GREEN TECH CORRIDOR (S-16113)
The Miami-Dade Board of County Commissioners adopted Resolution R-644-26, File Number 260947, awarding Contract No. S-16113 to All Construction & Plumbing, Inc. for the Green Tech Corridor S-1 North project. The contract amount is $12,506,147.00 with a 627-calendar-day period. The project extends the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, and replaces aging water mains. The work includes approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and approximately 4,000 linear feet of water main pipe, valves, fittings, fire hydrants, and reconnections to existing meters. The project is in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The final action was on 7/21/2026. The Infrastructure, Innovation & Technology Committee forwarded it with a favorable recommendation on 6/10/2026. The project was introduced on 5/20/2026. The contract period is 540 days to Substantial Completion, 570 days to Final Completion, and a 57-day Contingency Time Allowance. The project is funded in part by Building Better Communities General Obligation Bond Program Project No. 17. The project is part of the Connect to Protect initiative to transition properties from septic systems to the sanitary sewer system. The contract manager is Paul Adams, and the project manager is Doralba Vargas. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners adopted Resolution R-644-26 (File Number 260947) on July 21, 2026, awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties – Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for a total contract amount of $12,506,147.00 and a contract period of 627 calendar days. The project will extend the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, and will replace aging and undersized water mains. The project includes approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and approximately 4,000 linear feet of water main pipe, valves, fittings, fire hydrants, and reconnections to existing meters. The project is located in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The project is part of the Connect to Protect initiative, transitioning properties currently served by septic systems to the County's sanitary sewer system. Funding sources include BBC GOB Financing, Fire Hydrant Fund, Future WASD Revenue Bonds, WASD Revenue Bonds Sold, Water Connection Charges, and Water Renewal and Replacement Fund. The project is in WASD's FY 2025-2026 Adopted Budget under Program #967090 and Program #2000000072. The contract was competitively solicited with bids opened on July 31, 2025, and All Construction was the lowest responsive and responsible bidder. The Infrastructure, Innovation & Technology Committee forwarded the item to the Board with a favorable recommendation on June 10, 2026. The contract period includes 540 days to Substantial Completion, 570 days to Final Completion, and a 57-day Contingency Time Allowance. The project life expectancy is 50 years. Annual operations and maintenance cost impact is $10,000 each, funded by WASD Operating Revenues. The project does not include Art in Public Places. There are no protests to this award. The County Mayor or designee is authorized to manage the contract under the WASD Acceleration Ordinance, Section 2-8.2.12, and to use funds from the Building Better Communities General Obligation Bond Program Project No. 17. The contract manager is Paul Adams, and the project manager is Doralba Vargas. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners is awarding Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract is awarded to All Construction & Plumbing, Inc. for $12,506,147.00 with a duration of 627 calendar days. The project involves extending the sanitary sewer system and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative is part of the Connect to Protect initiative to transition properties from septic systems to the county's sanitary sewer system, aiming to improve water quality, public health, and support economic growth. Funding will come from the Building Better Communities General Obligation Bond (GOB) Program and other WASD funds. The Infrastructure, Innovation & Technology Committee forwarded the item to the BCC with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- Water & Sewer Department
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners adopted Resolution R-644-26 (File Number 260947) on July 21, 2026, awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties – Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for a total contract amount of $12,506,147.00 and a contract period of 627 calendar days. The project extends the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, and includes renewal/replacement of aging and undersized water mains. The project installs approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and replaces approximately 4,000 linear feet of water mains, including fire hydrants and reconnections to existing meters. The project is in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The project transitions properties currently served by septic systems to the County's sanitary sewer system as part of the Connect to Protect initiative. Funding sources include BBC GOB Financing, Fire Hydrant Fund, Future WASD Revenue Bonds, WASD Revenue Bonds Sold, Water Connection Charges, and Water Renewal and Replacement Fund. The Infrastructure, Innovation & Technology Committee forwarded the item to the BCC with a favorable recommendation on June 10, 2026. The contract was introduced on May 20, 2026. The project is in WASD's FY 2025-2026 Adopted Budget under Program #967090, Commercial and Industrial Corridors – Extension of Sewer System (Connect to Protect), and Program #2000000072, Water Reset Program – Small Diameter Water Mains Replacement. The life expectancy of the Project is 50 years. Annual Operations Cost Impact is $10,000 and Annual Maintenance Cost Impact is $10,000. There are no stated public comments or stakeholder sentiments in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners is awarding Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract is awarded to All Construction & Plumbing, Inc. for $12,506,147.00 and a period of 627 calendar days. The project involves extending the sanitary sewer system and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative is part of the Connect to Protect initiative to transition properties from septic systems to the county's sanitary sewer system, aiming to improve water quality, public health, and support economic growth. The project is funded in part by the Building Better Communities General Obligation Bond (GOB) Program. The Infrastructure, Innovation & Technology Committee forwarded the item to the BCC with a favorable recommendation. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- Water & Sewer Department (Requester), All Construction & Plumbing, Inc. (Contractor)
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners adopted Resolution R-644-26 (File Number 260947) on July 21, 2026, awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties – Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for a total contract amount of $12,506,147.00 and a contract period of 627 calendar days. The project extends the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, in Commission District 2, and includes renewal/replacement of aging and undersized water mains. The project installs approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and replaces approximately 4,000 linear feet of water mains, including fire hydrants and reconnections to existing meters. The project is part of the Connect to Protect initiative, transitioning properties currently served by septic systems to the County's sanitary sewer system. Funding sources include BBC GOB Financing, Fire Hydrant Fund, Future WASD Revenue Bonds, WASD Revenue Bonds Sold, Water Connection Charges, and Water Renewal and Replacement Fund. The project is in WASD's FY 2025-2026 Adopted Budget and Multi-Year Capital Plan under Program #967090 and Program #2000000072. The contract was competitively solicited with five bids received on July 31, 2025; All Construction was the lowest responsive and responsible bidder. The Infrastructure, Innovation & Technology Committee forwarded the item to the Board with a favorable recommendation on June 10, 2026. The contract period is 540 days to Substantial Completion, 570 days to Final Completion, and a 57-day Contingency Time Allowance. There are no protests to this award. The contract manager is Paul Adams (786-863-9425) and the project manager is Doralba Vargas (786-552-4445).
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, Miami-Dade County, Florida
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners (BCC) is set to award Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract, valued at $12,506,147.00, will be awarded to All Construction & Plumbing, Inc. for a period of 627 calendar days. The project involves extending the sanitary sewer system and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative is part of the 'Connect to Protect' program, aiming to transition properties from septic systems to the county's sanitary sewer system, enhancing property values, redevelopment potential, and supporting economic growth. Funding will come from the Building Better Communities General Obligation Bond Program and other WASD funds. The Infrastructure, Innovation & Technology Committee forwarded the item to the BCC with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation (Infrastructure, Innovation & Technology Committee); Recommendation to Award Contract (Staff Recommendation)
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- Water & Sewer Department (Requester)
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners awarded Contract No. S-16113 to ALL CONSTRUCTION & PLUMBING, INC. for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The project involves extending the sanitary sewer system and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative is part of the Connect to Protect initiative to transition properties from septic systems to the County's sanitary sewer system. The contract amount is $12,506,147.00 with a period of 627 calendar days. Funding is from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded the item to the Board with a favorable recommendation. No public comment or stakeholder sentiment was stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street
- Applicant:
- ALL CONSTRUCTION & PLUMBING, INC.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners is awarding Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North area. The contract is awarded to All Construction & Plumbing, Inc. for $12,506,147.00 with a duration of 627 calendar days. The project involves extending sanitary sewer systems and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative aims to transition properties from septic systems to the county sewer, enhancing property values, redevelopment potential, and supporting economic growth. The project is funded in part by the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- Water & Sewer Department (Requester); All Construction & Plumbing, Inc. (Contractor)
GREEN TECH CORRIDOR (S-16113)
Resolution awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties – Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for a total contract amount of $12,506,147.00 and a contract period of 627 calendar days. The project will extend the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street and replace aging and undersized water mains. The project will install approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and replace approximately 4,000 linear feet of water mains, including fire hydrants and reconnections to existing meters. The project is part of the Connect to Protect initiative, transitioning properties from septic systems to the County's sanitary sewer system. The resolution was adopted by the Board of County Commissioners on 7/21/2026. The Infrastructure, Innovation & Technology Committee forwarded it with a favorable recommendation on 6/10/2026. The project is located in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The contract will be managed under the Miami-Dade Water and Sewer Department's Consent Decree and Capital Improvement Programs Acceleration Ordinance, section 2-8.2.12. Funding includes Building Better Communities General Obligation Bond (GOB) Program Project No. 17-Countywide Water and Sewer System Enhancements. The fiscal impact is $12,506,147.00. The life expectancy of the project is 50 years. Annual operations cost impact is $10,000 and annual maintenance cost impact is $10,000. Five bids were received on July 31, 2025. The Engineer of Record determined the low bid acceptable on October 1, 2025. There are no protests to this award. The contract period is 627 days: 540 days to Substantial Completion, 570 days to Final Completion, and a 57-day Contingency Time Allowance. The project resulted from Resolution No. R-597-13. The Connect to Protect Initiative was launched in January 2022. Approximately 120,000 septic tank systems are still in use in Miami-Dade County, with 9,000 vulnerable to compromise or failure. The project will reduce the risk of groundwater contamination and nutrient loading to Biscayne Bay. The contract manager is Paul Adams, 786-863-9425. The project manager is Doralba Vargas, 786-552-4445.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners is awarding Contract No. S-16113 for Wastewater and Water Service to Commercial Properties in the Green Tech Corridor S-1 North. The contract is awarded to All Construction & Plumbing, Inc. for $12,506,147.00 with a period of 627 calendar days. The project involves extending the sanitary sewer system and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative aims to transition properties from septic systems to the county's sanitary sewer, enhancing property values, redevelopment potential, and supporting economic growth. Funding will come from the Building Better Communities General Obligation Bond Program and other WASD funds. The Infrastructure, Innovation & Technology Committee forwarded the item to the BCC with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners adopted Resolution R-644-26 (File Number 260947) on 7/21/2026, awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties – Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for a total contract amount of $12,506,147.00 and a contract period of 627 calendar days. The project extends the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, and provides for renewal/replacement of aging and undersized water mains. The project includes approximately 12,000 linear feet (LF) of sanitary sewer gravity pipe, manholes, and sewer laterals, and approximately 4,000 LF of water main pipe, valves, fittings, fire hydrants, and reconnections to existing meters. The project is in Commission District 2, represented by Commissioner Marleine Bastien. The project will transition properties currently served by septic systems to the County's sanitary sewer system as part of the Connect to Protect initiative. Funding sources include BBC GOB Financing, Fire Hydrant Fund, Future WASD Revenue Bonds, WASD Revenue Bonds Sold, Water Connection Charges, and Water Renewal and Replacement Fund. The project is in WASD's FY 2025-2026 Adopted Budget and Multi-Year Capital Plan under Program #967090, Commercial and Industrial Corridors – Extension of Sewer System (Connect to Protect), Volume #3, Page #103, and Program #2000000072, Water Reset Program – Small Diameter Water Mains Replacement, Volume #3, Page #123. The contract period is 540 days to Substantial Completion, 570 days to Final Completion, and a 57-day Contingency Time Allowance. The bid was opened on July 31, 2025, in response to a June 18, 2025 advertisement. Five bids were received. All Construction & Plumbing Inc. submitted the lowest total bid of $12,506,147.00. The Engineer of Record determined the low bid acceptable on October 1, 2025. There are no protests to this award. The County Mayor or designee is authorized to manage the contract pursuant to Section 2-8.2.12 of the Code of Miami-Dade County, Florida (WASD's Acceleration Ordinance), which allows change orders not exceeding ten percent (10%) of the base contract amount. The fiscal impact to the County is $12,506,147.00, inclusive of the Inspector General (IG) Fee. Annual Operations Cost Impact is $10,000, and Annual Maintenance Cost Impact is $10,000, funded by WASD Operating Revenues. The life expectancy of the Project is 50 years. The project does not include Art in Public Places. The contract manager is Paul Adams / 786-863-9425 / [email protected]. The project manager is Doralba Vargas / 786-552-4445 / [email protected]. The item was introduced on 5/20/2026, assigned to the County Attorney on 5/21/2026, forwarded to the Board of County Commissioners with a favorable recommendation by the Infrastructure, Innovation & Technology Committee on 6/10/2026, and adopted by the Board of County Commissioners on 7/21/2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners adopted Resolution R-644-26 (Legislative Item File Number 260947) on 7/21/2026, awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties – Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for a total contract amount of $12,506,147.00 and a contract period of 627 calendar days. The project will extend the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, within Commission District 2. The project will install approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and replace approximately 4,000 LF of aging and undersized water mains, including fire hydrants and reconnections to existing meters. The project will transition properties currently served by septic systems to the County's sanitary sewer system as part of the Connect to Protect initiative. The contract was awarded to the lowest responsive and responsible bidder. The Board also authorized the County Mayor or designee to use the Miami-Dade Water and Sewer Department's Consent Decree and Capital Improvement Programs Acceleration Ordinance, section 2-8.2.12, to manage the contract, and to use funds from the Building Better Communities General Obligation Bond (GOB) Program No. 17–Countywide Water and Sewer System Enhancements to pay in part for the extension of wastewater services to the Green Tech Corridor Area Basin 191. The item was introduced on 5/20/2026, forwarded to the BCC with a favorable recommendation by the Infrastructure, Innovation & Technology Committee on 6/10/2026, and adopted on 7/21/2026. The project is in WASD's FY 2025-2026 Adopted Budget and Multi-Year Capital Plan under Program #967090, Commercial and Industrial Corridors – Extension of Sewer System (Connect to Protect), and Program #2000000072, Water Reset Program – Small Diameter Water Mains Replacement. The fiscal impact to the County is $12,506,147.00, inclusive of the Inspector General (IG) Fee. The funding sources are BBC GOB Financing, Fire Hydrant Fund, Future WASD Revenue Bonds, WASD Revenue Bonds Sold, Water Connection Charges, and Water Renewal and Replacement Fund. The life expectancy of the project is 50 years. Annual operations cost impact is $10,000 and annual maintenance cost impact is $10,000, funded by WASD Operating Revenues. Five bids were received on July 31, 2025, in response to the June 18, 2025 advertisement. All Construction & Plumbing Inc. submitted a total bid of $12,506,147.00. The Engineer of Record determined on October 1, 2025, that the low bid was acceptable and that All Construction satisfied the requirements of the solicitation. There were no protests to this award. The contract period is 627 days: 540 days to Substantial Completion, 570 days to Final Completion, and a 57-day Contingency Time Allowance. The project does not include Art in Public Places. The contract manager is Paul Adams, and the project manager is Doralba Vargas. The sponsor is Commissioner Marleine Bastien. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, within Commission District 2
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners adopted Resolution R-644-26 (Legislative Item File Number 260947) awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties - Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for a total contract amount of $12,506,147.00 and a contract period of 627 calendar days. The project will extend the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, and will provide for the renewal/replacement of aging and undersized water mains throughout the area. The project will install approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and replace approximately 4,000 LF of aging and undersized water mains, including fire hydrants and reconnections to existing meters. The project is part of the Connect to Protect initiative, transitioning properties currently served by septic systems to the County's sanitary sewer system. The contract was awarded to the lowest responsive and responsible bidder, All Construction & Plumbing, Inc. The project is located within Commission District 2. The fiscal impact to the County is $12,506,147.00. The project is in WASD's FY 2025-2026 Adopted Budget and Multi-Year Capital Plan under Program #967090, Commercial and Industrial Corridors - Extension of Sewer System (Connect to Protect), and Program #2000000072, Water Reset Program - Small Diameter Water Mains Replacement. Funding sources include BBC GOB Financing, Fire Hydrant Fund, Future WASD Revenue Bonds, WASD Revenue Bonds Sold, Water Connection Charges, and Water Renewal and Replacement Fund. The life expectancy of the Project is 50 years. Annual Operations Cost Impact / Funding is $10,000. Annual Maintenance Cost Impact / Funding is $10,000. The contract period is 627 days: 540 days to Substantial Completion, 570 days to Final Completion, and a 57-day Contingency Time Allowance. Five bids were received on July 31, 2025. The Engineer of Record determined on October 1, 2025, that the low bid was acceptable. There are no protests to this award. The Board also authorized the County Mayor or designee to use the Miami-Dade Water and Sewer Department's Consent Decree and Capital Improvement Programs Acceleration Ordinance, section 2-8.2.12 of the Code of Miami-Dade County, Florida, to manage the Contract, and to use funds from the Building Better Communities General Obligation Bond (GOB) Program No. 17-Countywide Water and Sewer System Enhancements to pay in part for the extension of wastewater service to the area. The item was introduced on 5/20/2026, forwarded to the BCC with a favorable recommendation by the Infrastructure, Innovation & Technology Committee on 6/10/2026, and adopted by the Board of County Commissioners on 7/21/2026. The sponsor is Commissioner Marleine Bastien. The requester is the Water & Sewer Department. The contract manager is Paul Adams / 786-863-9425. The project manager is Doralba Vargas / 786-552-4445.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners awarded Contract No. S-16113 for Wastewater and Water Service to Commercial Properties in the Green Tech Corridor S-1 North. The contract was awarded to All Construction & Plumbing, Inc. for $12,506,147.00 with a contract period of 627 calendar days. The project involves extending the sanitary sewer system along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, installing approximately 12,000 linear feet of sewer pipe and manholes, and replacing approximately 4,000 linear feet of aging water mains, including fire hydrants and reconnections. This project is part of the Connect to Protect initiative to transition properties from septic systems to the County's sanitary sewer system. Funding will come from the Building Better Communities General Obligation Bond Program, among other sources. The Infrastructure, Innovation & Technology Committee forwarded the item to the Board with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners adopted Resolution R-644-26 (Legislative Item File Number 260947) awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties – Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for a total contract amount of $12,506,147.00 and a contract period of 627 calendar days. The project will extend the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, and will provide for the renewal/replacement of aging and undersized water mains throughout the area. The project will install approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and replace approximately 4,000 LF of aging and undersized water mains, including fire hydrants and reconnections to existing meters. The project is located within Commission District 2, represented by Commissioner Marleine Bastien. The final action was taken on 7/21/2026. The project was introduced on 5/20/2026. The Infrastructure, Innovation & Technology Committee forwarded it to the BCC with a favorable recommendation on 6/10/2026. The project will transition properties currently served by septic systems to the County's sanitary sewer system as part of the Connect to Protect initiative. The contract will be managed pursuant to the Miami-Dade Water and Sewer Department's Consent Decree and Capital Improvement Programs Acceleration Ordinance, section 2-8.2.12 of the Code of Miami-Dade County, Florida. Funding sources include Building Better Communities General Obligation Bond (GOB) Program No. 17–Countywide Water and Sewer System Enhancements, Fire Hydrant Fund, Future WASD Revenue Bonds, WASD Revenue Bonds Sold, Water Connection Charges, and Water Renewal and Replacement Fund. The project is in WASD's FY 2025-2026 Adopted Budget and Multi-Year Capital Plan under Program #967090, Commercial and Industrial Corridors – Extension of Sewer System (Connect to Protect), Volume #3, Page #103; and Program #2000000072, Water Reset Program – Small Diameter Water Mains Replacement, Volume #3, Page #123. The life expectancy of the Project is 50 years. Annual Operations Cost Impact / Funding: $10,000. Annual Maintenance Cost Impact / Funding: $10,000. The project does not include Art in Public Places. Five bids were received and opened on July 31, 2025, in response to the June 18, 2025, advertisement. All Construction & Plumbing Inc. submitted the lowest responsive and responsible bid. The Engineer of Record determined on October 1, 2025, that the low bid was acceptable as submitted. There are no protests to this award. The contract period is 540 days to Substantial Completion, 570 days to Final Completion, and a 57-day Contingency Time Allowance. The contract manager is Paul Adams / 786-863-9425 / [email protected]. The project manager is Doralba Vargas / 786-552-4445 / [email protected].
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners is awarding Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract is awarded to All Construction & Plumbing, Inc. for $12,506,147.00 with a period of 627 calendar days. The project involves extending sanitary sewer systems and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative is part of the 'Connect to Protect' program, aiming to transition properties from septic systems to the county's sanitary sewer system to improve public health, environmental quality, and support economic growth. Funding will come from the Building Better Communities General Obligation Bond Program and other WASD funds. The Infrastructure, Innovation & Technology Committee forwarded the item to the BCC with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- Water & Sewer Department (Requester), All Construction & Plumbing, Inc. (Contractor)
GREEN TECH CORRIDOR (S-16113)
Resolution awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties – Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for a total contract amount of $12,506,147.00 and a contract period of 627 calendar days. The project extends the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, and provides for renewal/replacement of aging and undersized water mains. The project installs approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and replaces approximately 4,000 linear feet of water mains, including fire hydrants and reconnections to existing meters. The project transitions properties currently served by septic systems to the County's sanitary sewer system as part of the Connect to Protect initiative. The resolution authorizes the County Mayor or designee to use the Miami-Dade Water and Sewer Department's Consent Decree and Capital Improvement Programs Acceleration Ordinance, section 2-8.2.12, to manage the contract, and to use funds from the Building Better Communities General Obligation Bond Program Project No. 17-Countywide Water and Sewer System Enhancements to pay in part for the extension of wastewater services to the Green Tech Corridor Area Basin 191. The contract was awarded to the lowest responsive and responsible bidder. The Board of County Commissioners adopted the resolution on 7/21/2026. The Infrastructure, Innovation & Technology Committee forwarded it to the BCC with a favorable recommendation on 6/10/2026. The item was introduced on 5/20/2026. The contract period is 627 days: 540 days to Substantial Completion, 570 days to Final Completion, and a 57-day Contingency Time Allowance. The project is located within Commission District 2, represented by Commissioner Marleine Bastien. The fiscal impact is $12,506,147.00, inclusive of the Inspector General Fee. The project is in WASD's FY 2025-2026 Adopted Budget and Multi-Year Capital Plan under Program #967090, Commercial and Industrial Corridors – Extension of Sewer System (Connect to Protect), Volume #3, Page #103; and Program #2000000072, Water Reset Program – Small Diameter Water Mains Replacement, Volume #3, Page #123. There is no impact to the General Fund. Funding sources are BBC GOB Financing, Fire Hydrant Fund, Future WASD Revenue Bonds, WASD Revenue Bonds Sold, Water Connection Charges, and Water Renewal and Replacement Fund. The life expectancy of the Project is 50 years. Annual Operations Cost Impact is $10,000, funded by WASD Operating Revenues. Annual Maintenance Cost Impact is $10,000, funded by WASD Operating Revenues. The Project does not include Art in Public Places. Five bids were received and opened on July 31, 2025, in response to the June 18, 2025 advertisement. The Engineer of Record determined on October 1, 2025, that the low bid was acceptable. There are no protests to this award. The contract manager is Paul Adams, 786-863-9425. The project manager is Doralba Vargas, 786-552-4445.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners is awarding Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract is awarded to All Construction & Plumbing, Inc. for $12,506,147.00 with a duration of 627 calendar days. The project involves extending sanitary sewer systems and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative aims to transition properties from septic systems to the county's sanitary sewer, enhancing property values, redevelopment potential, and supporting economic growth. Funds are sourced from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded the item to the BCC with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- Water & Sewer Department (Requester); All Construction & Plumbing, Inc. (Contractor)
GREEN TECH CORRIDOR (S-16113)
Resolution awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties – Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for a total contract amount of $12,506,147.00 and a contract period of 627 calendar days. The project will extend the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, and will provide for the renewal/replacement of aging and undersized water mains throughout the area. The project will install approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and replace approximately 4,000 LF of aging and undersized water mains, including fire hydrants and reconnections to existing meters. The project is part of the Connect to Protect initiative and will transition properties currently served by septic systems to the County's sanitary sewer system. The resolution authorizes the County Mayor or designee to use the Miami-Dade Water and Sewer Department's Consent Decree and Capital Improvement Programs Acceleration Ordinance, section 2-8.2.12, to manage the contract, and to use funds from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17-Countywide Water and Sewer System Enhancements to pay in part for the extension of wastewater services to the Green Tech Corridor Area Basin 191. The item was forwarded to the Board of County Commissioners with a favorable recommendation by the Infrastructure, Innovation & Technology Committee on 6/10/2026. The agenda date is 7/21/2026. The contract period is 627 days: 540 days to Substantial Completion, 570 days to Final Completion, and a 57-day Contingency Time Allowance. The project is located within Commission District 2. The contract manager is Paul Adams, and the project manager is Doralba Vargas. The fiscal impact is $12,506,147.00, inclusive of the Inspector General Fee. The funding sources are BBC GOB Financing, Fire Hydrant Fund, Future WASD Revenue Bonds, WASD Revenue Bonds Sold, Water Connection Charges, and Water Renewal and Replacement Fund. The life expectancy of the project is 50 years. Annual operations cost impact is $10,000, and annual maintenance cost impact is $10,000. The project does not include Art in Public Places. Five bids were received on July 31, 2025. All Construction & Plumbing Inc. submitted the lowest total bid of $12,506,147.00. The Engineer of Record determined on October 1, 2025, that the low bid was acceptable and that All Construction satisfied the requirements of the solicitation. There are no protests to this award. The project resulted from the adoption of Resolution No. R-597-13. The Connect to Protect Initiative was launched in January 2022. Approximately 120,000 septic tank systems are still in use in Miami-Dade County, and 9,000 are vulnerable to compromise or failure under current groundwater conditions. The project will reduce the risk of groundwater contamination and nutrient loading to Biscayne Bay. Applicable ordinances and measures include Local Preference Code Section 2-8.5, Local Certified Veteran Business Enterprise Preference Code Section 2-8.5.1, Sea Level Rise Ordinance 14-79, Sustainable Buildings Program Implementing Order 8-8, Buy American Iron & Steel Procurement Program Code Section 2-8.2.6.1, Office of Inspector General Fee Code Section 2-1076, and User Access Program Code Section 2-8.10.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners adopted Resolution R-644-26 (Legislative Item File Number 260947) awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties – Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for a total contract amount of $12,506,147.00 and a contract period of 627 calendar days. The project will extend the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, and will provide for the renewal/replacement of aging and undersized water mains throughout the area. The project will install approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and replace approximately 4,000 LF of aging and undersized water mains, including fire hydrants and reconnections to existing meters. The project is part of the Connect to Protect initiative to transition properties currently served by septic systems to the County's sanitary sewer system. The contract was competitively solicited with bids opened on July 31, 2025, and All Construction & Plumbing, Inc. was determined to be the lowest responsive and responsible bidder. The project is located in Commission District 2. The resolution authorizes the County Mayor or designee to manage the contract under the WASD Acceleration Ordinance and to use funds from the Building Better Communities General Obligation Bond Program No. 17 to pay in part for the extension of wastewater services. The Board adopted the item on July 21, 2026, following a favorable recommendation from the Infrastructure, Innovation & Technology Committee on June 10, 2026. The contract was introduced on May 20, 2026. The fiscal impact is $12,506,147.00, inclusive of the Inspector General Fee. The project is in WASD's FY 2025-2026 Adopted Budget and Multi-Year Capital Plan under Program #967090, Commercial and Industrial Corridors – Extension of Sewer System (Connect to Protect), and Program #2000000072, Water Reset Program – Small Diameter Water Mains Replacement. The life expectancy of the project is 50 years. Annual operations cost impact is $10,000 and annual maintenance cost impact is $10,000. There are no protests to this award. The contract manager is Paul Adams and the project manager is Doralba Vargas. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Resolution awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties – Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for a total contract amount of $12,506,147.00 and a contract period of 627 calendar days. The project will extend the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, and will provide for the renewal/replacement of aging and undersized water mains throughout the area. The project will install approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and replace approximately 4,000 linear feet of aging and undersized water mains, including fire hydrants and reconnections to existing meters. The project will transition properties currently served by septic systems to the County's sanitary sewer system as part of the Connect to Protect initiative. The resolution was adopted by the Board of County Commissioners on 7/21/2026. The Infrastructure, Innovation & Technology Committee forwarded it to the BCC with a favorable recommendation on 6/10/2026. The contract was competitively solicited with bids opened on July 31, 2025. There are no protests to this award. The project is located within Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The contract will be managed pursuant to the WASD's Acceleration Ordinance, section 2-8.2.12 of the Code of Miami-Dade County, Florida. Funding sources include BBC GOB Financing, Fire Hydrant Fund, Future WASD Revenue Bonds, WASD Revenue Bonds Sold, Water Connection Charges, and Water Renewal and Replacement Fund. The life expectancy of the project is 50 years. Annual operations cost impact is $10,000 and annual maintenance cost impact is $10,000, both funded by WASD Operating Revenues. The project does not include Art in Public Places. The contract period is 627 days: 540 days to Substantial Completion, 570 days to Final Completion, and a 57-day Contingency Time Allowance. The contract manager is Paul Adams / 786-863-9425 / [email protected]. The project manager is Doralba Vargas / 786-552-4445 / [email protected].
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
The Miami-Dade Board of County Commissioners adopted Resolution R-644-26, awarding Contract No. S-16113 for the Green Tech Corridor S-1 North wastewater and water service project to All Construction & Plumbing, Inc. The contract is for a total amount of $12,506,147.00 and a contract period of 627 calendar days. The project will extend the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street and will replace aging and undersized water mains. The project includes approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and approximately 4,000 linear feet of water main pipe, valves, fittings, fire hydrants, and reconnections to existing meters. The project is part of the Connect to Protect initiative to transition properties from septic systems to the County's sanitary sewer system. The final action was taken on July 21, 2026. The Infrastructure, Innovation & Technology Committee forwarded the item to the Board of County Commissioners with a favorable recommendation on June 10, 2026. The item was introduced on May 20, 2026. The contract was awarded to the lowest responsive and responsible bidder, All Construction & Plumbing, Inc., whose total bid was $12,506,147.00. The project is located in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The fiscal impact to the County is $12,506,147.00. The project is in WASD's FY 2025-2026 Adopted Budget and Multi-Year Capital Plan. The funding sources include BBC GOB Financing, Fire Hydrant Fund, Future WASD Revenue Bonds, WASD Revenue Bonds Sold, Water Connection Charges, and Water Renewal and Replacement Fund. The life expectancy of the project is 50 years. The annual operations cost impact is $10,000, and the annual maintenance cost impact is $10,000. The contract manager is Paul Adams, and the project manager is Doralba Vargas. There were no protests to this award. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners awarded Contract No. S-16113 to ALL CONSTRUCTION & PLUMBING, INC. for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The project involves extending the sanitary sewer system and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative aims to transition properties from septic systems to the county sewer, enhancing property values, redevelopment potential, and supporting economic growth. The contract amount is $12,506,147.00 with a period of 627 calendar days. The Infrastructure, Innovation & Technology Committee forwarded the item to the Board with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- ALL CONSTRUCTION & PLUMBING, INC.
GREEN TECH CORRIDOR (S-16113)
Resolution awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties – Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for a total contract amount of $12,506,147.00 and a contract period of 627 calendar days. The project will extend the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street and replace aging and undersized water mains. The project includes approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and approximately 4,000 LF of water main pipe, valves, fittings, fire hydrants, and reconnections to existing meters. The resolution was adopted by the Board of County Commissioners on 7/21/2026. The project is located within Commission District 2, represented by Commissioner Marleine Bastien. The project is part of the Connect to Protect initiative, transitioning properties currently served by septic systems to the County's sanitary sewer system. Funding sources include BBC GOB Financing, Fire Hydrant Fund, Future WASD Revenue Bonds, WASD Revenue Bonds Sold, Water Connection Charges, and Water Renewal and Replacement Fund. The contract will be managed under the WASD Acceleration Ordinance, section 2-8.2.12 of the Code of Miami-Dade County, Florida. The project is in WASD's FY 2025-2026 Adopted Budget and Multi-Year Capital Plan under Program #967090, Commercial and Industrial Corridors – Extension of Sewer System (Connect to Protect), Volume #3, Page #103; and Program #2000000072, Water Reset Program – Small Diameter Water Mains Replacement, Volume #3, Page #123. The life expectancy of the Project is 50 years. Annual Operations Cost Impact / Funding: $10,000. Annual Maintenance Cost Impact / Funding: $10,000. The project does not include Art in Public Places. Five bids were received on July 31, 2025. All Construction & Plumbing Inc. was the lowest responsive and responsible bidder. There are no protests to this award. The contract period is 627 days: 540 days to Substantial Completion, 570 days to Final Completion, and a 57-day Contingency Time Allowance. The project resulted from the adoption of Resolution No. R-597-13. The Connect to Protect Initiative was launched in January 2022. Approximately 120,000 septic tank systems are still in use in Miami-Dade County, with 9,000 vulnerable to compromise or failure. Contract Manager: Paul Adams / 786-863-9425. Project Manager: Doralba Vargas / 786-552-4445.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners adopted Resolution R-644-26 (Legislative Item File Number 260947) awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties - Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for a total contract amount of $12,506,147.00 and a contract period of 627 calendar days. The project will extend the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, and will provide for the renewal/replacement of aging and undersized water mains throughout the area. The project will install approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and replace approximately 4,000 LF of aging and undersized water mains, including fire hydrants and reconnections to existing meters. The project will transition properties currently served by septic systems to the County's sanitary sewer system as part of the Connect to Protect initiative. The contract was awarded to the lowest responsive and responsible bidder, All Construction & Plumbing, Inc. The project is located within Commission District 2, represented by Commissioner Marleine Bastien. The fiscal impact to the County is $12,506,147.00, inclusive of the Inspector General Fee. The funding sources include BBC GOB Financing, Fire Hydrant Fund, Future WASD Revenue Bonds, WASD Revenue Bonds Sold, Water Connection Charges, and Water Renewal and Replacement Fund. The life expectancy of the project is 50 years. Annual operations cost impact is $10,000 and annual maintenance cost impact is $10,000. The project does not include Art in Public Places. Five bids were received and opened on July 31, 2025. The Engineer of Record determined on October 1, 2025, that the low bid was acceptable. There are no protests to this award. The contract period is 540 days to Substantial Completion, 570 days to Final Completion, and a 57-day Contingency Time Allowance. The contract manager is Paul Adams, and the project manager is Doralba Vargas. The project resulted from the adoption of Resolution No. R-597-13. The Connect to Protect Initiative was launched in January 2022. Approximately 120,000 septic tank systems are still in use in Miami-Dade County, with 9,000 vulnerable to compromise or failure. The project will reduce the risk of groundwater contamination and nutrient loading to Biscayne Bay. The project supports enhanced property values, increased redevelopment potential, and infrastructure needed to support economic growth. The Board authorized the County Mayor or designee to use the Miami-Dade Water and Sewer Department's Consent Decree and Capital Improvement Programs Acceleration Ordinance, section 2-8.2.12, to manage the contract, and to use funds from the Building Better Communities General Obligation Bond Program No. 17-Countywide Water and Sewer System Enhancements to pay in part for the extension of wastewater services to the Green Tech Corridor Area Basin 191. The Board also authorized the County Mayor or designee to execute the contract and exercise termination and other provisions. The item was introduced on 5/20/2026, forwarded to the Board of County Commissioners with a favorable recommendation by the Infrastructure, Innovation & Technology Committee on 6/10/2026, and adopted by the Board of County Commissioners on 7/21/2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners adopted Resolution R-644-26 (Legislative Item File Number 260947) on 7/21/2026, awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties – Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for a total contract amount of $12,506,147.00 and a contract period of 627 calendar days. The project will extend the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, and will provide for the renewal/replacement of aging and undersized water mains throughout the area. The project will install approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and replace approximately 4,000 LF of aging and undersized water mains, including fire hydrants and reconnections to existing meters. The project will transition properties currently served by septic systems to the County's sanitary sewer system as part of the Connect to Protect initiative. The project is located within Commission District 2, represented by Commissioner Marleine Bastien. Funding sources include Building Better Communities General Obligation Bond (GOB) Program No. 17–Countywide Water and Sewer System Enhancements, Fire Hydrant Fund, Future WASD Revenue Bonds, WASD Revenue Bonds Sold, Water Connection Charges, and Water Renewal and Replacement Fund. The contract was competitively solicited with bids opened on July 31, 2025; All Construction & Plumbing, Inc. was the lowest responsive and responsible bidder. The Infrastructure, Innovation & Technology Committee forwarded the item to the BCC with a favorable recommendation on 6/10/2026. The item was introduced on 5/20/2026. The contract period includes 540 days to Substantial Completion, 570 days to Final Completion, and a 57-day Contingency Time Allowance. The fiscal impact to the County is $12,506,147.00, inclusive of the Inspector General Fee. The life expectancy of the project is 50 years. Annual operations cost impact is $10,000 and annual maintenance cost impact is $10,000, both funded by WASD Operating Revenues. There are no protests to this award. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners is awarding Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract is awarded to All Construction & Plumbing, Inc. for $12,506,147.00 with a period of 627 calendar days. The project involves extending the sanitary sewer system and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative aims to transition properties from septic systems to the county's sanitary sewer, enhancing property values, redevelopment potential, and supporting economic growth. Funding is partially from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded the item to the BCC with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- Water & Sewer Department (Requester), All Construction & Plumbing, Inc. (Contractor)
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners adopted Resolution R-644-26 (File Number 260947) on 7/21/2026, awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties – Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for a total contract amount of $12,506,147.00 and a contract period of 627 calendar days. The project extends the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, and provides for the renewal/replacement of aging and undersized water mains. The project installs approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and replaces approximately 4,000 LF of aging and undersized water mains, including fire hydrants and reconnections to existing meters. The project is part of the Connect to Protect initiative, transitioning properties currently served by septic systems to the County's sanitary sewer system. Funding sources include BBC GOB Financing, Fire Hydrant Fund, Future WASD Revenue Bonds, WASD Revenue Bonds Sold, Water Connection Charges, and Water Renewal and Replacement Fund. The project is in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The Infrastructure, Innovation & Technology Committee forwarded the item to the Board with a favorable recommendation on 6/10/2026. The contract was introduced on 5/20/2026. The Board adopted the resolution on 7/21/2026. The contract period is 540 days to Substantial Completion, 570 days to Final Completion, and a 57-day Contingency Time Allowance. The project life expectancy is 50 years. Annual operations cost impact is $10,000 and annual maintenance cost impact is $10,000, funded by WASD Operating Revenues. The contract manager is Paul Adams, and the project manager is Doralba Vargas. Five bids were received on July 31, 2025. The low bid was determined acceptable by the Engineer of Record on October 1, 2025. There were no protests to this award. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners is awarding Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract is awarded to All Construction & Plumbing, Inc. for $12,506,147.00 with a period of 627 calendar days. The project involves extending sanitary sewer systems and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative aims to transition properties from septic systems to the county's sanitary sewer, enhancing property values, redevelopment potential, and supporting economic growth. Funding will come from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded the item with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- Water & Sewer Department (Requester), All Construction & Plumbing, Inc. (Contractor)
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners is awarding Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract is awarded to All Construction & Plumbing, Inc. for $12,506,147.00 with a duration of 627 calendar days. The project involves extending sanitary sewer systems and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative is part of the Connect to Protect initiative to transition properties from septic systems to the county's sanitary sewer system, aiming to improve water quality, public health, property values, and support economic growth. The project is funded in part by the Building Better Communities General Obligation Bond (GOB) Program.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- Water & Sewer Department (Requester), All Construction & Plumbing, Inc. (Contractor)
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners is awarding Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract is awarded to All Construction & Plumbing, Inc. for $12,506,147.00 with a period of 627 calendar days. The project involves installing approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and laterals, and replacing approximately 4,000 linear feet of aging water mains, including fire hydrants. This project is part of the Connect to Protect initiative to transition properties from septic systems to the county's sanitary sewer system. The Infrastructure, Innovation & Technology Committee forwarded the item to the BCC with a favorable recommendation. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- Water & Sewer Department
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners adopted Resolution R-644-26 (Legislative Item File Number 260947) on July 21, 2026, awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties – Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for a total contract amount of $12,506,147.00 and a contract period of 627 calendar days. The project will extend the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, and will provide for the renewal/replacement of aging and undersized water mains throughout the area. The project will install approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and replace approximately 4,000 LF of aging and undersized water mains, including fire hydrants and reconnections to existing meters. The project will transition properties currently served by septic systems to the County's sanitary sewer system as part of the Connect to Protect initiative. The project is located within Commission District 2, represented by Commissioner Marleine Bastien. The contract was competitively solicited, with bids opened on July 31, 2025, and All Construction & Plumbing, Inc. was the lowest responsive and responsible bidder. The project is funded in part by Building Better Communities General Obligation Bond (GOB) Program No. 17 – Countywide Water and Sewer System Enhancements. The Board also authorized the County Mayor or designee to use the Miami-Dade Water and Sewer Department's Consent Decree and Capital Improvement Programs Acceleration Ordinance, section 2-8.2.12 of the Code of Miami-Dade County, Florida, to manage the contract. The fiscal impact to the County is $12,506,147.00, inclusive of the Inspector General Fee. The project is in WASD's FY 2025-2026 Adopted Budget and Multi-Year Capital Plan under Program #967090, Commercial and Industrial Corridors – Extension of Sewer System (Connect to Protect), and Program #2000000072, Water Reset Program – Small Diameter Water Mains Replacement. The life expectancy of the project is 50 years. Annual operations cost impact is $10,000, and annual maintenance cost impact is $10,000, both funded by WASD Operating Revenues. The project does not include Art in Public Places. There are no protests to this award. The contract was forwarded to the Board of County Commissioners with a favorable recommendation from the Infrastructure, Innovation & Technology Committee on June 10, 2026. The item was introduced on May 20, 2026. The contract manager is Paul Adams, and the project manager is Doralba Vargas. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
The Board of County Commissioners adopted Resolution R-644-26, File Number 260947, awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties – Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for a total contract amount of $12,506,147.00 and a contract period of 627 calendar days. The project will extend the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, and will provide for the renewal/replacement of aging and undersized water mains throughout the area. The project will install approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and replace approximately 4,000 LF of aging and undersized water mains, including fire hydrants and reconnections to existing meters. The project will transition properties currently served by septic systems to the County's sanitary sewer system as part of the Connect to Protect initiative. The project is located within Commission District 2, represented by Commissioner Marleine Bastien. The contract period is 627 days: 540 days to Substantial Completion, 570 days to Final Completion, and a 57-day Contingency Time Allowance. The fiscal impact is $12,506,147.00. The funding sources include BBC GOB Financing, Fire Hydrant Fund, Future WASD Revenue Bonds, WASD Revenue Bonds Sold, Water Connection Charges, and Water Renewal and Replacement Fund. The life expectancy of the project is 50 years. Annual Operations Cost Impact is $10,000. Annual Maintenance Cost Impact is $10,000. Five bids were received on July 31, 2025. All Construction & Plumbing Inc. submitted the lowest total bid of $12,506,147.00. The Engineer of Record determined the low bid was acceptable on October 1, 2025. There are no protests to this award. The contract manager is Paul Adams. The project manager is Doralba Vargas. The resolution authorizes the County Mayor or designee to use the Miami-Dade Water and Sewer Department's Consent Decree and Capital Improvement Programs Acceleration Ordinance, section 2-8.2.12 of the Code of Miami-Dade County, Florida, to manage the contract, and to use funds from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17-Countywide Water and Sewer System Enhancements to pay in part for the extension of wastewater services to the Green Tech Corridor Area Basin 191. The resolution was introduced on 5/20/2026, forwarded to the BCC with a favorable recommendation by the Infrastructure, Innovation & Technology Committee on 6/10/2026, and adopted by the Board of County Commissioners on 7/21/2026. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners adopted Resolution R-644-26, File Number 260947, on July 21, 2026, awarding Contract No. S-16113 to All Construction & Plumbing, Inc. for $12,506,147.00 over 627 calendar days. The project extends the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, and replaces aging water mains. The work includes approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and approximately 4,000 linear feet of water main pipe, valves, fittings, fire hydrants, and reconnections to existing meters. The project is in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The project is part of the Connect to Protect initiative, transitioning properties from septic systems to the County sewer system. Funding sources include BBC GOB Financing, Fire Hydrant Fund, Future WASD Revenue Bonds, WASD Revenue Bonds Sold, Water Connection Charges, and Water Renewal and Replacement Fund. The Infrastructure, Innovation & Technology Committee forwarded the item with a favorable recommendation on June 10, 2026. The contract was introduced on May 20, 2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners is awarding Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract is awarded to All Construction & Plumbing, Inc. for $12,506,147.00 with a period of 627 calendar days. The project involves extending the sanitary sewer system and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative aims to transition properties from septic systems to the county sewer, enhancing property values, redevelopment potential, and supporting economic growth. Funding is partially from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the BCC with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- Water & Sewer Department (Requester), All Construction & Plumbing, Inc. (Contractor)
GREEN TECH CORRIDOR (S-16113)
Resolution awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties – Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for a total contract amount of $12,506,147.00 and a contract period of 627 calendar days. The project extends the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, and provides renewal/replacement of aging and undersized water mains. The project installs approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and replaces approximately 4,000 linear feet of water mains, including fire hydrants and reconnections to existing meters. The project transitions properties currently served by septic systems to the County's sanitary sewer system as part of the Connect to Protect initiative. The resolution was adopted by the Board of County Commissioners on 7/21/2026. The Infrastructure, Innovation & Technology Committee forwarded it with a favorable recommendation on 6/10/2026. The contract was competitively solicited, with bids opened on July 31, 2025, and the Engineer of Record determined the low bid acceptable on October 1, 2025. There are no protests to this award. The project is in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The contract will be managed under the WASD Acceleration Ordinance, section 2-8.2.12. Funding sources include BBC GOB Financing, Fire Hydrant Fund, Future WASD Revenue Bonds, WASD Revenue Bonds Sold, Water Connection Charges, and Water Renewal and Replacement Fund. The life expectancy of the project is 50 years. Annual operations cost impact is $10,000 and annual maintenance cost impact is $10,000, both funded by WASD Operating Revenues. The project does not include Art in Public Places. The contract manager is Paul Adams, and the project manager is Doralba Vargas. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners adopted Resolution R-644-26 (Legislative Item File Number 260947) on 7/21/2026, awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties – Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for a total contract amount of $12,506,147.00 and a contract period of 627 calendar days. The project will extend the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, and will provide for the renewal/replacement of aging and undersized water mains throughout the area. The project will install approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and replace approximately 4,000 LF of aging and undersized water mains, including fire hydrants and reconnections to existing meters. The project will transition properties currently served by septic systems to the County's sanitary sewer system as part of the Connect to Protect initiative. The project is located within Commission District 2, represented by Commissioner Marleine Bastien. The contract was awarded to the lowest responsive and responsible bidder, All Construction & Plumbing, Inc., after five bids were received on July 31, 2025. The project is funded in part by Building Better Communities General Obligation Bond (GOB) Program No. 17 – Countywide Water and Sewer System Enhancements. The fiscal impact to the County is $12,506,147.00, inclusive of the Inspector General Fee. The project is in WASD's FY 2025-2026 Adopted Budget and Multi-Year Capital Plan under Program #967090, Commercial and Industrial Corridors – Extension of Sewer System (Connect to Protect), and Program #2000000072, Water Reset Program – Small Diameter Water Mains Replacement. The life expectancy of the Project is 50 years. Annual Operations Cost Impact / Funding: $10,000. Annual Maintenance Cost Impact / Funding: $10,000. The project does not include Art in Public Places. The contract was introduced on 5/20/2026, forwarded to the BCC with a favorable recommendation by the Infrastructure, Innovation & Technology Committee on 6/10/2026, and adopted by the Board of County Commissioners on 7/21/2026. There are no protests to this award. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners adopted Resolution R-644-26 (File Number 260947) on July 21, 2026, awarding Contract No. S-16113, Wastewater and Water Service to Commercial Properties – Green Tech Corridor S-1 North, to All Construction & Plumbing, Inc. for a total contract amount of $12,506,147.00 and a contract period of 627 calendar days. The project extends the sanitary sewer system to commercial and industrial parcels along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets, and provides for renewal/replacement of aging and undersized water mains. The project installs approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and sewer laterals, and replaces approximately 4,000 linear feet of water mains, including fire hydrants and reconnections to existing meters. The project transitions properties currently served by septic systems to the County's sanitary sewer system as part of the Connect to Protect initiative. Funding sources include BBC GOB Financing, Fire Hydrant Fund, Future WASD Revenue Bonds, WASD Revenue Bonds Sold, Water Connection Charges, and Water Renewal and Replacement Fund. The project is in Commission District 2, represented by Commissioner Marleine Bastien. The Infrastructure, Innovation & Technology Committee forwarded the item to the Board with a favorable recommendation on June 10, 2026. The contract was introduced on May 20, 2026. The contract manager is Paul Adams (786-863-9425) and the project manager is Doralba Vargas (786-552-4445).
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners awarded Contract No. S-16113 to All Construction & Plumbing, Inc. for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract amount is $12,506,147.00 for a period of 627 calendar days. The project involves extending the sanitary sewer system along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including approximately 12,000 linear feet of sewer pipe, manholes, and laterals. It also includes the renewal/replacement of approximately 4,000 linear feet of aging water mains, fire hydrants, and reconnections. This project is part of the Connect to Protect initiative to transition properties from septic systems to the County's sanitary sewer system, funded in part by the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded the item to the Board with a favorable recommendation. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street
- Applicant:
- Water & Sewer Department
GROUND LEASE AGREEMENT FOR COUNTY-OWNED LAND LOCATED ON PHT
Miami-Dade County Commissioners approved the bifurcation of a ground lease agreement for county-owned land. The project involves workforce and affordable housing development on a portion of Folio Nos. 01-3135-045-0010 and 01-3135-045-0020. The developer, RUDG, LLC, is assigning lease rights for the second phase to Residences at Wagner Creek, LLC. Key changes from the original master lease include refurbishing existing Jackson Medical Towers into 358 residential units (instead of demolishing and building new), modifying the workforce housing unit percentage, eliminating a planned hotel tower, replacing an initial rent payment with a capitalized lease payment of approximately $41,331,973, accelerating the construction completion date to December 2029, and adding provisions for a vocational high school and a parking lease-back option for the Public Health Trust. The total estimated cumulative rental revenue over the term is $534,923,191. The Public Health Trust is authorized to administer the bifurcated lease.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Approved
- Address:
- 1500 NW 12th Avenue, Miami, Florida
- Applicant:
- RUDG, LLC (assigning to Residences at Wagner Creek, LLC)
GROUND LEASE AGREEMENT FOR COUNTY-OWNED LAND LOCATED ON PHT
The Board of County Commissioners adopted Resolution R-688-26 approving the bifurcation of the Jackson Medical Towers Redevelopment Lease Agreement with RUDG, LLC for the second phase of a workforce and affordable housing development on County-owned land. The Phase 2 Lease is with Residences at Wagner Creek, LLC for a 99-year term. The project involves refurbishing existing Jackson Medical Towers structures into a 358-unit residential building with approximately 676 parking spaces, instead of demolition and new construction. The residential unit income mix is modified to a minimum of 20 percent workforce housing and a maximum of 30 percent unrestricted. The planned 128-unit hotel tower is eliminated. The initial rent payment of $135,000 is replaced with a capitalized lease payment estimated at approximately $41,331,973. Construction completion is accelerated from February 2032 to December 2029. A provision is added for a sublease for a vocational high school focused on health sciences. The Public Health Trust gets an annual option to lease back a minimum of 20 percent of parking spaces (estimated 135 spaces) at discounted rates. A minimum of 50 percent of residential units must be maintained as affordable housing. Estimated cumulative rental revenue over the term is $534,923,191. The capitalized lease payment entails a lump sum of ten percent of fair market value of existing improvements due at financial close (estimated $4,133,197) and the balance due after 33 years (estimated $37,198,776 plus interest). The project is located at 1500 NW 12th Avenue, Miami, Florida, on a portion of Folio Nos. 01-3135-045-0010 and 01-3135-045-0020. The property is in County Commission District 3. The resolution was adopted on July 21, 2026. The Housing Committee forwarded it with a favorable recommendation on July 14, 2026. The developer is RUDG, LLC, and the tenant is Residences at Wagner Creek, LLC. The file number is 261263. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 1500 NW 12th Avenue, Miami, Florida
- Applicant:
- RUDG, LLC (Developer); Residences at Wagner Creek, LLC (Tenant, affiliated with RUDG, LLC)
GROUND LEASE AGREEMENT FOR COUNTY-OWNED LAND LOCATED ON PHT
The Board of County Commissioners adopted Resolution R-688-26 approving the bifurcation of the Jackson Medical Towers Redevelopment Lease Agreement with RUDG, LLC for the second phase of development, a 99-year ground lease for workforce and affordable housing on County-owned land at 1500 NW 12th Avenue, Miami, Florida, on a portion of Folio Nos. 01-3135-045-0010 and 01-3135-045-0020. The Phase 2 Lease is with Residences at Wagner Creek, LLC, an affiliate of RUDG, LLC. The project involves refurbishing the existing Jackson Medical Towers structures into a 358-unit residential building with approximately 676 parking spaces, instead of demolishing and constructing a new tower. The residential unit income mix changes to a minimum of 20 percent workforce housing and a maximum of 30 percent unrestricted, from a minimum of 30 percent workforce and a maximum of 20 percent unrestricted. The planned 128-unit hotel tower is eliminated. The initial rent payment of $135,000 is replaced with a capitalized lease payment estimated at approximately $41,331,973. The construction schedule is accelerated from February 2032 to December 2029. The lease adds a provision for a vocational high school sublease and a provision for the Public Health Trust to lease back a minimum of 20 percent of parking spaces (estimated 135 spaces) at discounted rates. The total estimated cumulative rental revenue over the term is $534,923,191. The capitalized lease payment entails a lump sum of ten percent of fair market value due at financial close (estimated $4,133,197) and the balance due after 33 years (estimated $37,198,776 plus interest). The project is in County Commission District 3. The resolution was adopted on July 21, 2026, after being forwarded with a favorable recommendation from the Housing Committee on July 14, 2026. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 1500 NW 12th Avenue, Miami, Florida
- Applicant:
- RUDG, LLC (Developer); Residences at Wagner Creek, LLC (Tenant)
GROUND LEASE AGREEMENT FOR COUNTY-OWNED LAND LOCATED ON PHT
Miami-Dade County Board of County Commissioners approved the bifurcation of a ground lease agreement for county-owned land. The project involves workforce and affordable housing development on a portion of Folio Nos. 01-3135-045-0010 and 01-3135-045-0020. The second phase of the redevelopment will refurbish existing Jackson Medical Towers structures into a 358-unit residential building with approximately 676 parking spaces, instead of demolishing and building new. The unit income mix will change to a minimum of 20% workforce housing and a maximum of 30% unrestricted, down from 30% workforce and 20% unrestricted. The planned 128-unit hotel tower is eliminated. A capitalized lease payment of approximately $41,331,973 is replacing an initial rent payment. Construction is accelerated for completion by December 2029. A vocational high school focused on health sciences may be established via sublease, and the Public Health Trust has an option to lease back 20% of parking spaces. The total estimated cumulative rental revenue over the term is $534,923,191.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Approved
- Address:
- 1500 NW 12th Avenue, Miami, Florida
- Applicant:
- RUDG, LLC (Developer), Residences at Wagner Creek, LLC (Tenant)
GROUND LEASE AGREEMENT FOR COUNTY-OWNED LAND LOCATED ON PHT
Miami-Dade County Commission approved the bifurcation of a ground lease agreement for county-owned land. The project involves workforce and affordable housing development on a portion of Folio Nos. 01-3135-045-0010 and 01-3135-045-0020. The second phase of the redevelopment, now termed the Phase 2 Lease, will be with Residences at Wagner Creek, LLC, an entity affiliated with RUDG, LLC. Key changes from the original Master Lease include refurbishing existing Jackson Medical Towers into a 358-unit residential building with approximately 676 parking spaces (instead of demolition and new construction), modifying the workforce housing requirement to a minimum of 20% and unrestricted units to a maximum of 30%, eliminating a planned hotel tower, replacing an initial rent payment with a capitalized lease payment estimated at $41,331,973, accelerating the completion date to December 2029, and adding provisions for a vocational high school and a public health trust option to lease back parking spaces. The total estimated cumulative rental revenue over the term is $534,923,191. The Public Health Trust is authorized to execute the lease and administer its terms on behalf of the county.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Approved
- Address:
- 1500 NW 12th Avenue, Miami, Florida
- Applicant:
- RUDG, LLC (Developer), Residences at Wagner Creek, LLC (Tenant)
GROUND LEASE AGREEMENT FOR COUNTY-OWNED LAND LOCATED ON PHT
The Board of County Commissioners adopted Resolution R-688-26 approving the bifurcation of the Jackson Medical Towers Redevelopment Lease Agreement with RUDG, LLC for the second phase of development, a 99-year ground lease for workforce and affordable housing on County-owned land at 1500 NW 12th Avenue, Miami, Florida, on a portion of Folio Nos. 01-3135-045-0010 and 01-3135-045-0020. The Phase 2 Lease is with Residences at Wagner Creek, LLC, an entity affiliated with RUDG, LLC. The project involves refurbishing existing Jackson Medical Towers structures into a 358-unit residential building with approximately 676 parking spaces, instead of demolition and new construction. The residential unit income mix is modified so a minimum of 20 percent are workforce housing units and a maximum of 30 percent are unrestricted. The planned 128-unit hotel tower is eliminated. The initial rent payment is replaced with a capitalized lease payment estimated at approximately $41,331,973. Construction completion is accelerated to December 2029. A provision is added for a sublease for a vocational high school focused on health sciences. A provision gives the Public Health Trust an annual option to lease back a minimum of 20 percent of parking spaces (estimated 135 spaces) at discounted rates. The total cumulative estimated rental revenue to the Public Health Trust is $534,923,191 over the term. The capitalized lease payment entails a lump sum of ten percent of fair market value of existing improvements due at financial close (estimated $4,133,197) and the balance due after 33 years (estimated $37,198,776 plus interest), subordinate to a senior lender note. The Phase 2 Lease requires a minimum of 50 percent of residential units be maintained as affordable housing units. The resolution was adopted on July 21, 2026. The Housing Committee forwarded it with a favorable recommendation on July 14, 2026. The property is in County Commission District 3.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 1500 NW 12th Avenue, Miami, Florida
- Applicant:
- RUDG, LLC (Developer); Residences at Wagner Creek, LLC (Tenant, affiliated with RUDG, LLC)
GROUND LEASE AGREEMENT FOR COUNTY-OWNED LAND LOCATED ON PHT
The Board of County Commissioners adopted Resolution R-688-26, approving the bifurcation of the Jackson Medical Towers Redevelopment Lease Agreement with RUDG, LLC for the second phase of development, for a term of 99 years, for the provision of workforce and affordable housing on County-owned land located on a portion of properties currently bearing Folio Nos. 01-3135-045-0010 and 01-3135-045-0020, with a total cumulative estimated amount of rental revenue to the Public Health Trust of $534,923,191.00 over the term. The Phase 2 Lease is with Residences at Wagner Creek, LLC, an entity affiliated with RUDG, LLC. The project involves refurbishing the existing Jackson Medical Towers structures and converting them to a 358-unit residential building with approximately 676 parking spaces, instead of demolishing and constructing a new residential tower with 361 rental units. The residential unit income mix is modified so that a minimum of 20 percent of the residential units are maintained as workforce housing units and a maximum of 30 percent are unrestricted, instead of a minimum of 30 percent workforce and a maximum of 20 percent unrestricted. The planned 128-unit hotel tower is eliminated. The $135,000.00 initial rent payment is replaced with a capitalized lease payment estimated to be approximately $41,331,973.00. The construction schedule for completion of the second phase is accelerated from February 2032 to December 2029. A provision is added contemplating that the Tenant enter a sublease for the establishment of a vocational high school focused on health sciences on the leased premises. A provision is added giving the Public Health Trust an annual option to lease back a minimum of 20 percent of the parking space capacity (estimated to be 135 parking spaces) at discounted rates for employee parking. The Phase 2 Lease still requires that a minimum of 50 percent of the residential units delivered be maintained by Tenant as affordable housing units. The capitalized lease payment entails a lump sum payment by Tenant of ten percent of the fair market value of the existing improvements on the Phase 2 Lease premises, due on financial close (estimated to be $4,133,197.00), and the balance due subject to the terms of a promissory note, to be paid after 33 years (estimated to be $37,198,776.00, plus interest). The subject property is located in County Commission District 3. The Board authorized the Public Health Trust to execute the bifurcated Phase 2 Lease agreement and to act on behalf of the County as its agent in the performance of the County's obligations and exercise of the County's rights under the Phase 2 Lease. The Board authorized the County Mayor or County Mayor's designee to exercise any rights and perform any obligations delegated in the Phase 2 Lease, including approving and executing documents or agreements between RUDG, LLC and the Miami-Dade Department of Housing and Community Development or the Miami-Dade Department of Transportation and Public Works. The Board directed the County Mayor or County Mayor's designee to provide the Property Appraiser's Office with a copy of the executed Phase 2 Lease within 30 days of its execution.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 1500 NW 12th Avenue, Miami, Florida
- Applicant:
- RUDG, LLC (Developer); Residences at Wagner Creek, LLC (Tenant)
GROUND LEASE AGREEMENT FOR COUNTY-OWNED LAND LOCATED ON PHT
Resolution approving the bifurcation of the Jackson Medical Towers Redevelopment Lease Agreement with RUDG, LLC for the second phase of a workforce and affordable housing development on County-owned land. The project involves refurbishing existing Jackson Medical Towers structures into a 358-unit residential building with approximately 676 parking spaces, instead of demolition and new construction. The Phase 2 Lease is for a term of 99 years with estimated cumulative rental revenue of $534,923,191 to the Public Health Trust, including a capitalized lease payment estimated at approximately $41,331,973. The tenant is Residences at Wagner Creek, LLC, an entity affiliated with RUDG, LLC. The resolution was adopted by the Board of County Commissioners on July 21, 2026. The project also includes a provision for a vocational high school focused on health sciences and an annual option for the Public Health Trust to lease back a minimum of 20 percent of parking spaces at discounted rates. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 1500 NW 12th Avenue, Miami, Florida
- Applicant:
- RUDG, LLC (Developer); Residences at Wagner Creek, LLC (Tenant)
GROUND LEASE AGREEMENT FOR COUNTY-OWNED LAND LOCATED ON PHT
The Board of County Commissioners adopted Resolution R-688-26 (File Number 261263) on July 21, 2026, approving the bifurcation of the Jackson Medical Towers Redevelopment Lease Agreement with RUDG, LLC for the second phase of development, for a term of 99 years, for workforce and affordable housing on County-owned land located on a portion of properties bearing Folio Nos. 01-3135-045-0010 and 01-3135-045-0020. The Phase 2 Lease is with Residences at Wagner Creek, LLC, an entity affiliated with RUDG, LLC. The estimated cumulative rental revenue over the term is $534,923,191 to the Public Health Trust of Miami-Dade County, inclusive of a capitalized lease payment estimated to be approximately $41,331,973. The Phase 2 Lease includes material changes: refurbishing existing Jackson Medical Towers structures into a 358-unit residential building with approximately 676 parking spaces instead of demolishing and constructing a new residential tower with 361 rental units; modifying the residential unit income mix so a minimum of 20 percent are workforce housing units and a maximum of 30 percent are unrestricted, instead of a minimum of 30 percent workforce and a maximum of 20 percent unrestricted; eliminating the planned 128-unit hotel tower; eliminating the $135,000 initial rent payment and replacing it with a capitalized lease payment; accelerating construction completion from February 2032 to December 2029; adding a provision for a sublease for a vocational high school focused on health sciences; and adding a provision giving the Public Health Trust an annual option to lease back a minimum of 20 percent of parking space capacity (estimated to be 135 parking spaces) at discounted rates for employee parking. The Phase 2 Lease still requires a minimum of 50 percent of residential units be maintained as affordable housing units. The capitalized lease payment entails a lump sum payment of ten percent of the fair market value of existing improvements, due on financial close (estimated to be $4,133,197), and the balance due subject to a promissory note, to be paid after 33 years (estimated to be $37,198,776, plus interest). The subject property is located in County Commission District 3. The resolution authorizes the Public Health Trust to execute the Phase 2 Lease and administer its terms, and authorizes the County Mayor or designee to take certain actions. The resolution directs the County Mayor or designee to provide the Property Appraiser's Office with a copy of the executed Phase 2 Lease within 30 days of its execution. The resolution was introduced on July 7, 2026, and adopted on July 21, 2026. The Housing Committee forwarded it to the BCC with a favorable recommendation on July 14, 2026. The Prime Sponsor is Keon Hardemon. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 1500 NW 12th Avenue, Miami, Florida (stated as the location of the Jackson Memorial Medical Center campus in the recitals for the Master Lease)
- Applicant:
- RUDG, LLC (Developer); Residences at Wagner Creek, LLC (Tenant, an entity affiliated with RUDG, LLC)
GROUND LEASE AGREEMENT FOR COUNTY-OWNED LAND LOCATED ON PHT
The Board of County Commissioners adopted Resolution R-688-26 (File Number 261263) on July 21, 2026, approving the bifurcation of the Jackson Medical Towers Redevelopment Lease Agreement with RUDG, LLC for the second phase of development, a 99-year ground lease for workforce and affordable housing on County-owned land. The Phase 2 Lease is with Residences at Wagner Creek, LLC, an affiliate of RUDG, LLC. The project involves refurbishing existing Jackson Medical Towers structures into a 358-unit residential building with approximately 676 parking spaces, instead of demolition and new construction. The residential unit income mix is modified to a minimum of 20 percent workforce housing and a maximum of 30 percent unrestricted. The planned 128-unit hotel tower is eliminated. The initial rent payment is replaced with a capitalized lease payment estimated at approximately $41,331,973. Construction completion is accelerated to December 2029. A provision contemplates a sublease for a vocational high school focused on health sciences. The Public Health Trust gets an annual option to lease back a minimum of 20 percent of parking spaces (estimated 135 spaces) at discounted rates. The Phase 2 Lease requires a minimum of 50 percent of residential units be maintained as affordable housing. Estimated cumulative rental revenue over the term is $534,923,191. The capitalized lease payment entails a lump sum of ten percent of fair market value of existing improvements due at financial close (estimated $4,133,197) and the balance due after 33 years (estimated $37,198,776 plus interest). The Housing Committee forwarded the item to the BCC with a favorable recommendation on July 14, 2026. The item was adopted on July 21, 2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 1500 NW 12th Avenue, Miami, Florida
- Applicant:
- RUDG, LLC (Developer); Residences at Wagner Creek, LLC (Tenant, affiliated with RUDG, LLC)
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta