Browse Miami-Dade County civic records
Every published record for Miami-Dade County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.
29,905 records
BMS (HONEYWELL)
The document is a legislative item for the Miami-Dade County Board of County Commissioners, file number 261463, a resolution to authorize additional expenditure authority of $16,004,764.00 for Contract No. X027A, Building Management System (BMS), for the Miami-Dade Aviation Department (MDAD). The total modified cumulative contract amount would be $178,238,373.00. The contract is with Honeywell International, Inc., the original equipment manufacturer of the County's existing BMS. The additional funds are needed for unexpected maintenance and repair costs due to aging infrastructure, obsolete control systems, maintenance of newly added or renovated airport spaces, recently acquired facilities, and compliance with National Fire Protection Association (NFPA) requirements. The contract was awarded on November 7, 2017, via Resolution No. R-980-17, for a 10-year term with one five-year option to renew, and is valued at $112,023,768 for the current term. The current contract term expires on December 18, 2027. The item was introduced on 8/19/2026 and is scheduled for the Aviation and Seaport Committee agenda on 10/6/2026, as item 8P. The status is 'In Committee'. The staff recommendation is to approve the additional expenditure authority. The document does not state a final decision. The scope of the project is for Miami International Airport (MIA), General Aviation Airports, and MDAD buildings, with the impact described as countywide. The document does not state a specific street address, parcel, or acreage for the work. The business opportunity is for the contract with Honeywell International, Inc., which is the sole provider of the proprietary BMS system. The document notes that the vendor is not in compliance with the Small Business Enterprise-Construction (SBE-CON) goal, and the deficit will be addressed through the compliance process. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- not stated; staff recommendation is to approve
- Applicant:
- Miami-Dade Aviation Department (MDAD); vendor: Honeywell International, Inc.
BMS (HONEYWELL)
Miami-Dade County legislative item File Number 261463 is a Resolution before the Board of County Commissioners, agenda date 10/6/2026, agenda item 8P, introduced 8/19/2026, requesting additional expenditure authority of $16,004,764.00 for Contract No. X027A, Building Management System (BMS), for the Miami-Dade Aviation Department (MDAD), bringing the total modified cumulative contract amount to $178,238,373.00. The contract is with Honeywell International, Inc., the original equipment manufacturer of the County's existing BMS. The additional funds are needed for unexpected maintenance and repair costs due to aging infrastructure and obsolete control systems, maintenance of newly added or renovated airport spaces and recently acquired facilities, and compliance with National Fire Protection Association (NFPA) requirements. The contract was awarded on November 7, 2017, via Resolution No. R-980-17, for a 10-year term with one five-year option to renew, valued at $112,023,768 for the current term. The current contract term expires on December 18, 2027. The existing cumulative allocation is $162,233,609. The Aviation and Seaport Committee forwarded the item to the BCC with a favorable recommendation on 9/8/2026. The resolution authorizes the County Mayor or designee to exercise all provisions of the contract, including cancellation, renewal, or extensions. The fiscal impact is funded by Proprietary Funds from the FY 2025-26 Adopted Budget, Vol. 3, Page 203, Contractual Services. A 15.75% Small Business Enterprise-Construction (SBE-CON) goal and a 1% Small Business Enterprise-Goods & Services (SBE-G&S) goal applies; the vendor is not in compliance with the SBE-CON goal and is not in compliance with the 85% threshold for the SBE-G&S goal. The Responsible Wages and Benefits Ordinance applies. The scope states MIA is located within District 6, represented by Commissioner Natalie Milian Orbis, but the impact is countywide. The vendor principal address is 855 S. Mint Street, Charlotte, NC. The vendor principal is Vimal Kapur. The Procurement Contracting Manager is Marie S. Williams of the Strategic Procurement Department. The item was assigned to County Attorney David M. Murray on 8/21/2026. Roy Coley, Deputy Mayor, is the requester contact. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Before the Board; Aviation and Seaport Committee forwarded to BCC with a favorable recommendation on 9/8/2026; final action not stated
- Applicant:
- Miami-Dade Aviation Department (MDAD); vendor is Honeywell International, Inc.
BMS (HONEYWELL)
A resolution authorizes additional expenditure authority of $16,004,764.00 for a total modified cumulative contract amount of $178,238,373.00 for Contract No. X027A, Building Management System, for the Miami-Dade Aviation Department. The contract is with Honeywell International, Inc. The item was forwarded to the Board of County Commissioners with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026. The agenda date is 10/6/2026. The contract was awarded on November 7, 2017, via Resolution No. R-980-17. The current contract term expires on December 18, 2027. The additional expenditure authority is needed for unexpected maintenance and repair costs due to aging infrastructure and obsolete control systems, maintenance of newly added or renovated airport spaces and recently acquired facilities, and compliance with National Fire Protection Association requirements. The scope includes Miami International Airport, General Aviation Airports, and MDAD buildings. The vendor, Honeywell International, Inc., is the original equipment manufacturer of the County's existing BMS. The vendor is not in compliance with the Small Business Enterprise-Construction goal. The Responsible Wages and Benefits Ordinance applies. The impact is countywide in nature. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation
- Applicant:
- Miami-Dade Aviation Department; Honeywell International, Inc. is the vendor
BMS (HONEYWELL)
Resolution authorizing additional expenditure authority of $16,004,764.00 for a total modified cumulative contract amount of $178,238,373.00 for Contract No. X027A, Building Management System, for the Miami-Dade Aviation Department. The contract is with Honeywell International, Inc., the original equipment manufacturer of the County's existing BMS. The current contract term expires on December 18, 2027. The item was forwarded to the Board of County Commissioners with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026. The agenda date is 10/6/2026. The additional allocation is needed to cover unexpected maintenance and repair costs due to aging infrastructure and obsolete control systems, maintenance of newly added/renovated airport spaces and recently acquired facilities, and compliance with National Fire Protection Association requirements. The contract was awarded on November 7, 2017, via Resolution No. R-980-17 for a 10-year term with one five-year option to renew, valued at $112,023,768 for the current term. The remaining option to renew is valued at $50,209,841. The existing cumulative allocation is $162,233,609. The funding source is Proprietary Funds FY 2025-26 Adopted Budget, Vol. 3, Page 203, Contractual Services. The vendor is not in compliance with the SBE-CON goal and the deficit will be addressed through the compliance process. The vendor has complied with its commitment to utilize the SBE-G&S vendor for any needed engineering services. The Responsible Wages and Benefits Ordinance applies. The Living Wage Ordinance does not apply. The two percent User Access Program is not applicable. The scope is for Miami International Airport, General Aviation Airports, and MDAD buildings. MIA is located within District 6, represented by Commissioner Natalie Milian Orbis; the impact is countywide. The Procurement Contracting Manager is Marie S. Williams. The vendor principal address is 855 S. Mint Street, Charlotte, NC. The vendor principal is Vimal Kapur. Due diligence found no adverse findings relating to vendor responsibility.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026; pending BCC assignment; agenda date 10/6/2026
- Applicant:
- Miami-Dade Aviation Department (MDAD); Honeywell International, Inc. is the awarded vendor
BMS (HONEYWELL)
The document is a legislative item for Miami-Dade County, file number 261463, seeking additional expenditure authority for Contract No. X027A, a Building Management System (BMS) for the Miami-Dade Aviation Department (MDAD). The requested additional amount is $16,004,764.00, bringing the total modified cumulative contract amount to $178,238,373.00. The current cumulative allocation is $162,233,609. The contract was awarded on November 7, 2017, via Resolution No. R-980-17, for a 10-year term with a five-year option to renew. The current contract term expires on December 18, 2027. The vendor is Honeywell International, Inc., with a principal address of 855 S. Mint Street, Charlotte, NC. The document does not state a specific street address, parcel, or acreage for the work, as it is a countywide contract for BMS services at Miami International Airport, General Aviation Airports, and MDAD buildings. The requested action is to authorize additional expenditure authority, and the recommendation is for approval. The document was introduced on 8/19/2026, scheduled for the Aviation and Seaport Committee on 9/8/2026, and the Board of County Commissioners agenda date is 10/6/2026. The document does not state any public comment or stakeholder sentiment. The document states the need for additional funds is due to aging infrastructure, obsolete control systems, maintenance of newly added or renovated spaces, and compliance with National Fire Protection Association (NFPA) requirements. The document also states a 15.75% Small Business Enterprise-Construction (SBE-CON) goal and a 1% Small Business Enterprise-Goods & Services (SBE-G&S) goal applies, and the vendor is not in compliance with the SBE-CON goal. The document does not state a specific project site, size, or zoning change.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- recommended for approval
- Applicant:
- Miami-Dade Aviation Department (MDAD); vendor is Honeywell International, Inc.
BMS (HONEYWELL)
Resolution authorizing additional expenditure authority of $16,004,764.00 for Contract No. X027A, Building Management System (BMS), for the Miami-Dade Aviation Department (MDAD), bringing the total modified cumulative contract amount to $178,238,373.00. The contract is with Honeywell International, Inc., the original equipment manufacturer of the County's existing BMS. The additional funds are needed for unexpected maintenance and repair costs due to aging infrastructure, obsolete control systems, maintenance of newly added or renovated airport spaces, recently acquired facilities, and compliance with National Fire Protection Association (NFPA) requirements. The contract was awarded on November 7, 2017, via Resolution No. R-980-17 for a 10-year term with one five-year option to renew, valued at $112,023,768 for the current term. The current contract term expires on December 18, 2027. The existing cumulative allocation is $162,233,609. The item was forwarded to the Board of County Commissioners (BCC) with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026. The agenda date is 10/6/2026. The vendor is not in compliance with the Small Business Enterprise-Construction (SBE-CON) goal, and the deficit will be addressed through the compliance process. The vendor has complied with its commitment to utilize the SBE-G&S vendor for any needed engineering services. The Responsible Wages and Benefits Ordinance applies. The impact is countywide in nature, with MIA located within District 6.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026; pending BCC assignment, agenda date 10/6/2026
- Applicant:
- Miami-Dade Aviation Department (MDAD); Vendor: Honeywell International, Inc.
BMS (HONEYWELL)
Resolution authorizing additional expenditure authority of $16,004,764.00 for a total modified cumulative contract amount of $178,238,373.00 for Contract No. X027A, Building Management System, for the Miami-Dade Aviation Department. The contract is with Honeywell International, Inc. for BMS services at Miami International Airport, General Aviation Airports, and MDAD buildings. The contract was awarded on November 7, 2017, via Resolution No. R-980-17 for a 10-year term with one five-year option to renew, valued at $112,023,768 for the current term. The current contract term expires on December 18, 2027. The existing cumulative allocation is $162,233,609. The requested increase is based on anticipated needs for the remainder of the current contract term. The item was forwarded to the BCC with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026. The agenda date is 10/6/2026. The vendor is not in compliance with the SBE-CON goal and the deficit will be addressed through the compliance process. The vendor has complied with its commitment to utilize the SBE-G&S vendor for any needed engineering services. The Responsible Wages and Benefits Ordinance applies. The Living Wage Ordinance does not apply. The two percent User Access Program is not applicable. Due diligence found no adverse findings relating to vendor responsibility.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026; pending before the Board of County Commissioners
- Address:
- Miami International Airport (MIA), General Aviation Airports, and MDAD buildings; MIA is located within District 6
- Applicant:
- Miami-Dade Aviation Department (MDAD); Honeywell International, Inc. is the vendor
BMS (HONEYWELL)
Resolution authorizing additional expenditure authority of $16,004,764.00 for Contract No. X027A, Building Management System (BMS), for the Miami-Dade Aviation Department (MDAD), bringing the total modified cumulative contract amount to $178,238,373.00. The contract is with Honeywell International, Inc., the original equipment manufacturer of the County's existing BMS. The additional funds are needed for unexpected maintenance and repair costs due to aging infrastructure, obsolete control systems, maintenance of newly added/renovated airport spaces and recently acquired facilities, and compliance with National Fire Protection Association (NFPA) requirements. The contract was awarded on November 7, 2017, via Resolution No. R-980-17 for a 10-year term with one five-year option to renew, valued at $112,023,768 for the current term. The current contract term expires on December 18, 2027. The existing cumulative allocation is $162,233,609. The requested increase is based on anticipated needs for the remainder of the current contract term. The item was introduced on 8/19/2026, assigned to the County Attorney on 8/21/2026, and is scheduled for the Aviation and Seaport Committee agenda on 10/6/2026 as item 8P. Status is 'In Committee'. The staff recommendation is to approve. The vendor is not in compliance with the 15.75% Small Business Enterprise-Construction (SBE-CON) goal, and the deficit will be addressed through the compliance process. The vendor has complied with its commitment to utilize the SBE-G&S vendor for engineering services. The Responsible Wages and Benefits Ordinance applies. The Living Wage Ordinance does not apply. The two percent User Access Program is not applicable. The impact is countywide in nature, with MIA located in District 6.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Recommended for approval by staff; status: In Committee; final action not stated
- Address:
- Miami International Airport (MIA), General Aviation Airports, and MDAD buildings; MIA is located within District 6
- Applicant:
- Miami-Dade Aviation Department (MDAD); vendor: Honeywell International, Inc., 855 S. Mint Street, Charlotte, NC; Vimal Kapur
BMS (HONEYWELL)
A resolution before the Miami-Dade Board of County Commissioners authorizes additional expenditure authority of $16,004,764.00 for Contract No. X027A, Building Management System, for the Miami-Dade Aviation Department, bringing the total modified cumulative contract amount to $178,238,373.00. The contract is with Honeywell International, Inc. The item was introduced on 8/19/2026, forwarded to the BCC with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026, and is scheduled for the BCC agenda on 10/6/2026 as item 8P. The contract was originally awarded on November 7, 2017, via Resolution No. R-980-17 for a 10-year term with a five-year option to renew. The current contract term expires on December 18, 2027. The additional funds are needed for unexpected maintenance and repair costs due to aging infrastructure, obsolete control systems, maintenance of newly added or renovated airport spaces, and compliance with National Fire Protection Association requirements. The scope is countywide in nature, with Miami International Airport located in District 6. The vendor, Honeywell International, Inc., is the original equipment manufacturer of the County's existing BMS, and the system relies on proprietary software, hardware, and system architecture. The document does not state a specific street address, parcel number, acreage, or number of units. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- recommended for approval by the Aviation and Seaport Committee; pending before the Board of County Commissioners
- Applicant:
- Miami-Dade Aviation Department; vendor Honeywell International, Inc.
BMS (HONEYWELL)
The document is a legislative item for the Miami-Dade County Board of County Commissioners, file number 261463, a resolution to authorize additional expenditure authority of $16,004,764.00 for Contract No. X027A, Building Management System (BMS), for the Miami-Dade Aviation Department (MDAD), bringing the total modified cumulative contract amount to $178,238,373.00. The contract is with Honeywell International, Inc., the original equipment manufacturer of the County's existing BMS. The additional funds are needed for unexpected maintenance and repair costs due to aging infrastructure, obsolete control systems, maintenance of newly added or renovated airport spaces, and compliance with National Fire Protection Association (NFPA) requirements. The contract was awarded on November 7, 2017, via Resolution No. R-980-17, for a 10-year term with one five-year option to renew, valued at $112,023,768 for the current term. The current contract term expires on December 18, 2027. The existing cumulative allocation is $162,233,609, and the remaining option to renew is valued at $50,209,841. The item was introduced on 8/19/2026, assigned to the County Attorney on 8/21/2026, and is scheduled for the Aviation and Seaport Committee agenda on 10/6/2026 as item 8P. The status is 'In Committee'. The recommendation is to approve the additional expenditure authority. The scope states MIA is located within District 6, but the impact is countywide. The funding source is Proprietary Funds from the FY 2025-26 Adopted Budget, Vol. 3, Page 203, Contractual Services. The vendor principal address is 855 S. Mint Street, Charlotte, NC. The vendor is not in compliance with the Small Business Enterprise-Construction (SBE-CON) goal, and the deficit will be addressed through the compliance process. The Responsible Wages and Benefits Ordinance applies. The document does not state a specific street address, parcel, acreage, or number of units for a construction project, as it is a contract expenditure authorization, not a land use or development project. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Recommended for approval
- Applicant:
- Honeywell International, Inc.
BMS (HONEYWELL)
Resolution authorizing additional expenditure authority of $16,004,764.00 for a total modified cumulative contract amount of $178,238,373.00 for Contract No. X027A, Building Management System (BMS), for the Miami-Dade Aviation Department (MDAD). The contract covers BMS services for Miami International Airport (MIA), General Aviation Airports, and MDAD buildings. The additional funds are needed for unexpected maintenance and repair costs due to aging infrastructure, obsolete control systems, newly added or renovated airport spaces, recently acquired facilities, and compliance with National Fire Protection Association (NFPA) requirements. The vendor is Honeywell International, Inc., the original equipment manufacturer. The current contract term expires on December 18, 2027. The item was introduced on 8/19/2026, assigned to the County Attorney on 8/21/2026, and is scheduled for the Aviation and Seaport Committee on 10/6/2026 as agenda item 8P. Status is 'In Committee'. No decision is stated. Public comment sentiment is not stated.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- not stated; status is 'In Committee'; agenda date 10/6/2026
- Address:
- Miami International Airport (MIA), General Aviation Airports, and MDAD buildings; MIA is located within District 6, represented by Commissioner Natalie Milian Orbis; impact is countywide.
- Applicant:
- Miami-Dade Aviation Department (MDAD); vendor: Honeywell International, Inc., 855 S. Mint Street, Charlotte, NC; principal: Vimal Kapur
BMS (HONEYWELL)
Resolution authorizing additional expenditure authority of $16,004,764.00 for a total modified cumulative contract amount of $178,238,373.00 for Contract No. X027A, Building Management System, for the Miami-Dade Aviation Department. The contract is with Honeywell International, Inc., the original equipment manufacturer. The additional funds are needed for unexpected maintenance and repair costs due to aging infrastructure, obsolete control systems, maintenance of newly added or renovated airport spaces, and compliance with National Fire Protection Association requirements. The contract was awarded on November 7, 2017, via Resolution No. R-980-17 for a 10-year term with one five-year option to renew, valued at $112,023,768 for the current term. The current contract term expires on December 18, 2027. The existing cumulative allocation is $162,233,609. The item was introduced on 8/19/2026, forwarded to the Board of County Commissioners with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026, and is scheduled for the Board agenda on 10/6/2026 as item 8P9. The status is 'Before the Board'. The file number is 261463. The requester is Strategic Procurement. The impact is countywide in nature, with Miami International Airport located in District 6. The vendor is not in compliance with the Small Business Enterprise-Construction goal of 15.75%, and the deficit will be addressed through the compliance process. The vendor has complied with its commitment to utilize the Small Business Enterprise-Goods & Services vendor for engineering services. The Responsible Wages and Benefits Ordinance applies. The Living Wage Ordinance does not apply. The two percent User Access Program is not applicable.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Before the Board; forwarded to BCC with a favorable recommendation
- Applicant:
- Honeywell International, Inc.
BMS (HONEYWELL)
A Miami-Dade County legislative item seeks Board approval for additional expenditure authority of $16,004,764 for Contract No. X027A, Building Management System (BMS), for the Miami-Dade Aviation Department (MDAD), bringing the total modified cumulative contract amount to $178,238,373. The contract is with Honeywell International, Inc., the original equipment manufacturer of the County's existing BMS. The item was introduced on 8/19/2026, assigned to the County Attorney on 8/21/2026, and is scheduled for the 10/6/2026 agenda. The decision is not stated. The additional funds are needed to cover unexpected maintenance and repair costs due to aging infrastructure, obsolete control systems, and compliance with National Fire Protection Association (NFPA) requirements. The contract was awarded on November 7, 2017, via Resolution No. R-980-17, for a 10-year term with one five-year option to renew, valued at $112,023,768 for the current term. The current contract term expires on December 18, 2027. The existing cumulative allocation is $162,233,609. The funding source is Proprietary Funds from the FY 2025-26 Adopted Budget. The vendor, Honeywell International, Inc., is not in compliance with the Small Business Enterprise-Construction (SBE-CON) goal, and the deficit will be addressed through the compliance process. The Responsible Wages and Benefits Ordinance applies. The impact is countywide in nature, though MIA is located within District 6.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- not stated (status: In Committee; agenda date 10/6/2026)
- Applicant:
- Miami-Dade Aviation Department (MDAD); vendor is Honeywell International, Inc.
BMS (HONEYWELL)
The document is a legislative item for the Miami-Dade Board of County Commissioners, seeking approval for additional expenditure authority of $16,004,764.00 for Contract No. X027A, Building Management System (BMS), for the Miami-Dade Aviation Department (MDAD). The total modified cumulative contract amount would be $178,238,373.00. The contract is with Honeywell International, Inc., the original equipment manufacturer of the County's existing BMS. The additional funds are needed to cover unexpected maintenance and repair costs due to aging infrastructure, obsolete control systems, maintenance of newly added or renovated airport spaces, and compliance with National Fire Protection Association (NFPA) requirements. The contract was awarded on November 7, 2017, via Resolution No. R-980-17, for a 10-year term with one five-year option to renew, valued at $112,023,768 for the current term. The current contract term expires on December 18, 2027. The existing cumulative allocation is $162,233,609. The item was introduced on 8/19/2026, and is scheduled for the Board of County Commissioners agenda on 10/6/2026, as item 8P9. The Aviation and Seaport Committee forwarded it to the BCC with a favorable recommendation on 9/8/2026. The document does not state a specific street address, parcel, or acreage for the project, as it is a countywide contract for services. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Pending before the Board of County Commissioners; Aviation and Seaport Committee forwarded with a favorable recommendation
- Applicant:
- Miami-Dade Aviation Department (MDAD); Vendor: Honeywell International, Inc.
BMS (HONEYWELL)
Resolution authorizing additional expenditure authority of $16,004,764.00 for a total modified cumulative contract amount of $178,238,373.00 for Contract No. X027A, Building Management System, for the Miami-Dade Aviation Department. The contract is with Honeywell International, Inc. for BMS services at Miami International Airport, General Aviation Airports, and MDAD buildings. The additional funds are needed for unexpected maintenance and repair costs due to aging infrastructure, obsolete control systems, maintenance of newly added/renovated spaces, and compliance with National Fire Protection Association requirements. The contract was awarded on November 7, 2017, via Resolution No. R-980-17, for a 10-year term with one five-year option to renew. The current contract term expires on December 18, 2027. The item was forwarded to the BCC with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026. The agenda date is 10/6/2026. The vendor is not in compliance with the SBE-CON goal and the deficit will be addressed through the compliance process. The vendor has complied with its commitment to utilize the SBE-G&S vendor for any needed engineering services. The Responsible Wages and Benefits Ordinance applies. The Living Wage Ordinance does not apply. The two percent User Access Program is not applicable. A 15.75% Small Business Enterprise-Construction (SBE-CON) goal and a 1% Small Business Enterprise-Goods & Services (SBE-G&S) goal applies. The impact of this item is countywide in nature. MIA is located within District 6, represented by Commissioner Natalie Milian Orbis. The vendor principal address is 855 S. Mint Street, Charlotte, NC. The principal is Vimal Kapur. The Procurement Contracting Manager is Marie S. Williams. Due diligence was conducted with no adverse findings. The funding source is Proprietary Funds FY 2025-26 Adopted Budget, Vol. 3, Page 203, Contractual Services. The existing cumulative allocation is $162,233,609. The remaining option to renew valued at $50,209,841 was approved under Resolution No. R-980-17.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026; pending BCC assignment; agenda date 10/6/2026
- Applicant:
- Miami-Dade Aviation Department (MDAD); vendor is Honeywell International, Inc.
BMS (HONEYWELL)
Resolution authorizing additional expenditure authority of $16,004,764.00 for a total modified cumulative contract amount of $178,238,373.00 for Contract No. X027A, Building Management System, for the Miami-Dade Aviation Department. The contract is with Honeywell International, Inc. The item was introduced on 8/19/2026, assigned to the County Attorney on 8/21/2026, and is scheduled for the Aviation and Seaport Committee agenda on 10/6/2026 as item 8P. The status is 'In Committee'. The resolution authorizes the County Mayor or designee to exercise all provisions of the contract, including cancellation, renewal, or extensions. The additional expenditure authority is needed for unexpected maintenance and repair costs due to aging infrastructure, obsolete control systems, maintenance of newly added/renovated airport spaces, and compliance with National Fire Protection Association requirements. The contract was awarded on November 7, 2017, via Resolution No. R-980-17 for a 10-year term with one five-year option to renew, valued at $112,023,768 for the current term. The current contract term expires on December 18, 2027. The existing cumulative allocation is $162,233,609. The funding source is Proprietary Funds FY 2025-26 Adopted Budget, Vol. 3, Page 203, Contractual Services. The vendor is Honeywell International, Inc., principal address 855 S. Mint Street, Charlotte, NC, principal Vimal Kapur. The scope states MIA is located within District 6, represented by Commissioner Natalie Milian Orbis, but the impact is countywide. A 15.75% Small Business Enterprise-Construction goal and a 1% Small Business Enterprise-Goods & Services goal applies; the vendor is not in compliance with the SBE-CON goal. The Responsible Wages and Benefits Ordinance applies. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- In Committee; recommendation is to approve
- Applicant:
- Miami-Dade Aviation Department (MDAD); vendor Honeywell International, Inc.
BMS (HONEYWELL)
Resolution authorizing additional expenditure authority of $16,004,764.00 for Contract No. X027A, Building Management System (BMS), for the Miami-Dade Aviation Department (MDAD), increasing the total modified cumulative contract amount to $178,238,373.00. The contract is with Honeywell International, Inc., the original equipment manufacturer of the County's existing BMS. The additional funds are needed for unexpected maintenance and repair costs due to aging infrastructure, obsolete control systems, maintenance of newly added/renovated airport spaces and recently acquired facilities, and compliance with National Fire Protection Association (NFPA) requirements. The contract was awarded on November 7, 2017, via Resolution No. R-980-17, for a 10-year term with one five-year option to renew. The current contract term expires on December 18, 2027. The item was forwarded to the Board of County Commissioners (BCC) with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026. The BCC agenda date is 10/6/2026. The vendor is not in compliance with the 15.75% Small Business Enterprise-Construction (SBE-CON) goal, and the deficit will be addressed through the compliance process. The vendor has complied with its commitment to utilize the Small Business Enterprise-Goods & Services (SBE-G&S) vendor for any needed engineering services. The Responsible Wages and Benefits Ordinance applies. The Living Wage Ordinance does not apply. The two percent User Access Program is not applicable. The impact of this item is countywide in nature. MIA is located within District 6, represented by Commissioner Natalie Milian Orbis. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026; pending BCC decision on 10/6/2026
- Applicant:
- Miami-Dade Aviation Department (MDAD); Honeywell International, Inc. (vendor)
BMS (HONEYWELL)
The document is a legislative item for Miami-Dade County, File Number 261463, a Resolution to authorize additional expenditure authority of $16,004,764.00 for Contract No. X027A, Building Management System (BMS), for the Miami-Dade Aviation Department (MDAD), bringing the total modified cumulative contract amount to $178,238,373.00. The contract is with Honeywell International, Inc., the original equipment manufacturer of the County's existing BMS. The additional funds are needed for unexpected maintenance and repair costs due to aging infrastructure, obsolete control systems, maintenance of newly added/renovated airport spaces, recently acquired facilities, and compliance with National Fire Protection Association (NFPA) requirements. The contract was awarded on November 7, 2017, via Resolution No. R-980-17, for a 10-year term with one five-year option to renew. The current contract term expires on December 18, 2027. The item was introduced on 8/19/2026, forwarded to the Board of County Commissioners (BCC) with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026, and is scheduled for the BCC agenda on 10/6/2026 as item 8P9. The recommendation is for the Board to approve the additional expenditure authority. The impact is stated as countywide in nature, with MIA located in District 6. The funding source is Proprietary Funds from the FY 2025-26 Adopted Budget, Vol. 3, Page 203, Contractual Services. The vendor, Honeywell International, Inc., has a principal address of 855 S. Mint Street, Charlotte, NC, and the principal is Vimal Kapur. A 15.75% Small Business Enterprise-Construction (SBE-CON) goal and a 1% Small Business Enterprise-Goods & Services (SBE-G&S) goal applies; the vendor is not in compliance with the SBE-CON goal, and while not in compliance with the 85% threshold for the SBE-G&S goal, the vendor has complied with its commitment to utilize the SBE-G&S vendor for engineering services. The Responsible Wages and Benefits Ordinance applies. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026; pending BCC approval on 10/6/2026
- Applicant:
- Miami-Dade Aviation Department (MDAD); Vendor: Honeywell International, Inc.
DCIP STATION 77
Miami-Dade County, through the Miami-Dade Fire Rescue Department, seeks retroactive approval to apply for, receive, and expend up to $7,736,674.00 in grant funds from the United States Department of War's Office of Local Defense Community Cooperation through its Defense Community Infrastructure Program (DCIP) for the construction of Miami-Dade Fire Rescue Station 77 in close proximity to the Homestead Air Reserve Base. The local cash match of up to $5,018,217.00 (30%) will come from the Fire District Fund. The resolution was forwarded to the Board of County Commissioners with a favorable recommendation by the Safety and Health Committee on 9/8/2026, and is scheduled for the Board agenda on 10/6/2026 as item 8E3. The project is in District 9 and will provide services to the Homestead region of Miami-Dade County and the Homestead Air Reserve Base. The station will be built on land previously owned by the base but now owned by Miami-Dade County. The document does not state a specific street address, parcel/folio number, acreage, or square footage. The applicant is the Miami-Dade Fire and Rescue Department. The case/file number is 261457. The decision is pending before the Board. Key dates: Introduced 8/18/2026; Safety and Health Committee 9/8/2026; Board agenda date 10/6/2026. The business opportunity is the construction of a new fire station, with grant funds of up to $7,736,674.00 and local match funds of up to $5,018,217.00. The document does not state any public comment or stakeholder sentiment.
- Board:
- Safety and Health Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Pending before the Board; forwarded to BCC with a favorable recommendation by the Safety and Health Committee on 9/8/2026
- Applicant:
- Miami-Dade Fire and Rescue Department
DCIP STATION 77
Resolution retroactively approving and authorizing the County Mayor or designee to apply for, receive, and expend up to $7,736,674.00 in grant funds from the United States Department of War's Office of Local Defense Community Cooperation through its Defense Community Infrastructure Program (DCIP) for the construction of Miami-Dade Fire Rescue Station 77 in close proximity to the Homestead Air Reserve Base. The County's local cash match of up to $5,018,217.00 will come from the Fire District Fund. The item was introduced on 8/18/2026, assigned to the County Attorney on 8/20/2026, and is scheduled for the Safety and Health Committee agenda on 10/6/2026 as item 8E. Status is In Committee. No decision is stated. No public comment is stated.
- Board:
- Safety and Health Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Applicant:
- Miami-Dade Fire Rescue Department