Board of Adjustments Regular Meeting Agenda
Board of Adjustments Regular Meeting · 2026-04-21 · agenda
The Board of Adjustments will consider a variance request for a swimming pool and pool deck at 224 Overlook Road. The applicant, Cristiano Pedrosa with Prime Property Construction LLC, seeks to allow a 6.1-foot side and 6.9-foot rear setback to the water line of the pool, deviating from the required 10-foot setback. The property is zoned R-1A. The meeting is scheduled for April 21, 2026.
Agenda items
- 1. 224 Overlook Rd - Area Map
- 1. CUTS MUST BE MADE THE SAME DAY AS PLACEMENT AND AS SOON AS THE CONCRETE HAS SET
- 1. Draft Board of Adjustments Regular Meeting Minutes
- 1. GOVERNING CODES:
- 1. OVERHANG TO BE 8" TYP. UNLESS OTHERWISE NOTED
- 1. PROPERTY ZONED R-1A AT CITY OF WINTER PARK, ORANGE COUNTY, FL.
- 1. REC. PRACTICE FOR HOT WEATHER CONCRETING (ACI 305).
- 10. DRAINAGE NOTES:
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Utilities (Sub)
- 10. EPOXY:
- 11. NO DIG OUT ANTICIPATED. NO MIDPOINT INSPECTION ANTICIPATED. ALL
- 11. SOFFITS:
- 12. BEFORE STARTING ANY DIGGING CONTRACTOR SHOULD CALL 811
- 12. PRE-ENGINEERED WOOD TRUSSES:
- 13. EXISTING SIDEWALK TO BE REPAIRED FROM ANY CONSTRUCTION
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- 13. FIELD REPAIR NOTES:
- 14. DRAINAGE PONDS MUST BE SODDED, AND THE USE OF GRAVELS,
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 14. WOOD
- 2. 224 Overlook Rd - Aerial Map
- 2. CUTS MADE THE NEXT DAY, OR AT ANY SUBSEQUENT TIMES, DO NOT PROVIDE ADEQUATE PROTECTION
- 2. GENERAL DESIGN LOADS:
- 2. REC. PRACTICE FOR COLD WEATHER CONCRETING (ACI 306).
- 2. ROOF PITCH SEE ROOF PLAN
- 2. WASTEWATER PROVIDED BY THE CITY OF WINTER PARK.
- 3. 224 Overlook Rd - Survey
- 3. CUTS SHOULD BE SEALED WITH A SEMI-RIGID EPOXY OR ACRYLIC ADHESIVE SEALANT. BACKER ROD IS
- 3. DEFLECTION CRITERIA:
- 3. NO EXISTING WELL OR SEPTIC SYSTEM ON SITE, NOR IDENTIFIED 75FT
- 3. REC. PRACTICE FOR CONCRETE FORMWORK (ACI 347).
- 3. REFER TO STRUCTURAL DRAWINGS FOR BEAM AND PLATE
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 4. 224 Overlook Rd - Civil Site Plan
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- Real Estate Development
- 4. Public Hearings (Public participation and comment on these matters
- 4. Public Hearings (Public participation and comment on these matters must be
- 4. Public Hearings (Public participation and comment on these matters must be
- 4. RELOCATION OF WATER METER AND SEWER AND POINT OF
- 5. 224 Overlook Rd - Arch Set
- Engineering & Architecture
- 5. SPREAD FOOTING FOUNDATIONS:
- 5. SURVEY BASED ON NAVD 88 DATUM
- 6. 224 Overlook Rd - Applicant Submittal
- Engineering & Architecture
- Title & Settlement Services
- 6. ALL EASEMENTS PRESENT AT THE PROPERTY SHOWN PER DRAWINGS.
- 6. STRUCTURAL FILL:
- 7. SLABS ON GRADE SLABS ON GRADE:
- 7. THIS DRAWING DOES NOT REPRESENT A SURVEY. SURVEY MUST BE
- 8. CAST IN PLACE CONCRETE:
- 8. PROPERTY AT ZONE "X" PER FEMA PANEL 12095C0255F (EFF. 9/25/2009)
- 9. CONCRETE MASONRY:
- 9. NO WETLANDS PRESENT AT THE PROPERTY.
- A. ALL CONCRETE CONSTRUCTION SHALL CONFORM TO THE "SPECIFICATIONS FOR
- A. ALL CONSTRUCTION SHALL CONFORM WITH THE 8 th EDITION (2023) FLORIDA BUILDING CODE
- A. ALL EPOXY CALLED FOR IN PLANS TO BE SIMPSON SET (CONCRETE OR MASONRY),
- A. ALL MASONRY CONSTRUCTION SHALL CONFORM TO THE "BUILDING CODE
- A. ALL PREFABRICATED WOOD TRUSSES SHALL BE SECURELY FASTENED TO THEIR
- A. ALL SLABS ON GRADE SHALL CONSIST OF A 4 INCH THICK 2500 PSI (MIN) SLAB PLACED OVER A 6
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- A. ALL STRUCTURAL SHEATHING SHALL CONFORM TO THE DESIGN SPECIFICATIONS
- A. MISSED "J" BOLTS FOR WOOD BEARING WALLS MAY BE SUBSTITUTED WITH 1
- A. NEW FILL MATERIAL AND EXISTING BASE MATERIAL SHALL BE FREE OF ALL REFUSE, DEBRIS, AND
- A. SHOP DRAWINGS FOR ALL STRUCTURAL ELEMENTS SHOWN ON THE CONSTRUCTION DOCUMENTS
- A. THE BOTTOM OF ALL EXTERIOR FOOTINGS SHALL BE LOCATED AS INDICATED ON THE DRAWINGS.
- B. ALL CONCRETE MASONRY SHALL HAVE A SPECIFIED COMPRESSIVE STRENGTH OF
- B. ALL FOUNDATIONS HAVE BEEN DESIGNED FOR AN ASSUMED NET ALLOWABLE SOIL BEARING
- Concrete & Masonry
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- B. ANY TERMITE TREATMENT SPECIFIED AND PERMITTED BY FBC-1816 IS ACCEPTABLE, INCLUDING:
- B. FILL MATERIAL SHALL BE DEPOSITED IN 8 INCH MAXIMUM LOOSE LIFTS AND COMPACTED TO A
- B. FLOOR SHEATHING:
- B. FOR MISSED VERTICAL DOWELS, DRILL A 3
- B. IN ADDITION TO THE ABOVE, ALL CONCRETE WORK SHALL CONFORM TO THE
- B. OTHER CODES:
- Electrical
- Concrete & Masonry
- Carpentry & Cabinetry
- Construction (Other)
- Engineering & Architecture
- Building & Industrial Supply
- B. PRE-FABRICATED WOOD TRUSSES SHALL BE DESIGNED IN ACCORDANCE WITH THE
- B. THE CONTRACTOR SHALL REVIEW THE ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING
- C. ALL CONCRETE EXPOSED TO PUBLIC VIEW SHALL CONFORM TO THE REQUIREMENTS
- C. ALL FILL PLACED UNDER SPREAD FOOTINGS SHALL BE COMPACTED TO A DRY DENSITY OF AT
- C. ALL WALLS SHALL BE CONSTRUCTED OF NORMAL WEIGHT HOLLOW LOAD BEARING
- C. FOR MORTAR JOINTS LESS THAN 1
- C. IN ADDITION TO THE FLORIDA BUILDING CODE ALL CONSTRUCTION SHALL CONFORM WITH THE
- C. ROOF SHEATHING:
- C. SLABS ON GRADE SHALL BE SCREED, FLOATED, AND STEEL TROWELED TO FORM A SMOOTH,
- C. THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS SHOWN ON THE CONTRACT
- General Contractor
- Engineering & Architecture
- C. TRUSS MEMBERS AND CONNECTIONS SHALL BE PROPORTIONED (WITH A MAXIMUM
- D. ALL CONCRETE, UNLESS NOTED OTHERWISE, SHALL BE STONE AGGREGATE
- D. ALL EXISTING SOIL CONTAINING GRAVEL, CONSTRUCTION OR DEMOLITION DEBRIS, ORGANIC
- D. ALL EXTERIOR WALLS AND BEARING WALLS SHALL BE CONSTRUCTED USING TYPE
- D. BRIDGING FOR PRE-ENGINEERED TRUSSES SHALL BE AS REQUIRED BY THE TRUSS
- D. MISSED LINTEL STRAPS FOR MASONRY CONSTRUCTION MAY BE SUBSTITUTED
- D. PLACE CONCRETE PER ACI 302. CONTRACTOR SHALL READ, UNDERSTAND FOLLOW GUIDELINES
- D. SCALES SHOWN ON THE CONSTRUCTION DOCUMENTS ARE FOR GENERAL INFORMATION ONLY.
- D. VERTICAL WALL SHEATHING (INC. GABLES, TRUSS HEELS ETC.):
- E. ALL CONCRETE EXPOSED TO WEATHER SHALL HAVE AN AIR ENTRAINMENT OF 5%
- E. ALL FILL FOR CONCRETE MASONRY SHALL BE GROUT CONFORMING TO ASTM C 476
- E. EXTEND SLAB 1-1/2" INCHES AT DOOR OPENINGS, EXTEND SLAB 1-1/2" INCHES AT SLIDING
- E. NO MORE THAN 10 STRAPS MAY BE SUBSTITUTED OR NO MORE THAN 3 IN A ROW
- E. TRUSS ELEVATIONS AND SECTIONS ARE FOR GENERAL CONFIGURATION OF TRUSSES
- Carpentry & Cabinetry
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- E. WOOD GRADE SHALL BE REGULAR SOUTHERN PINE NO. 2, 19% MOISTURE
- F. ALL MANUFACTURED/GLULAM/POWERBEAM/LVL MEMBERS TO HAVE A MINIMUM
- F. ALL MASONRY WALLS SHALL BE REINFORCED WITH 9GA LADDER TYPE GALVANIZED
- F. ALL REINFORCING BARS SHALL BE NEW BILLET STEEL CONFORMING TO GRADE 60
- F. DESIGN SPECIFICATIONS FOR LIGHT WEIGHT METAL PLATE CONNECTED WOOD
- F. IF MISSED, MSTAM36 OR MSTAM40 STRAP IS MISSED FOR 2 ND FLOOR JAMB STUD
- F. SAW CUT CONTROL JOINTS IN CONCRETE SLAB RECOMMENDED AT 12'-0" O.C. MAX PER DETAIL 1
- Concrete & Masonry
- General Contractor
- Building & Industrial Supply
- G. ALL DOUBLE BEAMS TO BE CONNECTED WITH 12d NAILS AT 16" O.C. STAGGERED,
- G. ALL REINFORCING BARS FOR MASONRY SHALL BE NEW BILLET STEEL CONFORMING
- G. ALL REINFORCING SHALL BE DETAILED, FABRICATED AND PLACED IN ACCORDANCE
- G. PRE-ENGINEERED WOOD TRUSSES SHALL BE DESIGNED BY THE MANUFACTURER IN
- Carpentry & Cabinetry
- Construction (Other)
- Engineering & Architecture
- H. ALL SIMPSON CONNECTORS TO BE INSTALLED PER MANUFACTURER'S
- H. ALL VERTICAL REINFORCING SHALL BE LAP SPLICED A MINIMUM OF 48 BAR
- H. GROUND BLAST FURNACE SLAG MAY BE USED TO REPLACE UP TO 50% OF THE
- H. THE TRUSS MANUFACTURER SHALL DETERMINE ALL SPANS WORKING POINTS,
- I. ALL WOOD IN CONTACT WITH THE GROUND AND THAT SUPPORTS PERMANENT
- I. IF VERTICAL REINFORCING. IS MISSING AND/OR MISPLACED, REPLACEMENT
- I. MINIMUM COVER FOR ALL REINFORCING SHALL BE AS FOLLOWS UNLESS OTHERWISE
- T. O. FINISH SLAB
- General Contractor
- Concrete & Masonry
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Windows, Doors & Glass
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- T. O. FINISH SLAB
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- T. O. FINISH SLAB
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Drywall & Insulation
- General Contractor
- Building & Industrial Supply
- T. O. FINISH SLAB
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Drywall & Insulation
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- T. O. FINISH SLAB
- T. O. FINISH SLAB
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- HVAC & Climate Control
- Painting & Flooring
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- T. O. FINISH SLAB
- T. O. FINISH SLAB
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- HVAC & Climate Control
- Plumbing
- Electrical
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- T. O. FINISH SLAB
- T. O. FINISH SLAB
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- a. BOA #26-01. Request of Property Owner for variance approval
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- HVAC & Climate Control
- Plumbing
- Electrical
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- a. BOA #26-04. Request of Cristiano Pedrosa with Prime Property
- Concrete & Masonry
- Plumbing
- Electrical
- Construction (Other)
- Real Estate Development
- Engineering & Architecture
- a. BOA #26-04. Request of Cristiano Pedrosa with Prime Property
- Pool & Spa Construction
- Concrete & Masonry
- Plumbing
- Site Prep, Grading & Hardscape
- General Contractor
- Real Estate Development
- Engineering & Architecture
- b. BOA #26-02. Request of Anthony Ewen with EDesign
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
Follow this across meetings
Applicants and firms
Locations
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta