Skip to main content

Sé el Primero, Construye Relaciones Duraderas

Board of County Commissioners: julio de 2026

Miami-Dade County

CELEBRATING 30 YEARS OF EXCELLENCE

This legislative item, File Number 261282, titled 'CELEBRATING 30 YEARS OF EXCELLENCE IN CREDIT RATINGS AND SECURITIES AND EXCHANGE COMMISSION COMPLIANCE', was introduced on 7/10/2026 and was before the Board on 7/21/2026 as Agenda Item 2B14. The requester is the Mayor. No specific project details, zoning changes, or applicant information are provided.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Report
Decision:
Before the Board
Applicant:
Mayor

CELEBRATING 30 YEARS OF EXCELLENCE

This legislative item, File Number 261282, titled 'CELEBRATING 30 YEARS OF EXCELLENCE IN CREDIT RATINGS AND SECURITIES AND EXCHANGE COMMISSION COMPLIANCE', was introduced on 7/10/2026 and is pending BCC assignment with an agenda date of 7/21/2026. The requester is the Mayor. No specific project details, zoning changes, or physical location information are provided.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Report
Decision:
Pending BCC Assignment
Applicant:
Mayor

CELEBRATING 30 YEARS OF EXCELLENCE

This legislative item, File Number 261282, titled 'CELEBRATING 30 YEARS OF EXCELLENCE IN CREDIT RATINGS AND SECURITIES AND EXCHANGE COMMISSION COMPLIANCE,' was introduced on 7/10/2026 and is pending BCC assignment. The agenda date is 7/21/2026 with agenda item number 2B14. No specific development project details, applicant, or decision are stated.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Report
Decision:
Pending BCC Assignment
Applicant:
Mayor

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order approves a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to unforeseen subsurface conditions requiring extensive roadway restoration, and conflicts with communication and electrical duct banks. Funds will be utilized from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation. The original contract was awarded on November 22, 2021, and ratified on March 15, 2022. The revised substantial completion date is February 15, 2027, and the final completion date is March 17, 2027.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Infrastructure, Innovation & Technology Committee; pending Board of County Commissioners approval
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County is approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida, for the D2-C2 project involving water main and gravity sewer installation. The change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract award to $12,664,944.53. The increase is attributed to differing subsurface conditions requiring larger trenching and additional restoration, as well as unforeseen conflicts with communication and electrical duct banks. Funds will be used from the Building Better Communities General Obligation Bond Program. The project involves approximately 9,246 linear feet of sanitary sewer mains and 9,851 linear feet of ductile iron water main service lines. The Infrastructure, Innovation & Technology Committee forwarded this to the Board of County Commissioners with a favorable recommendation. The original contract was awarded on November 22, 2021, and ratified on March 15, 2022. The revised substantial completion date is February 15, 2027, and the final completion date is March 17, 2027.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved (Change Order No. 1 approved by Board of County Commissioners)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and along NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners (BCC) is considering Resolution approving Change Order No. 1 to Contract No. S-958 between Miami-Dade County and Lanzo Construction Co., Florida. This change order grants a time extension of 1,000 calendar days and increases the contract amount by $5,411,816.28, bringing the total contract award from $7,253,128.25 to $12,664,944.53. The project involves proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to differing subsurface conditions requiring larger trenching and additional restoration, and unforeseen conflicts with communication and electrical duct banks. Funds will be used from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17-Countywide Water and Sewer System Enhancements. The Infrastructure, Innovation & Technology Committee forwarded this item to the BCC with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Recommended for approval by Infrastructure, Innovation & Technology Committee; pending Board of County Commissioners decision
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and along NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners (BCC) is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order significantly increases the contract amount by $5,411,816.28, bringing the total to $12,664,944.53, and extends the project timeline by 1,000 calendar days. The original contract, awarded in November 2021, was for water main and sewer line installation along NW 22nd Avenue from NW 79th Street to NW 90th Street, and a force main along NW 87th Street. The increase is attributed to unforeseen subsurface conditions requiring extensive roadway restoration, conflicts with existing communication and electrical duct banks, and replenishment of the contingency allowance. A credit was applied for the substitution of concrete manholes for fiberglass. The project aims to extend critical wastewater infrastructure and replace undersized water mains in an industrial and commercial area, funded in part by the Building Better Communities General Obligation Bond (GOB) Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the BCC with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Before the Board (pending final action by County Commission)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and along NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order approves a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to unforeseen subsurface conditions requiring extensive roadway restoration, and conflicts with communication and electrical duct banks. Funds will be utilized from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Pending Board of County Commissioners approval
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order approves a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to unforeseen subsurface conditions requiring extensive roadway restoration and conflicts with communication and electrical duct banks. Funds will be utilized from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation. The original contract was awarded on November 22, 2021, and ratified on March 15, 2022. The revised substantial completion date is February 15, 2027, and the final completion date is March 17, 2027.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Recommended for approval (by Infrastructure, Innovation & Technology Committee); Pending Board of County Commissioners approval
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners approved Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract award to $12,664,944.53. The project involves proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to differing subsurface conditions requiring larger trenching and additional restoration, and unforeseen conflicts with communication and electrical duct banks. Funds will be used from the Building Better Communities General Obligation Bond Program Project No. 17. The original contract was awarded on November 22, 2021, and ratified on March 15, 2022. The revised substantial completion date is February 15, 2027, and the final completion date is March 17, 2027. Public comment is not stated.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and along NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract award to $12,664,944.53. The project involves proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to differing subsurface conditions requiring larger trenching and additional restoration, as well as unforeseen conflicts with communication and electrical duct banks. Funds will be used from the Building Better Communities General Obligation Bond Program. The original contract was awarded on November 22, 2021, and ratified on March 15, 2022. The revised substantial completion date is February 15, 2027, and the final completion date is March 17, 2027. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved (Change Order No. 1 approved)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and along NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order approves a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase in cost and time is attributed to unforeseen subsurface conditions requiring extensive roadway restoration, and conflicts with existing communication and electrical duct banks. Funds will be utilized from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation. The original contract was awarded on November 22, 2021, and ratified on March 15, 2022. The revised substantial completion date is February 15, 2027, and the final completion date is March 17, 2027.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Infrastructure, Innovation & Technology Committee; pending Board of County Commissioners approval.
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners (BCC) is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order significantly increases the contract amount by $5,411,816.28, bringing the total to $12,664,944.53, and extends the project timeline by 1,000 calendar days. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is attributed to unforeseen subsurface conditions requiring extensive roadway restoration, conflicts with communication and electrical duct banks, and replenishment of the contingency allowance. A credit was applied for the substitution of concrete manholes for fiberglass. Funding is from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17 and other WASD sources. The original contract was awarded in November 2021 for $7,253,128.25 with a 750-day duration. The revised substantial completion date is February 15, 2027, and final completion is March 17, 2027. The Infrastructure, Innovation & Technology Committee forwarded this item to the BCC with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Before the Board (pending final action)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and along NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order approves a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to unforeseen subsurface conditions requiring extensive roadway restoration and conflicts with communication and electrical duct banks. Funds will be utilized from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation. The original contract was awarded on November 22, 2021, and ratified on March 15, 2022. The revised substantial completion date is February 15, 2027, and the final completion date is March 17, 2027.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by the Infrastructure, Innovation & Technology Committee; pending Board of County Commissioners approval
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners adopted Resolution R-644-26 on July 21, 2026, approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida. This change order extends the contract duration by 1,000 calendar days and increases the contract amount by $5,411,816.28, bringing the total contract award to $12,664,944.53. The project involves the installation of 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase in cost and time is attributed to differing subsurface conditions requiring larger trenching and additional restoration, as well as unforeseen conflicts with communication and electrical duct banks. Funds for the wastewater service extension will be sourced from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17. The original contract was awarded on November 22, 2021, for $7,253,128.25 with a 750-day duration. The revised substantial completion date is February 15, 2027, and the final completion date is March 17, 2027. The project aims to extend critical wastewater infrastructure and replace undersized water mains in an industrial and commercial area.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and along NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract award to $12,664,944.53. The project involves the installation of 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to differing subsurface conditions requiring larger trenching and additional restoration, and unforeseen conflicts with communication and electrical duct banks. Funds will be used from the Building Better Communities General Obligation Bond Program. The original contract was awarded on November 22, 2021, for $7,253,128.25. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved (Change Order No. 1)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and along NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County is approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida, for the D2-C2 project. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract award to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase in cost and time is attributed to differing subsurface conditions requiring larger trenching and additional restoration, as well as unforeseen conflicts with communication and electrical duct banks. Funds for the wastewater service extension will come in part from the Building Better Communities General Obligation Bond Program Project No. 17. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board of County Commissioners with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved (Change Order No. 1)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order approves a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase in cost and time is attributed to unforeseen subsurface conditions requiring extensive roadway restoration, and conflicts with existing communication and electrical duct banks. Funds will be utilized from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation. The original contract was awarded on November 22, 2021, and ratified on March 15, 2022. The revised substantial completion date is February 15, 2027, and the final completion date is March 17, 2027.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Pending Board of County Commissioners approval
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners approved Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract award to $12,664,944.53. The project involves the installation of 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to differing subsurface conditions requiring larger trenching and additional restoration, and unforeseen conflicts with communication and electrical duct banks. Funds will be used from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17. The original contract was awarded on November 22, 2021, for $7,253,128.25 with a 750-day duration. The revised substantial completion date is February 15, 2027, and the final completion date is March 17, 2027. Public comment is not stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract award to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to differing subsurface conditions requiring larger trenching and additional restoration, as well as unforeseen conflicts with communication and electrical duct banks. Funds will be used from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved (Change Order No. 1 approved)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and along NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order approves a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase in cost and time is attributed to unforeseen subsurface conditions requiring extensive roadway restoration, and conflicts with existing communication and electrical duct banks. Funds for the wastewater service extension will be sourced from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation. The original contract was awarded on November 22, 2021, and ratified on March 15, 2022. The revised substantial completion date is February 15, 2027, and the final completion date is March 17, 2027.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Pending Board of County Commissioners approval (recommended favorable by Infrastructure, Innovation & Technology Committee)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract award to $12,664,944.53. The project involves the installation of 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to differing subsurface conditions requiring larger trenching and additional restoration, and unforeseen conflicts with communication and electrical duct banks. Funds will be used from the Building Better Communities General Obligation Bond Program. The original contract was awarded on November 22, 2021, for $7,253,128.25 with a 750-day duration. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved (Change Order No. 1)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and along NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order approves a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase in cost and time is attributed to unforeseen subsurface conditions requiring extensive roadway restoration, and conflicts with existing communication and electrical duct banks. Funds will be utilized from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Infrastructure, Innovation & Technology Committee; pending Board of County Commissioners approval.
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order approves a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase in cost and time is attributed to unforeseen subsurface conditions requiring extensive roadway restoration, and conflicts with existing communication and electrical duct banks. Funds for the wastewater service extension will be sourced from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation. The original contract was awarded on November 22, 2021, and ratified on March 15, 2022. The revised substantial completion date is February 15, 2027, and the final completion date is March 17, 2027.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Infrastructure, Innovation & Technology Committee; pending Board of County Commissioners approval
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to unforeseen subsurface conditions requiring extensive roadway restoration and conflicts with communication and electrical duct banks. Funds will be utilized from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation (Infrastructure, Innovation & Technology Committee); Pending BCC Assignment (Board of County Commissioners)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract award to $12,664,944.53. The project involves proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to differing subsurface conditions requiring larger trenching and additional restoration, as well as unforeseen conflicts with communication and electrical duct banks. Funds will be used from the Building Better Communities General Obligation Bond Program Project No. 17. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved (Change Order No. 1 approved)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and along NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order approves a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase in cost and time is attributed to unforeseen subsurface conditions requiring extensive roadway restoration, and conflicts with existing communication and electrical duct banks. Funds will be utilized from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation. The original contract was awarded on November 22, 2021, and ratified on March 15, 2022.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Pending Board of County Commissioners approval
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to unforeseen subsurface conditions requiring extensive roadway restoration and conflicts with communication and electrical duct banks. Funds will be utilized from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Infrastructure, Innovation & Technology Committee; pending Board of County Commissioners decision.
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162nd Street from NW 6th Avenue to NE 8th Avenue. The increase in cost is attributed to utility conflicts, required roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project has been successfully completed. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021. The change order extends the substantial completion date to August 5, 2024, and the final completion date to October 4, 2024. The project is part of Miami-Dade Water and Sewer Department's Capital Improvement Program. Small Business Enterprise (SBE) goals for the contract are expected to be satisfied upon approval of this change order.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying action by the County Mayor or County Mayor’s designee, specifically approval of Change Order No. 1
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is set to ratify Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162nd Street from NW 6th Avenue to NE 8th Avenue. The increase in cost is attributed to various construction challenges including utility conflicts, roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project is part of Miami-Dade Water and Sewer Department's Capital Improvement Program. The change order was introduced on 6/30/2026 and is scheduled for an agenda date of 7/21/2026. The project has since been completed. No public comment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Pending BCC Assignment (for ratification of Change Order No. 1)
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is set to ratify Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162nd Street from NW 6th Avenue to NE 8th Avenue. The increase in cost is attributed to various construction challenges including utility conflicts, roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project has been successfully completed, and this change order serves as the final contract closeout. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021. The total contract value will increase from $19,314,785.95 to $20,977,101.12. The change order includes a value engineering credit of $56,150.00 and reallocation of $720,899.14 in unused contract funds to offset additional costs. Small Business Enterprise (SBE) goals for the contract are expected to be met upon approval of this change order.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Recommended for ratification
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The increase in contract amount is attributed to various construction challenges including utility conflicts, required roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project has since been successfully completed and this change order serves as the final contract closeout. The project is part of Miami-Dade Water and Sewer Department's Capital Improvement Program.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying action by the County Mayor or County Mayor’s designee, specifically approval of Change Order No. 1
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners adopted Resolution R-645-26 on July 21, 2026, ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. This change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day time extension for the construction of a 60-inch force main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) and encountered issues such as utility conflicts, roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and differing site conditions. The total contract value increased from $19,314,785.95 to $20,977,101.12. The project is now completed. The change order was funded through WASD Revenue Bonds.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162nd Street from NW 6th Avenue to NE 8th Avenue. The increase in cost is attributed to utility conflicts, required roadway repairs, tree mitigation, pipe interconnection complexities due to unforeseen site conditions, failures of existing asbestos cement pipe water mains, and delays from late design revisions and permitting issues. The project has been successfully completed, and this change order serves as the final contract closeout. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021. The change order extends the substantial completion date from June 6, 2023, to August 5, 2024, and the final completion date from August 5, 2023, to October 4, 2024. The total contract value increases from $19,314,785.95 to $20,977,101.12. The project is part of Miami-Dade Water and Sewer Department's Capital Improvement Program.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Ratified (Change Order No. 1 approved)
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners (BCC) is ratifying Change Order #1 to Contract #S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of pipe along NW 162 Street from NW 6 Avenue to NE 8 Avenue. Reasons for the change order include utility conflicts, required roadway repairs, tree mitigation, pipe interconnection complexities, failures of existing asbestos cement pipe water mains, and permitting issues. The project has been successfully completed. The original contract was awarded on January 7, 2021, and ratified by the BCC on April 20, 2021. The total contract value will increase from $19,314,785.95 to $20,977,101.12. The change order was funded through WASD Revenue Bonds.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying action by the County Mayor or County Mayor’s designee approving Change Order No. 1
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The increase in cost is attributed to various construction challenges including utility conflicts, roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project has been successfully completed. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021. The change order extends the substantial completion date from June 6, 2023, to August 5, 2024, and the final completion date from August 5, 2023, to October 4, 2024. The total contract value is increased from $19,314,785.95 to $20,977,101.12. The project is part of Miami-Dade Water and Sewer Department's Capital Improvement Program.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying action by the County Mayor or County Mayor’s designee, specifically approval of Change Order No. 1
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of pipe along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The increase in cost is attributed to various construction challenges including utility conflicts, roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project has been successfully completed. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021. The change order extends the substantial completion date to August 5, 2024, and the final completion date to October 4, 2024.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying action by the County Mayor or County Mayor’s designee approving Change Order No. 1
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved installing approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The additional costs are attributed to utility conflicts, required roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and delays from late design revisions and differing site conditions. The project is part of Miami-Dade Water and Sewer Department's Capital Improvement Program. The change order was approved by the County Mayor or designee and is presented for ratification by the Board. The project has since been successfully completed and this change order serves as the final contract closeout. Small Business Enterprise (SBE) goals for the contract are stated to be satisfied upon approval of this change order.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Ratification of Change Order No. 1 recommended
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order #1 to Contract S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The increase in cost is attributed to utility conflicts, required roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project has since been successfully completed. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021. The extended substantial completion date is August 5, 2024, and the final completion date is October 4, 2024.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Ratified (Change Order #1 approved)
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

This legislative item concerns Change Order #1 for Contract S-945 between Miami-Dade County and Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). The change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved constructing approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The additional costs are attributed to utility conflicts, roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and delays from late design revisions and differing site conditions. The project has been successfully completed. The Board of County Commissioners is being asked to ratify this action. Public comment is not stated in this document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Recommended for ratification
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of pipe along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The additional costs are attributed to utility conflicts, roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and pipe interconnection complexities. The project is part of Miami-Dade Water and Sewer Department's Capital Improvement Program. The change order extends the substantial completion date to August 5, 2024, and the final completion date to October 4, 2024. The project has since been successfully completed. The document also details value engineering savings and reallocation of unused contract funds to offset the increase. Small Business Enterprise (SBE) measures are noted as being satisfied upon contract completion.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying action by the County Mayor or County Mayor’s designee approving Change Order No. 1
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order #1 to Contract S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. Reasons for the change order include utility conflicts, required roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and differing site conditions. The project has since been successfully completed. The Board is expected to ratify this change order on July 21, 2026. Public comment is not stated in this document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Recommended for ratification
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The increase in cost is attributed to utility conflicts, required roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project has been successfully completed. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021. The change order extends the substantial completion date to August 5, 2024, and the final completion date to October 4, 2024.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying action by the County Mayor or County Mayor’s designee
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of pipe along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The increase in cost is attributed to utility conflicts, roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project has been successfully completed. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021. The change order extends the substantial completion date to August 5, 2024, and the final completion date to October 4, 2024.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying Change Order No. 1
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved installing approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The additional costs are attributed to utility conflicts, required roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and delays from late design revisions and differing site conditions. The project has been successfully completed, and this change order serves as the final contract closeout. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021. The total contract value increased from $19,314,785.95 to $20,977,101.12. The change order was funded through WASD Revenue Bonds Sold and Future WASD Revenue Bonds. Small Business Enterprise (SBE) goals for the contract are noted as satisfied upon approval of this change order.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Ratified (Change Order No. 1 approved)
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved constructing approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The additional costs are attributed to utility conflicts, required roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and delays from late design revisions and differing site conditions. The project has been successfully completed. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021. The change order extends the Substantial Completion Date from June 6, 2023, to August 5, 2024, and the Final Completion Date from August 5, 2023, to October 4, 2024. The total contract value increased from $19,314,785.95 to $20,977,101.12. The change order also addresses a value engineering credit of $56,150.00 and reallocates $720,899.14 in unused contract funds. Small Business Enterprise (SBE) goals for the contract are noted as satisfied upon approval of this change order.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Ratified (Change Order No. 1 approved)
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order #1 to Contract #S-945 with Ric-Man International, Inc. for the construction of a 60-inch force main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The increase in cost is attributed to utility conflicts, required roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project has been successfully completed, and this change order serves as the final contract closeout. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying action by the County Mayor or County Mayor’s designee approving Change Order No. 1
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order #1 to Contract S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The increase in cost is attributed to utility conflicts, required roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project has since been successfully completed. The Board is expected to ratify this change order on July 21, 2026.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Recommended for ratification
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is set to ratify Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The increase in cost is attributed to various construction challenges including utility conflicts, required roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project has been successfully completed, and this change order serves as the final contract closeout. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021. The change order extends the substantial completion date from June 6, 2023, to August 5, 2024, and the final completion date from August 5, 2023, to October 4, 2024. The project is part of Miami-Dade Water and Sewer Department's Capital Improvement Program.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Recommended for ratification
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The additional costs are attributed to utility conflicts, roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and delays from late design revisions and differing site conditions. The project is part of Miami-Dade Water and Sewer Department's Capital Improvement Program. The change order was approved by the County Mayor or designee and requires Board ratification. The project has since been completed. Public comment is not stated in this document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Ratification of Change Order No. 1 approved
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.

Comienza tu prueba gratis