CHANGE ORDER #1 LANZO (S-20331)
The Miami-Dade Board of County Commissioners adopted Resolution R-750-26 (File Number 261434) on September 1, 2026, ratifying Change Order No. 1 to Contract No. S-20331 between Miami-Dade County and Lanzo Construction Co. Florida. The change order is for an emergency project for operational and resiliency improvements to the Calcium Carbonate Lagoon and Softeners at the Alexander Orr Water Treatment Plant. It reallocates $1,629,590.00 in existing contract funds to address an overrun in Bid Item 7 (excavation, loading, hauling, and disposal of calcium carbonate residual) and increases the contract by $2,003,650.00 to replenish the contingency allowance. The original contract award was $23,742,340.00 with a contingency allowance of $2,003,650.00 and a duration of 540 calendar days. The Notice to Proceed was issued on February 24, 2025, with a final completion date of August 18, 2026. The project is located at 6800 SW 87th Ave. in Commission District 10. The emergency was declared on November 12, 2024, due to a breach of a sludge lagoon berm. The original estimated quantity of calcium carbonate residual removal was 175,000 cubic yards, which has been exceeded. The change order is funded from WASD Revenue Bonds Sold, Future Revenue Bonds and Proprietary Funds, with no impact to the General Fund. The project is in WASD's Fiscal Year 2025-26 Adopted Budget under Water Reset Program - Water Treatment Plant - Alexander Orr, Jr. Expansion, Program #9650031, Volume #3, Page #123 and under Contractual Services, Volume #3, Page #100. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 6800 SW 87th Ave.
- Applicant:
- Miami-Dade County and Lanzo Construction Co. Florida
CHANGE ORDER #1 LANZO (S-20331)
Resolution R-750-26 ratifies Change Order No. 1 to Contract No. S-20331 between Miami-Dade County and Lanzo Construction Co. Florida for an emergency project at the Alexander Orr Water Treatment Plant. The change order reallocates $1,629,590.00 in existing contract funds to address an overrun in Bid Item 7 for excavation, loading, hauling, and disposal of calcium carbonate residual, and increases the contract by $2,003,650.00 to replenish the contingency allowance. The project involves operational and resiliency improvements to the calcium carbonate lagoon and softeners. The original contract award was $23,742,340.00 with a contingency allowance of $2,003,650.00 and a duration of 540 calendar days. The Notice to Proceed was issued February 24, 2025, with a final completion date of August 18, 2026. The emergency was declared on November 12, 2024, due to a breach of a sludge lagoon berm. The original estimated quantity of calcium carbonate residual removal was 175,000 cubic yards, which has been exceeded. The resolution was adopted on September 1, 2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 6800 SW 87th Ave.
- Applicant:
- Miami-Dade County Water & Sewer Department; Lanzo Construction Co. Florida (contractor)
CHANGE ORDER #1 LANZO (S-20331)
Resolution R-750-26, File Number 261434, ratified Change Order No. 1 to Contract No. S-20331 between Miami-Dade County and Lanzo Construction Co. Florida for an emergency project at the Alexander Orr Water Treatment Plant. The change order reallocates $1,629,590.00 in existing contract funds to address an overrun in Bid Item 7 for excavation, loading, hauling, and disposal of calcium carbonate residual, and increases the contract by $2,003,650.00 to replenish the contingency allowance. The project address is 6800 SW 87th Ave. The original contract award was $23,742,340.00 with a contingency allowance of $2,003,650.00 and a duration of 540 calendar days. The Notice to Proceed was issued February 24, 2025, with a final completion date of August 18, 2026. The original estimated quantity of calcium carbonate residual was 175,000 cubic yards, which was exceeded. The action was adopted on September 1, 2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 6800 SW 87th Ave.
- Applicant:
- Miami-Dade County Water and Sewer Department; Contractor: Lanzo Construction Co. Florida
CHANGE ORDER #1 LANZO (S-20331)
Resolution ratifying Change Order No. 1 to Contract No. S-20331 between Miami-Dade County and Lanzo Construction Co. Florida for an emergency project at the Alexander Orr Water Treatment Plant. The change order reallocates $1,629,590.00 in existing contract funds to address an overrun in Bid Item 7 for excavation, loading, hauling, and disposal of calcium carbonate residual, and increases the contract by $2,003,650.00 to replenish the contingency allowance. The project involves operational and resiliency improvements to the calcium carbonate lagoon and softeners. The resolution was adopted on 9/1/2026. The original contract award was $23,742,340.00 with a contingency allowance of $2,003,650.00 and a duration of 540 calendar days. The Notice to Proceed was issued on 2/24/2025, with a final completion date of 8/18/2026. The original estimated quantity of calcium carbonate residual removal was 175,000 cubic yards, which has been exceeded. The project is funded from WASD Revenue Bonds Sold, Future Revenue Bonds and Proprietary Funds, with no impact to the General Fund.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 6800 SW 87th Ave.
- Applicant:
- Miami-Dade County Water and Sewer Department; Lanzo Construction Co. Florida (contractor)
CHANGE ORDER #1 LANZO (S-20331)
Resolution R-750-26 ratifies Change Order No. 1 to Contract No. S-20331 between Miami-Dade County and Lanzo Construction Co. Florida for an emergency project at the Alexander Orr Water Treatment Plant. The change order reallocates $1,629,590.00 in existing contract funds to address an overrun in Bid Item 7 for excavation, loading, hauling, and disposal of calcium carbonate residual, and increases the contract by $2,003,650.00 to replenish the contingency allowance. The project address is 6800 SW 87th Ave. The original contract was awarded on February 14, 2025, ratified by the Board on June 26, 2025, via Resolution No. R-613-25, for $23,742,340.00 with a contingency allowance of $2,003,650.00 and a duration of 540 calendar days. The Notice to Proceed was issued on February 24, 2025, making the final completion date August 18, 2026. The emergency was declared on November 12, 2024, due to a breach of a sludge lagoon berm. The change order was introduced on August 14, 2026, and the final action was on September 1, 2026. The fiscal impact is funded from WASD Revenue Bonds Sold, Future Revenue Bonds and Proprietary Funds, with no impact to the General Fund. The project is in WASD's Fiscal Year 2025-26 Adopted Budget and Multi-Year Capital Plan under Water Reset Program - Water Treatment Plant - Alexander Orr, Jr. Expansion, Program #9650031, Volume #3, Page #123 and under Contractual Services, Volume #3, Page #100. The original estimated quantity for calcium carbonate removal was 175,000 cubic yards, and field conditions confirmed quantities exceeded this estimate. The reallocated line items include Bid Item 500 Price Escalation ($601,095.00), Bid Item 505 permits and fees ($601,095.00), Bid Item 11 construction of a new dike and improvement to existing dikes ($407,400.00), and Bid Item 503 reimbursement of off-duty police officers ($20,000.00). The document does not state any public comment or stakeholder sentiment. The document does not state a business opportunity beyond the change order itself.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 6800 SW 87th Ave.
- Applicant:
- Miami-Dade County Water and Sewer Department; Contractor: Lanzo Construction Co. Florida
CHANGE ORDER #1 LANZO (S-20331)
Resolution R-750-26 ratifies Change Order No. 1 to Contract No. S-20331 between Miami-Dade County and Lanzo Construction Co. Florida for an emergency project at the Alexander Orr Water Treatment Plant. The change order reallocates $1,629,590.00 in existing contract funds to address an overrun in Bid Item 7 for excavation, loading, hauling, and disposal of calcium carbonate residual, and increases the contract by $2,003,650.00 to replenish the contingency allowance. The project was declared an emergency on November 12, 2024, due to a breach of a sludge lagoon berm. The original contract was awarded on February 14, 2025, ratified by the Board on June 26, 2025, via Resolution No. R-613-25, for $23,742,340.00 with a contingency allowance of $2,003,650.00 and a duration of 540 calendar days. Notice to Proceed was issued February 24, 2025, with a final completion date of August 18, 2026. The resolution was introduced on August 14, 2026, and adopted on September 1, 2026. The project is located at 6800 SW 87th Ave. in Commission District 10. The original estimated quantity of calcium carbonate residual was 175,000 cubic yards, which has been exceeded. The fiscal impact is funded from WASD Revenue Bonds Sold, Future Revenue Bonds and Proprietary Funds, with no impact to the General Fund. The project is in WASD's Fiscal Year 2025-26 Adopted Budget and Multi-Year Capital Plan under Water Reset Program - Water Treatment Plant - Alexander Orr, Jr. Expansion, Program #9650031, Volume #3, Page #123 and under Contractual Services, Volume #3, Page #100. Small Business Enterprise measures did not apply to the contract.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 6800 SW 87th Ave.
- Applicant:
- Miami-Dade County Water and Sewer Department; Lanzo Construction Co. Florida
CHANGE ORDER #1 LANZO (S-20331)
Resolution R-750-26, File Number 261434, adopted September 1, 2026, ratifies Change Order No. 1 to Contract No. S-20331 between Miami-Dade County and Lanzo Construction Co. Florida for an emergency project at the Alexander Orr Water Treatment Plant. The change order reallocates $1,629,590.00 in existing contract funds to address an overrun in Bid Item 7 for excavation, loading, hauling, and disposal of calcium carbonate residual, and increases the contract by $2,003,650.00 to replenish the contingency allowance. The project address is 6800 SW 87th Ave. The original contract award was $23,742,340.00 with a contingency allowance of $2,003,650.00 and a duration of 540 calendar days. The Notice to Proceed was issued February 24, 2025, with a final completion date of August 18, 2026. The original estimated quantity of calcium carbonate residual was 175,000 cubic yards, which was exceeded. The project is in Commission District 10. The fiscal impact is funded from WASD Revenue Bonds Sold, Future Revenue Bonds and Proprietary Funds. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 6800 SW 87th Ave.
- Applicant:
- Miami-Dade County Water & Sewer Department; Contractor: Lanzo Construction Co. Florida
CHANGE ORDER #1 LANZO (S-20331)
The document is a legislative item for Miami-Dade County, File Number 261434, a Resolution (R-750-26) that was Adopted on 9/1/2026. It ratifies Change Order No. 1 to Contract No. S-20331 between Miami-Dade County and Lanzo Construction Co. Florida for an emergency project at the Alexander Orr Water Treatment Plant (AOWTP), located at 6800 SW 87th Ave. The change order reallocates existing contract funds in the amount of $1,629,590.00 to address a documented overrun in Bid Item 7 (excavation, loading, hauling, and disposal of calcium carbonate residual) and increases the contract by $2,003,650.00 to replenish the contract's contingency allowance. The original contract was awarded on February 14, 2025, for $23,742,340.00, with a total duration of 540 calendar days. The Notice to Proceed was issued on February 24, 2025, making the Final Completion Date August 18, 2026. The project is funded from WASD Revenue Bonds Sold, Future Revenue Bonds and Proprietary Funds. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 6800 SW 87th Ave.
- Applicant:
- Miami-Dade County Water and Sewer Department (WASD); Contractor: Lanzo Construction Co. Florida
CHANGE ORDER #1 LANZO (S-20331)
The document is a resolution ratifying Change Order No. 1 to Contract No. S-20331 between Miami-Dade County and Lanzo Construction Co. Florida for an emergency project at the Alexander Orr Water Treatment Plant. The change order reallocates $1,629,590.00 in existing contract funds to address an overrun in Bid Item 7 for excavation, loading, hauling, and disposal of calcium carbonate residual, and increases the contract by $2,003,650.00 to replenish the contingency allowance. The project was declared an emergency on November 12, 2024, due to a breach of a sludge lagoon berm. The contract was awarded on February 14, 2025, ratified by the Board on June 26, 2025, via Resolution No. R-613-25, with a total award of $23,742,340.00 and a duration of 540 calendar days. The Notice to Proceed was issued on February 24, 2025, with a final completion date of August 18, 2026. The resolution was adopted on September 1, 2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 6800 SW 87th Ave.
- Applicant:
- Miami-Dade County Water & Sewer Department; Lanzo Construction Co. Florida (contractor)
CHANGE ORDER #1 LANZO (S-20331)
Resolution ratifying Change Order No. 1 to Contract No. S-20331 between Miami-Dade County and Lanzo Construction Co. Florida for an emergency project at the Alexander Orr Water Treatment Plant. The change order reallocates $1,629,590.00 in existing contract funds to address an overrun in Bid Item 7 for excavation, loading, hauling, and disposal of calcium carbonate residual, and increases the contract by $2,003,650.00 to replenish the contingency allowance. The project was awarded on February 14, 2025, ratified by the Board on June 26, 2025, via Resolution No. R-613-25, with a total contract award of $23,742,340.00 and a 540-calendar-day duration. The Notice to Proceed was issued February 24, 2025, making the final completion date August 18, 2026. The emergency was declared on November 12, 2024, due to a breach of a sludge lagoon berm. The original estimated quantity of calcium carbonate residual was 175,000 cubic yards, which has been exceeded. The agenda date is September 1, 2026, agenda item number 8O2. The file number is 261434. The item was introduced on August 14, 2026. The status is 'In Draft'. The staff recommendation is to ratify the change order. The fiscal impact is funded from WASD Revenue Bonds Sold, Future Revenue Bonds and Proprietary Funds, with no impact to the General Fund. The project is in WASD's Fiscal Year 2025-26 Adopted Budget and Multi-Year Capital Plan under Water Reset Program - Water Treatment Plant - Alexander Orr, Jr. Expansion, Program #9650031, Volume #3, Page #123 and under Contractual Services, Volume #3, Page #100. The project is being performed at WASD's AOWTP, located at 6800 SW 87th Ave., in Commission District 10, represented by Chairman Anthony Rodriguez. The contract was awarded pursuant to Section 2-8.2.12 of the Code of Miami-Dade County, Florida (WASD's Acceleration Ordinance). The change order reallocates funds from Bid Item 500 (Price Escalation) $601,095.00, Bid Item 505 (permits, fees, impact fees and inspections) $601,095.00, Bid Item 11 (construction of a new dike and improvement to existing dikes) $407,400.00, and Bid Item 503 (reimbursement of off-duty police officers) $20,000.00. The contingency allowance was depleted due to unforeseen conditions including emergency repairs to a leak at the North Lagoon, repairs to the truck wash station, upgrades and additional repairs to deteriorated catwalks, and higher hauling and disposal costs due to saturated material. WASD and the Contractor continue to validate remaining excavation quantities, and a subsequent reconciliation change order may be presented at contract closeout if necessary. Small Business Enterprise measures did not apply to the contract. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- In Draft; staff recommendation is to ratify Change Order No. 1; agenda date September 1, 2026, agenda item number 8O2
- Address:
- 6800 SW 87th Ave.
- Applicant:
- Miami-Dade County Water and Sewer Department; Contractor: Lanzo Construction Co. Florida
CHANGE ORDER #1 LANZO (S-20331)
The document is a resolution ratifying Change Order No. 1 to Contract No. S-20331 between Miami-Dade County and Lanzo Construction Co. Florida for an emergency project at the Alexander Orr Water Treatment Plant. The change order reallocates $1,629,590.00 in existing contract funds to address an overrun in Bid Item 7 for excavation, loading, hauling, and disposal of calcium carbonate residual, and increases the contract by $2,003,650.00 to replenish the contingency allowance. The project involves operational and resiliency improvements to the calcium carbonate lagoon and softeners. The original contract award was $23,742,340.00 with a contingency allowance of $2,003,650.00 and a duration of 540 calendar days. The Notice to Proceed was issued on February 24, 2025, with a final completion date of August 18, 2026. The resolution was adopted on September 1, 2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 6800 SW 87th Ave.
- Applicant:
- Miami-Dade County Water and Sewer Department; Lanzo Construction Co. Florida (contractor)
CHANGE ORDER #1 LANZO (S-20331)
Resolution ratifying Change Order No. 1 to Contract No. S-20331 between Miami-Dade County and Lanzo Construction Co. Florida for an emergency project at the Alexander Orr Water Treatment Plant. The change order reallocates $1,629,590.00 in existing contract funds to address an overrun in Bid Item 7 for excavation, loading, hauling, and disposal of calcium carbonate residual, and increases the contract by $2,003,650.00 to replenish the contingency allowance. The project involves operational and resiliency improvements to the calcium carbonate lagoon and softeners. The original contract award was $23,742,340.00 with a contingency allowance of $2,003,650.00 and a duration of 540 calendar days. The Notice to Proceed was issued on February 24, 2025, with a final completion date of August 18, 2026. The emergency was declared on November 12, 2024, due to a breach of a sludge lagoon berm causing loss of sludge and backwash water disposal capacity. The original estimated quantity of calcium carbonate residual removal was 175,000 cubic yards, which was exceeded due to saturated material and differing site conditions. The resolution was adopted on September 1, 2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 6800 SW 87th Ave.
- Applicant:
- Miami-Dade County Water and Sewer Department; Contractor: Lanzo Construction Co. Florida
CHANGE ORDER #1 LANZO (S-20331)
The document is a resolution ratifying Change Order No. 1 to Contract No. S-20331 between Miami-Dade County and Lanzo Construction Co. Florida for an emergency project at the Alexander Orr Water Treatment Plant. The change order reallocates $1,629,590.00 in existing contract funds to address an overrun in Bid Item 7 for excavation, loading, hauling, and disposal of calcium carbonate residual, and increases the contract by $2,003,650.00 to replenish the contingency allowance. The project was declared an emergency on November 12, 2024, due to a breach of a sludge lagoon berm. The contract was awarded on February 14, 2025, ratified by the Board on June 25, 2025, via Resolution No. R-613-25, with a total award of $23,742,340.00 and a duration of 540 calendar days. The Notice to Proceed was issued on February 24, 2025, with a final completion date of August 18, 2026. The resolution was adopted on September 1, 2026. The project is located at 6800 SW 87th Ave. in Commission District 10. The original estimated quantity of calcium carbonate residual removal was 175,000 cubic yards, and field conditions confirmed quantities exceeded this estimate. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 6800 SW 87th Ave.
- Applicant:
- Miami-Dade County Water and Sewer Department; Contractor: Lanzo Construction Co. Florida
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution R-751-26 ratifies Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar day time extension with no additional fiscal impact. The project was completed. The contract was awarded on May 11, 2021 for $107,605,400.00 with a duration of 792 calendar days. The project increases the permitted average annual daily flow from 112.5 to 131 million gallons per day and peak flow capacity from 285 MGD to 305 MGD. The project includes construction of headworks, two oxygenation trains, odor control facilities, and installation of large diameter pipelines including a connection to an existing 72-inch force main at SW 232nd Street. The project is located at WASD's South District Wastewater Treatment Plant in Commission District 8. The change order was adopted on September 1, 2026. The document does not state a street address, parcel number, or acreage. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water and Sewer Department; Contractor: Poole & Kent Company of Florida
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution R-751-26, File Number 261435, adopted September 1, 2026, ratifies Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar day time extension with no additional fiscal impact. The project increased permitted average annual daily flow from 112.5 to 131 million gallons per day and peak flow capacity from 285 MGD to 305 MGD. The project is located at the South District Wastewater Treatment Plant in Commission District 8. The contract was awarded May 11, 2021, with a total amount not to exceed $107,605,400.00. The Notice to Proceed was issued August 30, 2021. Substantial Completion Date extended from November 19, 2023 to October 18, 2025; Final Completion Date extended from January 18, 2024 to December 17, 2025. The project has been successfully completed. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade Water and Sewer Department; Poole & Kent Company of Florida (Contractor)
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution R-751-26 (File Number 261435) ratifies Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar day time extension with no additional fiscal impact. The project is located at WASD's South District Wastewater Treatment Plant in Commission District 8. The project increases the permitted average annual daily flow from 112.5 to 131 million gallons per day and peak flow capacity from 285 MGD to 305 MGD. The contract was awarded on May 11, 2021, ratified by Resolution No. R-821-21, with a total award not to exceed $107,605,400.00. The Notice to Proceed was issued August 30, 2021. Change Order No. 1 extends the Substantial Completion Date from November 19, 2023 to October 18, 2025 and the Final Completion Date from January 18, 2024 to December 17, 2025. The action was adopted on September 1, 2026. The project was successfully completed. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water and Sewer Department; Contractor: Poole & Kent Company of Florida
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution R-751-26 ratifies Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. Change Order No. 1 grants a 699-calendar day time extension with no additional fiscal impact. The project was completed. The contract was awarded on May 11, 2021 for $107,605,400.00 with a duration of 792 calendar days. The Notice to Proceed was issued August 30, 2021. The Substantial Completion Date was extended from November 19, 2023 to October 18, 2025, and the Final Completion Date from January 18, 2024 to December 17, 2025. The project increases the permitted average annual daily flow from 112.5 to 131 million gallons per day (MGD) and peak flow capacity from 285 MGD to 305 MGD at the South District Wastewater Treatment Plant. The project includes construction of headworks, two oxygenation trains, odor control facilities, and installation of large diameter pipelines including a connection to an existing 72-inch force main at SW 232nd Street. The resolution was introduced on 8/14/2026, adopted on 9/1/2026. The project is located in Commission District 8. The document does not state a specific street address or parcel/folio for the plant. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water and Sewer Department; Poole & Kent Company of Florida (Contractor)
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution R-751-26, File Number 261435, adopted September 1, 2026, ratifies Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. Change Order No. 1 grants a 699-calendar day time extension with no additional fiscal impact. The project increases permitted average annual daily flow from 112.5 to 131 million gallons per day (MGD) and peak flow capacity from 285 MGD to 305 MGD. The project includes construction of headworks, two oxygenation trains, odor control facilities, and installation of large diameter pipelines including a connection to an existing 72-inch force main at SW 232nd Street. The project is located at WASD's South District Wastewater Treatment Plant in Commission District 8. The contract was awarded May 11, 2021, with a total award not to exceed $107,605,400.00, and ratified via Resolution No. R-821-21. Notice to Proceed was issued August 30, 2021. Change Order No. 1 extends the Substantial Completion Date from November 19, 2023 to October 18, 2025, and the Final Completion Date from January 18, 2024 to December 17, 2025. The project has been successfully completed. Delays were caused by third-party manufacturing issues, field coordination conflicts with adjacent Ocean Outfall Legislation projects, and late design and startup-related issues. The project is necessary to meet State-mandated Ocean Outfall Legislation requirements under section 403.086(9) of the Florida Statutes. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted (ratification of Change Order No. 1)
- Address:
- SW 232nd Street (connection to existing 72-inch force main); project at South District Wastewater Treatment Plant, Commission District 8
- Applicant:
- Miami-Dade County Water and Sewer Department; Contractor: Poole & Kent Company of Florida
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution R-751-26, adopted September 1, 2026, ratifies Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar-day time extension with no additional fiscal impact. The project was completed. The contract was awarded May 11, 2021 for $107,605,400.00 with a duration of 792 calendar days. The Notice to Proceed was issued August 30, 2021. The change order extends the Substantial Completion Date from November 19, 2023 to October 18, 2025 and the Final Completion Date from January 18, 2024 to December 17, 2025. The project increases the permitted average annual daily flow from 112.5 to 131 million gallons per day and peak flow capacity from 285 MGD to 305 MGD at the South District Wastewater Treatment Plant. The project includes construction of headworks, two oxygenation trains, odor control facilities, and installation of large diameter pipelines including a connection to an existing 72-inch force main at SW 232nd Street. The project is located in Commission District 8. The change order was necessary due to delays from third-party manufacturing issues, field coordination conflicts with adjacent Ocean Outfall Legislation projects, and late design and startup-related issues. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water & Sewer Department; Contractor: Poole & Kent Company of Florida
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution ratifying Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. Change Order No. 1 grants a 699-calendar day time extension with no additional fiscal impact. The project has been completed and this change order serves as final contract closeout. The project allows for an increase of the permitted average annual daily flow from 112.5 to 131 million gallons per day (MGD) and an increase of peak flow capacity from 285 MGD to 305 MGD. The project includes construction of headworks, two oxygenation trains, odor control facilities, and installation of large diameter pipelines including a connection to an existing 72-inch force main at SW 232nd Street. The contract was awarded on May 11, 2021, with a total amount not to exceed $107,605,400.00. The Notice to Proceed was issued on August 30, 2021. The decision was Adopted on 9/1/2026. File Number: 261435. Reference: R-751-26. Introduced: 8/14/2026. Agenda Item Number: 8O3. The project is located in Commission District 8. Public comment sentiment is not stated.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water & Sewer Department; Contractor: Poole & Kent Company of Florida