an updated Bid Analysis, All Construction's bid would only be 1% higher. The three apparent low bidders' prices fell within 10% of one another. All Construction has been awarded two contracts from the County over the past five years, with a total value of $12,872,119.00. All Construction has three evaluations in the Capital Improvement Information System, with a rating of 3.3 out of a possible 4.0 maximum. The project will be performed along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets. The project is located within Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The Board adopted the resolution on 7/21/2026. The Infrastructure, Innovation & Technology Committee forwarded the item to the BCC with a favorable recommendation on 6/10/2026. The item was introduced on 5/20/2026. The final action date was 7/21/2026. The agenda date was 7/21/2026. The agenda item number was 8O1. The legislative history shows the Board of County Commissioners adopted the item on 7/21/2026. The Infrastructure, Innovation & Technology Committee forwarded the item on 6/10/2026. The County Attorney was assigned on 5/21/2026. Roy Coley was assigned on 5/20/2026. The Office of Agenda Coordination was assigned on 5/20/2026. The report notes the item has 17 pages. The contract is attached as Exhibit D. The Project Worksheet is attached as Exhibit A. The Engineer of Record letter is attached as Exhibit B. The Bid Analysis is attached as Exhibit C. The Connect to Protect details are in Exhibit E. The resolution authorizes the County Mayor or County Mayor's designee to utilize the Miami-Dade Water and Sewer Department's Consent Decree and Capital Improvement Programs Acceleration Ordinance, section 2-8.2.12 of the Code of Miami-Dade County, Florida, to manage Contract No. S-16113. The resolution authorizes the use of funds from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17-Countywide Water and Sewer System Enhancements to pay in part for the extension of wastewater services to the Green Tech Corridor Area Basin 191. The resolution authorizes the County Mayor or County Mayor's designee to execute the contract and to exercise the termination and other provisions contained therein. The vendor selection table lists the following bids: All Construction & Plumbing Inc. base bid $10,810,000.00, total bid $12,506,147.00; Acosta Tractors, Inc. base bid $11,337,397.04, total bid $13,111,136.74; Lanzo Construction Co. Florida base bid $11,928,355.39, total bid $13,761,190.93; David Mancini and Sons Inc. base bid $12,980,311.85, total bid $14,918,343.03; Pabon Engineering Inc. base bid $14,417,502.14, total bid $16,499,252.35. Total bid includes contingency and dedicated allowances. The due diligence performed included a review of vendor information in the Business Management Workforce System, which discovered no adverse information. The contract manager is Paul Adams, phone 786-863-9425, email [email protected]. The project manager is Doralba Vargas, phone 786-552-4445, email [email protected]. The applicable ordinances and measures include Local Preference Code Section 2-8.5, Local Certified Veteran Business Enterprise Preference Code Section 2-8.5.1, Sea Level Rise Ordinance 14-79, Sustainable Buildings Program Implementing Order 8-8, Buy American Iron & Steel Procurement Program Code Section 2-8.2.6.1, Office of Inspector General Fee Code Section 2-1076, and User Access Program Code Section 2-8.10. The resolution was sponsored by Marleine Bastien. No registered lobbyist is listed. The sunset provision is no. The effective date and expiration date are not stated. The document does not state any public comment or stakeholder sentiment.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
Applicant:
All Construction & Plumbing, Inc.

GREEN TECH CORRIDOR (S-16113)

Resolution awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties - Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for $12,506,147.00 and a 627-calendar-day contract period. The project extends the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, and replaces aging water mains. The project installs approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and approximately 4,000 linear feet of water main pipe, valves, fittings, fire hydrants, and reconnections. The project is part of the Connect to Protect initiative, transitioning properties from septic systems to the County's sanitary sewer system. The resolution was adopted by the Board of County Commissioners on 7/21/2026. The Infrastructure, Innovation & Technology Committee forwarded it with a favorable recommendation on 6/10/2026. The contract was competitively solicited, with bids opened on July 31, 2025, and no protests were received. The project is located in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The fiscal impact is $12,506,147.00, funded by BBC GOB Financing, Fire Hydrant Fund, Future WASD Revenue Bonds, WASD Revenue Bonds Sold, Water Connection Charges, and Water Renewal and Replacement Fund. The project is in WASD's FY 2025-2026 Adopted Budget under Program #967090 and Program #2000000072. The life expectancy is 50 years. Annual operations and maintenance cost impact is $10,000 each, funded by WASD Operating Revenues. The contract manager is Paul Adams, and the project manager is Doralba Vargas. The County Mayor or designee is authorized to manage the contract under the WASD Acceleration Ordinance, Section 2-8.2.12, and to use Building Better Communities GOB funds for the wastewater extension. The contract period includes 540 days to Substantial Completion, 570 days to Final Completion, and a 57-day Contingency Time Allowance. The apparent low bidder's price was 19% above the Engineer of Record's pre-bid estimate, but only 1% higher against an updated Bid Analysis. The document does not state any public comment or stakeholder sentiment.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
Applicant:
All Construction & Plumbing, Inc.

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta