Skip to main content

Sé el Primero, Construye Relaciones Duraderas

Board of Commissioners Meeting

Taylor County

Latest meetings

2nd Amended Agenda

This document is a suggested agenda for the Taylor County Board of County Commissioners meeting on Tuesday, July 21, 2026, at 6:00 PM, held at 201 E. Green Street, Taylor County Administrative Complex, Perry, Florida. The agenda includes various items such as ratification of grant applications for the Perry-Foley Airport Hangar Project and Keaton Beach Channel Dredging Project, an extension of a grant agreement for Steinhatchee Coastal Park, approval of grant applications, lease agreements, and plans related to cybersecurity, behavioral health transportation, and law enforcement salary assistance. It also includes discussions on the destruction of county vouchers and tax documents, a presentation on the Steinhatchee Coastal Park Project by AVCON, Inc., a discussion on 4-H groundbreaking at Camp Cherry Lake, and a discussion regarding requested speed humps on Keaton Beach Drive. The agenda also lists items for general business, county attorney matters (including an executive session for Graceland vs. Taylor County), and county administrator items. Public comment is permitted for three minutes per agenda item.

Board:
Board of Commissioners Meeting
Date:
2026-07-21
Type:
Agenda
Address:
201 E. GREEN STREET, PERRY, FLORIDA

Amended Agenda Packet

[Perry-Foley Airport, Keaton Beach] Taylor County Board of County Commissioners will consider ratifying the Chairman's signature on grant applications for the Perry-Foley Airport Hangar Project and the Keaton Beach Channel Dredging Project to the Florida Commerce, Rural Infrastructure Fund (RIF) Program. The Perry-Foley Airport Hangar Project seeks $814,000 in RIF funding for construction of a 10-unit hangar, with an estimated total project cost of $1,964,000. The Keaton Beach Channel Dredging Project seeks $1,597,500 as a cost-share match for the federal channel dredging, which has an estimated cost of $10,650,000. [Steinhatchie Coastal Park; case D0280] Taylor County Board of County Commissioners will consider ratifying the Chairman's signature on an extension of Grant Agreement D0280 with the Florida Department of Commerce for the Steinhatchie Coastal Park. The extension is needed to accommodate the time required for permitting park infrastructure and future facilities. The original grant award was $300,000 with no match required from the county. The agreement period is extended to December 15, 2026. Taylor County Board of County Commissioners will consider approval of the 2026 Rural County Fall Grant application. The grant funds the maintenance costs associated with Taylor County's 911 system. This is a full reimbursement grant with no match required from the county, funded by the State 911 Board. The associated quotes are for MEVO Disaster Recovery ($3,055.68 annually) and Database Management Services for NGCS ($5,231.04 annually). [Perry-Foley Airport, 517 Industrial Park Drive, Perry, Florida 32348; case 420_0568 replacing 420_0442] Taylor County Board of County Commissioners will consider approval of a hangar lease agreement with the Florida Department of Agriculture and Consumer Services (FDACS) for Hangar #5 at Perry-Foley Airport. The new lease has a monthly rate of $235.00. The lease is month-to-month, automatically renewed, with either party able to terminate upon 90 days written notice. The lease is for the storage of specific aircraft or similar aircraft owned or leased by FDACS. Taylor County Board of County Commissioners is seeking approval to apply for the Florida Local Government Cybersecurity Grant Program for continuing cybersecurity services. This grant offers funding at no cost to the county, with the state planning to cover future solution costs. If the state cannot fund solutions in the future, the county will decide whether to discontinue them or cover fees from its budget. Specifics of the grant application are not publicly disclosed due to the sensitive nature of cybersecurity information. [2634 Capital Circle NE, Tallahassee, FL 32308 (Apalachee Center, Central Receiving Facility)] Taylor County is seeking approval for its triennial Designated Receiving Facility and Behavioral Health Transportation Plan, required under Florida Statute. The plan aims to evaluate and improve the current system for individuals experiencing behavioral health crises, ensuring timely and coordinated care. Key priorities include evaluating transportation procedures for Baker Act and Marchman Act individuals, ensuring coordination among law enforcement, EMS, hospitals, and behavioral health providers, reviewing response times, reducing emergency room utilization, and strengthening inter-agency communication. The plan designates Apalachee Center, located at 2634 Capital Circle NE, Tallahassee, FL 32308, as the Central Receiving Facility. The Taylor County Sheriff's Office will transport individuals subject to the Baker and Marchman Acts to this facility. The plan involves collaboration with Tallahassee Memorial Hospital Behavioral Health and HCA Florida Capital Hospital Behavioral Health. [case AJ026] Taylor County Board of County Commissioners is seeking approval for the FY26 Law Enforcement Salary Assistance (LESA) Grant. This grant, part of Governor Ron DeSantis' initiative for fiscally constrained counties, provides salary assistance to law enforcement agencies. Taylor County has participated since July 2022. The FY26 grant award is $494,538.00, funded by nonrecurring General Revenue funds, for salary increases for deputy sheriffs and correctional officers employed by the Sheriff's Office or county-operated correctional facility. The grant period is July 1, 2026, to June 30, 2027. [case FY27-26 – FDLE – SFA – LESA – AJ026] Taylor County Board of County Commissioners approved the signature of Chairman English for the Law Enforcement Salary Assistance for Fiscally Constrained Counties FY26 Grant. The grant award amount is $494,538.00. The recipient is the Taylor County Board of County Commissioners. The purpose is to provide salary assistance to fiscally constrained counties. Taylor County Clerk of Court Gary Knowles requested approval to destroy county vouchers, canceled warrants, and allied instruments from 1999 through 2024, and similar instruments pertaining to the Office of Clerk of Circuit Court from 1999-2024. The Board of County Commissioners is requested to approve this destruction, which is authorized by Florida Statutes Section 28.30 and 28.31. The records have been audited. The meeting date requested is July 21, 2026. Taylor County Clerk of Court Gary Knowles requested approval to destroy County 941-Tax Documents and W-2 forms and incidental instruments from 2000 through 2020. The destruction is authorized by Florida Statutes Section 28.30 and 28.31, and the records have been audited. The meeting date requested is July 21, 2026. [Steinhatchee Coastal Park] AVCON, Inc. will provide a presentation and conceptual site plan for the Steinhatchee Coastal Park Project. The project is 100% funded by a Florida Commerce Rural Infrastructure Fund Program grant of $300,000, with no match required from the County. The County has also approved submitting a FRDAP grant for construction and is exploring other funding sources like CPI, RESTORE Act, and Transportation Alternatives. The meeting date is July 21, 2026. [Camp Cherry Lake] Betsy Barfield will discuss the 4-H groundbreaking of a cabin at Camp Cherry Lake. The meeting date requested is July 21, 2026. The Taylor County Board of County Commissioners will consider approving the extension of the 2026 tax roll. This is due to statutory changes in the Value Adjustment Board (VAB) hearing process, which are delaying the issuance of tax notices beyond November 1. The Tax Collector requests authorization for the VAB and Property Appraiser to certify and extend the rolls prior to VAB hearing completion, with a final recertification after hearings conclude. The meeting date requested is July 21, 2026. [Sports Complex] The Board will discuss tournaments at the Sports Complex. The meeting date requested is July 21, 2026. The Board will consider the appointment/reappointment of three Taylor County Recreation Advisory Board members: Will Hall, Benjamin Nawling, and Justin Dean. Staff advertised the vacancies, and the recommendation is to reappoint these members. The meeting date requested is July 21, 2026. [Keaton Beach Drive] The Board will discuss requested speed humps on Keaton Beach Drive. Permanent residents have requested their construction. The estimated fiscal impact is approximately $35,000, and it is not a budgeted expense. The meeting date requested is July 21, 2026. [1 Buckeye Drive, Perry, Florida 32348-7702; case FL0000876-009-IW1S] Foley Cellulose LLC is seeking a permit for the continued operation of its wastewater treatment system and groundwater monitoring at the former Foley Mill site. The permit authorizes the discharge of 5.0 MGD annual average daily flow of non-process wastewater and stormwater through Outfall D-001 or D-002 to the Fenholloway River. The facility is located at 1 Buckeye Drive, Perry, Florida. The Department of Environmental Protection has assigned permit file number FL0000876-009-IW1S. The permit review indicates changes from a previous draft, including adjusted criteria for discharging to D-001, added monitoring and reporting for Lagoon 1, and changes to river and groundwater monitoring locations and frequency. The Board of County Commissioners and Taylor County Development Authority (TCDA) had comments on the draft permit, some of which were not addressed by the FDEP, including requests for an updated wastewater process diagram, a closure plan for unused components, a comprehensive alternative analysis, and an anti-degradation analysis. Options for addressing continued concerns include allowing the permit to be issued, petitioning for an administrative hearing (estimated cost $30,000-$50,000, deadline July 24, 2026), or requesting an extension of time to file a petition.

Board:
Board of Commissioners Meeting
Date:
2026-07-21
Type:
Agenda_packet
Decision:
Consideration for ratification of Chairman's signature
Address:
Perry-Foley Airport, Keaton Beach
Applicant:
Taylor County Board of County Commissioners

Agenda

[201 E. GREEN STREET, PERRY, FLORIDA] The Taylor County Board of County Commissioners will consider approving advertising for the Ash Street Sidewalk and Roadway Reconstruction Project under the FDOT Federally Funded Local Agency Program and the State Funded Small County Outreach Program. The board will also consider approving the notice of request for Statement of Qualifications (SOQ) for the Steinhachee Commercial Seafood Facility Planning and Feasibility Study. Additionally, they will review and consider approval of the notice of request for SOQ for four HMGP Stormstormwater Project Design Grants. The board will consider awarding Ovid Solutions, LLC a contract for CDBG-DR and MIT Grants Administrative and Environmental Services. They will also review and consider approval to amend the scope of work in Grant Agreement LW719 for the renovation of Hodges Park to remove restroom construction and add a basketball court and tetherball area. Discussions will also be held regarding restroom facility options at Hodges Park and a kayak launch at Hampton Springs Park. The board will consider approval of an agreement with iWorQ for permitting software.

Board:
Board of Commissioners Meeting
Date:
2026-07-06
Type:
Agenda
Address:
201 E. GREEN STREET, PERRY, FLORIDA

Agenda Packet

[Ash Street from US HWY 19 at its West end to East of Johnson Stripling Road at its East end; case 2016-006-ENG] Taylor County Board of County Commissioners will consider approving the advertising for the Ash Street Sidewalk and Roadway Reconstruction Project. This project involves widening and resurfacing approximately 1.8 miles of Ash Street from US HWY 19 to East of Johnson Stripling Road, including safety modifications, drainage improvements, pavement markings, signage, and sidewalk extension/reconstruction. Proposals will be received on August 14, 2026, and opened on August 18, 2026. Funding is partially covered by FY 2021/27 SCOP Funding ($1,848,485.27) and FY 2026/28 LAP Funding ($800,920.00), with potential need for additional funding. [Ash Street, Taylor County, Florida; case 2016-006-ENG] This document outlines the bid and contract forms for the Ash Street Widening/Resurfacing LAP/SCOP Project in Taylor County, Florida. The project involves widening an existing road from approximately 19/20 ft to 24 ft, reclaiming asphalt, resurfacing approximately 1.3 miles, and includes work on concrete sidewalks, ditches, stormwater culverts, turf, signage, and pavement markings. The contract duration for substantial completion is 335 days, and for final completion is 365 days. The document details various certifications and affidavits required from bidders, including those related to public entity crimes, labor and services, debarment, lobbying activities, drug-free workplace, and financial capacity. It also specifies the agreement between Taylor County (Owner) and the Contractor, including payment procedures and a three-year warranty period for workmanship and materials. [case 2016-006-ENG] This document is a contract agreement for the Ash Street FDOT LAP and SCOP Project, identified by case number 2016-006-ENG. It outlines the terms and conditions between the Owner (Taylor County Board of County Commissioners) and the Contractor. Key provisions include payment terms, contractor representations regarding site conditions and legal compliance, and the definition of contract documents. It also details requirements for public records, preference to state residents, indemnification, and conflict of interest. Additionally, it incorporates federal requirements such as the FHWA-1273 form, nondiscrimination clauses, Davis-Bacon Act provisions, and contract work hours and safety standards. The agreement specifies that venue for any litigation will be in Taylor County, Florida. [Ash Street; case 2016-006-ENG] This document pertains to the Ash Street Widening/Resurfacing LAP/SCOP Contract in Taylor County, Florida. The project involves widening and resurfacing an approximately 1.3 mile section of Ash Street, from its current 19/20 ft width to a 24 ft paved roadway. Work includes installing limerock widening strips, reclaiming existing asphalt, resurfacing, reworking existing and constructing new concrete sidewalks, reshaping ditches, extending/removing/adding stormwater culverts, performance turf, signage, and pavement markings. The Taylor County Board of County Commissioners is the owner. Bid due date is August 14, 2026. The document also includes standard clauses for federal-aid construction contracts regarding labor standards, equal employment opportunity, contract work hours and safety standards, subletting, safety, false statements, clean air and water acts, debarment, lobbying, use of U.S.-flag vessels, and employment preferences for Appalachian Development Highway System projects. It also includes a Bid Bond, Performance Bond, and Payment Bond. [Ash Street; case 2016-006-ENG] This document pertains to the FDOT LAP and SCOP Project: Ash Street, with case/file number 2016-006-ENG. The project involves widening and resurfacing an existing approximately 19/20 ft wide road to a 24 ft wide paved roadway over approximately 1.3 miles. Work includes installing limerock widening strips, reclaiming existing asphalt, resurfacing, reworking and constructing new concrete sidewalks, reshaping ditches, extending/removing/adding stormwater culverts, and installing performance turf, signage, and pavement markings. The document also details the standard general conditions of the construction contract, including definitions, contractor and owner responsibilities, bonds, insurance, changes in the work, payments, and dispute resolution. This document is a section of the EJCDC C-700 Standard General Conditions of the Construction Contract, specifically covering Articles 4, 5, and 6. It details responsibilities and conditions related to subsurface and hazardous environmental conditions, bonds and insurance, and general contractor responsibilities including supervision, labor, materials, equipment, progress schedules, substitutes, subcontractors, patent fees, permits, laws, taxes, and site usage. It outlines procedures for handling differing site conditions, requirements for various types of insurance and bonds, and the contractor's obligations for safety, compliance, and project execution. It does not contain specific project details like addresses, sizes, or development proposals. [case 2016-006-ENG] This document is part of the EJCDC C-700 Standard General Conditions of the Construction Contract for the FDOT LAP and SCOP Project: Ash Street, Case Number 2016-006-ENG. It details the contractor's responsibilities and the contractual framework for construction work, including safety, record keeping, submittals, changes in the work, claims, costs, and tests/inspections. It does not contain specific project development details like addresses, sizes, or zoning changes, nor does it mention any applicant, developer, or owner names. Public comment or stakeholder sentiment is not stated. [Ash Street; case 2016-006-ENG] The Taylor County Board of County Commissioners is undertaking improvements to Ash Street under an FDOT LAP/SCOP Agreement. The project involves widening and resurfacing an approximately 1.3-mile section of the road from 19/20 ft to 24 ft wide. This includes installing limerock widening strips, reclaiming existing asphalt, and resurfacing. Additional work includes reworking existing and constructing new concrete sidewalks, reshaping ditches, extending, removing, and adding stormwater culverts, and installing performance turf, signage, and pavement markings. The project requires adherence to FDOT Standard Plans and Specifications, as amended by Taylor County. The warranty period for workmanship and materials is extended to three years. Materials testing will be performed by an independent lab approved by the County and compensated by the Contractor. All layout work must be supervised by a Florida-registered Land Surveyor. Asphalt application efforts must be maintained at one location at a time, with a County representative on-site. Specific requirements are detailed for roller operation, joint offsets, limerock base, prime coat application, seeding/mulching, asphalt spread rate tolerances, sodding, cross-drain signage, and concrete work. The County will provide Project Representative services, with inspections conducted by authorized County representatives during a standard work week, requiring prior authorization for weekend work and at least 24 hours notice for critical project aspects. The County Engineer, Kenneth Dudley, P.E., is the primary responsible agent. [Ash Street Sidewalk; case 2016-006-ENG] This document details the Florida Department of Transportation's (FDOT) Local Agency Program (LAP) project for Ash Street Sidewalk, identified by case number 2016-006-ENG and FPID(s) 435683-5-58-01. It outlines the prequalification requirements for bidders, specifying that prequalification is not required for construction contracts of $250,000 or less, or for constructing buildings. The Department may also waive prequalification for contracts of $500,000 or less. The document also details procedures for alterations to plans or the character of work, including definitions of 'significant change' and 'major item of work.' It specifies allowable costs for extra work, materials, supplies, and equipment, and outlines compensation for indirect costs, expenses, and profit. Procedures for cost savings initiatives, claims for extra work or delay, and mandatory claim records are also provided. Contractors are cautioned against claims for loss of profit, consequential damages, and attorney fees, and are informed that all claims are subject to audit. [case 2016-006-ENG] This document is a section of a larger contract detailing various requirements for contractors and suppliers working on FDOT LAP Project: Ash Street Sidewalk. It covers audit procedures, material acceptance criteria, product sourcing (including Buy America provisions), legal and regulatory compliance (e.g., FHWA 1273, Endangered Species Act, Section 4(f) of USDOT Act), equipment usage on bridges, wage rates, Disadvantaged Business Enterprise (DBE) program requirements, on-the-job training (OJT) programs, E-Verify for employment eligibility, and subletting/assigning of contracts. It specifies detailed documentation requirements for claims, material certifications, and product approvals. It also outlines procedures for handling defective materials and managing construction schedules. The document does not describe a specific project for which work is to be pursued, but rather sets forth the contractual obligations and operational guidelines for contractors. [Ash Street from N. Byron Butler Parkway (US Hwy 19 - SR-20) to N. Helen Street; case 2016-006-ENG] This document details contract administration and payment procedures for the FDOT LAP Project: Ash Street Sidewalk. It outlines contractor responsibilities, personnel qualifications, contract time adjustments for increased work or unforeseen delays, and procedures for claiming time extensions. It also specifies liquidated damages for failure to complete work on time, with daily charges varying by contract amount. Measurement and payment are based on final calculations or plan quantities, with provisions for compensation for altered quantities. The document details partial payment procedures, including for stockpiled materials, and requirements for contractor certification of payments to subcontractors. The project involves widening and resurfacing Ash Street in Taylor County, Florida, from N. Byron Butler Parkway to N. Helen Street, a length of 9,465 linear feet (1.79 miles). Key construction activities include clearing and grubbing, excavation, embankment, stabilization, reworking limerock base, milling existing asphalt, paving with Superpave asphaltic concrete and asphalt friction course, concrete work for culverts, manholes, and inlets, pipe culvert installation, concrete curb and gutter, concrete sidewalk and driveways, guardrail removal, fencing, sodding, and pavement markings. [Ash Street] This document contains detailed engineering plans and specifications for road construction and widening projects along Ash Street in Taylor County, Florida. It includes information on proposed pavement, sidewalks, driveways, storm drainage, and other infrastructure elements. The plans cover various segments of Ash Street, with specific stationing and offsets indicating the precise locations of proposed work. The project involves widening the road, replacing storm drains, installing concrete sidewalks, and managing right-of-way. Specific details include pipe sizes, concrete and limerock specifications, and grading requirements. The document also references Taylor County Board of County Commissioners and project numbers like 435683-5-58-01 and 443406-1-54-01. [Post Office Box 620, Perry, Florida 32348; case G3S39] Taylor County Board of County Commissioners is seeking approval for a Florida Commission for the Transportation Disadvantaged Planning Grant Agreement for FY 2026-2027. The county is eligible to receive $23,720 to fund planning and oversight of the local transportation disadvantaged program. This grant will cover a portion of the Grants Department salaries, benefits, office supplies, and equipment. The grant cannot be used for actual transportation costs. The agreement is for the period of July 1, 2026, to June 30, 2027. [Post Office Box 620, Perry, Florida 32348 (for Taylor County Board of County Commissioners); 108 North Jefferson Street, Perry, Florida 32347 (for SOQ submissions); case FM/JOB No(s). 43202911401, CONTRACT NO. G3S39] Taylor County Board of County Commissioners and the Commission for the Transportation Disadvantaged have entered into a TD Planning Grant Agreement for Fiscal Year 2026-27. The agreement covers planning services related to the Transportation Disadvantaged Service Plan, Community Transportation Coordinator selection and evaluation, Local Coordinating Board meetings, public workshops, by-laws, grievance procedures, Annual Operating Reports, Actual Expenditures Reports, and quarterly progress reports. The total project cost is $23,720.00, funded 100% by State Funds from the Commission for the Transportation Disadvantaged. The project period begins July 1, 2026, and ends June 30, 2027. Invoices must be received by August 15, 2027. Separately, Taylor County is soliciting Statements of Qualifications (SOQ) for the Steinhatchee Commercial Seafood Facility Planning and Feasibility Study Project. This project is funded by a $298,440 Florida Commerce Rural Infrastructure Fund (RIF) grant and will include environmental assessments, economic development and capital costs planning, and a feasibility study. SOQs are due by August 14, 2026, and bid openings are scheduled for August 18, 2026. The project is located in Steinhatchee, Taylor County, Florida. [201 East Green Street, Perry, Florida 32347; case V0244] Amendment to Business Agreement V0244 between Big Bend Community Based Care, Inc., d/b/a NWF Health Network, and Taylor County Board of County Commissioners. The amendment increases the maximum amount for state fiscal year 2025-26 from $80,960.00 to $82,068.00. Payment schedules are adjusted to reflect this increase, with monthly payments from March 2026 to May 2026 increasing from $6,746.67 to $7,023.67, and June 2026 payment increasing from $6,746.63 to $7,023.63. The agreement effective dates remain July 1, 2025, to June 30, 2026. Unspent funds may be rolled over to the next fiscal year. [McDaniel Road, from Wright Road to Pisgah Road (CR361)] Resolution to adopt budget changes for the SCOP Road Project (McDaniel Road) Fund to reflect unanticipated monies for the fiscal year ending September 30, 2026. This resolution adds $349,626 to the SCOP Road Project Fund budget, specifically for contractual services related to the McDaniel Road project. [CR359A (McDaniel Road) from Wright Road to Pisgah Road (CR361); case G2656 (Contract No.), 445816-1-54-01 (FPN)] Supplemental Agreement No. 3 to State-Funded Grant Agreement G2656 (FPN 445816-1-54-01) between the State of Florida Department of Transportation and Taylor County. This supplemental agreement provides additional funding of $1,376,246.00 for the construction contract for CR359A (McDaniel Road) from Wright Road to Pisgah Road (CR361). The total project cost is $2,746,246.00, with $1,370,000.00 from FY2022 and $1,376,246.00 from FY2026 state funds. Resolution to adopt budget changes for the General Fund to reflect unanticipated monies for the fiscal year ending September 30, 2026. This resolution adds $53,371 to the General Fund budget for the 911 Rural County Maintenance Grant, with expenditures allocated to R&M - Office Equipment. [case 26-04-24 (Grant Number), CSFA # 72.001] Grant award from the Florida Emergency Communications Board for the Spring 2026 Rural Grant Program to Taylor County. The approved amount is $53,370.87 for 911 System Maintenance. The grant term initiates upon receipt of the letter, and a grant award agreement will be sent for signature. [case HMGP Project Nos. 4734-138-R, 4734-135-R, 4734-136-R, 4734-137-R] Taylor County is soliciting Statements of Qualifications (SOQ) from qualified professional engineering firms for Phase I design services for four Hazard Mitigation Grant Program (HMGP) stormwater projects. These projects are funded through FEMA under Disaster Declaration DR-4734 (Hurricane Idalia) and administered by the Florida Division of Emergency Management. The projects include flood risk reduction at Foley Cut Off Road, East Ellison Road, Dewey McGuire Road, and Wilder Creek. The total estimated Phase I funding is $351,937, with specific amounts allocated per project. The selection process will be based on qualifications, not price, and fees will be negotiated with the top-ranked firm. The County Administrator recommended approving the advertisement for these SOQs. Taylor County is holding a public hearing on the passage of a proposed ordinance granting an Economic Development Ad Valorem Tax Exemption to Roy's Restaurant, Inc. The ordinance specifies exempted items, provides an expiration date, finds that the business meets F.S. 196.012 requirements, and includes provisions for annual reports and an effective date. The proposed ordinance can be inspected at the Clerk of the Circuit Court's Office. Taylor County has been allocated $700,000 for the initial year to organize and offer Coordinated Opioid Recovery (CORE) Network services to its citizens. Doctors Memorial Hospital, Disc Village, and Apalachee Mental Health have collaborated to present an implementation plan for consideration by the Board of County Commissioners. The funding is not flowing through Taylor County's budget. A discussion is scheduled regarding data center development in Taylor County. The County may face future proposals for large-scale data center developments, which can present concerns related to energy consumption, water usage, environmental impacts, infrastructure demands, public health, quality of life, and long-term land-use planning. The recommended actions include holding a special meeting on the issue, implementing a moratorium on future developments, and ensuring full transparency from elected officials. The discussion aims to proactively evaluate potential impacts before any projects are approved or incentivized. Taylor County Board of County Commissioners is considering awarding Ovid Solutions, LLC a contract for CDBG-DR and MIT grants administrative and environmental services. These services are for the Doctors' Memorial Hospital Roofing Retrofit and Facility Resiliency Project, the Special Needs Shelter Project at the Public Safety Complex, and the Steinhatchee Roads Project. Ovid Solutions, LLC was the highest-ranked proposer with 278 points, and their proposed rate is $415,800. The contract is 100% grant funded. [Hodges Park; case Grant Agreement LW719] Taylor County Board of County Commissioners is considering a letter to the Florida Department of Environmental Protection (FDEP) to amend the scope of work for Grant Agreement LW719 for the renovation of Hodges Park. The amendment requests the removal of restroom construction and the addition of a basketball court and tetherball area. The original grant amount was $200,000. Restrooms will be constructed later using Pot 3 RESTORE ACT funding. [912 Hwy 51 NE, Steinhatchee; case 2026-CE-0507] Taylor County Board of County Commissioners will consider legal action regarding Code Enforcement Case Taylor County versus Ronnie Brogdon. The case involves violations of County Ordinance Section 30-71 – Abandoned property. An order was issued on May 6, 2026, requiring the property owner to bring the parcel into compliance by the 30th day from the order date, with a fine of $25.00 per day thereafter until compliance. The property is identified by Parcel # 10286-500, located at 912 Hwy 51 NE, Steinhatchee. [03655-000] Taylor County Board of County Commissioners will consider the execution of a deed and resolution to donate county-owned property to the School District for recreational activities. The property is described as all of Blocks 11, 12, 13, 14, 17, 18, 19, 20, 22, 23, and 24, and portions of Blocks 15 and 16, and Block 25 in Peacock Highlands, with Property Identification Number 03655-000. Taylor County Board of County Commissioners will consider a letter of request to review coverage to the Florida Association of Counties Trust (FACT). The FACT Claims Committee met on June 23, 2026, and voted to affirm a coverage denial for a claim. The County is requesting an appeal of this decision to the FACT Board of Trustees. [Hampton Springs Park] Taylor County Board of County Commissioners will continue discussions regarding a kayak launch at Hampton Springs Park. The Coastal River Alliance of the Big Bend presented a plan for adding or improving a kayak launch. The County Administrator was tasked with determining permitting requirements. [Hodges Park] Taylor County Board of County Commissioners will discuss restroom facility options for Hodges Park. Portable restrooms are currently in place, and staff has researched other portable restroom options for the Board to consider. This follows a previous item where restroom construction was removed from a grant scope of work to be funded by RESTORE Act Pot 3 funding. [201 East Green Street, Perry, FL 32347] Taylor County Board of County Commissioners considered approval of a grants report format. The board also considered approval of an agreement with iWorQ for permitting software to provide online permitting for building permits. The agreement is for a three-year term at $14,214.00 for the first year, or a one-year term at $23,690.00. The board approved the agreement with iWorQ.

Board:
Board of Commissioners Meeting
Date:
2026-07-06
Type:
Agenda_packet
Decision:
Consider approval to advertise for RFPs
Address:
Ash Street from US HWY 19 at its West end to East of Johnson Stripling Road at its East end
Applicant:
Taylor County Board of County Commissioners

2nd Amended Agenda

This document is a suggested agenda for the Taylor County Board of County Commissioners meeting on June 16, 2026. It lists various items for consideration, including approval of minutes, invoices, draft RFPs, service plans, contract renewals, resolutions, and bids. Several items relate to potential construction and infrastructure projects, such as the design-build of Fire Station 7, flood risk reduction, boat ramp feasibility studies, canal dredging, and the potential for a kayak launch. Public comment is permitted for agenda items, with a three-minute limit per speaker. The agenda also includes discussions on grant funding cycles and the utilization of park facilities for events.

Board:
Board of Commissioners Meeting
Date:
2026-06-16
Type:
Agenda
Address:
201 E. GREEN STREET, PERRY, FLORIDA

2nd Amended Agenda Packet

[Steinhatchee, FL] Taylor County Board of County Commissioners will consider approving the draft Request for Proposals (RFP) for the Design-Build of Fire Station 7. The project is funded by State Appropriations totaling $1,500,000. Proposals are due by July 29, 2026, with an opening on August 3, 2026. A pre-proposal conference is scheduled for July 9, 2026. The project involves the final design and construction of the facility located in Steinhatchee, FL. The contract will be awarded to the respondent offering the best overall service and value, not necessarily the lowest price. The design and construction are expected to be completed within 210 calendar days. [Taylor County, Florida] This document outlines the contractual and procedural requirements for the Taylor County Fire Station 7 Design-Build Improvement Project. It details the proposal submission process, including required documentation, qualifications, and experience. Key contractual terms such as retainage, sales tax exemptions for the owner, audit rights, and the signing of agreements are specified. The project involves design and construction services for a new fire station in Taylor County, Florida. The agreement specifies a 200-day timeline for substantial completion and 210 days for final payment, with liquidated damages of $1,690.00 per day for delays. A three-year warranty is required for workmanship and materials. The contract price is based on a Guaranteed Maximum Price (GMP) and Unit Price Work, with the GMP amount to be determined. The document also includes various affidavits and certifications required from bidders, such as non-collusion and public entity crime statements. The owner, Taylor County Board of County Commissioners, is exempt from Florida sales and use taxes on owner-direct purchased materials. [case D-610-1 (Performance Bond), D-615-3 (Payment Bond)] This document pertains to the Taylor County Fire Station 7 Design-Build Improvement Project. It includes a Design/Builder Contract Performance Bond and a Design/Builder Payment Bond. The owner is the Taylor County Board of County Commissioners. The project scope includes all programming, design, permitting, construction, labor, and equipment necessary for the fire station, including site development, regulatory matters, testing, surveying, environmental mitigation, geotechnical, traffic management, architectural, engineering, landscaping, security, structural and interior design, acoustical, lighting, construction, and post-construction services. The documents outline the terms and conditions for these bonds, including surety obligations, payment procedures, and dispute resolution. This document is a section of the EJCDC D-700 Standard General Conditions of the Contract Between Owner and Design Builder, specifically covering Articles 4 through 8. It details responsibilities related to hazardous environmental conditions, reference points, insurance, bonds, design professional services, supervision, labor, materials, equipment, progress schedules, subcontractors, patent fees, permits, laws, taxes, site use, record documents, safety, emergencies, submittals, continuing work, post-construction, warranties, indemnification, and owner responsibilities. It outlines the obligations of both the Design/Builder and the Owner regarding project execution, risk management, and contractual compliance. Key aspects include the Design/Builder's responsibility for the work, safety, and compliance with laws, and the Owner's responsibility for providing necessary information, site access, and timely payments. It also specifies insurance and bonding requirements. The document does not contain information about specific projects, addresses, or development proposals. This document is a section of the EJCDC D-700 Standard General Conditions of the Contract Between Owner and Design Builder, specifically covering Articles 9 through 16. It details procedures for changes in the work, claims, cost of the work, cash allowances, unit prices, changes to the contract price and times, tests and inspections, correction of defective construction, payments, suspension of work, termination, dispute resolution, and miscellaneous provisions. It also includes supplementary conditions that amend or supplement the general conditions, particularly regarding hazardous environmental conditions and inclement weather. The document outlines the rights and responsibilities of both the Owner and the Design/Builder in various contractual scenarios, including payment processes, handling of disputes, and procedures for project completion and termination. It does not describe a specific project or development. [1 12th Street N.E., Steinhatchee, FL 32359] Taylor County Fire Station 7 is a Design-Build Improvement Project located at 1 12th Street N.E., Steinhatchee, FL 32359, Parcel #25-09-00-09753-000. The project involves the design and construction of a new fire station, including site development, permitting, and all labor and equipment. The total project budget is $1,500,000. The existing building on the site is to be removed. The project requires adherence to all permits and regulations, including protection of wetlands and Manatees. The contract price is a Guaranteed Maximum Price. The project is governed by Florida law, with venue in Taylor County. [Taylor County Jail] Taylor County is approving the non-renewal of a Master Pharmacy Services Agreement with Diamond Pharmacy for inmate medication at the Taylor County Jail. The county will transition to Jay's Pharmacy for this service, citing convenience and the ability to use inmate insurance to offset medication costs. The agreement was effective September 8, 2015. [Wilder Creek area, Perry, Florida 32347; case 4734-137-R] Taylor County is approving a contract with the Florida Department of Emergency Management for Wilder Creek Flood Risk Reduction (Contract 4734-137-R). This is for Phase I of a Hazard Mitigation Grant Program project, which includes surveying, engineering, design, plans preparation, permitting, and bidding. Phase II will involve improving existing culverts to reduce flood risk from a 50-year storm event. The project aims to address repetitive flooding and structural damage caused by the current system's lack of capacity. The federal portion of the funding is $108,832.50, with a state match of $36,277.50. [2489 Shumard Oak Boulevard, Tallahassee FL 32399-2100 (for Division of Emergency Management Cashier); case 4734-137-R] This document details a Subrecipient Agreement (Agreement #H1346) between the State of Florida Division of Emergency Management and Taylor County for Flood Risk Reduction project (Project #: 4734-137-R). The agreement is funded by FEMA HMGP Award (4734-137-R) with a total federal fund obligation of $103,650.00 for this agreement and $108,832.50 total to the subrecipient. The period of performance is March 09, 2026, to September 30, 2027. The agreement outlines terms and conditions for fund disbursement, reporting, audits, and procurement, emphasizing compliance with federal and state laws. Taylor County is the Sub-Recipient, and the Florida Division of Emergency Management is the pass-through entity. No public comment is stated in this section. [Near Wilder Creek area, Perry, Florida 32347. Specific locations include culverts at Pharo Morgan Road and Morgan Whiddon Road.; case HMGP DR-4734-137-R] Taylor County, Florida, has been awarded a Hazard Mitigation Grant Program (HMGP) grant of $103,650.00 for Phase I of a flood risk reduction project near the Wilder Creek area in Perry, Florida. This phase includes preliminary engineering designs, surveys, permitting, and bidding. No construction is approved at this time. Phase II will involve upgrading existing culverts to larger box culverts under Pharo Morgan Road and Morgan Whiddon Road to protect against a 50-year storm event. The total project cost is $145,110.00, with a state match of $36,277.50. The project is funded under FEMA-4734-DR-FL, with a period of performance from March 9, 2026, to September 30, 2027. Taylor County is seeking proposals for Grant Administration Services for Community Development Block Grant (CDBG) Mitigation (MIT) and Disaster Recovery (DR) grants. Services will include environmental reviews and permitting. The grants are for the DMH Hardening of Facility ($2,500,000), Steinhatchee Road Paving Project ($1,050,000), and Public Safety Complex-Emergency Shelter Project ($4,969,425). Administrative fees will be paid 100% from grant funds. [Keaton Beach and Steinhatchee] AVCON, Inc. presented findings from the Keaton Beach and Steinhatchee Boat Ramps By-Pass Feasibility Study. The study, funded by a RESTORE Act Pot 3 grant of $383,665 ($350,000 for the study, $33,665 retained by Balmoral), analyzed alternatives for by-passes and roadway widening. The study is a planning exercise only, with no immediate construction funding programmed. Alternative KB-3 (widening existing roadway) was identified as providing the biggest improvement for the investment with reduced impact, but faces challenges with permitting, limited right-of-way, and maintenance of traffic during construction. Findings include sandy soil over limestone with a high water table, requiring removal of unsuitable soils. Taylor County Board of County Commissioners considered adoption of resolutions to reflect unanticipated monies in the General Fund and Small County Surtax Fund. For the General Fund, $12,659 was added for Donation (revenue), $11,400 for County Extension, $872 for Other Salaries & Wages, and $387 for FICA/Medicare Taxes, totaling $25,318. This was for the fiscal period ending September 30, 2026. For the Small County Surtax Fund, budget changes were made to reflect unanticipated monies for the fiscal period ending September 30, 2026, including adjustments to Cash Brought Forward, 1% Sales Tax Reserve/Capital, 1% Sheriff's Sales Reserve/Capital, and 1% DMH Sales Allocation/Capital. [Wilder Creek area, Perry, Florida 32347; Culvert, Pharo Morgan Road, Perry, Florida, 32347 (30.138276, -83.562476); Culvert, Morgan Whiddon Road, Perry, Florida, 32347 (30.139491, -83.564494); case 4734-137-R] Taylor County is involved in a Hazard Mitigation Grant Program project (Project #: 4734-137-R, Contract #: H1346) for Flood Risk Reduction near the Wilder Creek area in Perry, Florida. The current phase (Phase I) focuses on surveying, engineering, design, plans preparation, permitting, and bidding for Phase II approval. No construction activities have been approved yet. Phase II proposes upgrading culverts from 42-inch Corrugated Aluminum Pipe (CAP) to 3-barrel 3-foot by 6-foot box culverts under Pharo Morgan Road and Morgan Whiddon Road to address stormwater runoff capacity issues and reduce flooding. The project is designed for a 50-year storm event. The award amount is $103,650.00, with an obligation/action date of March 09, 2026. [10037-000, 10038-000, and 10040-300] Roy's Restaurant, Inc. is requesting an ad valorem tax exemption for real and personal property. The Taylor County Development Authority (TCDA) reviewed the application and found it complete and eligible. The TCDA recommends a 50% tax exemption for 5 years, consistent with their scoring matrix, though the Board of County Commissioners has discretion up to 100% for 10 years. The restaurant was previously demolished by a hurricane, and legal counsel believes rebuilding constitutes a de facto new business or an expansion. The project involves $3,500,000 in real property capital investment and $335,000 in tangible personal property capital investment, with an anticipated creation of 20 full-time jobs at $18.00/hour. The TCDA scored the application 8 out of 18, with the highest points for Phase of Operation and Capital Investment. [Keaton Beach, Steinhatchee Boat Ramp Basin, Dekle Beach, Dark Island, Cedar Island; case FDEM Grant Agreement D1551] Taylor County is considering an amendment to FDEM Grant Agreement D1551 for $5,050,000. Amendment 1 extends the contract period from June 30, 2026, to April 30, 2027. The grant funds are for dredging canals at Keaton Beach and the Steinhatchee Boat Ramp Basin, and for the design, engineering, and permitting of canals at Dekle Beach, Dark Island, and Cedar Island. The amendment also allows for additional studies and surveys for Keaton Beach canals and the Steinhatchee Boat Ramp basin if needed. The grant requires no county match.

Board:
Board of Commissioners Meeting
Date:
2026-06-16
Type:
Agenda_packet
Decision:
Consider Approval of RFP for Advertisement
Address:
Steinhatchee, FL
Applicant:
Taylor County Fire Rescue

Minutes

[201 E. GREEN STREET] Taylor County Board of County Commissioners meeting on June 16, 2026, addressed various items including the approval of invoices, the draft RFP for design-build of Fire Station 7, review of the Transportation Disadvantaged Service Plan, non-renewal of a pharmacy services contract with Diamond Pharmacy for inmate medication at the Taylor County Jail, and approval of Contract 4734-137-R with the Florida Department of Emergency Management for Wilder Creek Flood Risk Reduction. The board also considered resolutions for unanticipated monies, received RFPs for CDBG MIT and DR Grant Administration, heard a presentation on a feasibility study for Keaton Beach and Steinhatchee Boat Ramps, and received information on the Emergency Watershed Protection Program and potential for a kayak launch at Hampton Springs Park. An ad valorem tax exemption request for Roy's Restaurant was recommended and approved for drafting an ordinance. The board approved the utilization of Hodges Park for a sponsored fireworks event on July 3, 2026, despite concerns about debris. Funding of $40,000.00 was approved for millings at specific roll-off sites, with one commissioner dissenting due to concerns about the longevity of millings. Applications for FRDAP and RIF grants were approved for submission, including for Steinhachee Coastal Park and airport hanger construction. Amendment 1 to FDEM Grant Agreement D1551 for $5,050,000.00 for dredging canals at Keaton Beach and Steinhatchee Boat Ramp Basin, and design/engineering/permitting/dredging at Dekle Beach, Dark Island, and Cedar Island was approved. The board approved construction of two picnic areas, concrete pads, picnic tables, a sand volleyball court, and playground equipment at Hodges Park. Guidelines and budget for a Cold Weather Warming Center were approved. Speed humps were approved for construction at the end of CR-14, funded by District 1 paving funds. The meeting also included a notice of non-renewal for the Master Pharmacy Services Agreement with Diamond Pharmacy for the Taylor County Jail, effective at the end of the current contract term. An agreement for waiver of local match requirements for Hazard Mitigation Grant Program (HMGP) for Hurricane Idalia was noted, with Taylor County as the subrecipient and a total award amount of $36,277.50. [201 East Green Street, Perry, Florida 32347 (Taylor County Administrator's Office); case FEMA-DR-4734-FL (Federal Award Identification Number), H1346 (Agreement Number), 4734-137-R (Project Number)] This document is a Sub-Recipient Agreement between the State of Florida Division of Emergency Management and Taylor County for Flood Risk Reduction. The agreement is funded by FEMA HMGP award 4734-137-R and associated Subrecipient Agreement H1346. The total federal funds obligated are $103,650.00, with a total subaward period of performance from March 09, 2026, to September 30, 2027. The agreement outlines terms and conditions for fund disbursement, record retention, audits, reporting, and procurement, emphasizing compliance with federal and state laws and regulations. Taylor County is the sub-recipient, and the Florida Division of Emergency Management is the pass-through entity. The agreement details responsibilities for monitoring, default, remedies, termination, and intellectual property rights. It also includes mandated conditions related to public records, employment of unauthorized workers, and procurement standards. [near the Wilder Creek area; case DR-4734-137-R] This document outlines the terms and conditions for a Hazard Mitigation Grant Program (HMGP) award to Taylor County, Florida, for flood risk reduction improvements near the Wilder Creek area. The project is currently in Phase I, focusing on preliminary engineering designs, surveys, permitting, and bidding. No construction activities are approved at this time. Phase II will involve upgrading culverts under Pharo Morgan Road and Morgan Whiddon Road to improve stormwater runoff capacity and protect against a 50-year storm event. The total project cost is $145,110.00, with a federal share of $108,832.50 and a state match of $36,277.50. The period of performance is from March 9, 2026, to September 30, 2027. The document details numerous compliance requirements for contractors and subrecipients, including merit-based selection, anti-kickback provisions, labor standards, clean air and water acts, suspension and debarment, anti-lobbying, and contracting with small and minority businesses. It also specifies environmental compliance, historic preservation, and accessibility standards. The Sub-Recipient (Taylor County) is responsible for procuring services and ensuring compliance with all federal, state, and local laws and regulations. The document emphasizes that all contract awards must be based solely on technical merit, cost-effectiveness, and demonstrated ability to perform the work. [108 North Jefferson Street, Suite 102, Perry, Florida 32347 (for proposal submission); Pharo Morgan Road, Perry, Florida, 32347; Morgan Whiddon Road, Perry, Florida, 32347; Keaton Beach; Steinhatchee; case 10183, MS045, MS047 (CDBG-DR/MIT contracts); 4734-137-R (Flood Risk Reduction project); H1346 (Contract number for Flood Risk Reduction project)] Taylor County is seeking grant administration services for Community Development Block Grant Disaster Recovery (CDBG-DR) and Mitigation (CDBG-MIT) projects. The projects include Critical Facility Hardening (DMH) with contract number 10183 for $2,500,000, a paving project (IRP-Steinhatchee Roads) with contract number MS045 for $1,050,000, and an Emergency Shelter project (IRP-TC Emergency Shelter) with contract number MS047 for $4,969,425. The grant administration services will cover project monitoring, reporting, financial record keeping, environmental reviews, and coordination with state and federal agencies, architects, engineers, and contractors. Proposals are due by June 12, 2026, at 4:00 p.m. at the Clerk of Courts, 108 North Jefferson Street, Suite 102, Perry, Florida 32347. Proposals will be publicly opened on June 16, 2026, at 6:00 p.m. during a Board of Commissioners meeting. Taylor County is also undertaking flood risk reduction projects with project number 4734-137-R and contract number H1346, involving culvert improvements under Pharo Morgan Road and Morgan Whiddon Road in Perry, Florida. This phase focuses on surveying, engineering, design, plans preparation, permitting, and bidding, with no construction approved yet. The project aims to upgrade from 42-inch Corrugated Aluminum Pipe (CAP) to 3-barrel 3-foot by 6-foot box culverts to address stormwater runoff capacity issues and protect against a 50-year storm event. Additionally, Taylor County is involved in boat ramp improvements at Keaton Beach and Steinhatchee, as detailed in a feasibility report by AVCON, INC. [Keaton Beach Boat Ramp Corridor: 20131 Keaton Beach Road 32348, Perry, FL; Steinhatchee Boat Ramp Corridor: 1st Avenue Southeast between Main Street and 2nd Street East 32359 Steinhatchee, FL] This feasibility report evaluates potential improvements for the Keaton Beach and Steinhatchee boat ramp facilities in Taylor County, Florida, to address localized traffic congestion and operational bottlenecks, particularly during peak seasons. The report examines existing conditions, analyzes traffic data, and proposes several alternatives for each location. For Keaton Beach, alternatives include a 'No-Build' scenario, constructing a bypass road (KB-2), and local roadway widening (KB-3). The bypass road (KB-2) is not recommended due to significant environmental impacts and right-of-way acquisition challenges. Local improvements (KB-3) are considered more cost-effective but limited by existing right-of-way. For Steinhatchee, alternatives include a 'No-Build' scenario (ST-1), improving local roads with a short bypass (ST-2), a medium bypass by connecting existing segments (ST-3), and a long bypass along Central Avenue (ST-4). The short bypass (ST-2) offers limited relief. The medium (ST-3) and long bypass (ST-4) alternatives provide more substantial traffic relief but involve new construction on undeveloped land, leading to higher costs, environmental impacts, and right-of-way acquisition needs. The report also details environmental considerations, geotechnical findings, construction constraints, and utility coordination requirements for all proposed alternatives. Taylor County is considering improvements to boat ramps at Keaton Beach and Steinhatchee. A feasibility report evaluated various alternatives for roadway and drainage enhancements. The report concluded that while local improvements are more cost-efficient, there is greater public interest in projects elsewhere, leading to no further action recommended at this time. The data serves as a baseline for future consideration if priorities change. Traffic analysis indicates current levels of service are adequate through 2050, with modest growth projections. Geotechnical reports for Steinhatchee drainage improvements at 4th Street/Allen Lane and 13th Street East/Central Avenue detail subsurface conditions and provide recommendations for culvert and drainage designs, noting slightly to moderately aggressive soil conditions for steel and concrete. [4th Street and Allen Lane; 13th Street East and Central Avenue; case NV5 Project No. 24-0629] This document is a Geotechnical Engineering Report for the Steinhatchee Drainage Improvements project, located in Taylor County, Florida, specifically at 4th Street and Allen Lane, and 13th Street East and Central Avenue. The report details soil conditions, including SPT N-values, soil models, internal friction angles, unit weights, unconfined compression, and modulus of subgrade reaction. It provides recommendations for retaining walls, box culvert foundations, and concrete end-wall foundations. Key findings include that soils are slightly to moderately aggressive for steel and concrete. The report also discusses construction considerations such as dewatering, clearing and grubbing, and embankment recommendations. Specific recommendations for box culvert foundations at 4th Street, Station 301+00, indicate a nominal bearing capacity of 5,500 psf and an allowable bearing capacity of 2,475 psf. Concrete end-wall foundations are recommended with an allowable bearing capacity of 2,500 psf and a modulus of subgrade reaction of 50 pci. The report also includes detailed soil boring logs and laboratory test results. [case 01551] Modification #1 to Subgrant Agreement between the Division of Emergency Management and Taylor County, Florida. The agreement, originally for $5,050,000.00 with a period of performance from April 22, 2024, to June 30, 2026, is amended to extend the period of performance to April 30, 2027. The scope of work includes dredging of Keaton Beach Canal System, Steinhatchee Boat Basin, Canals at Dark Island, Cedar Island, and Dekle Beach. Eligible costs cover dredging, permits, design, engineering, construction, and acquisition of spoil sites. The total budget remains $5,050,000.00.

Board:
Board of Commissioners Meeting
Date:
2026-06-16
Type:
Minutes
Decision:
Approved for multiple items including invoices, RFP for Fire Station 7, TDSP, non-renewal of pharmacy contract, Wilder Creek Flood Risk Reduction contract, resolutions for funds, RFPs for grant administration, feasibility study presentation, EWP program presentation, kayak launch proposal, tax exemption ordinance draft, fireworks event, roll-off site millings, FRDAP/RIF grant applications, FDEM Grant Agreement amendment, Hodges Park improvements, Cold Weather Warming Center guidelines/budget, speed humps on CR-14, and HMGP waiver agreement.
Address:
201 E. GREEN STREET
Applicant:
Taylor County

Agenda

[201 E. GREEN STREET, PERRY, FLORIDA] Approval of the first payment request for the rehabilitation of Sadaytril Smith's home in the amount of $29,950. Approval of Change Order 2 to the contract for the rehabilitation of Sadaytril Smith's home through the HHRP SHIP Program. Approval of an extension to Grant Agreement 230049101.01 for Spring Warrior and an amendment to Special Awards Conditions to enable a "Yellow Book" appraisal for the Spring Warrior Fish Camp site, funded by POT 3 Restore Act funds. Approval of the New Safety Complex Appropriations State Funded Grant Agreement (F0174) for $6.75 million for new construction of the Safety Complex. Approval of a contract agreement with Tetra Tech for storm debris monitoring in Taylor County until August 31, 2027. Consideration of Bid Committee Recommendation and approval of a draft agreement with Lee Services for right of way mowing. Consideration of approval of a draft rental agreement for Forest Capital Hall. Consideration of approval of a task work order with Locklear Consulting for plan reviews of Industrial Drive and Spring Warrior Road construction projects. Consideration of approval of State Funded Agreement No. 26-04-24 for the 2026 Spring Rural County Grant Program. Receiving bids for the Doctors’ Memorial Hospital (DMH) Roofing Retrofit, Hardening, and Repair Project. Receiving bids for Taylor County Mosquito Control Services. Consideration of approval of FDOT Supplemental Funding Agreement for the McDaniel Road Widening/Resurfacing Project under the FDOT Small County Outreach Program.

Board:
Board of Commissioners Meeting
Date:
2026-06-01
Type:
Agenda
Decision:
Consideration/Approval/Receiving Bids
Address:
201 E. GREEN STREET, PERRY, FLORIDA

Agenda Packet

[106 El Dorado Drive, Perry, FL 32347] Taylor County Board of County Commissioners will consider approval of the first payment request for the rehabilitation of Sadaytril Smith's home in the amount of $29,950. This project is funded through the HHRP SHIP Disaster Recovery Program. Additionally, the board will consider approval of Change Order 2 to the contract for the rehabilitation of Sadaytril Smith's home, in the amount of $5,500, to address rotten and/or water-damaged sheetrock and painting. Funds for this change order are also covered by the HHRP Program. [Spring Warrior Fish Camp site; case 230049101.01] Taylor County Board of County Commissioners will consider approval of an extension to Grant Agreement 230049101.01 for Spring Warrior and an amendment to Special Awards Conditions. This will enable the county to have a 'Yellow Book' appraisal completed for the Spring Warrior Fish Camp site. The Spring Warrior Grant is funded by POT 3 RESTORE Act funds. The county has sufficient funds for the appraisal, but additional funding may be needed if acquisition is pursued. The period of performance for the subrecipient agreement between The Gulf Consortium and Taylor County has been extended through 09/30/2028. [case F0174] Taylor County Board of County Commissioners will consider approval of the New Safety Complex Appropriations State Funded Grant Agreement (F0174) for the new construction of the Safety Complex. The grant amount is $6.75 million and is state-funded. [Taylor County] Taylor County Board of County Commissioners will consider approval of a contract agreement with Tetra Tech for storm debris monitoring in Taylor County until August 31, 2027. Taylor County Board of County Commissioners will consider the Bid Committee Recommendation and approval of a draft agreement with Lee Services for right of way mowing. [Forest Capital Hall] Taylor County Board of County Commissioners will consider approval of a draft rental agreement for Forest Capital Hall. [Industrial Drive and Spring Warrior Road] Taylor County Board of County Commissioners will consider approval of a Task Work Order with Locklear Consulting for plan reviews of Industrial Drive and Spring Warrior Road construction projects. [case 26-04-24] Taylor County Board of County Commissioners will consider approval of the State Funded Agreement No. 26-04-24 for the 2026 Spring Rural County Grant Program. [Doctors’ Memorial Hospital (DMH)] Taylor County Board of County Commissioners will receive bids for the Doctors’ Memorial Hospital (DMH) Roofing Retrofit, Hardening, and Repair Project. [Taylor County] Taylor County Board of County Commissioners will receive bids for Taylor County Mosquito Control Services. [McDaniel Road] Taylor County Board of County Commissioners will consider approval of a FDOT Supplemental Funding Agreement for the McDaniel Road Widening/Resurfacing Project under the FDOT Small County Outreach Program. This document is a meeting agenda or record containing numerous line items, primarily consisting of numerical codes and references (e.g., '/7/18/17/13/17/8/i255/6/11/i255/10/i255/19/18/21/16/i255/17/3/19/19/6/7/6/15/11/13/i255/13/18/i255/12/15/13/15/21/16/6/11/15/i255/7/18/16/2/5/6/10/11/7/15/i255/23/6/13/14/i255/13/14/15/i255/21/15/41/3/6/21/15/16/15/11/13/17/i255/10/11/12/i255/18/4/38/15/7/13/6/22/15/17/i255/18/19/i255/13/14/15/i255/45/3/12/20/15/13/i255'). These codes do not appear to represent specific development projects with identifiable addresses, sizes, zoning changes, applicants, or case numbers. Therefore, no actionable information for contractors regarding specific work opportunities can be extracted from this document. This document appears to be a collection of page numbers and internal document references, rather than a civic record with development project details. It lacks specific information such as addresses, project sizes, zoning changes, applicant names, case numbers, decisions, or key dates. Therefore, no business opportunities or public sentiment can be extracted. The document contains a large amount of unformatted text, likely scanned from a public record, with no discernible project details, addresses, zoning changes, applicant names, case numbers, decisions, or dates. It appears to be a collection of page numbers and potentially OCR errors or corrupted data, making it impossible to extract any factual information for contractors. [201 E. Green Street, Perry, FL 32347 (Client); 2301 Lucien Way, Suite 120, Maitland, FL 32751 (Contractor)] Taylor County Board of County Commissioners is considering approval of a contract agreement with Tetra Tech for storm debris monitoring services. This contract is necessary because a former debris monitoring contractor is no longer providing services, requiring the county to move to its next choice from a previous bid process. The agreement is effective through August 31, 2027. Tetra Tech's hourly rates are provided for various positions, with specific notes on the non-utilization of Load Ticket Data Entry Clerks due to electronic ticketing. The contract is a reimbursable expense contingent on a federal declaration. Public comment is not stated in this document. [201 E. Green Street, Perry, FL 32347 (Client address); 2301 Lucien Way, Suite 120, Maitland, FL 32751 (Contractor address)] This document is a Master Services Agreement for Disaster Debris Monitoring Services between Tetra Tech, Inc. and Taylor County, Florida. It outlines the terms and conditions of the agreement, including confidentiality, data protection, and remedies for breach of contract. It also details federal provisions related to equal employment opportunity, the Davis-Bacon Act, the Contract Work Hours and Safety Standards Act, rights to inventions, Clean Air Act, Federal Water Pollution Control Act, debarment and suspension, and the Byrd Anti-Lobbying Amendment. The agreement specifies that Tetra Tech, Inc. will provide monitoring services, and Taylor County, Florida will be the client. Key personnel for communication are listed: Jonathan Burgiel for Tetra Tech, Inc. and the County Administrator for Taylor County, Florida. The document does not contain information about specific projects, locations, or dates of approval/denial, as it is a master services agreement and not a project-specific record. Taylor County Board of County Commissioners considered and recommended awarding a contract to A&R Lee Services, LLC for roadside right-of-way mowing. The contract is for approximately 1,100 acres at a rate of $36.85 per acre, for a term of 3 years with a potential 1-year renewal. The County Administrator submitted the recommendation after proposals were opened on May 19th, and A&R Lee Services was the sole bidder. [203 Forest Park Drive, Perry, FL 32348] Taylor County Board of County Commissioners considered updating the Forest Capital Hall rental packet. The update adds language regarding the duty to supervise minors and acknowledges the County's priority (emergency) use of the hall, which may lead to cancellation of existing rentals. The recommended action is to approve the updated rental packet. [Industrial Drive and Spring Warrior Road] Taylor County Board of County Commissioners is considering approval of a task work order with Locklear Consulting for plan reviews of two construction projects: Industrial Drive and Spring Warrior Road. The total fiscal impact is $4,500. Locklear Consulting was previously approved for a continuing contract with Taylor County on March 24, 2026, which is valid for up to five years. The contract covers professional engineering services including feasibility analysis, cost estimation, design, permitting, construction management, inspections, testing, and review of land development applications. The work is being performed under Florida Statutes Section 287.055. [County Road 362 (Industrial Park Drive)] Locklear & Associates, Inc. submitted a proposal to Taylor County to provide engineering design review services for the widening and resurfacing of approximately 1.2 miles of County Road 362 (Industrial Park Drive). The project is funded by a grant from the Florida Department of Transportation. Locklear will review plans and specifications prepared by GACE for completeness, constructability, and compliance with standards. The compensation for this service is not to exceed $2,000. [County Road 361A (Spring Warrior Road)] Locklear & Associates, Inc. submitted a proposal to Taylor County to provide engineering design review services for the widening and resurfacing of approximately 6.7 miles of County Road 361A (Spring Warrior Road). The project is funded by a grant from the Florida Department of Transportation. Locklear will review plans and specifications prepared by North Florida Professional Services (NFPS) at 60% and 90% design milestones for completeness, constructability, and compliance with standards. The compensation for this service is not to exceed $2,500. [case 26-04-24] Taylor County is seeking approval to sign a State-Funded Agreement No. 26-04-24 for the 2026 Spring Rural County Grant Program. The grant application was approved by the state, and the agreement outlines terms and conditions to receive monies and request reimbursement for the 2026 Spring Maintenance Grant. The fiscal impact is $53,370.87. The agreement term is from April 17, 2026, to April 16, 2028. [Doctors' Memorial Hospital, Perry, Florida] Taylor County Board of County Commissioners is seeking bids for the Doctors' Memorial Hospital (DMH) Roofing Retrofit, Hardening, and Repair Project. The project involves approximately 74,129 square feet of roof repair/replacement and 8,111 square feet of metal wall panel installation. The project is 100% grant funded by a Florida Commerce CDBG-MIT Grant. Bids are due by May 15, 2026, and will be opened on May 19, 2026. Award will be based on the lowest responsive bid. Previous experience with healthcare facilities is recommended. [Taylor County, Florida] Taylor County Board of County Commissioners is soliciting bids for mosquito control services for Taylor County. Bids are due by May 29, 2026, and will be opened on June 1, 2026. The County reserves the right to award to the bidder offering the best overall service, not necessarily the lowest price. [Taylor County] Taylor County Board of County Commissioners is considering the appointment of one member to the Taylor County Planning Board. Two applications have been received from Shannon Millinor and Frank Yelverton. The Board will consider appointing one of these candidates or re-advertising. [Taylor County] Taylor County Board of County Commissioners is considering the approval of Big Bend Transit, Inc. (BBT) as the designated Community Transportation Coordinator (CTC) for Taylor County for FY 2026-2031. BBT is the sole bidder and has served as CTC for over 28 years. The Florida Commission for the Transportation Disadvantaged requires the county to approve the Memorandum of Agreement and authorizing resolution by June 2, 2026, for a state meeting on June 11, 2026. Payments are directly reimbursed by the Florida Commission to BBT. [Taylor County; case 26-04-24] Grant award of $53,370.87 to Taylor County Board of County Commissioners for 911 System Maintenance, under the Spring 2026 Rural County Reimbursement Grant Program. Funds are from the State of Florida, Department of Management Services. The grant agreement details funding rules and must be signed and returned within 45 days of receipt. Recipients are required to comply with the Florida Single Audit Act. [McDaniel Road from Wright Road to Pisgah Road; case 445816-1-54-01] Taylor County Board of County Commissioners will consider approving Supplemental Agreement No. 3 for the McDaniel Road Widening/Resurfacing Project under the FDOT Small County Outreach Program. This agreement provides an additional $1,376,246 for the project, which involves widening and resurfacing approximately 1.3 miles of McDaniel Road from Wright Road to Pisgah Road. The project includes safety modifications, drainage improvements, and pavement markings. The original funding was insufficient for the lowest responsive bid received from Anderson Columbia Co., Inc. ($2,395,370.46). The supplemental funding, combined with remaining project funds, allows the full scope of construction to proceed. The Board will pass a Resolution authorizing the Chairperson to execute the agreement.

Board:
Board of Commissioners Meeting
Date:
2026-06-01
Type:
Agenda_packet
Decision:
Considered for approval
Address:
106 El Dorado Drive, Perry, FL 32347
Applicant:
Sadaytril Smith

Minutes

[201 E. GREEN STREET, PERRY, FLORIDA] The Taylor County Board of County Commissioners met on June 1, 2026. Key decisions included approving the agenda, recognizing Shirley Garvin for her service, approving consent items including payments for home rehabilitation for Sadaytril Smith and a grant agreement for a new safety complex, receiving bids for the Doctors’ Memorial Hospital roofing retrofit and Taylor County Mosquito Control Services, appointing Shannon Millinor to the Planning Board, approving Big Bend Transit as the Community Transportation Coordinator, discussing the nepotism policy, approving a supplemental funding agreement for the McDaniel Road widening/resurfacing project, and discussing informational items. The meeting adjourned at approximately 7:00 PM. This document details a grant agreement between the State of Florida Division of Emergency Management and Taylor County for the construction of a Public Safety Complex. The project involves constructing a Category 5 hurricane-rated structure to house Emergency Management, EMS, and Fire Rescue administrative offices, and a portion of the Sheriff's offices. It will also include a sheltering area for essential personnel and/or special needs citizens. The total state funding allocated is $6,750,000.00 for Fixed Capital Outlay. The scope of work includes architectural and engineering services, construction management, site work, and potentially fixtures, furniture, and equipment. The facility must be designed and constructed to meet stringent storm shelter standards. Taylor County Emergency Management will have rent-free use of the facility for its life. The agreement outlines reporting requirements, audit procedures, payment terms, remedies for default, and termination clauses. Specific deliverables include an initial timeline, site work drawings, and a certificate of occupancy. The project is scheduled for completion by June 30, 2028. [201 E. Green Street, Perry, FL 32347] Taylor County, Florida, entered into a Master Services Agreement with Tetra Tech, Inc. for disaster debris monitoring services. The agreement is effective from May 13, 2026, through August 31, 2027. The scope of services is detailed in Taylor County's RFP and Tetra Tech's Technical Approach. Payment is based on hourly rates plus project-related expenses. The agreement includes provisions for insurance, indemnity, and dispute resolution. Taylor County entered into a contract with A&R Lee for roadside right-of-way mowing services. The contract term is 3 years, commencing June 1, 2026, and ending May 31, 2029, with an option for a one-year renewal. The scope of work includes litter removal, weed eating, and mowing approximately 1,100 acres, 3 to 4 times per year. The contract price is $36.85 per acre. The contract requires the contractor to maintain general liability insurance of $1,000,000 and worker's compensation insurance. [case 26-04-24] The State of Florida Department of Management Services (DMS) entered into a Grant Agreement with Taylor County for upgrading 911 systems. The agreement term is two years, from April 17, 2026, to April 16, 2028. The total reimbursable amount is not to exceed $53,370.87. The payment method is cost-reimbursement or rural payment. The scope of work involves tasks to complete 911 System Maintenance in accordance with the Grantee's contract with its vendor. [case 26-04-24] Taylor County Board of County Commissioners was awarded a $53,370.87 grant from the Florida Emergency Communications Board for 911 System Maintenance. The grant, identified as CSFA #72.001 and Grant Number 26-04-24, will fund maintenance and support services for their 911 system from AK Associates and Solacom. The project aims to ensure continued operation of the wireless Phase II system, which is crucial for public safety in this rural county. The grant term begins April 16, 2026. The procurement method is listed as NONE, but a sole source justification is provided to maintain warranty agreements. [Doctors' Memorial Hospital, Perry, Florida] Taylor County is seeking bids for the Doctors' Memorial Hospital Roofing, Retrofit, Hardening, and Repair Project. The project involves repair/replacement of the existing roof membrane, insulation, flashing, structural decking, and roofing load path, totaling approximately 74,129 square feet. Additionally, it includes covering penthouses with stucco walls with a new 8,111 square foot metal panel wall system. Bids must be lump sum. Contractors can obtain bid documents from Architects Lewis + Whitlock, PA for a non-refundable $50.00. Respondents must have approval from Florida Commerce Community Development Block Grant (CDBG) MIT program staff and the Agency for Health care Administration (AHCA). Previous experience with healthcare facilities is recommended. Bids are due by 4:00 p.m. local time on May 15, 2026, at the Taylor County Clerk of Court office. Bid opening is scheduled for May 19, 2026, at 6:00 p.m. at the Taylor County Administrative Complex. [Taylor County, Florida] Taylor County is soliciting bids for mosquito control services. Bids must be submitted in a sealed envelope marked 'TAYLOR COUNTY MOSQUITO CONTROL SERVICES' to the Clerk of Court by 4:00 p.m. local time on May 29, 2026. Bids will be opened at 6:00 p.m. local time on June 1, 2026, at the Taylor County Administrative Complex. The County reserves the right to reject any or all bids and is not bound to award based on price alone. A local business preference of up to 5% may be assigned. Bid packages can be obtained from www.taylorcountygov.com. [Taylor County, Florida; case Contract# TD-2638] Taylor County Board of County Commissioners is requesting Big Bend Transit, Inc. (BBT) be selected as the Community Transportation Coordinator (CTC) for Taylor County for the period of July 1, 2026, to June 30, 2031. BBT was the only bidder and has served the county for over 28 years. The Board has authorized the Chairperson to execute the necessary agreements with the Florida Commission for the Transportation Disadvantaged. [McDaniel Road (CR359A) from Wright Road to Pisgah Road (CR361), Taylor County, Florida; case Contract No. G2656, FPN 445816-1-54-01] Taylor County Board of County Commissioners is authorizing the Chairperson to enter into Supplemental Agreement No. 3 for the McDaniel Road Widening/Resurfacing Small County Outreach Program Project. This supplemental agreement provides additional funding of $1,376,246.00 for the construction contract awarded to the lowest bidder. The project extends from Wright Road to Pisgah Road (CR361).

Board:
Board of Commissioners Meeting
Date:
2026-06-01
Type:
Minutes
Decision:
Approved agenda, proclamation, consent items, appointments, agreements, and discussed policy and informational items. Received bids for roofing and mosquito control services.
Address:
201 E. GREEN STREET, PERRY, FLORIDA
Applicant:
Taylor County

Amended Agenda

[201 E. Green Street, Perry, Florida] Taylor County Board of County Commissioners meeting on May 19, 2026, at 6:00 PM at 201 E. Green Street, Perry, Florida. Agenda includes consideration of final payments for demolition and reconstruction of homes through the HHRP program for Michael Barnes ($75,916.80), Sharon Phelps ($92,506.00), Kristina and Robert Hugger ($93,579.00), and Randolph Copeland ($64,396.80). Also includes consideration of Change Order #1 for rehabilitation of Sadaytril Smith's home ($3,425.00) through the HHRP SHIP program. The Board will review and consider approval of the 2026 Airport Improvement Program Grant Application and the 2026 Airport Infrastructure Grant Application for the taxiway realignment project at Perry Foley Airport. Consideration of award for the Taxiway Realignment Project to Anderson Columbia ($1,731,830.03) is contingent on FAA funding. Other items include award of the McDaniel Road Widening/Resurfacing Project, award of the 13th and Central USACE Floodplain Mitigation Project, review of Big Bend Healthcare Coalition Project submissions, approval of funds for courthouse parking lot improvements ($11,308.00), budget transfer for signage at Hodges Park and Glenn Ratliff Memorial Sports Complex ($10,800), adoption of resolutions for unanticipated and shortfall of monies in various funds, bids for roadside right-of-way mowing, discussion of building permit #30830 for Anthony Wilson at 145 Cedar Island Road, quarterly update from Taylor County Development Authority Director Bob Cate, discussion of speed humps at the end of CR-14, and discussion of solid waste operations. Grant agreements for taxiway realignment phase 2 and a new hangar at Perry-Foley Airport will be reviewed. Cold weather warming center guidelines and budget will be considered. A draft settlement agreement with Ponchos Cantina and Grill and a draft interlocal agreement for distribution of local option gas tax with the City of Perry will be considered.

Board:
Board of Commissioners Meeting
Date:
2026-05-19
Type:
Agenda
Address:
201 E. Green Street, Perry, Florida

Amended Agenda Packet

[201 E. GREEN STREET (Administrative Complex), 212 Tippett Drive (Michael Barnes), 17886 Phelps Road (Sharon Phelps), 306 Folsom Place (Kristina and Robert Hugger), 203 Ivy Avenue (Randolph Copeland), Perry Foley Airport] The Taylor County Board of County Commissioners will consider final payments for several home demolition and reconstruction projects funded through the HHRP program. These include projects for Michael Barnes ($75,916.80), Sharon Phelps ($92,506.00), Kristina and Robert Hugger ($93,579.00), and Randolph Copeland ($64,396.80). A change order for $3,425.00 for Sadaytril Smith's home rehabilitation is also on the agenda. Additionally, the board will review and consider approval of grant applications to the FAA for the Taxiway Realignment Project at Perry Foley Airport, including a $1,334,048.53 application for the Airport Improvement Program and a separate grant agreement for Phase 2 of the project. A new hangar construction grant application is also being considered. The board will also consider awarding the McDaniel Road Widening/Resurfacing Project and the 13th and Central USACE Floodplain Mitigation Project. Other items include final payment approval for the Courthouse parking lot improvements ($11,308.00), installation of signs at Hodges Park and Glenn Ratliff Memorial Sports Complex ($10,800), and adoption of resolutions for budget adjustments. Bids for roadside right-of-way mowing will be received. Ray Curtis will discuss building permit #30830 for Anthony Wilson at 145 Cedar Island Road. Bob Cate will provide a quarterly update. The board will discuss speed humps at the end of CR-14 and solid waste operations. [Perry Foley Airport] This document outlines the administrative and certification requirements for airport improvement projects funded by the Federal Aviation Administration (FAA). It details procedures for grant applications, budget information, indirect costs, lobbying certifications, and representations regarding land use, defaults, disabilities, consistency with local plans, consideration of local interests, consultation with users, public hearings, air and water quality, exclusive rights, and land acquisition. It also specifies budget categories for various project expenses, including administration, preliminary expenses, land acquisition, architectural and engineering fees, inspection, land development, relocation, demolition, construction, equipment, and miscellaneous items. The document includes sections on exclusions from federal participation and the proposed method of financing the non-federal share. Furthermore, it requires a program narrative statement detailing objectives, benefits, approach, geographic location, and sponsor's representative. A bid tabulation for Taxiway Realignments at Perry Foley Airport, opened on April 21, 2026, shows bids from Anderson Columbia Co., Inc., Curt's Construction, Inc., and C.W. Roberts Contracting, Inc., with estimated costs ranging from $1,127,550.00 to $2,363,845.75. A Task Order for Bid and Construction Phase Services for these Taxiway Realignments was issued to AVCON, Inc. for $99,800.00, covering bid phase services and construction administration. The document also includes certifications related to drug-free workplaces and equipment and construction contracts, emphasizing compliance with federal procurement standards and labor laws. [Perry Foley Airport] Taylor County Board of County Commissioners is seeking approval for a 2026 Airport Infrastructure Grant application to the FAA for $406,000 to fund the Taxiway Realignment Project at Perry Foley Airport. The total project cost is $427,868.42, with $17,094.74 in FDOT grant funding already secured. An additional $4,273.68 is needed. The realignment is required to comply with current FAA standards and regulations. [Perry Foley Airport, Perry, Florida] Project involves taxiway realignments at Perry Foley Airport in Perry, Florida. The project is for construction only and is part of the Airport Improvement Program. Key dates include bid opening on April 17, 2026, and bid tabulation/recommendation of award on April 29, 2026. The estimated total project cost is $2,363,845.75. AVCON, Inc. is providing bid and construction phase services for a fee of $99,800.00. Taylor County Board of County Commissioners is the sponsor. [Perry Foley Airport] Taylor County Board of County Commissioners is considering awarding the Taxiway Realignments Project at Perry Foley Airport to Anderson Columbia Co., Inc. for $1,731,830.03. This award is contingent on obtaining additional FAA funding. Three bids were received, and Anderson Columbia was the low bidder. The project includes base bid and additive alternate number 1. [McDaniel Road from Wright Road at its South end to Pisgah Road at its North end] Taylor County Board of County Commissioners is considering awarding the McDaniel Road Widening/Resurfacing Project to Anderson Columbia Co., Inc. for $2,395,370.46. This project is part of the FDOT Small County Outreach Program and involves widening and resurfacing approximately 1.3 miles of McDaniel Road. The award is contingent on funding availability, with potential state and local funding sources being explored. Four proposals were received, and Anderson Columbia was the apparent lowest responsive bidder. [13th and Central area, Steinhatchee Community; case 2024-005-OEC] Taylor County Board of County Commissioners is considering awarding the 13th and Central USACE Floodplain Mitigation Project to Anderson Columbia Co., Inc. for $2,157,229.33. This project aims to address flooding in the Steinhatchee Community using American Rescue Plan Act funding and involves drainage improvements and roadway reconstruction. The award is contingent on funding availability. Two proposals were received, and Anderson Columbia was the apparent lowest responsive bidder. [13th and Central area] The Taylor County Board of County Commissioners is considering awarding the 13th and Central USACE Floodplain Mitigation Project to Anderson Columbia Co., Inc. as the apparent lowest responsive bidder for $2,157,229.33. The project involves drainage improvements and roadway reconstruction to lessen flooding severity. Funding of $2,026,848 is available from ARPA Funding for Fiscal Year 2026/27. Bids were opened on April 21, 2026. The meeting date requested for the decision is May 19, 2026. Taylor County Emergency Management is seeking approval for four grant applications for the 2026-2027 Big Bend Healthcare Coalition Projects. The projects include a large messaging sign board, a large-scale mass casualty event preparedness initiative, a teen CERT program, and a health fair expo in multiple locations. The recommended action is to approve these submissions. These are reimbursement grants with no direct fiscal impact or match required. [Courthouse Parking Lot] The Taylor County Board of County Commissioners is considering approving $11,308.00 from the Court Facilities Fund for cleaning, sealing, replacing parking bumpers, and re-striping the Courthouse parking lot. Young Striping and Sealing provided an invoice for this work. The meeting date requested for the decision is May 19, 2026. [Hodges Park and Glenn Ratliff Taylor County Sports Complex] The Taylor County Board of County Commissioners is considering approval of a budget transfer from the General Fund-Contingency for the installation of a sign at Hodges Park and to replace the dedication sign at Glenn Ratliff Taylor County Sports Complex. The combined cost for both signs is $10,800. The sign at Hodges Park is a replacement for one destroyed by Hurricane Helene. The meeting date requested for the decision is May 19, 2026. [Plantation Road from SR-55(US19) to SR-20(US27); case G3K65 (Contract No.)] The Taylor County Board of County Commissioners is considering adopting resolutions to reflect unanticipated monies in various funds, including the SCOP Road Project (Plantation Road). The resolution for the SCOP Road Project Fund for the fiscal year ending September 30, 2026, includes adding $2,505,889 for SCOP Grant Revenue, $340,000 for Professional Services, $2,165,589 for Contractual Services, and $300 for Legal Advertising. A State-Funded Grant Agreement with the Florida Department of Transportation for the SCOP Road Project (Plantation Rd from SR-55(US19) to SR-20(US27)) has a term commencing upon execution and completion by 12/07/2028. The estimated project cost is $2,505,889.00, with the Department participating up to this amount. [case FWC Agreement #25017 (Monitoring), FWC Agreement #25016 (Construction)] The Taylor County Board of County Commissioners is considering adopting resolutions to reflect unanticipated monies in various funds, including the General Fund for the FWC Artificial Reef Monitoring and Construction Grants for the fiscal year ending September 30, 2026. The Artificial Reef Monitoring Grant is for $16,000, and the Artificial Reef Construction Grant is for $60,000. These are part of the Florida Artificial Reef Program. The FWC Agreement #25017 is for monitoring, and FWC Agreement #25016 is for construction. [Perry Foley Airport; case 3-12-0064-023-2025 (FAA AIP Project No.)] The Taylor County Board of County Commissioners is considering adopting resolutions to reflect unanticipated monies in the Airport Fund for FY26. This includes $34,500 for Airport Lease - land, designated for Airport Ops - Capital/Equipment, and $91,922 for FAA/Taxi Realign Design, designated for Contractual Services. An invoice for rental/leased space for 4,000 linear feet of inactive runway space and an access road from April 2025 to April 2026 was for $34,500. The meeting date requested for the decision is May 19, 2026. [case HM 25-10 (Contract #)] The Taylor County Board of County Commissioners is considering adopting resolutions to reflect unanticipated monies in the General Fund for the Volunteer Florida Grant (EM) in the amount of $200,000 for the fiscal year ending September 30, 2026. The grant is for Hurricane Helene and/or Hurricane Milton Recovery, with a contract total of $200,000 and a Grantee Share Total of $107,626. The grant period is December 1, 2025, to November 30, 2026. The budget transfer includes allocations for Salaries/Wages ($8,264), FICA/MED ($750), Petroleum Products ($6,000), Contractual Services ($121,986), Materials ($48,000), and Equipment <$5,000 ($15,000). Taylor County Board of County Commissioners approved budget amendments on May 19, 2026, for various funds. This includes an increase of $90,020 for the 911/PSAP Upgrade Project, an increase of $115,175 for the 911 Rural County Maintenance (Fall) Grant, and an allocation of $2,500 for the Spring Warrior Boat Ramp, including $1,000 for contractual services. Additionally, $5,000 was allocated for the FOOT Vault Generator System, $95,228 for the FDOT AVGAS Fuel Farm Project, and $50,000 for RIF/DOC Stein Coast Park Planning. A significant appropriation of $698,130 for Rehabilitation and $26,308 for Demolition/Construction related to SHIP Disaster - Idalia was approved. The Affordable Housing Fund received $100,000 cash brought forward, with $90,000 for Rehabilitation and $10,000 for Homebuyers Assistance. The Affordable Housing Fund (2022-2023 Grant) received $60,000 cash brought forward for Demolition/Construction. The General Fund budget was amended for Canal Dredging/SA Idalia with $83,533 cash brought forward for Capital/Infrastructure. The Restore Act/Stein BR Bypass and Hodges Pk Rehab received $115,009 for Contractual Services. The DOT/1st Ave & CR 361 Sidewalk Fund received $417,754 in LAP Grant Revenue, with $248,083 allocated for Contractual Services. The MSTU Fund received $7,392 for R&M - Auto. Budget shortfalls were noted for the CDBG Grant Fund ($83,787), Airport Fund ($38,400 for Taxiway design/construction), and General Fund. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, adding $90,020 to the GENERAL FUND for the 911/PSAP Upgrade Project, with $90,020 allocated to Capital Outlay - Equipment. The agreement period is from execution or September 15, 2025, whichever is later, to June 30, 2026, with a maximum reimbursement of $90,019.80. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, adding $115,175 to the GENERAL FUND for the 911 Rural County Maintenance (Fall) Grant, with $115,175 allocated to Capital Outlay - Equipment. The grant is for the fiscal year ending September 30, 2026. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, allocating $2,500 to the Spring Warrior Boat Ramp. This includes $1,000 for Contractual Services, $500 for R&M Building & Grounds, $500 for General Operating Supplies, and $500 for Signs/Materials. This is for the fiscal year ending September 30, 2026. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, allocating $5,000 to the Airport Fund for the FOOT Vault Generator System, specifically for Contractual Services. This is for the fiscal year ending September 30, 2026. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, allocating $95,228 to the Airport Fund for the FDOT AVGAS Fuel Farm Project, specifically for Capital/Infrastructure. This is for the fiscal year ending September 30, 2026. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, allocating $50,000 to the GENERAL FUND for RIF/DOC Stein Coast Park Planning. This includes $50,000 for Contractual Services. This is for the fiscal year ending September 30, 2026. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, for SHIP Disaster - Idalia within the GENERAL FUND. This includes $698,130 for Rehabilitation and $26,308 for Demolition/Construction. The total amended budget for this item is $2,069,650. This is for the fiscal year ending September 30, 2026. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, for the Affordable Housing Fund (2023-2024 Grant). This includes $100,000 cash brought forward, with $90,000 allocated for Rehabilitation and $10,000 for Homebuyers Assistance. This is for the fiscal year ending September 30, 2026. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, for the Affordable Housing Fund (2022-2023 Grant). This includes $60,000 cash brought forward, allocated for Demolition/Construction. This is for the fiscal year ending September 30, 2026. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, for Canal Dredging/SA Idalia within the GENERAL FUND. This includes $83,533 cash brought forward for Capital/Infrastructure. This is for the fiscal year ending September 30, 2026. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, for the Restore Act/Stein BR Bypass and Hodges Park Rehab within the GENERAL FUND. This includes $115,009 for Contractual Services. This is for the fiscal year ending September 30, 2026. [1st Avenue South & CR361; case FPN 435683-3-58-01] Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, for the DOT/1st Ave & CR 361 Sidewalk Fund. This includes $417,754 in LAP Grant Revenue, with $248,083 allocated for Contractual Services. This is for the fiscal year ending September 30, 2026. A supplemental agreement (Supplemental No. 3, Contract No. G2V95) was executed on May 23, 2025, adding $248,083 for construction to the 1st Avenue South & CR361 Sidewalk project, which is 0.411 miles long. The total project cost is $875,377. [8999 US 19] Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, for the MSTU Fund, allocating $7,392 for R&M - Auto. This amendment reflects reimbursement received by the BCC for Taylor County Fire Rescue staffing provided at the Iron Horse Mud Ranch from October 9-11, 2025. This is for the fiscal year ending September 30, 2026. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, to address a shortfall in the CDBG Grant Fund, reducing the budget by $83,787. This reduction impacts Demolition/Construction. This is for the fiscal year ending September 30, 2026. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, to address a shortfall in the Airport Fund, reducing the budget by $38,400 for FOOT Design/Constr Taxiway, specifically for Capital/Infrastructure. This is for the fiscal year ending September 30, 2026. [108 North Jefferson Street, Suite 102, or P.O. Box 620, Perry, Florida 32348 (for bid submission); 201 East Green Street, Perry, Florida 32347 (for bid opening); case PO# 20261071] Taylor County is soliciting sealed bids for roadside right-of-way mowing. Bids are due by 4:00 PM on May 19, 2026, and will be opened at 6:05 PM on the same date. Bid documents can be obtained from the Clerk of Court. The County reserves the right to reject any or all bids. [Perry, Taylor County, Florida] Taylor County Board of Commissioners approved budget changes to amend the General Fund budget for the fiscal period ending September 30, 2026. The changes reflect a shortfall of monies for a particular purpose. The resolution was approved on May 19, 2026. [Perry-Foley Airport; case FDOT Grant Agreement #443552-3-94-26] Taylor County Board of County Commissioners will discuss the Florida Department of Transportation Grant Agreement #443552-3-94-26 and a resolution for the design and construction of the Taxiway Realignment Phase 2 Project at Perry-Foley Airport. The total estimated project cost is $6,250,000, with FDOT funding a maximum of $500,000 or 8% of the total project cost. The FAA requires airports to conform to a standard taxiway alignment system, and Perry-Foley Airport's taxiways are not in compliance with current FAA standards. [Perry-Foley Airport; case PFL0014389] This document is a Public Transportation Grant Agreement between the State of Florida Department of Transportation and Taylor County for the PERRY-FOLEY APT DESIGN & CONSTRUCT TAXIWAY REALIGNMENT PH2 project. The project involves design and construction for taxiway realignment, including various components such as excavation, paving, airfield lighting, signage, and drainage. The total financial assistance awarded is $6,250,000.00, with $5,625,000.00 from FAA funds, $500,000.00 from DPTO funds, and $125,000.00 from LF funds. The agreement outlines extensive terms and conditions for design, construction, insurance, indemnification, environmental compliance, and project management. Key requirements for contractors include being prequalified by the Department for work on state right-of-way, providing payment and performance bonds, and adhering to specific design and construction standards. Construction Engineering Inspection (CEI) services must be provided by a Department-prequalified consultant, separate from the design firm. The agreement specifies insurance requirements, including Commercial General Liability with limits of $1,000,000 per occurrence and $5,000,000 annual aggregate, and potentially Railroad Protective Liability Coverage if applicable. The Agency is responsible for all environmental compliance and obtaining necessary permits. The project must begin expenditures within one year of the agreement date, with potential for a one-year extension. No public comment is mentioned in this section. [Perry-Foley Airport; case 446364-1-94-26] Taylor County Board of County Commissioners is seeking approval for a Public Transportation Grant Agreement with the Florida Department of Transportation (FDOT) for the design and construction of a new hangar at Perry-Foley Airport. The project has an estimated total cost of $1,000,000, with FDOT providing a maximum of $500,000 (50% of the total project cost). The county is responsible for the remaining 50% match, which they are seeking through other grant funding sources due to fiscal constraints. FAA does not provide funding for hangars. The agreement is for the period through June 30, 2029. [Perry-Foley Airport/Perry, FL; case PFL0015721] This document is a Public Transportation Grant Agreement between the State of Florida Department of Transportation and Taylor County for the Design & Construction of a New Hangar at Perry-Foley Airport. The total financial assistance is $1,000,000.00, with $500,000.00 from the State and $500,000.00 in local matching funds. The project scope includes consultant and design fees, survey, geotechnical costs, permitting, construction inspection, material testing, mobilization, maintenance of traffic, erosion control, demolition, pavement work, drainage, utilities, power supplies, building construction (foundation, structure, roof, MEP, drainage, fire prevention), pavement marking, lighting, signage, fencing, landscaping, and security systems. The agreement outlines various terms and conditions related to construction standards, approvals, insurance, indemnification, and compliance with state and federal regulations. It specifies that the Agency (Taylor County) is responsible for hiring qualified consultants and contractors, obtaining necessary permits, and ensuring compliance with all applicable standards and laws. The Department of Transportation will issue a Notice to Proceed for the construction phase. The agreement also details requirements for payment and performance bonds, construction engineering inspection (CEI) services, and the submission of as-built plans and certifications upon completion. Specific clauses address work on the Department's right-of-way, environmental regulations, and hazard removal. The agreement is governed by Florida law, and the Department determines the forum and venue for disputes. The agreement was executed by James M. Knight, P.E., Urban Planning and Modal Administrator for the Department of Transportation, and representatives for Taylor County. This document pertains to a Grant Agreement between the State of Florida Department of Transportation and an unnamed Agency for aviation-related projects. It outlines numerous assurances and conditions the Agency must adhere to, covering areas such as airport zoning, consistency with local plans and airport master plans, financial planning, revenue expenditure, fee structures, public-private partnerships, economic nondiscrimination, air and water quality, operations and maintenance, federal funding eligibility, project implementation timelines, exclusive rights, airfield access, retention of rights and interests, consultant/contractor selection, planning projects, land acquisition, construction projects, and noise mitigation. It also includes program-specific terms for reporting on health care choices, geoengineering, weather modification, and energy policy goals. Additionally, it details contract payment requirements and audit requirements for state financial assistance. [203 Forest Park Dr, Perry, FL 32348; 1013 Riverside Dr, Steinhatchee, FL 32359] Taylor County Board of County Commissioners will consider approving guidelines and a budget for a Cold Weather Warming Center. The center will activate when temperatures drop to 27 degrees Fahrenheit or lower for 4 or more consecutive hours, factoring in wind chill. The primary location is Forest Capital Hall at 203 Forest Park Dr, Perry, FL 32348, with a secondary location in Steinhatchee Community at 1013 Riverside Dr, Steinhatchee, FL 32359. The budget is approximately $30,750 per site, covering deputy pay, county worker pay, background checks, supplies, and meals/snacks. Operations require a deputy and at least one county employee, with volunteers assisting. The center will operate from 6:30 PM with a registration window, closing by 8:30 AM the next morning unless extreme temperatures persist. No pets are allowed, except for service animals. [21239 Keaton Beach Drive, Keaton Beach, Taylor County, Florida] Taylor County Board of County Commissioners will consider approving a draft settlement agreement between the County and Ponchos Cantina & Grille, LLC, Ponchos 76, LLC, and Luis Alfonso Bautista Pulido. The agreement resolves disputes concerning permitting, construction, and operation of a business at 21239 Keaton Beach Drive, Keaton Beach, Taylor County, Florida. The County grants a variance for a setback encroachment of a pole barn structure and a floodplain management variance for restroom facilities to remain at ground level below the base flood elevation, subject to specific construction guidelines. Ponchos must submit engineered plans for floodplain compliance within 60 days and complete construction within 120 days of approval, or elevate/remove the restrooms. The agreement also addresses parking and food truck operations, acknowledging state preemption of certain regulations, and alcohol regulation, confirming the County's limited authority. Ponchos' engineer must certify the structure's design and construction compliance within 60 days. Upon approval of structural certification, Ponchos can commence business operations, including food, beverage, and alcohol service, subject to state law and ABT licensing. Both parties release claims against each other related to the disputes, contingent on the fulfillment of specified conditions within 180 days. [21239 Keaton Beach Drive] This document details a settlement agreement related to Poncho's Cantina & Grille, LLC and Ponchos 76, LLC, including exhibits for an 8COP license, ABT form, and a business operations plan for a property at 21239 Keaton Beach Drive, Keaton Beach, Taylor County, Florida. The business operations plan outlines a site layout with a pole barn, coffee truck, food truck, bar truck, outdoor seating, and restroom facilities. Separately, the Taylor County Board of County Commissioners is considering an Interlocal Agreement with the City of Perry for the distribution of local option gas tax proceeds. The agreement, effective January 1, 2027, and terminating December 31, 2031, allocates 70% of the tax proceeds to Taylor County and 30% to the City of Perry. The Board is recommended to approve this agreement on May 19, 2026. The document also provides general information on Florida's local option fuel tax ordinances and interlocal agreements.

Board:
Board of Commissioners Meeting
Date:
2026-05-19
Type:
Agenda_packet
Decision:
Consideration for approval of final payments, change order, grant applications, project awards, budget transfers, resolutions, and bid reception.
Address:
201 E. GREEN STREET (Administrative Complex), 212 Tippett Drive (Michael Barnes), 17886 Phelps Road (Sharon Phelps), 306 Folsom Place (Kristina and Robert Hugger), 203 Ivy Avenue (Randolph Copeland), Perry Foley Airport
Applicant:
Taylor County Board of County Commissioners, Michael Barnes, Sharon Phelps, Kristina and Robert Hugger, Randolph Copeland, Sadaytril Smith, Anderson Columbia, Jerry Walters Construction, Inc., JG Parker Enterprises, Inc.

Minutes

[106 El Dorado Drive, Perry, FL 32347 (Sadaytril Smith's home)] Taylor County Board of County Commissioners approved final payments for demolition and reconstruction of homes through the HHRP Program. Projects include Michael Barnes ($75,916.80), Sharon Phelps ($92,506.00), Kristina and Robert Hugger ($93,579.00), and Randolph Copeland ($64,396.80). A change order for rehabilitation of Sadaytril Smith's home was approved for $3,425.00. The board also approved the 2026 Airport Improvement Program and Airport Infrastructure Grant applications for the taxiway realignment project at Perry Foley Airport and recommended awarding the project to Anderson Columbia for $1,731,830.03, contingent on FAA funding. The McDaniel Road widening/resurfacing project and the 13th and Central USACE floodplain mitigation project were considered for award. Final payment for the courthouse parking lot cleaning, sealing, and restriping was approved for $11,308.00. Budget transfers for signs at Hodges Park and Glenn Ratliff Memorial Sports Complex were considered. Resolutions for unanticipated and shortfall monies in various funds were adopted. Bids for roadside right-of-way mowing were received. A public request regarding building permit #30830 was tabled. A quarterly update from the Taylor County Development Authority was provided. The board discussed recognition of service for Shirley Garvin and appointed three individuals to the Doctor Memorial Hospital Board of Directors. A request for speed humps at the end of CR-14 was discussed. Solid waste operations were discussed due to a full roll-off site. The board approved grant agreements and resolutions for the taxiway realignment phase 2 project and a new hangar at Perry-Foley Airport. A draft settlement agreement with Ponchos Cantina and Grill was approved. A draft interlocal agreement for the distribution of the 6-cent local option gas tax with the City of Perry was approved. [Perry Foley Airport, Perry, Florida] Taylor County Board of County Commissioners is seeking federal assistance for taxiway realignments at the Perry Foley Airport in Perry, Florida. The project is estimated to cost $1,404,261.61, with $1,334,048.53 in federal funding requested. The proposed project start date is July 1, 2026, and the end date is November 30, 2026. The application is for construction only. [108 Industrial Park Drive, Perry, FL 32347] Taylor County Board of County Commissioners is undertaking taxiway realignments at Perry Foley Airport, located at 108 Industrial Park Drive, Perry, FL 32347. The project involves removal of asphalt and base, grading, drainage, new base and asphalt, pavement markings, taxiway edge lighting, sodding, erosion control, and maintenance of traffic. The total project cost is estimated at $1,404,262, with $1,334,049 requested as Federal Share. The project will be publicly advertised and awarded to the lowest responsive bidder. AVCON, Inc. is providing bid and construction phase services for a fee of $99,800. A geotechnical subconsultant will provide material acceptance testing for $12,000, and a surveyor will provide an as-built survey for $8,000. The construction duration is estimated at 150 days to substantial completion and 180 days to final completion. [Perry Foley Airport] Taylor County Board of County Commissioners is applying for $406,000.00 in Airport Improvement Program (AIP) funds for Taxiway Realignments - Construction Only at Perry Foley Airport. The project is scheduled to start on July 1, 2026, and end on November 30, 2026. The application includes certifications regarding conflicts of interest and lobbying. No public comment is mentioned in this document. [108 Industrial Park Drive, Perry, FL 32347] This document outlines the application and approval process for federal assistance for airport improvement projects, specifically focusing on the Taxiway Realignments project at Perry Foley Airport. It details the project schedule, budget, and certifications required by the sponsor, Taylor County. The project involves the removal of asphalt and base, grading, drainage, installation of new base and asphalt, pavement markings, taxiway edge lighting, sodding, erosion control, and traffic maintenance. The total project cost is estimated at $427,368, with $406,000 in Federal Share requested and $21,368 in other shares. AVCON, Inc. is providing bid and construction phase services for a fee of $99,800, which includes subconsultant services for material testing and surveying. The project is scheduled for bid advertisement on March 18, 2026, bid opening on April 17, 2026, and award recommendation on April 29, 2026. Construction completion is estimated to be 180 days following the Notice to Proceed. [Perry Foley Airport] Taylor County Board of County Commissioners is seeking to undertake taxiway realignments at Perry Foley Airport. This project is part of the Airport Improvement Program (AIP). The project involves construction only. The sponsor has certified compliance with federal standards for project plans, specifications, procurement, and conflict of interest. Key dates and specific project numbers are not stated. [1st Avenue South & CR 361; case FPN 435683-3-58-01] Taylor County Board of County Commissioners is amending the budget for the DOT/1st Ave & CR 361 Sidewalk Fund for the fiscal year ending September 30, 2026. This amendment includes additional funding of $417,754 for LAP Grant Revenue and $412,534 for Contractual Services. The project involves the construction of a sidewalk on 1st Avenue South & CR 361, spanning 0.411 miles. A supplemental agreement #3 was executed on May 23, 2025, for this project, adding $248,083 in funding. The project is identified as FPN 435683-3-58-01. Taylor County Board of County Commissioners is amending the General Fund budget for the fiscal year ending September 30, 2026, to reflect unanticipated monies for the Restore Act/Stein BR Bypass project. This amendment includes $115,009 in revenue and $115,009 for Contractual Services. The project is related to Restore Act/Hodges Pk Rehab. Taylor County Board of County Commissioners is amending the General Fund budget for the fiscal year ending September 30, 2026, to reflect unanticipated monies for Canal Dredging/SA Idalia. This amendment includes $83,533 in revenue and $83,533 for Capital/Infrastructure and Rehabilitation. The project involves canal dredging. Taylor County Board of County Commissioners is amending the Affordable Housing Fund (2022-2023 Grant) budget for the fiscal year ending September 30, 2026. This amendment includes $60,000 in revenue and $60,000 for Demolition/Construction. The project is related to the SHIP Grant. Taylor County Board of County Commissioners is amending the Affordable Housing Fund (2023-2024 Grant) budget for the fiscal year ending September 30, 2026. This amendment includes $100,000 in revenue and $90,000 for Rehabilitation and $10,000 for Homebuyers Assistance. The project is related to the SHIP Grant. Taylor County Board of County Commissioners is amending the General Fund budget for the fiscal year ending September 30, 2026, for the SHIP Disaster - Idalia project. This amendment includes $724,438 in revenue and $698,130 for Rehabilitation and $26,308 for Demolition/Construction. The project is related to SHIP Disaster - Idalia. [Stein Coast Park] Taylor County Board of County Commissioners is amending the General Fund budget for the fiscal year ending September 30, 2026, for the RIF/DOC Stein Coast Pk Planning project. This amendment includes $50,000 in revenue and $50,000 for Contractual Services. The project is related to RIF/DOC Stein Coast Pk Planning. Taylor County Board of County Commissioners is amending the Airport Fund budget for the fiscal year ending September 30, 2026, for the FDOT AVGAS Fuel Farm Project. This amendment includes $95,228 for Capital/Infrastructure. The project is related to the FDOT AVGAS Fuel Farm Project. Taylor County Board of Commissioners approved budget amendments for the fiscal period ending September 30, 2026. These amendments involve adjustments to various funds, including the Airport Fund, General Fund, and CDBG Grant Fund, reflecting unanticipated monies or shortfalls for specific purposes. Specific projects include FDOT-AVGAS Fuel Farm improvements, FDOT-Vault Generator System, Spring Warrior Boat Ramp, 911/PSAP Upgrade Project, FAA/Taxi Realign Design, Airport Lease, FWC Artificial Reef Construction and Monitoring Grants, SCOP Road Project Plantation Road, and CDBG Housing Demolition/Construction. The total budget adjustments across these funds are not explicitly aggregated into a single figure but are detailed within their respective accounts. Taylor County Board of Commissioners approved a resolution to amend the budget for the fiscal period ending September 30, 2026, to include $5,000 for the FOOT Vault Generator System and $5,000 for Contractual Services related to it. This amendment affects the Airport Fund. Taylor County Board of Commissioners approved a resolution to amend the budget for the fiscal period ending September 30, 2026, to transfer funds for the Spring Warrior Boat Ramp project. This includes $2,500 for Contractual Services, $500 for R&M Bldg & Grounds, $500 for Gen Oper. Supplies, and $500 for Signs/Materials. This amendment affects the General Fund. Taylor County Board of Commissioners approved a resolution to amend the budget for the fiscal period ending September 30, 2026, to include $115,175 for the 911 Rural County Maintenance (Fall) Grant, specifically for Capital Outlay - Equipment. This amendment affects the General Fund. Taylor County Board of Commissioners approved a resolution to amend the budget for the fiscal period ending September 30, 2026, to include $90,020 for the 911/PSAP Upgrade Project, specifically for Capital Outlay - Equipment. This amendment affects the General Fund. Taylor County Board of Commissioners approved a resolution to amend the budget for the fiscal period ending September 30, 2026, to include $91,922 for FAA/Taxi Realign Design, specifically for Contractual Services. This amendment affects the Airport Fund. Taylor County Board of Commissioners approved a resolution to amend the budget for the fiscal period ending September 30, 2026, to include $200,000 for the Volunteer Florida Grant (EM), $8,264 for Salaries/Wages, $750 for FICA/MED, $6,000 for Petroleum Products, $121,986 for Contractual Services, $48,000 for Materials, and $15,000 for Equipment <$5,000. This amendment affects the General Fund. Taylor County Board of Commissioners approved a resolution to amend the budget for the fiscal period ending September 30, 2026, to include $34,500 for Airport Lease - land and $34,500 for Airport Ops - Capital/Equipment. This amendment affects the Airport Fund. Taylor County Board of Commissioners approved a resolution to amend the budget for the fiscal period ending September 30, 2026, to include $60,000 for FWC Artificial Reef Construction Grant, specifically for Contractual Services. This amendment affects the General Fund. Taylor County Board of Commissioners approved a resolution to amend the budget for the fiscal period ending September 30, 2026, to include $16,000 for FWC Artificial Reef Monitoring Grant, specifically for Contractual Services. This amendment affects the General Fund. [Plantation Rd from SR-55(US 19) to SR-20(US27)] Taylor County Board of Commissioners approved a resolution to amend the budget for the fiscal period ending September 30, 2026, for the SCOP Road Project Plantation Road. This includes $2,505,889 for SCOP Grant - Revenue, $340,000 for Professional Services, $2,165,589 for Contractual Services, and $300 for Legal Advertising. The project involves design, construction, and CEI for widening/resurfacing Plantation Road from SR-55 (US 19) to SR-20 (US 27). The total estimated project cost is $2,505,889.00. Taylor County Board of Commissioners approved a resolution to amend the budget for the fiscal period ending September 30, 2026, to reduce the CDBG Grant Fund budget by $83,787 for Housing Demolition/Construction. This amendment affects the CDBG Grant Fund. [case PO# 20261071] Taylor County Board of Commissioners is soliciting sealed bids for Roadside Right-of-Way Mowing. Qualified firms or individuals must submit bids by May 19, 2026, to the Clerk of Court. Bids will be opened on May 19, 2026. Bid documents can be obtained from the Clerk of Court. The County reserves the right to reject any or all bids and is not bound to award based on the lowest price. A local business preference of five percent may be assigned. [Perry Foley Airport; case Financial Management Project No: 443552-3-94-26] Taylor County Board of County Commissioners and the State of Florida Department of Transportation (FDOT) have entered into a Public Transportation Grant Agreement for the Perry Foley Airport Taxiway Realignment Project Phase 2. The project has an estimated cost of $6,250,000, with FDOT contributing a maximum of $500,000 (8% of eligible costs). The agreement covers the design and construction of the taxiway realignment. The term of the agreement is from the effective date through March 31, 2029. The document outlines detailed terms and conditions for financial assistance, project responsibilities, payment, auditing, and contract requirements. [Perry-Foley Airport; case PFL0014389] This document outlines the terms and conditions of a Public Transportation Grant Agreement between the State of Florida Department of Transportation and an unnamed Agency. It details requirements for contractors and subcontractors, including prohibitions on using discriminatory vendors, ensuring contractor responsibility, and prohibiting lobbying with grant funds. It also mandates the use of E-Verify for employment eligibility verification. A specific project is described: PERRY-FOLEY APT DESIGN & CONSTRUCT TAXIWAY REALIGNMENT PH2, located at Perry-Foley Airport in Perry, Florida. The project scope includes various construction elements for taxiway rehabilitation/reconstruction, such as excavation, pavement work, lighting systems, signage, and drainage. The total financial assistance for this project is $6,250,000.00, comprising $500,000.00 in State funds, $125,000.00 in Local funds, and $5,625,000.00 in Federal funds. The agreement specifies requirements for design and construction, including the need for a Notice to Proceed before construction begins, contractor prequalification, and the provision of Construction Engineering Inspection (CEI) services by a Department-prequalified consultant. It also details insurance requirements, indemnification clauses, and environmental compliance responsibilities. The Agency is responsible for obtaining permits and ensuring compliance with various federal, state, and local regulations, as well as Department standards. [Perry Foley Airport; case 446364-J-94-26] Taylor County Board of County Commissioners and the State of Florida Department of Transportation (FDOT) have formalized an agreement for the Design & Construction of a New Hangar at Perry Foley Airport. The project has an estimated cost of $1,000,000, with FDOT funding a maximum of $500,000 (50% of eligible costs). The agreement is for the period from the Effective Date through June 30, 2029. The project involves aviation grant program funding. [Perry-Foley Airport; case PFL0015721] This document is a Public Transportation Grant Agreement between the State of Florida Department of Transportation and an Agency for the Design & Construction of a New Hangar (PFL0015721) at Perry-Foley Airport in Perry, FL. The total financial assistance awarded is $1,000,000.00, with $500,000.00 allocated for Environmental/Design/Construction phases. The agreement outlines various terms and conditions, including audit requirements, restrictions on convicted or discriminatory vendors, prohibitions on lobbying with funds, and requirements for E-Verify employment eligibility checks. It also details indemnification, insurance requirements, and specific terms for construction, including design standards, right-of-way usage, and inspection services. The Agency is responsible for compliance with all applicable laws and regulations, including environmental and safety standards. The project scope includes consultant and design fees, survey, permitting, construction inspection, demolition, pavement, drainage, utilities, building construction, and security systems. [21239 Keaton Beach Drive, Keaton Beach, Taylor County, Florida; case Poncho's v. Taylor County] This document outlines a settlement agreement between Taylor County and Ponchos Cantina & Grille, LLC, Ponchos 76, LLC, and Luis Alfonso Bautista Pulido regarding property at 21239 Keaton Beach Drive, Keaton Beach, Taylor County, Florida. The agreement grants a variance for a setback encroachment of a structure and a floodplain management variance for restroom facilities, subject to specific construction guidelines and engineer-certified plans. It also addresses parking and food truck operations, acknowledging state preemption of certain regulations, and confirms the county's lack of ordinances prohibiting alcohol sales. The county agrees to certify that no zoning ordinance prohibits alcohol sales in the Mixed Use Urban Development zoning district. Ponchos must provide structural certification for the building. Upon county approval of structural certification, Ponchos can commence business operations, including food, beverage, and alcohol service, regardless of pending floodplain compliance measures. The agreement includes mutual releases of claims related to past disputes, with conditions precedent for the releases to take effect. This document is an Interlocal Agreement between Taylor County, Florida, and the City of Perry, Florida, establishing a distribution formula for the proceeds of a local option gas tax. The agreement specifies that Taylor County will receive 70% of the tax proceeds, and the City of Perry will receive 30%. This agreement is set to take effect on January 1, 2027, and will terminate on December 31, 2032. It also outlines requirements for providing distribution proportions to the State of Florida Department of Revenue and filing the agreement with the Clerk of the Circuit Court. [Webb Lane in the Sugar Hill Estates area, Taylor County, Florida; case K & L Investments, LLC v. Taylor County] This document is a settlement agreement between Taylor County, Florida, and K & L INVESTMENTS, LLC, concerning Parcel 09595-850 located on Webb Lane in the Sugar Hill Estates area, Taylor County, Florida. The dispute centers on road frontage requirements imposed by Taylor County Ordinance 2006-14, which K & L contends should not apply to their property that predates the ordinance. The agreement requires the County to execute and record a 'Notice of Vested Rights' declaring that the property has vested rights to residential development and is not subject to the road frontage requirements. Upon recording, the County will process building permit applications for the property without regard to these requirements, provided other regulations are met. The agreement includes mutual releases of claims, with conditions precedent for the releases to become effective, including the County's execution of the notice and K & L's recording of it within 60 days. [Webb Lane] This document is a Notice of Vested Rights related to a Settlement Agreement between K & L Investments, LLC and Taylor County. The property in question, Parcel 09595-850 on Webb Lane in the Sugar Hill Estates area, has a vested right to residential development that predates Taylor County Ordinance 2006-14, which imposed road frontage requirements. Therefore, these requirements will not be applied to this property, and a building permit will not be denied solely on that basis. This vested right runs with the land for K & L Investments, LLC and its successors. The settlement agreement also states that the prevailing party in any enforcement action is entitled to recover attorney's fees and costs. The agreement itself is confidential except as required by law or court order.

Board:
Board of Commissioners Meeting
Date:
2026-05-19
Type:
Minutes
Decision:
Approved (final payments, change order, grant applications, project award recommendation, courthouse parking lot improvements, budget transfers, resolutions, settlement agreement, interlocal agreement), Considered (McDaniel Road widening/resurfacing, 13th and Central USACE floodplain mitigation, sign installation), Received Bids (roadside right-of-way mowing), Tabled (building permit #30830, cold weather warming center guidelines), Discussed (solid waste operations, speed humps at CR-14)
Address:
106 El Dorado Drive, Perry, FL 32347 (Sadaytril Smith's home)
Applicant:
Michael Barnes, Sharon Phelps, Kristina and Robert Hugger, Randolph Copeland, Sadaytril Smith, Anderson Columbia, not stated (McDaniel Road widening/resurfacing), not stated (13th and Central USACE floodplain mitigation), not stated (Hodges Park and Glenn Ratliff Memorial Sports Complex), not stated (Perry Foley Airport taxiway realignment phase 2), not stated (Perry Foley Airport new hangar), Ponchos Cantina and Grill, City of Perry

Amended Agenda

This document is a suggested agenda for the Taylor County Board of County Commissioners meeting on May 4, 2026. It outlines various items for consideration, including grant applications, contract extensions, budget amendments, and public hearings for specific projects. Key business opportunities for contractors include a milling project on Bethea Road, bids for McDaniel Road widening/resurfacing, and a Request for Proposals (RFP) for the Taylor County Community Transportation Coordinator. Additionally, there is a proposal modification with WSP for the Dekle Beach Canal System dredging design and a notice of site dedication for the Taylor County Sports Complex rehabilitation. The agenda also includes a request to replace two air handler units at the County Jail and consideration of a final development order and mining permit for Alan Roberts Mine.

Board:
Board of Commissioners Meeting
Date:
2026-05-04
Type:
Agenda
Address:
201 E. GREEN STREET, PERRY, FLORIDA

Amended Agenda Packet

[201 E. Green Street, Perry, Florida] Taylor County Board of County Commissioners meeting on May 4, 2026, at 6:00 PM at 201 E. Green Street, Perry, Florida. Agenda items include approval of grant applications, budget amendments, contract extensions for debris cleanup and management, and consideration of various proposals and appointments. Key items for contractors include bids for McDaniel Road widening/resurfacing and a Request for Proposals (RFP) for the Taylor County Community Transportation Coordinator.

Board:
Board of Commissioners Meeting
Date:
2026-05-04
Type:
Agenda_packet
Address:
201 E. Green Street, Perry, Florida

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.

Comienza tu prueba gratis