Skip to main content

Sé el Primero, Construye Relaciones Duraderas

Browse City of Apopka civic records

Every published record for City of Apopka, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.

1,642 records

1. Ordinance No. 3162 - IPMC Revisions

The City of Apopka is reviewing a proposal to annex a 1.16-acre parcel located east of Effie Drive and north of Kelly Park Road. This property is currently vacant and zoned for county agricultural use. The applicant intends to develop this land for commercial purposes, aligning with the city's Kelly Park Interchange Form-Based Code. This annexation is planned to allow for future commercial development that fits the city's growth strategy. The process is currently under review, with a second reading and adoption by the City Commission scheduled for June 17, 2026. If approved, this project could lead to site preparation, grading, utility work, paving, and the construction of commercial buildings. Contractors, suppliers, and service providers in site preparation, civil engineering, construction, and commercial development should consider reaching out to the applicant or city planning department to learn more about potential opportunities as the project moves forward.

Board:
Apopka City Commission Meeting
Date:
2026-06-17
Type:
Agenda_item
Address:
East of Effie Drive and North of Kelly Park Road
Applicant:
Effie Road Holdings, LLC

1. Ordinance No. 3162 - Second Reading - IPMC Revisions (Code Enforcement)

Apopka City Commission Meeting listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Apopka City Commission Meeting
Date:
2026-06-17
Type:
Agenda_item

1. Ordinance No. 3162 - Second Reading - IPMC Revisions (Code Enforcement)

Apopka City Commission Meeting listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Apopka City Commission Meeting
Date:
2026-06-17
Type:
Agenda_item

1. Ordinance No. 3163

Apopka City Commission Meeting listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Apopka City Commission Meeting
Date:
2026-06-17
Type:
Agenda_item

1. PL-26-3 - Crossroads at Kelly Park Phase 2A-2 - Plat (PL), (1st Submittal)

A final plat for a new subdivision, known as Crossroads at Kelly Park Phase 2A-2, is currently under review by the City of Apopka's Development Review Committee. This project, proposed by Jen Florida 51 LLC and applied for by Pape Dawson, involves dividing land into 78 residential lots. The location is along Soapberry Avenue. This early stage in the review process means that site plans, bids, and permits are not yet finalized. The project will likely involve initial site clearing and grading, followed by underground utility work, road construction, and then the vertical construction of homes. Contractors, suppliers, and service providers in site preparation, utilities, paving, framing, and related trades should consider reaching out now to understand the project's scope and potential needs as it moves forward. Early engagement can provide an advantage before formal bidding begins.

Board:
Development Review Committee Meeting
Date:
2026-06-17
Type:
Agenda_item
Address:
Soapberry Avenue
Applicant:
Jen Florida 51 LLC

1. PL-26-3 - Crossroads at Kelly Park Phase 2A-2 - Plat (PL), (1st Submittal)

A new plat for 78 lots is under review for the Crossroads at Kelly Park Phase 2A-2 project, located on Soapberry Avenue. Jen Florida 51 LLC is the owner, with Pape Dawson represented by Genevieve LaBuda as the applicant. This project is in its early stages, currently under review by the Development Review Committee. The proposed development involves creating a final plat for 78 residential lots. This process will likely lead to site clearing and grading, followed by underground utility installation, road construction, and final landscaping. Contractors, suppliers, and service providers in site preparation, civil engineering, utility work, paving, and landscaping should consider reaching out to the applicant or project manager early. Engaging now, before final site plans and permits are established, offers the best opportunity to compete for future work.

Board:
Development Review Committee Meeting
Date:
2026-06-17
Type:
Agenda_item
Address:
Soapberry Avenue
Applicant:
Jen Florida 51 LLC

1. Redlined City of Apopka Purchasing Policy _Phase 1

Apopka City Commission Meeting listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Apopka City Commission Meeting
Date:
2026-06-17
Type:
Agenda_item

1. Required by the contract or agreement; or

Apopka City Commission Meeting listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Apopka City Commission Meeting
Date:
2026-06-17
Type:
Agenda_item

1. Resolution 2026-29 - MOA AT785

Apopka City Commission Meeting listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Apopka City Commission Meeting
Date:
2026-06-17
Type:
Agenda_item

1. Resolution Number 2026-28 - BA#6

The City of Apopka is reviewing a resolution to amend its budget for the fiscal year 2025-2026. This budget amendment includes an amount totaling $1,000,000. The city is also considering a Highway Maintenance Memorandum of Agreement with the Florida Department of Transportation. This agreement covers ongoing maintenance tasks like mowing, litter pickup, street sweeping, and tree maintenance along specific state roads. The project is currently under review by the City Commission. This process could lead to work involving general city services and maintenance. Local contractors, suppliers, and service providers are encouraged to stay informed as this budget amendment and maintenance agreement move forward. Early engagement before final permits and bidding could offer a competitive advantage.

Board:
Apopka City Commission Meeting
Date:
2026-06-17
Type:
Agenda_item
Address:
SR 436 from the Seminole County Line to US 441

1. SANITARY SEWERS, FORCE MAINS, AND STORM SEWERS SHOULD ALWAYS CROSS UNDERNEATHWATER MAINS. INSTALLATIONS OF SANITARY SEWERS, FORCE MAINS AND STORM SEWERS, ATCROSSINGS OF WATER MAINS, SHALL BE PERFORMED SO AS TO PROVIDE A MINIMUM VERTICALDISTANCE OF 18 INCHES BETWEEN THE INVERT OF THE UPPER PIPE AND THE CROWN OF THELOWER PIPE, WHENEVER POSSIBLE. THE CROSSING SHALL BE ARRANGED SO THAT THE SEWERJOINTS AND WATER JOINTS SHALL BE EQUIDISTANT FROM THE POINT OF CROSSING WITH NO

The City of Apopka's Development Review Committee is considering new standards for how sanitary sewers, force mains, and storm sewers cross underneath water mains. These proposed rules focus on maintaining specific vertical and horizontal distances between pipes, using ductile iron pipe (DIP) at crossings, and ensuring joints are leak-free and mechanically restrained. In situations where sewers must cross over water mains, specific separation criteria and pipe material requirements will apply, with options for sleeving pipes. The item is currently under review by the committee. This review could lead to new construction requirements for future utility projects, involving site preparation, excavation, pipe installation, and potentially concrete and paving work. Contractors, suppliers, and service providers in the utility and civil construction sectors are encouraged to monitor this review. Understanding these potential new standards early, before specific projects are designed and bid, offers an advantage in preparing for upcoming work.

Board:
Development Review Committee Meeting
Date:
2026-06-17
Type:
Agenda_item

1. Separate the West Pond work from the East Pond work.

City Commission Discussion Workshop - Golden Gem listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

1. Station Street Development Agreement - Notice of Default

This item concerns a Station Street Development Agreement and a Notice of Default. The City of Apopka is addressing a default on a development agreement related to the Station Street area. The City Commission is reviewing this matter. This situation may lead to future actions concerning the development, potentially involving site remediation or redevelopment in the brownfields areas around the Town Center. Businesses involved in site preparation, environmental services, or general contracting may find opportunities as the city addresses the default and plans for the future of the Station Street development. Early engagement with city planning departments could provide insight into upcoming needs.

Board:
Apopka City Commission Meeting
Date:
2026-06-17
Type:
Agenda_item

1. The insurance afforded to such additional insured only applies to the extent permitted by law; and

Apopka City Commission Meeting listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Apopka City Commission Meeting
Date:
2026-06-17
Type:
Agenda_item

1. Utility Estimated Billing Policy

The City of Apopka is planning to implement a new Utility Estimated Billing Policy. This policy will create a standard process for billing customers when water meters or related equipment are not working correctly and accurate usage cannot be measured. It will apply to customers with active payment plans for past charges due to meter issues. The policy will go into effect once approved by the City Commission. This initiative involves establishing procedures for estimated billing, which may require updates to billing software and customer service protocols. While no new construction is involved, businesses that provide utility meter services, billing system support, or administrative services related to customer accounts could find opportunities. Reaching out to the City of Apopka early could provide insight into potential needs as this policy is put into practice.

Board:
Apopka City Commission Meeting
Date:
2026-06-17
Type:
Agenda_item
Decision:
City of Apopka

1. When a meter and/or antenna is verified as malfunctioning, the City will generate an estimated

This item concerns a proposed policy change by the City of Apopka regarding how water meter malfunctions are handled. If a water meter or antenna is found to be not working, the City plans to estimate water usage for the affected customer's billing period. This estimate will be based on the customer's past water use. The policy is currently under review by the Apopka City Commission. This review process could lead to the implementation of new procedures for utility billing and meter maintenance. The work involved would primarily be administrative and data analysis related to customer billing history. Businesses that provide utility meter services, data management, or consulting on billing systems might find opportunities. Engaging early in the review process could allow businesses to offer insights or services before final decisions are made.

Board:
Apopka City Commission Meeting
Date:
2026-06-17
Type:
Agenda_item

10. ALL ON-SITE FIRE HYDRANTS SHALL BE PAINTED WITH HIGH GRADE ENAMEL FEDERAL SAFETY YELLOW (OSHA APPROVED), AND MUSTBE LOCATED A MINIMUM OF 6 FEET FROM THE EDGE OF PAVEMENT OR BACK OF CURB, OTHERWISE BOLLARDS WILL BE REQUIRED FORTO ASSURE ADEQUATE FLUSHING AND DISINFECTION/CHLORINATION.PROTECTION ALL FIRE HYDRANTS SHALL COMPLY WITH AWWA STANDARDS C502-80 THEREOF.

This civic agenda item concerns planned utility work for the City of Apopka. The project involves the installation and protection of fire hydrants and water mains, requiring compliance with AWWA and City of Apopka Utility Department standards. Specific requirements include painting all on-site fire hydrants federal safety yellow and ensuring they are located at least 6 feet from pavement edges or curbs, with bollards needed if this distance cannot be met. Measures against corrosion must be used, and pipe cover, joint, and packing materials must meet specified standards. The project is currently under review by the Development Review Committee. This work will likely involve site preparation, grading, underground utility installation, concrete work for foundations or protection, and potentially paving. Contractors specializing in utility work, site preparation, concrete, and painting may find opportunities. Early engagement before final plans and permits are issued could be advantageous.

Board:
Development Review Committee Meeting
Date:
2026-06-17
Type:
Agenda_item

10. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN AN "ON-SITE THAT THE OWNER OR ENGINEER WILL INSPECT AND/OR ENFORCE SAFETY REGULATIONS. BEEN PROVIDED FOR THE CONTRACTOR'S INFORMATION ONLY AND DOES NOT IMPLY IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO COMPLY AND

Development Review Committee Meeting listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Development Review Committee Meeting
Date:
2026-06-17
Type:
Agenda_item

11. CONTRACTOR TO INSTALL TEMPORARY BLOWOFFS, AT THE END(S) OF PROPOSED WATER MAINS AND SERVICE LATERALS TO BUILDING(S),

Development Review Committee Meeting listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Development Review Committee Meeting
Date:
2026-06-17
Type:
Agenda_item

12. ALL SANITARY SEWER WORK SHALL CONFORM WITH APPLICABLE CITY OF APOPKA13. PRIOR TO COMMENCING WORK WHICH REQUIRES CONNECTING PROPOSED FACILITIES TO EXISTING LINES OR APPURTENANCES, THE CONTRACTOR SHALL VERIFY THE LOCATION AND ELEVATION(S) OF EXISTING CONNECTION POINT(S) AND NOTIFY THE OWNER'S ENGINEER OF ANY CONFLICTS

This item concerns planned sanitary sewer work for the City of Apopka. All work must follow the City of Apopka Utilities Department's standards and specifications. Before connecting new facilities to existing sewer lines or structures, contractors must confirm the location and elevation of these connection points. Any conflicts found must be reported to the owner's engineer. This early stage means potential work in site preparation, underground utility installation, and connections to existing infrastructure. Contractors, suppliers, and service providers in utility construction and related fields should engage now to understand project needs before formal bidding begins.

Board:
Development Review Committee Meeting
Date:
2026-06-17
Type:
Agenda_item

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta