The Port Orange City Council will consider approving Task Authorization No. 8 with Hall and Ogle Architects, Inc. for design services for renovations to the REC Center. The project aims to mitigate noise issues in the main lobby/atrium space and improve the reception area's separation between staff and the public. Minor renovations to the second-floor play area are also included. The estimated cost for these design services is not to exceed $30,000. This design work was approved in the FY26 CIP budget. [1000 City Center Circle, Port Orange, Florida 32129 (City); 208 Magnolia Avenue, Daytona Beach, Florida 32114 (Hall & Ogle Architects, Inc.); case RFSQ 22-03] Master Contract for Architectural Services awarded to Hall & Ogle Architects, Inc. for various renovation, restoration, construction, and general consulting projects within the City of Port Orange. The contract establishes terms for future Task Authorizations, which will detail specific project scopes, timelines, and payments. Hall & Ogle Architects, Inc. will provide services including preconstruction meetings, shop drawing review, record drawing review, cost estimating, and construction administration. The contract also outlines insurance requirements, payment terms, and dispute resolution processes. The City of Port Orange reserves the right to approve sub-consultants. [1395 Dunlawton Avenue, Port Orange, FL 32120 (REC Center); case Task Authorization Proposal (related to RFSQ 22-03)] Proposal for architectural services for the Port Orange REC Center Renovations, specifically for a Schematic Design Package to address acoustic mitigation in the main lobby/atrium and modifications to the front reception area. The scope also includes minor renovations to the second-floor play area. The proposal includes floor plans, building sections/elevations, 3D renderings, and an Opinion of Probable Construction Cost. Hall & Ogle Architects, Inc. is proposing to provide full Architectural and Engineering services through design documentation, bidding, and construction. [1000 City Center Circle, Port Orange, FL 32129 (Venue); case not stated (City Council Agenda Item B6b)] Approval of a Standard Contract with Open Sky Productions, LLC for an America 250 Drone Show at the 4th of July Celebration. The show will feature 200 drones for a 15-20 minute duration with customizable designs and sponsor logo creation. Funding will come from the Parks and Recreation Department's existing budget, sponsorships, and the veterans banner program. Open Sky was selected after Great Lakes Drone Company (lowest bidder at $43,000) and the City could not agree on contract terms. Open Sky's contract is for $66,000. [4655 City Center Circle, Port Orange, Florida] This document contains information related to two distinct projects: 1) A donation/exchange agreement for artificial turf installation at the REC facility, and 2) A task authorization for site work for a new bathroom at the City Center Sports Complex. The turf project involves Cunningham's Lawn and Landscaping, LLC and AAA Fence providing materials and labor valued at $18,060.00 in exchange for sponsorship recognition. The bathroom project involves Paul Culver Construction, Inc. performing site work, including concrete pad, fencing, landscaping, and plumbing, for an amount not to exceed $160,500.00. [4655 City Center Dr., Port Orange, FL, 32129; case RFP #24-01] Paul Culver Construction, Inc. submitted a proposal for the Port Orange Sport Complex Restroom Addition project. The project scope includes general conditions, sitework, fencing, landscaping, plumbing, and electrical work. The total bid amount is $160,500.00. This document outlines administrative and procedural requirements for contractors and trades related to payment applications, project management, coordination, and submittals for the CITY PARK RESTROOM ADDITION project. It details the format and content of the Schedule of Values, Application for Payment forms, progress documentation, and submittal procedures, including the use of electronic systems like Procore. Key processes covered include preconstruction conferences, progress meetings, submittal timelines (21 days for review), RFI procedures (7 days for response), and BIM 3D coordination. It emphasizes the importance of detailed documentation, timely submittals, and coordination among all parties to ensure efficient project execution and payment processing. This document outlines submittal procedures, quality requirements, references, temporary facilities, product requirements, and execution requirements for the CITY PARK RESTROOM ADDITION project. It details the processes for submitting design data, manufacturer's instructions, field reports, insurance certificates, and bonds. It specifies quality assurance and control measures, including testing, inspections, mockups, and qualifications for various personnel and agencies. The document also covers requirements for temporary utilities, site offices, equipment, traffic controls, waste disposal, security, and protection facilities. Product selection, delivery, storage, handling, and warranty procedures are outlined, along with the process for requesting product substitutions. Finally, it addresses examination of existing conditions, preparation for work, construction layout, field engineering, progress cleaning, starting and adjusting systems, protection of installed work, and correction of deficiencies. Project: City Park Restroom Addition. This document details execution requirements, construction waste management, closeout procedures, operation and maintenance data, project record documents, demonstration and training, demolition, clearing and grubbing, and site excavation for the City Park Restroom Addition project. It outlines procedures for site preparation, waste disposal, record keeping, and training for the owner's personnel. Specific requirements include waste management goals of 50 percent salvage/recycling by weight, proper disposal of hazardous materials, maintaining record drawings of all changes, and providing comprehensive operation and maintenance manuals. Demolition involves removal and disposal of designated pavements, concrete, curbs, culverts, and utilities. Clearing and grubbing includes removal of vegetation, rocks, roots, and debris, as well as stripping topsoil. Site excavation covers roadways, parking areas, building pads, embankment areas, and waterways, with specific testing and quality assurance protocols. This document details the site excavation, backfilling, and concrete work for the City Park Restroom Addition. It specifies requirements for grading, erosion control, dewatering, soil compaction, utility trenching, and the placement of various concrete elements like sidewalks, curbs, gutters, dumpster pads, and equipment pads. The project involves extensive site preparation and construction of foundational and surface elements. [Spruce Creek Road (from South of Selin Circle to Herbert St); case FDOT #439865; City of Port Orange #CD221; FPN 439865-3-34-01] This document details a change order for post-design services for the St. John's River to Sea (SJR2C) Loop Shared-Use Nonmotorized (SUN) Trail Project. The original contract with Stanley Consultants, Inc. (Engineer of Record) was for post-design services during construction. Unexpected field conditions, including conflicts with underground utilities, ADA accessibility improvements, revisions to stormwater system pathways, and replacement of a deteriorated segment of the trail on Spruce Creek Road, have exhausted the original service hours. A change order is requested for an additional $20,400.50, extending the post-design services through August 31, 2026, bringing the revised total to $49,425.60. The project completion date has also been extended from April 30, 2026, to July 2026 due to delays in receiving FDOT concurrence. Funding is available within the project's remaining balance, and discussions are underway with FDOT for potential reimbursement. [SJR2C Loop Trail (Spruce Creek Rd) from South of Selin Circle to Herbert St; case Task Authorization No.: 04, SCI PROJECT No.:31733 / 31733.04] Stanley Consultants, Inc. (SCI) is providing post-design services for the SJR2C Loop Trail project, located along Spruce Creek Road from South of Selin Circle to Herbert Street. This project involves structural support for pedestrian facilities over culverts and lighting systems. A change order increased the contract amount and extended the completion date. Florida Bridge and Transportation, Inc. (FBT) is a sub-consultant for structural services. [3459 S. Ridgewood Ave, Port Orange, FL (adjacent to Riverwalk Park); case Resolution No. 26-17, BOT File No. 644003702, ERP No. 78624-12] The City of Port Orange is entering into a Sovereignty Submerged Land Lease Agreement (BOT File No. 644003702) with the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida for a 10-slip docking facility and boardwalk adjacent to Riverwalk Park. The lease is for a 5-year term, commencing retroactively on September 19, 2025, and requires construction within this term. The project includes dredging for navigational access and channel markers. [1000 City Center Circle, Port Orange, Florida 32129 (Lessee's address); case Sovereignty Submerged Lands Lease No. 644003702] Sovereignty Submerged Lands Lease No. 644003702 for submerged lands adjacent to riparian upland property. The lease is between the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida (Lessor) and the City of Port Orange, Florida (Lessee). The lease terms include record keeping, property rights, assignment restrictions, liability, notices, taxes, nuisances, maintenance, non-discrimination, enforcement, renewal, removal of structures, liens, riparian rights, amendments, advertisement restrictions, USACE authorization, compliance with Florida laws, liveaboard limitations, prohibition of gambling vessels, and special conditions regarding mooring. The lease was executed by Brad Richardson for the Lessor and Scott Stiltner for the Lessee. The lease term is not explicitly stated but has a renewal provision. The lease agreement was sent to the City of Port Orange on 03/31/2026. [842 and 846 Bears Trail Properties; case Resolution No. 26-20] City Council agenda item (B8) regarding Resolution No. 26-20 for Second Quarter Budget Amendments for Fiscal Year 2025-2026. Notable items include funds for the purchase of 842 and 846 Bears Trail Properties for the Nixon Stormwater Pump Station & Force Main project, adjustments for a Fire Truck purchase, YMCA Improvements Locker Room Renovation, and additional budget for Parks Bond Projects including Willow Run Park Expansion and City Center Sports Complex Expansion. The total amended budget is $336,192,322.00. [1737 Fern Park Drive; case CUSE-26-0001] City Council agenda item (H15) for a Special Exception Request for a Retail Nursery and Garden Supplies Facility at 1737 Fern Park Drive. The ±9.37-acre property was rezoned to Agricultural (A) zoning in December 2025. The applicants, Daniel D. and Sandra L. Bordis, plan to demolish the existing home and construct a new residence on the east side, and operate a retail and wholesale nursery on the west half. The proposed facility will include a fenced outdoor storage area, plant sales areas, and a 400-square-foot office building. Access will be via a shared drive connecting to Taylor Road. The Planning Commission recommended approval (6-0) on March 26, 2026. The City Council meeting is scheduled for April 21, 2026. [Not stated (property located near well-fields); case ITB #25-23] City Council agenda item (I16) regarding the intent to reject all bids for ITB #25-23 City of Port Orange Hunting Lease. The City issued an Invitation to Bid for a hunting lease of approximately 11,839 acres of City and County-owned property near well-fields. Ten bids were received, and after an intent to award to the incumbent tenant, three bid protests were filed. Concerns raised included the current tenant's management, the solicitation format, and bid ranking. City Staff recommends rejecting all bids to review the scope, address procedural issues, and consult with County partners before issuing a revised solicitation.
Agenda items
- 1) Company Services:
- 1. Great Lakes Drone Company, LLC d/b/a Starlight Aerial Productions ($43,000)
- 1. Hall and Ogle Architects Inc. - Task
- Engineering & Architecture
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- 1. Open Sky Drone Contract
- 1. Provide all certifications ("Architect of Record" function) surveys, calculations, drawings, technical
- 1. Provision of Services
- Engineering & Architecture
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Landscaping & Lawn Service
- Business Consulting
- 1. Silent Invocation
- 1. Silent Invocation
- 1. This Task Authorization expressly modifies the Contract and in the event of a conflict, the terms and
- 1. This Task Authorization expressly modifies the Contract and in the event of a conflict, the terms and
- 10. FCCMA Recognition for being a Council-Manager City for 55 years
- 10. Port Orange Day - Daytona Tortugas
- 10. Port Orange Day - Daytona Tortugas
- 10. Subcontractors and Outside Associates and Consultants. Any subcontractors and outside associates or
- 11. Termination.
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Legal Services
- 11. Water Conservation Month
- 12. Council Members
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 12. Examination of Records
- 13. City Attorney
- 13. Public Records Corn liance. The Architect shall comply with public records laws as set forth in Chapter 1 19,
- Legal Services
- 14. Citizen Advisory Committee for TPO
- 14. Citizen Advisory Committee for TPO
- 14. Termination for Non-A ro nation of Funds.
- 15. Appoint a new Volusia Flagler TPO member
- Government Authority
- 15. Approval of the request for a Special Exception for a Retail Nursery and Garden
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Building Materials & Garden Supply
- Engineering & Architecture
- 15. Approval of the request for a Special Exception for a Retail Nursery and Garden
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Building Materials & Garden Supply
- Engineering & Architecture
- Real Estate Development
- 15. Insurance Architect shall maintain insurance, as required herein, during the life of this Contract. Architect
- Engineering & Architecture
- Commercial & Business Insurance
- General Contractor
- Building & Industrial Supply
- 16. Assi nabilit of Contract, Neither this Contract, nor any part hereof, may be assigned by the Architect to any
- 16. Intent to Reject all bids for ITB #25-23 City of Port Orange Hunting Lease
- 16. Intent to Reject all bids for ITB #25-23 City of Port Orange Hunting Lease
- 16. Second Reading - Ordinance No. 2026-4 - LDC Amendment/Chapters 2 and 16
- Site Prep, Grading & Hardscape
- Waste Management
- Building & Industrial Supply
- Legal Services
- Engineering & Architecture
- 17. Second Reading - Ordinance No. 2026-5 - LDC Amendment/Chapters 2, 14, and
- Engineering & Architecture
- Painting & Flooring
- Signage & Printing
- 17. Soi/ere/' n Immunit . The City expressly retains all rights, benefits and immunities of sovereign immunity in
- 18. FY2025 Audit Discussion with James Moore & Company
- 18. Liabilit for Loss or Dama e. Architect shall be liable for any loss of, or damage to, City property caused by
- 19. Non-discrimination. During the performance of this Contract, Architect agrees as follows:
- Legal Services
- Office & Business Support Services
- 2) Client Responsibilities:
- 2. Authorization for Services. This Contract standing alone does not authorize the performance of any work or
- Engineering & Architecture
- 2. Hall & Ogle Architectural Services
- 2. In addition to all other terms and conditions contained in the Contract, Architect shall provide services
- Engineering & Architecture
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Landscaping & Lawn Service
- 2. In addition to all other terms and conditions contained in the Contract, Architect shall provide services
- 2. Open Sky ($66,000)
- 2. Open Sky Quote Open Sky Quote.pdf
- 2. Prepare time scaled diagrams showing the dates of completion of various design phases and scheduled
- 20. E-Verifv. Architect shall utilize the U. S. Department of Homeland Security's E-Verify system to verify the
- 22. Force Ma'eure. Neither party shall be liable for any delay in performance or failure to perform any obligation
- 23. Controllin Law. THIS AGREEMENT CONTAINS IMPORTANT MATTERS AFFECTING LEGAL RIGHTS
- 24. Additional Provisions. This Contract includes all additional provisions as may have been outlined in written
- 27. Truth-in-Ne otiations
- Legal Services
- Engineering & Architecture
- 28. Waiver of Breach and Materialit Failure to enforce any provision of this Contract shall not be deemed a
- 29. Contract Construction
- 3. Architect shall complete the aforementioned services within seven hundred thirty (730) days form
- 3. Architect shall complete the services to be provided herein within _ days of the date of written
- 3. Cit Obli ations. The City reserves the right to utilize lump sum or hourly rate compensation, at the hourly
- Engineering & Architecture
- Business Consulting
- 3. During construction bidding, provide such amplifications and explanations that may be necessary to clarify the
- 3. Executed Renewal Form Hall & Ogle
- 3. Sky Elements ($88,000)
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Windows, Doors & Glass
- 3. Sky Elements Quote Sky Elements Quote.pdf
- 30. Authorit to Si n. Each person signing this Agreement warrants that he or she is duly authorized to do so
- Engineering & Architecture
- General Contractor
- Building & Industrial Supply
- 4. Contract Administration. The Purchasing Manager, Jill Poolman ("Contract Administrator"), shall perform
- Legal Services
- Engineering & Architecture
- 4. Furnish consultation and advice as requested by the City during the construction of a project, including
- General Contractor
- Engineering & Architecture
- Business Consulting
- 4. Hall & Ogle Architects GL AL WC
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- 4. In return for the services identified above, the City agrees to compensate Architect at the prices set
- 4. StarLight Aerial Productions
- 5. 2529.Port Orange Rec Center 2529.Port Orange Rec Center
- Engineering & Architecture
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Lighting & Low-Voltage Systems
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- 5. Furnish all other Architectural services included without limitation those specified hereinafter and those
- Engineering & Architecture
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Lighting & Low-Voltage Systems
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Legal Services
- 5. Open Sky Sunbiz Open Sky Sunbiz.pdf
- 5. Statement if Architectural Services. The Architect shall:
- Engineering & Architecture
- General Contractor
- Building & Industrial Supply
- Legal Services
- Business Consulting
- 5. Truth-in-Negotiations
- Legal Services
- Accounting & Tax
- 6. Bid Awards and Contract Items
- 6. Bid Awards and Contract Items
- 6. Bid Awards and Contract Items
- 6. HTA - Open Sky HTA - Open Sky.pdf
- Event Planning & Rentals
- Admin Services (Other)
- 6. Res onsibilit of the Architect. The Architect shall be responsible for the professional and technical accuracy
- 6. This Task Authorization may be executed in one or more counterparts, each of which shall be
- Engineering & Architecture
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Landscaping & Lawn Service
- Business Consulting
- 7. Resolution No. 26-17- Sovereignty Submerged Land Lease for the Port Orange
- Construction (Other)
- Legal Services
- Government Authority
- 7. Resolution No. 26-17- Sovereignty Submerged Land Lease for the Port Orange
- Construction (Other)
- Government Authority
- 7. Resolution No. 26-18 - Approval of State of Florida Department of Environmental
- Utilities (Sub)
- General Contractor
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- 7. Reuse of Documents. The City shall have unlimited rights, for the benefit of the City in all drawings, designs,
- Engineering & Architecture
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- 8. Ex erf Witness. The Architect shall serve as an expert witness for the City in any legal proceedings regarding
- 8. Resolution No. 26-19 - Tow Rates for Wrecker Service Agreement
- 8. Resolution No. 26-20 - Approval of the Second Quarter Budget Amendments for
- 8. Resolution No. 26-20 - Approval of the Second Quarter Budget Amendments for
- 9. Approval of a Utility Easement to the City of Daytona Beach Shores on a portion
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- 9. Atlantic High School Basketball Team - Runner-up in the State Finals
- 9. Atlantic High School Basketball Team - Runner-up in the State Finals
- 9. Modifications to Sco e of Work/Chan e Orders.
- F. COMMENTS AND ADDITIONAL ITEMS
- F. COMMENTS AND ADDITIONAL ITEMS
- G. BOARD APPOINTMENTS, INTERVIEWS, AND REPORTS
- G. BOARD APPOINTMENTS, INTERVIEWS, AND REPORTS
- a) Access and permission to use the location specified for the show, in such form as the Company may require, in
- a) Subject to the terms of this Agreement the Company will provide the following services (the “ Services”):
- a. Approval of Change Order No. 1 to the Masci General Contractor, Inc.
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Building & Industrial Supply
- a. Approval of Task Authorization No. 8 with Hall and Ogle Architects, Inc. for
- Engineering & Architecture
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Cleaning & Janitorial
- Pressure Washing & Exterior Cleaning
- Signage & Printing
- a. Approval of Task Authorization No. 8 with Hall and Ogle Architects, Inc. for
- Engineering & Architecture
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Cleaning & Janitorial
- Pest Control
- a. First Step Shelter - Councilman Shawn Goepfert
- a. First Step Shelter - Councilman Shawn Goepfert
- a. Regular City Council Meeting - April 7, 2026
- a. Regular City Council Meeting - April 7, 2026
- a. Regular City Council Meeting - March 17, 2026
- a. Riverwalk Update
- a. Riverwalk Update
- Real Estate Development
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Legal Services
- Landscaping & Lawn Service
- Concrete & Masonry
- Painting & Flooring
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Drywall & Insulation
- Windows, Doors & Glass
- a. Riverwalk Update
- a. The costs incurred in the performance of the work and service terminated,
- a. Volusia Flagler TPO - Councilman Jonathan Foley
- b) An appropriate site for the Services to be performed. Approval and confirmation of the Latitude and Longitude
- b) The Company will be responsible for providing the Special Flight Operations Certificate from the FAA and any
- b. Approval of Contract with GSM Engineered Fabric, LLC for Belt Filter Press
- Construction (Other)
- Utilities (Sub)
- b. Approval of a Standard Contract with Open Sky for an America 250 Drone Show
- Recreation (Other)
- Business Consulting
- Engineering & Architecture
- Admin Services (Other)
- Event Planning & Rentals
- b. Approval of a Standard Contract with Open Sky for an America 250 Drone Show
- Recreation (Other)
- Event Planning & Rentals
- Business Consulting
- Engineering & Architecture
- b. General Employee's Pension - Mayor Scott Stiltner
- General Contractor
- Carpentry & Cabinetry
- Drywall & Insulation
- HVAC & Climate Control
- Painting & Flooring
- Restoration & Waterproofing
- Engineering & Architecture
- Landscaping & Lawn Service
- Building & Industrial Supply
- Real Estate Development
- b. Port Orange South Daytona Chamber of Commerce - Councilman Shawn
- b. Port Orange South Daytona Chamber of Commerce - Councilman Shawn
- b. Stormwater Projects Update
- General Contractor
- Site Prep, Grading & Hardscape
- Plumbing
- Electrical
- Concrete & Masonry
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- b. The completed or partially completed plans, drawings, information, and
- Legal Services
- Accounting & Tax
- b. The cost of settling and paying claims arising out of the termination of work
- c) All necessary security services to ensure the safety of Company equipment and personnel
- c. A sum, as profit on Paragraph 11 (a) above, determined by the Contract
- c. Approval of Amendment No. 1 to the J&A Balboa Enterprises, Inc. d/b/a
- c. Approval of the Donation/Exchange Agreements — Cunningham's Lawn and
- Site Prep, Grading & Hardscape
- Construction (Other)
- Landscaping & Lawn Service
- Building & Industrial Supply
- c. Approval of the Donation/Exchange Agreements — Cunningham's Lawn and
- Site Prep, Grading & Hardscape
- Construction (Other)
- Landscaping & Lawn Service
- Building & Industrial Supply
- c. ArtHaus - Vice Mayor Tracy Grubbs
- c. ArtHaus - Vice Mayor Tracy Grubbs
- c. Parks and Recreation Bond Projects Update
- c. Parks and Recreation Bond Projects Update
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- c. Parks and Recreation Bond Projects Update
- d) All permits, licenses, and authorizations necessary for the event and Services, save and except for the
- d. Approval of Task Authorization No. 8 to Paul Culver Construction, Inc. for the
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Plumbing
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- d. Approval of Task Authorization No. 8 to Paul Culver Construction, Inc. for the
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Construction (Other)
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- e. Approval of Change Order #1 to Task Authorization #4 to Stanley Consultants,
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Landscaping & Lawn Service
- e. Approval of Change Order #1 to Task Authorization #4 to Stanley Consultants,
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- i) FAA flight authorization
- ii) Launch site check (as applicable)
- iii) Standard show design with up to 4 custom animations approved by Client
- iv) Programmed music soundtrack
- v) Duration of show: 12-13:30 minutes
- vi) Staff travel and expenses
- vii) Equipment freight and logistics expenses
- viii) Set up, installation, dismantle of equipment
Follow this across meetings
Applicants and firms
- Hall and Ogle Architects, Inc.
- Hall & Ogle Architects, Inc.
- Open Sky Productions, LLC
- Cunningham's Lawn and Landscaping, LLC and AAA Fence (for turf project); Paul Culver Construction, Inc. (for bathroom project)
- Paul Culver Construction, Inc.
- Stanley Consultants, Inc. (Engineer of Record)
- Stanley Consultants, Inc.
- City of Port Orange (Lessee), Board of Trustees of the Internal Improvement Trust Fund of the State of Florida (Lessor)
- City of Port Orange, Florida
- City of Port Orange
- Daniel D. and Sandra L. Bordis
Locations
- 1000 City Center Circle, Port Orange, Florida 32129 (City); 208 Magnolia Avenue, Daytona Beach, Florida 32114 (Hall & Ogle Architects, Inc.)
- 1395 Dunlawton Avenue, Port Orange, FL 32120 (REC Center)
- 1000 City Center Circle, Port Orange, FL 32129 (Venue)
- 4655 City Center Circle, Port Orange, Florida
- 4655 City Center Dr., Port Orange, FL, 32129
- Spruce Creek Road (from South of Selin Circle to Herbert St)
- SJR2C Loop Trail (Spruce Creek Rd) from South of Selin Circle to Herbert St
- 3459 S. Ridgewood Ave, Port Orange, FL (adjacent to Riverwalk Park)
- 1000 City Center Circle, Port Orange, Florida 32129 (Lessee's address)
- 842 and 846 Bears Trail Properties
- 1737 Fern Park Drive
- Not stated (property located near well-fields)
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta