CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution ratifying Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. Change Order No. 1 grants a 699-calendar day time extension with no additional fiscal impact. The project has been completed and this change order serves as final contract closeout. The project allows for an increase of the permitted average annual daily flow from 112.5 to 131 million gallons per day (MGD) and an increase of peak flow capacity from 285 MGD to 305 MGD. The project includes construction of headworks, two oxygenation trains, odor control facilities, and installation of large diameter pipelines including a connection to an existing 72-inch force main at SW 232nd Street. The contract was awarded on May 11, 2021, with a total amount not to exceed $107,605,400.00. The Notice to Proceed was issued on August 30, 2021. The decision was Adopted on 9/1/2026. File Number: 261435. Reference: R-751-26. Introduced: 8/14/2026. Agenda Item Number: 8O3. The project is located in Commission District 8. Public comment sentiment is not stated.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water & Sewer Department; Contractor: Poole & Kent Company of Florida
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution R-751-26, file number 261435, adopted September 1, 2026, ratifies Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. Change Order No. 1 grants a 699-calendar day time extension with no additional fiscal impact. The project is located at the South District Wastewater Treatment Plant in Commission District 8. The project increases permitted average annual daily flow from 112.5 to 131 million gallons per day and peak flow capacity from 285 MGD to 305 MGD. The contract was awarded May 11, 2021 for $107,605,400.00 with a duration of 792 calendar days. The Notice to Proceed was issued August 30, 2021. Change Order No. 1 extends the Substantial Completion Date from November 19, 2023 to October 18, 2025 and the Final Completion Date from January 18, 2024 to December 17, 2025. The project has been successfully completed. The change order is for time extension only and is exempt from Resolution R-1001-15 small business enterprise requirements. The contractor complied with the SBE goals. The project is necessary to meet State-mandated Ocean Outfall Legislation requirements. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water and Sewer Department; Contractor: Poole & Kent Company of Florida
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution R-751-26, File Number 261435, adopted September 1, 2026, ratifies Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar day time extension with no additional fiscal impact. The project is located at the South District Wastewater Treatment Plant in Commission District 8. The project increases permitted average annual daily flow from 112.5 to 131 million gallons per day and peak flow capacity from 285 MGD to 305 MGD. The contract was awarded May 11, 2021, ratified by Resolution R-821-21, with a total amount not to exceed $107,605,400.00. The project has been successfully completed. The change order extends the Substantial Completion Date from November 19, 2023 to October 18, 2025 and the Final Completion Date from January 18, 2024 to December 17, 2025. Delays were due to third-party manufacturing issues, field coordination conflicts with adjacent Ocean Outfall Legislation projects, and late design and startup-related issues. The project is necessary to meet State-mandated Ocean Outfall Legislation requirements. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water and Sewer Department; Contractor: Poole & Kent Company of Florida
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution R-751-26, File Number 261435, adopted September 1, 2026, ratifies Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar day time extension with no additional fiscal impact. The project is located at WASD's South District Wastewater Treatment Plant in Commission District 8. The project increases permitted average annual daily flow from 112.5 to 131 million gallons per day and peak flow capacity from 285 MGD to 305 MGD. The contract was awarded May 11, 2021, with a total amount not to exceed $107,605,400.00. The project has been successfully completed. The change order extends the Substantial Completion Date from November 19, 2023 to October 18, 2025 and the Final Completion Date from January 18, 2024 to December 17, 2025. The document does not state a street address, parcel/folio, or acreage. Public comment sentiment is not stated.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water and Sewer Department; Poole & Kent Company of Florida
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution R-751-26 ratifies Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar day time extension with no additional fiscal impact. The project increases the permitted average annual daily flow from 112.5 to 131 million gallons per day (MGD) and peak flow capacity from 285 MGD to 305 MGD. The project includes construction of headworks, two oxygenation trains, odor control facilities, and installation of large diameter pipelines including a connection to an existing 72-inch force main at SW 232nd Street. The contract was awarded on May 11, 2021, with a total amount not to exceed $107,605,400.00. The Notice to Proceed was issued August 30, 2021. Change Order No. 1 extends the Substantial Completion Date from November 19, 2023 to October 18, 2025 and the Final Completion Date from January 18, 2024 to December 17, 2025. The resolution was introduced August 14, 2026, and adopted September 1, 2026. The project is located at WASD's South District Wastewater Treatment Plant in Commission District 8. The project was successfully completed. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water and Sewer Department; Poole & Kent Company of Florida (Contractor)
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution R-751-26 ratifies Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar day time extension with no additional fiscal impact. The project increased permitted average annual daily flow from 112.5 to 131 million gallons per day and peak flow capacity from 285 MGD to 305 MGD. The project is located at the South District Wastewater Treatment Plant in Commission District 8. The contract was awarded on May 11, 2021, with a total amount not to exceed $107,605,400.00. The change order extends the Substantial Completion Date from November 19, 2023 to October 18, 2025 and the Final Completion Date from January 18, 2024 to December 17, 2025. The resolution was adopted on September 1, 2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water and Sewer Department; Poole & Kent Company of Florida (Contractor)
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution R-751-26 ratifies Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar day time extension with no additional fiscal impact. The project was completed. The contract was awarded on May 11, 2021 for $107,605,400.00 with a duration of 792 calendar days. The Notice to Proceed was issued August 30, 2021. The Substantial Completion Date was extended from November 19, 2023 to October 18, 2025, and the Final Completion Date from January 18, 2024 to December 17, 2025. The project increases the permitted average annual daily flow from 112.5 to 131 million gallons per day (MGD) and the peak flow capacity from 285 MGD to 305 MGD at the South District Wastewater Treatment Plant. The project includes construction of headworks, two oxygenation trains, odor control facilities, and installation of large diameter pipelines including a connection to an existing 72-inch force main at SW 232nd Street. The project is located in Commission District 8. The resolution was adopted on September 1, 2026. The project was ratified by the Board via Resolution No. R-821-21. The change order was necessary due to delays from third-party manufacturing issues, field coordination conflicts with adjacent Ocean Outfall Legislation projects, and late design and startup-related issues. The project is necessary to meet State-mandated Ocean Outfall Legislation requirements. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- South District Wastewater Treatment Plant, located in Commission District 8; connection to an existing 72-inch force main at SW 232nd Street
- Applicant:
- Miami-Dade County Water and Sewer Department; Contractor: Poole & Kent Company of Florida
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution ratifying Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar day time extension with no additional fiscal impact. The project was performed at WASD's South District Wastewater Treatment Plant, located in Commission District 8. The project will allow for the increase of the permitted average annual daily flow from 112.5 to 131 million gallons per day and the increase of the peak flow capacity of the Plant from 285 MGD to 305 MGD. The project consists of the construction of headworks, two oxygenation trains and odor control facilities and includes the installation of large diameter pipelines, including a connection to an existing 72-inch force main at SW 232nd Street. The contract was awarded on May 11, 2021, with a total award amount not to exceed $107,605,400.00. The resolution was adopted on September 1, 2026. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water & Sewer Department; Poole & Kent Company of Florida
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution R-751-26 ratifies Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar day time extension with no additional fiscal impact. The project was completed. The project increases the permitted average annual daily flow from 112.5 to 131 million gallons per day (MGD) and peak flow capacity from 285 MGD to 305 MGD. The project includes construction of headworks, two oxygenation trains, odor control facilities, and installation of large diameter pipelines, including a connection to an existing 72-inch force main at SW 232nd Street. The contract was awarded on May 11, 2021, with a total amount not to exceed $107,605,400.00. The Notice to Proceed was issued on August 30, 2021. The final action was on September 1, 2026. The project is located at WASD's South District Wastewater Treatment Plant in Commission District 8. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water & Sewer Department; Contractor: Poole & Kent Company of Florida
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution R-751-26, File Number 261435, ratified Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar day time extension with no additional fiscal impact. The project was performed at the South District Wastewater Treatment Plant in Commission District 8. The project increases the permitted average annual daily flow from 112.5 to 131 million gallons per day and the peak flow capacity from 285 MGD to 305 MGD. The contract was awarded May 11, 2021, for a total amount not to exceed $107,605,400.00. The change order extended the Substantial Completion Date from November 19, 2023 to October 18, 2025, and the Final Completion Date from January 18, 2024 to December 17, 2025. The resolution was adopted on September 1, 2026. The document does not state a street address, parcel/folio, or acreage. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water & Sewer Department; Contractor: Poole & Kent Company of Florida
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution R-751-26, File Number 261435, adopted September 1, 2026, ratifies Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar day time extension with no additional fiscal impact. The project is located at the South District Wastewater Treatment Plant in Commission District 8. The project increases permitted average annual daily flow from 112.5 to 131 million gallons per day and peak flow capacity from 285 MGD to 305 MGD. The contract was awarded May 11, 2021, with a total amount not to exceed $107,605,400.00. The project has been successfully completed. Public comment sentiment is not stated.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted (ratification of Change Order No. 1)
- Address:
- South District Wastewater Treatment Plant, Commission District 8, Miami-Dade County, Florida; includes connection to an existing 72-inch force main at SW 232nd Street
- Applicant:
- Miami-Dade County Water and Sewer Department; Contractor: Poole & Kent Company of Florida
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution R-751-26, File Number 261435, adopted September 1, 2026, ratifies Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar-day time extension with no additional fiscal impact. The project increased permitted average annual daily flow from 112.5 to 131 million gallons per day (MGD) and peak flow capacity from 285 MGD to 305 MGD. The project is located at the South District Wastewater Treatment Plant in Commission District 8. The contract was awarded May 11, 2021, with a total amount not to exceed $107,605,400.00. The Notice to Proceed was issued August 30, 2021. Substantial Completion Date extended from November 19, 2023 to October 18, 2025; Final Completion Date extended from January 18, 2024 to December 17, 2025. The project has been successfully completed. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade Water and Sewer Department; Poole & Kent Company of Florida
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution R-751-26 (File Number 261435) ratifies Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar day time extension with no additional fiscal impact. The project was completed. The contract was awarded on May 11, 2021, with a total amount not to exceed $107,605,400.00. The project increases the permitted average annual daily flow from 112.5 to 131 million gallons per day (MGD) and the peak flow capacity from 285 MGD to 305 MGD. The project includes construction of headworks, two oxygenation trains, odor control facilities, and installation of large diameter pipelines, including a connection to an existing 72-inch force main at SW 232nd Street. The project is located at WASD's South District Wastewater Treatment Plant in Commission District 8. The resolution was introduced on 8/14/2026, and the final action was on 9/1/2026. The decision was Adopted. The project was ratified by the Board via Resolution No. R-821-21. The Notice to Proceed was issued on August 30, 2021. The Substantial Completion Date was extended from November 19, 2023 to October 18, 2025, and the Final Completion Date from January 18, 2024 to December 17, 2025. The change order was necessary due to delays caused by third-party manufacturing issues, field coordination conflicts with adjacent Ocean Outfall Legislation (OOL) projects, and late design and startup-related issues. The project is necessary to meet the requirements of the State-mandated OOL pursuant to section 403.086(9) of the Florida Statutes. The contract was awarded with a 10.65 percent Small Business Enterprise (SBE) - Construction goal and a 2 percent SBE - Goods goal. The Contractor complied with the SBE goals. The project experienced six events that impacted the Contract's critical path: delays to Oxygenation Trains MCC Fabrication (425-day time extension), Headworks 3 Grit Collector and Conveyor MCC Bucket Modifications (76-day time extension, 38 days compensable, total cost $219,511.00), O2 Trains Exhaust Fan Wiring (75-day time extension, cost $16,614.00), Startup and Commissioning Delays (62-day time extension), Postponed Installation of the 72-inch Plug Valve (42-day time extension, cost $51,139.00), and Building Automation System (BAS) Master Panel Connection to Fire Alarm Panel (19-day time extension, compensable, total cost $164,574.00).
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water and Sewer Department; Contractor: Poole & Kent Company of Florida
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution R-751-26 ratifies Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar day time extension with no additional fiscal impact. The project is located at the South District Wastewater Treatment Plant in Commission District 8. The project increases permitted average annual daily flow from 112.5 to 131 million gallons per day and peak flow capacity from 285 MGD to 305 MGD. The contract was awarded on May 11, 2021, with a total amount not to exceed $107,605,400.00. The Notice to Proceed was issued August 30, 2021. Change Order No. 1 extends the Substantial Completion Date from November 19, 2023 to October 18, 2025 and the Final Completion Date from January 18, 2024 to December 17, 2025. The resolution was introduced August 14, 2026, and adopted September 1, 2026. The project was successfully completed. The change order is for time extension only, with no additional fiscal impact. The document does not state a specific street address, parcel, or folio number. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water and Sewer Department; Contractor: Poole & Kent Company of Florida
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution R-751-26 ratifies Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar day time extension with no additional fiscal impact. The project was completed and the change order serves as final contract closeout. The project increases the permitted average annual daily flow from 112.5 to 131 million gallons per day and peak flow capacity from 285 MGD to 305 MGD. The project includes construction of headworks, two oxygenation trains, odor control facilities, and installation of large diameter pipelines including a connection to an existing 72-inch force main at SW 232nd Street. The contract was awarded on May 11, 2021 for $107,605,400.00 with a duration of 792 calendar days. The Notice to Proceed was issued August 30, 2021. Change Order No. 1 extends the Substantial Completion Date from November 19, 2023 to October 18, 2025 and the Final Completion Date from January 18, 2024 to December 17, 2025. The resolution was introduced August 14, 2026 and adopted September 1, 2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water and Sewer Department; Poole & Kent Company of Florida (Contractor)
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution ratifying Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar day time extension with no additional fiscal impact. The project is located at WASD's South District Wastewater Treatment Plant in Commission District 8. The project increases permitted average annual daily flow from 112.5 to 131 million gallons per day and peak flow capacity from 285 MGD to 305 MGD. The contract was awarded May 11, 2021 for $107,605,400.00 with a 792-calendar day duration. The change order extends the Substantial Completion Date from November 19, 2023 to October 18, 2025 and the Final Completion Date from January 18, 2024 to December 17, 2025. The project has been successfully completed. The item was introduced August 14, 2026, agenda date September 1, 2026, agenda item number 8O3, and is before the Board. The resolution ratifies the County Mayor's action approving the change order. The project is necessary to meet State-mandated Ocean Outfall Legislation requirements. The change order is for a time extension only, and Resolution No. R-1001-15 does not apply. The Contractor complied with SBE goals. The project experienced six delay events: MCC fabrication delay (425 days), Headworks 3 grit collector modifications (76 days, 38 compensable, cost $219,511.00), O2 Trains exhaust fan wiring (75 days, cost $16,614.00), startup and commissioning delays (62 days), postponed installation of 72-inch plug valve (42 days, cost $51,139.00), and BAS master panel connection (19 days, compensable, cost $164,574.00).
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Pending before the Board; recommendation is to ratify Change Order No. 1
- Applicant:
- Miami-Dade County Water and Sewer Department; Contractor: Poole & Kent Company of Florida
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution R-751-26 ratifies Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar day time extension with no additional fiscal impact. The project is located at the South District Wastewater Treatment Plant in Commission District 8. The project increases permitted average annual daily flow from 112.5 to 131 million gallons per day and peak flow capacity from 285 to 305 MGD. The contract was awarded May 11, 2021 for $107,605,400.00. The change order extends the Substantial Completion Date from November 19, 2023 to October 18, 2025 and the Final Completion Date from January 18, 2024 to December 17, 2025. The project has been successfully completed. The resolution was adopted on September 1, 2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water and Sewer Department; Poole & Kent Company of Florida (contractor)
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution R-751-26 ratifies Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar day time extension with no additional fiscal impact. The project is located at the South District Wastewater Treatment Plant in Commission District 8. The project increases permitted average annual daily flow from 112.5 to 131 million gallons per day and peak flow capacity from 285 MGD to 305 MGD. The contract was awarded May 11, 2021 for $107,605,400.00 with a duration of 792 calendar days. The Notice to Proceed was issued August 30, 2021. Substantial Completion Date was extended from November 19, 2023 to October 18, 2025, and Final Completion Date from January 18, 2024 to December 17, 2025. The project has been successfully completed. The resolution was adopted on September 1, 2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade Water and Sewer Department; Poole & Kent Company of Florida (Contractor)
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution ratifying Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar day time extension with no additional fiscal impact. The project is complete and this change order serves as final contract closeout. The project increases the permitted average annual daily flow from 112.5 to 131 million gallons per day and peak flow capacity from 285 MGD to 305 MGD. The contract was awarded on May 11, 2021 for $107,605,400.00. The change order extends the Substantial Completion Date from November 19, 2023 to October 18, 2025 and the Final Completion Date from January 18, 2024 to December 17, 2025. The resolution was adopted on September 1, 2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- South District Wastewater Treatment Plant, located in Commission District 8
- Applicant:
- Miami-Dade County Water & Sewer Department; Contractor: Poole & Kent Company of Florida
CHANGE ORDER #1 POOLE & KENT (S-931)
Resolution ratifying Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar day time extension with no additional fiscal impact. The project has been completed. The project increases the permitted average annual daily flow from 112.5 to 131 million gallons per day (MGD) and the peak flow capacity from 285 MGD to 305 MGD at the South District Wastewater Treatment Plant. The project includes construction of headworks, two oxygenation trains, odor control facilities, and installation of large diameter pipelines including a connection to an existing 72-inch force main at SW 232nd Street. The contract was awarded on May 11, 2021, with a total amount not to exceed $107,605,400.00. The Notice to Proceed was issued on August 30, 2021. Change Order No. 1 extends the Substantial Completion Date from November 19, 2023 to October 18, 2025, and the Final Completion Date from January 18, 2024 to December 17, 2025. The project is located in Commission District 8, represented by Commissioner Danielle Cohen Higgins. The item was introduced on 8/14/2026, with an agenda date of 9/1/2026, agenda item number 8O3. The status is 'Before the Board'. The resolution ratifies action by the County Mayor or designee pursuant to Section 2-8.2.12 of the Code of Miami-Dade County. The project was ratified by the Board via Resolution No. R-821-21. The project is necessary to meet State-mandated Ocean Outfall Legislation requirements. The delays were caused by third-party manufacturing issues, field coordination conflicts with adjacent Ocean Outfall Legislation projects, and late design and startup-related issues. The change order is for a time extension only. The Contractor complied with Small Business Enterprise goals. The contract was awarded with a 10.65% SBE-Construction goal and a 2% SBE-Goods goal.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Pending BCC Assignment; Status: Before the Board; Resolution seeking ratification of Change Order No. 1
- Address:
- SW 232nd Street (connection to existing 72-inch force main); South District Wastewater Treatment Plant, Commission District 8
- Applicant:
- Miami-Dade County Water & Sewer Department; Contractor: Poole & Kent Company of Florida