AGC ELECTRIC, INC. FOR THE REPLACEMENT OF EXISTING SPAN-WIRE

Resolution authorizing Supplemental Agreement No. 1 with AGC Electric, Inc. for design-build services for the replacement of existing span-wire signalized intersections for mast-arm configuration, countywide in Miami-Dade County. The agreement increases the maximum contract value by $1,298,633.43 to $10,225,993.43 and extends the contract term by 566 non-compensable calendar days to 1,466 calendar days. The project includes 14 intersections under construction. The Transportation Committee forwarded it to the BCC with a favorable recommendation on 9/9/2026; the BCC agenda date is 10/6/2026. The additional funds address inflationary increases in construction material costs (steel, aluminum, PVC, copper) and the time extension is for utility coordination delays with Florida Power & Light and COVID-19-related work restrictions. Funded through Mobility Impact Fees. No public comment sentiment is stated.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by the Transportation Committee on 9/9/2026; pending BCC approval on 10/6/2026
Applicant:
AGC Electric, Inc.

AGC ELECTRIC, INC. FOR THE REPLACEMENT OF EXISTING SPAN-WIRE

Resolution authorizing Supplemental Agreement No. 1 with AGC Electric, Inc. for design-build services to replace existing span-wire signalized intersections with mast-arm configurations countywide. The agreement increases the maximum contract value by $1,298,633.43 to $10,225,993.43 and extends the contract term by 566 non-compensable calendar days to 1,466 calendar days. The project is funded through Mobility Impact Fees. The Transportation Committee forwarded it to the Board of County Commissioners with a favorable recommendation on 9/9/2026. The Board agenda date is 10/6/2026. The project includes 14 intersections under construction. The additional funds address inflationary increases in construction material costs (steel, aluminum, PVC, copper) and the time extension is for delays related to utility coordination with Florida Power & Light and COVID-19-related work restrictions. No public comment or stakeholder sentiment is stated in the document.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Transportation Cmte forwarded to BCC with a favorable recommendation on 9/9/2026; final Board action pending as of agenda date 10/6/2026
Applicant:
AGC Electric, Inc.

AGC ELECTRIC, INC. FOR THE REPLACEMENT OF EXISTING SPAN-WIRE

Resolution authorizing Supplemental Agreement No. 1 with AGC Electric, Inc. for design-build services to replace existing span-wire signalized intersections with mast-arm configurations. The agreement increases the maximum contract value by $1,298,633.43 to $10,225,993.43 and extends the contract term by 566 non-compensable calendar days to 1,466 calendar days. The project is funded through Mobility Impact Fees. The project currently includes 14 intersections under construction. The additional funds address inflationary increases in construction material costs, and the time extension is due to utility coordination delays with Florida Power & Light and COVID-19-related work restrictions. The item was introduced on 8/19/2026, assigned to the County Attorney on 8/24/2026, and is scheduled for the Transportation Committee on 10/6/2026. The status is 'In Committee' and no final action is stated.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Applicant:
AGC Electric, Inc.

AGC ELECTRIC, INC. FOR THE REPLACEMENT OF EXISTING SPAN-WIRE

Resolution authorizing Supplemental Agreement No. 1 with AGC Electric, Inc. for design-build services to replace existing span-wire signalized intersections with mast-arm configurations. The agreement increases the maximum contract value by $1,298,633.43 to $10,225,993.43 and extends the contract term by 566 non-compensable calendar days to 1,466 calendar days. The project is funded through Mobility Impact Fees. The Transportation Committee forwarded the item to the Board of County Commissioners with a favorable recommendation on 9/9/2026. The Board agenda date is 10/6/2026. The project includes 14 intersections under construction. The additional funds address inflationary increases in construction material costs, and the time extension is due to utility coordination delays with Florida Power & Light and early-phase COVID-19-related work restrictions. No public comment sentiment is stated.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by the Transportation Committee on 9/9/2026; pending before the Board with an agenda date of 10/6/2026
Applicant:
AGC Electric, Inc.

AGC ELECTRIC, INC. FOR THE REPLACEMENT OF EXISTING SPAN-WIRE

Resolution authorizing Supplemental Agreement No. 1 with AGC Electric, Inc. for design-build services to replace existing span-wire signalized intersections with mast-arm configurations. The agreement increases the maximum contract value by $1,298,633.43 to $10,225,993.43 and extends the contract term by 566 non-compensable calendar days to 1,466 calendar days. The project is funded through Mobility Impact Fees. The additional funds address inflationary increases in construction material costs, and the time extension is due to utility coordination delays with Florida Power & Light and COVID-19-related work restrictions. The project currently includes 14 intersections under construction. The item was introduced on 8/19/2026 and was in committee as of the document date, with an agenda date of 10/6/2026. The staff recommendation is to approve. No public comment sentiment is stated in the document.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
In Committee; staff recommendation is to approve
Applicant:
AGC Electric, Inc.

AGC ELECTRIC, INC. FOR THE REPLACEMENT OF EXISTING SPAN-WIRE

Resolution authorizing Supplemental Agreement No. 1 with AGC Electric, Inc. for design-build services to replace existing span-wire signalized intersections with mast-arm configurations. The agreement increases the maximum contract value to $10,225,993.43 and extends the contract term to 1,466 non-compensable calendar days. The project is countywide and includes 14 intersections under construction. The Transportation Committee forwarded the item to the Board of County Commissioners with a favorable recommendation on 9/9/2026. The Board agenda date is 10/6/2026. The additional funds address inflationary increases in construction material costs and the time extension is for utility coordination delays and COVID-19-related work restrictions. No public comment sentiment is stated.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee on 9/9/2026; final Board action pending on 10/6/2026
Applicant:
AGC Electric, Inc.

AGC ELECTRIC, INC. FOR THE REPLACEMENT OF EXISTING SPAN-WIRE

Resolution authorizing Supplemental Agreement No. 1 with AGC Electric, Inc. for design-build services for the replacement of existing span-wire signalized intersections for mast-arm configuration. The contract value increases by $1,298,633.43 to $10,225,993.43, and the contract term extends by 566 non-compensable calendar days to 1,466 calendar days. The project is funded through Mobility Impact Fees. The Transportation Committee forwarded it to the Board of County Commissioners with a favorable recommendation on 9/9/2026. The Board agenda date is 10/6/2026. The project includes 14 intersections under construction. The additional funds address inflationary increases in construction material costs. The time extension is due to utility coordination with Florida Power & Light and COVID-19-related work restrictions. No public comment sentiment is stated.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by the Transportation Committee on 9/9/2026; pending before the Board with an agenda date of 10/6/2026
Applicant:
AGC Electric, Inc.

AGC ELECTRIC, INC. FOR THE REPLACEMENT OF EXISTING SPAN-WIRE

Resolution authorizing Supplemental Agreement No. 1 with AGC Electric, Inc. for design-build services to replace existing span-wire signalized intersections with mast-arm configurations countywide. The agreement increases the maximum contract value by $1,298,633.43 to $10,225,993.43 and extends the contract term by 566 non-compensable calendar days to 1,466 calendar days. The project is funded through Mobility Impact Fees. The Transportation Committee forwarded the item to the Board of County Commissioners with a favorable recommendation on 9/9/2026. The Board agenda date is 10/6/2026. The project currently includes 14 intersections under construction. The time extension is attributed to utility coordination delays with Florida Power & Light and early-phase COVID-19-related work restrictions. The price adjustment addresses significant inflationary increases in construction material costs since the bid date, including steel, aluminum, PVC, and copper, calculated using the Consumer Price Index. No public comment or stakeholder sentiment is stated in the document.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by the Transportation Committee on 9/9/2026; pending Board action on 10/6/2026
Applicant:
AGC Electric, Inc.

AGC ELECTRIC, INC. FOR THE REPLACEMENT OF EXISTING SPAN-WIRE

Resolution authorizing Supplemental Agreement No. 1 with AGC Electric, Inc. for design-build services to replace existing span-wire signalized intersections with mast-arm configurations. The agreement increases the contract value by $1,298,633.43 to a total of $10,225,993.43 and extends the contract term by 566 non-compensable calendar days to a total of 1,466 calendar days. The project is funded through Mobility Impact Fees. The Transportation Committee forwarded the item to the Board of County Commissioners with a favorable recommendation on 9/9/2026. The agenda date is 10/6/2026. The project currently includes 14 intersections under construction. The additional funds address inflationary increases in construction material costs and the time extension is for utility coordination delays with Florida Power & Light and COVID-19-related work restrictions. The original contract was awarded on March 7, 2023, under Resolution No. R-180-23 in the amount of $8,927,360.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by the Transportation Committee on 9/9/2026; pending before the Board with an agenda date of 10/6/2026
Applicant:
AGC Electric, Inc.

AGC ELECTRIC, INC. FOR THE REPLACEMENT OF EXISTING SPAN-WIRE

Resolution authorizing Supplemental Agreement No. 1 with AGC Electric, Inc. for design-build services to replace existing span-wire signalized intersections with mast-arm configurations countywide. The agreement increases the contract value by $1,298,633.43 to $10,225,993.43 and extends the contract term by 566 non-compensable calendar days to 1,466 calendar days. The project is funded through Mobility Impact Fees. The Transportation Committee forwarded the item to the Board of County Commissioners with a favorable recommendation on 9/9/2026. The Board agenda date is 10/6/2026. The project includes 14 intersections under construction. The time extension is attributed to utility coordination with Florida Power & Light and early-phase COVID-19-related work restrictions. The price adjustment addresses inflationary increases in construction material costs including steel, aluminum, PVC, and copper, calculated using the Consumer Price Index. No public comment sentiment is stated in the document.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Transportation Committee forwarded to the Board of County Commissioners with a favorable recommendation on 9/9/2026. Final Board action is pending as of the document date.
Address:
Not stated. The project is countywide in scope.
Applicant:
AGC Electric, Inc. (Design-Builder); Miami-Dade County Department of Transportation and Public Works (DTPW) is the requester.

AGC ELECTRIC, INC. FOR THE REPLACEMENT OF EXISTING SPAN-WIRE

Resolution authorizing Supplemental Agreement No. 1 with AGC Electric, Inc. for design-build services to replace existing span-wire signalized intersections with mast-arm configurations. The agreement increases the maximum contract value by $1,298,633.43 to $10,225,993.43 and extends the contract term by 566 non-compensable calendar days to 1,466 calendar days. The project is funded through Mobility Impact Fees. The additional funds address inflationary increases in construction material costs (steel, aluminum, PVC, copper) and the time extension is due to utility coordination delays with Florida Power & Light and COVID-19-related work restrictions. The project includes 14 intersections under construction. The original contract was awarded on March 7, 2023, under Resolution No. R-180-23 in the amount of $8,927,360. The item was introduced on 8/19/2026 and is scheduled for the Transportation Cmte agenda on 10/6/2026 as item 8N. The staff recommendation is approval. No public comment or stakeholder sentiment is stated in the document.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Recommended for approval (staff recommendation); status is In Committee; agenda date 10/6/2026
Applicant:
AGC Electric, Inc.

AGC ELECTRIC, INC. FOR THE REPLACEMENT OF EXISTING SPAN-WIRE

Resolution authorizing Supplemental Agreement No. 1 with AGC Electric, Inc. for design-build services to replace existing span-wire signalized intersections with mast-arm configurations. The agreement increases the contract value by $1,298,633.43 to $10,225,993.43 and extends the contract term by 566 non-compensable calendar days to 1,466 calendar days. The project is funded through Mobility Impact Fees. The Transportation Committee forwarded it to the BCC with a favorable recommendation on 9/9/2026. The BCC agenda date is 10/6/2026. The project includes 14 intersections under construction. The time extension is due to utility coordination with Florida Power & Light and COVID-19-related work restrictions. The price adjustment is due to inflationary increases in construction material costs, calculated using the Consumer Price Index. No public comment sentiment is stated in the document.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Cmte on 9/9/2026; pending BCC action on 10/6/2026
Applicant:
AGC Electric, Inc.

AGC ELECTRIC, INC. FOR THE REPLACEMENT OF EXISTING SPAN-WIRE

Resolution authorizing Supplemental Agreement No. 1 with AGC Electric, Inc. for design-build services to replace existing span-wire signalized intersections with mast-arm configurations countywide in Miami-Dade County. The agreement increases the maximum contract value by $1,298,633.43 to $10,225,993.43 and extends the contract term by 566 non-compensable calendar days to 1,466 calendar days. The project includes 14 intersections under construction. The additional funds address inflationary increases in construction material costs (steel, aluminum, PVC, copper) and the time extension is for utility coordination delays with Florida Power & Light. The project is funded through Mobility Impact Fees. The item was introduced on 8/19/2026 and is scheduled for the Transportation Cmte agenda on 10/6/2026 as item 8N. Status is In Committee. No public comment sentiment is stated in the document.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Pending (In Committee); recommended for approval by staff; agenda date 10/6/2026
Applicant:
AGC Electric, Inc. (Design-Builder); Miami-Dade County (County Mayor or designee to execute)

AGC ELECTRIC, INC. FOR THE REPLACEMENT OF EXISTING SPAN-WIRE

Resolution authorizing Supplemental Agreement No. 1 with AGC Electric, Inc. for design-build services to replace existing span-wire signalized intersections with mast-arm configurations, countywide in Miami-Dade County. The agreement increases the maximum contract value by $1,298,633.43 to $10,225,993.43 and extends the contract term by 566 non-compensable calendar days to 1,466 calendar days. The project is funded through Mobility Impact Fees. The Transportation Committee forwarded it to the Board of County Commissioners with a favorable recommendation on 9/9/2026, and it is scheduled for the Board agenda on 10/6/2026. The additional funds address inflationary increases in construction material costs and the time extension is for utility coordination delays with Florida Power & Light and COVID-19-related work restrictions. The project includes 14 intersections under construction. No public comment or stakeholder sentiment is stated in the document.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by the Transportation Committee on 9/9/2026; pending Board action on 10/6/2026
Applicant:
AGC Electric, Inc.

AGC ELECTRIC, INC. FOR THE REPLACEMENT OF EXISTING SPAN-WIRE

Resolution authorizing Supplemental Agreement No. 1 between AGC Electric, Inc. and Miami-Dade County for design-build services to replace existing span-wire signalized intersections with mast-arm configurations. The agreement increases the maximum contract value by $1,298,633.43 to $10,225,993.43 and extends the contract term by 566 non-compensable calendar days to 1,466 calendar days. The project is funded through Mobility Impact Fees. The additional funds address inflationary increases in construction material costs (steel, aluminum, PVC, copper) and the time extension is due to utility coordination delays with Florida Power & Light and COVID-19-related work restrictions. The project includes 14 intersections under construction. The item was introduced on 8/19/2026 and is scheduled for the Transportation Cmte agenda on 10/6/2026. Status is In Committee. No public comment or stakeholder sentiment is stated in the document.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Pending; recommended for approval by staff; status is In Committee
Applicant:
AGC Electric, Inc.

AGC ELECTRIC, INC. FOR THE REPLACEMENT OF EXISTING SPAN-WIRE

This is a legislative item for a supplemental agreement to an existing design-build contract for replacing span-wire signalized intersections with mast-arm configurations countywide in Miami-Dade County. The project is countywide in scope and includes 14 intersections under construction. The supplemental agreement increases the contract value by $1,298,633.43 to $10,225,993.43 and extends the contract term by 566 non-compensable calendar days to 1,466 calendar days. The item was forwarded to the Board of County Commissioners with a favorable recommendation by the Transportation Committee on 9/9/2026. The agenda date is 10/6/2026. The applicant is AGC Electric, Inc. The case file number is 261479. The decision is a favorable recommendation from the Transportation Committee, pending before the Board. The reason for the increase is inflationary increases in construction material costs and delays from utility coordination with Florida Power & Light and COVID-19-related work restrictions. The project is funded through Mobility Impact Fees.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Cmte on 9/9/2026; pending before the Board
Applicant:
AGC Electric, Inc.

AGC ELECTRIC, INC. FOR THE REPLACEMENT OF EXISTING SPAN-WIRE

Resolution authorizing Supplemental Agreement No. 1 with AGC Electric, Inc. for design-build services to replace existing span-wire signalized intersections with mast-arm configurations. The agreement increases the maximum contract value by $1,298,633.43 to $10,225,993.43 and extends the contract term by 566 non-compensable calendar days to 1,466 calendar days. The project is countywide in nature and includes 14 intersections under construction. Funded through Mobility Impact Fees. The Transportation Committee forwarded it to the Board of County Commissioners with a favorable recommendation on 9/9/2026. Agenda date is 10/6/2026. The increase addresses inflationary increases in construction material costs and delays from utility coordination with Florida Power & Light and COVID-19-related work restrictions. No public comment sentiment is stated.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Cmte on 9/9/2026; pending BCC assignment
Applicant:
AGC Electric, Inc.

AGC ELECTRIC, INC. FOR THE REPLACEMENT OF EXISTING SPAN-WIRE

Resolution authorizing Supplemental Agreement No. 1 between AGC Electric, Inc. and Miami-Dade County for design-build services for the replacement of existing span-wire signalized intersections for mast-arm configuration. The agreement increases the maximum contract value to $10,225,993.43 and increases the contract term to 1,466 non-compensable calendar days. The project is funded through Mobility Impact Fees. The additional expenditure authority is needed to address significant inflationary increases in construction material costs since the project's bid date, including steel, aluminum, PVC, and copper. The requested 566-day time extension is primarily attributable to delays associated with utility coordination, including Florida Power & Light (FPL) certifications and the issuance of Utility Work Schedules (UWS) required for overhead utility adjustments at project locations. Coordination with FPL began in 2023. The project schedule was also affected by early-phase COVID-19-related work restrictions. The project currently includes 14 intersections under construction. The Transportation Cmte forwarded the item to the BCC with a favorable recommendation on 9/9/2026. The agenda date is 10/6/2026. The project is part of Miami-Dade County's mast-arm replacement program, initiated after Hurricanes Katrina and Wilma. The original contract was awarded on March 7, 2023, under Resolution No. R-180-23, in the amount of $8,927,360. The procurement complied with applicable Small Business Enterprise (SBE) requirements. No adverse findings relating to the vendor's responsibility were identified. No public comment or stakeholder sentiment is stated in the document.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
Transportation Cmte forwarded to BCC with a favorable recommendation on 9/9/2026; agenda date 10/6/2026; final action not stated
Applicant:
AGC Electric, Inc.

AGC ELECTRIC, INC. FOR THE REPLACEMENT OF EXISTING SPAN-WIRE

Resolution authorizing Supplemental Agreement No. 1 with AGC Electric, Inc. for design-build services to replace existing span-wire signalized intersections with mast-arm configurations. The agreement increases the maximum contract value by $1,298,633.43 to $10,225,993.43 and extends the contract term by 566 non-compensable calendar days to 1,466 calendar days. The project is funded through Mobility Impact Fees. The additional funds address inflationary increases in construction material costs (steel, aluminum, PVC, copper) and the time extension is due to utility coordination delays with Florida Power & Light and early-phase COVID-19 restrictions. The project currently includes 14 intersections under construction. The item was introduced on 8/19/2026, assigned to the Transportation Committee, and is scheduled for agenda date 10/6/2026 as item 8N. Status is 'In Committee'. No final action is stated. No public comment or stakeholder sentiment is stated.

Board:
Transportation Cmte
Date:
2026-09-09
Type:
Resolution
Decision:
In Committee; no final action stated
Applicant:
AGC Electric, Inc.

APAB REAPPOINTMENT - ARTURO LOPEZ

This is a legislative matter for the reappointment of Arturo Lopez to the Agricultural Practices Advisory Board (APAB) as the farm labor representative. No construction or development project is described. The document is a resolution for a board appointment, not a land use or building project. The file number is 261415. The resolution was introduced on 8/11/2026, scheduled for the Board of County Commissioners on 10/6/2026, and forwarded to the BCC with a favorable recommendation by the Recreation, Tourism, and Resiliency Committee on 9/9/2026. The applicant is Arturo Lopez, recommended by the Coalition of Florida Farmworker Organizations, Inc. The decision is pending before the BCC. No address, parcel, size, or zoning change is stated. No public comment or stakeholder sentiment is stated.

Board:
Recreation, Tourism, and Resiliency Committee
Date:
2026-09-09
Type:
Resolution
Decision:
Pending before the Board of County Commissioners; forwarded with favorable recommendation from the Recreation, Tourism, and Resiliency Committee on 9/9/2026
Applicant:
Arturo Lopez

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta