MPO Technical Advisory Committee (TAC) Meeting: junio de 2026
Pasco County
5) May 6, 2026: Opportunity for public comment on the Draft FY 2027 - 2031 TIP made available at the MPO CAC meeting in Dade City
The MPO Technical Advisory Committee (TAC) is reviewing the Draft Fiscal Year 2027 - 2031 Transportation Improvement Program (TIP). This document outlines planned transportation projects for Pasco County over the next five years. The draft TIP was made available for public comment at a recent MPO CAC meeting. This is an early stage in the planning process, offering a chance for input before finalization. The TIP typically includes projects such as road construction, bridge repairs, public transit improvements, and other transportation infrastructure. These projects would likely involve site clearing, grading, utility work, paving, and construction of new or improved transportation facilities. Local contractors, trades, suppliers, and service providers should monitor the TIP development process. Engaging early, before specific projects are fully designed and bid, can provide an advantage in understanding future work opportunities.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
5) The projects are consistent with:
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
5. Ensuring there are facilities from where organizations can perform essential functions. Protecting
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
5. Environment: Protect and enhance the environment, promote energy conservation, improve quality of
This item is a discussion point for the MPO Technical Advisory Committee regarding environmental considerations in transportation planning. It focuses on protecting and enhancing the environment, promoting energy conservation, improving quality of life, and ensuring transportation projects align with planned growth and economic development. The agenda item is currently under review as part of ongoing discussions. This topic could lead to future projects involving environmental assessments, sustainable design practices, and infrastructure improvements that support economic development. Contractors, suppliers, and service providers in environmental consulting, engineering, and construction may find opportunities as specific projects are identified and planned. Early engagement is advised to understand potential project scopes and timelines.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
6) Federal funds can reasonably be expected to be made available for all projects within the time period shown for transportation project
The Pasco County MPO is reviewing transportation improvement projects for inclusion in its Transportation Improvement Program (TIP). These projects are identified through the MPO's List of Project Priorities (LOPP) and the 2050 Long-Range Transportation Plan (LRTP). Projects are selected based on feasibility, MPO priorities, FDOT work programs, and federal requirements. The MPO is currently in the planning and review stages for future transportation projects. The development process for these projects typically involves several phases, including planning, design, and eventual construction. This early stage presents an opportunity for local contractors, trades, suppliers, and service providers to engage with the MPO and understand upcoming needs. Reaching out now, before specific project plans, bids, and permits are finalized, allows businesses to position themselves for potential work as these projects move forward.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
6) May 6, 2026: Draft FY 2027 - 2031 TIP presented to the MPO TAC for review and comment at their regular meeting in Dade City
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
6. Achieving the organization’s timely and orderly recovery and reconstitution from an emergency.
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
6. Connectivity: Enhance the integration and connectivity of the transportation systems, across and between
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
7) May 6, 2026: Opportunity for public comment on the Draft FY 2027 - 2031 TIP made available at the MPO TAC meeting in Dade City
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
7. Efficient Management: Promote efficient management and operations.
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
7. Ensuring and validating continuity readiness through a dynamic and integrated continuity Test,
The Pasco MPO is planning its Unified Planning Work Program (UPWP) for Fiscal Years 2027 and 2028. This program outlines various planning activities and tasks to manage the transportation planning process. Key activities include developing strategic plans, maintaining continuity of operations plans, procuring necessary equipment and software, and managing grants and contracts. The MPO will also focus on public engagement, data collection, and coordinating with state and local agencies. This planning effort is currently under review and will involve tasks such as administrative support, financial management, and compliance with federal and state regulations. The scope of work will include services related to planning, administration, and potentially procurement of equipment and software. Local contractors, suppliers, and service providers in areas like professional services, IT, and administrative support can find opportunities by engaging with the MPO early in this planning process before specific bids and contracts are finalized.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
- Applicant:
- Pasco MPO
8) May 6, 2026: Draft FY 2027 – 2031 TIP presented to the MPO BPAC for review and comment at their regular meeting in Dade City
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
8. Preservation: Emphasize the preservation of the existing transportation system.
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
9) May 6, 2026: Opportunity for public comment on the Draft FY 2027 - 2031 TIP made available at the MPO BPAC meeting in Dade City
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
9. Resilience. Improve system resiliency and reliability & reduce or mitigate stormwater impacts on surface
The MPO Technical Advisory Committee is reviewing a proposal to improve system resiliency and reliability. This initiative aims to reduce or mitigate stormwater impacts on surface transportation. The project is currently under review by the committee. Work could involve site preparation, grading, and potentially underground utility and stormwater management system installation. Future phases might include paving and landscaping. Contractors, suppliers, and service providers in site preparation, grading, and utility work should consider reaching out early. Understanding the project's scope before final plans and permits are set can offer a competitive advantage.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
A. Approval of New Regular Member of the Technical Advisory Committee - A. Rivero
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
A. Freight Planning
Pasco County MPO is planning a freight plan update to guide future programming decisions. This initiative involves reassessing freight needs, issues, and opportunities for system growth and improvement within the county. The plan will refine recommendations for freight-related projects, update policies and strategies to support economic development through efficient goods movement, and enhance integration between freight transportation and land use planning. The project is currently in the planning and development phase, with activities scheduled from July 2026 through June 2028. This will involve extensive outreach to the freight community and meetings with freight providers and economic development groups. Businesses involved in transportation, logistics, economic development consulting, and related professional services could find opportunities to engage with this long-term planning effort as the plan develops.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
A. Long Range Transportation Plan (LRTP)
The Pasco MPO is undertaking a significant update to its Long Range Transportation Plan (LRTP) for the year 2050, with activities planned from July 2026 through June 2028. This comprehensive plan will guide transportation needs and investments across all travel modes and facilities in Pasco County for the next 25 years. The update includes developing long-range and short-range strategies for an integrated multimodal transportation system, focusing on pedestrian walkways and bicycle facilities. Key activities involve updating the Congestion Management Process (CMP), implementing cost-feasible projects, integrating freight objectives, conducting corridor studies, and developing safety, security, and resiliency plans. This process will involve extensive data analysis, modeling, and coordination with various agencies and stakeholders. Businesses involved in engineering, planning, data analysis, and potentially construction-related consulting services for corridor studies could find opportunities as this plan moves forward. Early engagement is advised as the plan scope, project needs, and recommendations are being determined.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
B. Approval of New Regular Member of the Technical Advisory Committee - A. Atefi
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
B. Transit Planning and Coordination
The Pasco County Metropolitan Planning Organization (MPO) is reviewing transit needs and plans to support GO PASCO in developing transit programs. This initiative involves evaluating transportation projects and funds, coordinating with GO PASCO and regional transit agencies, and exploring intermodal centers. The MPO will also consider regional rapid transit corridors and transit-oriented development. Additionally, efforts will focus on updating the Transit Signal Priority Corridor Plan and providing planning assistance for future transit studies and technological improvements. This planning work is scheduled from July 2026 through June 2028. Local contractors, suppliers, and service providers in areas like transit planning, engineering, data analysis, and technology implementation could find opportunities. Engaging early allows businesses to understand the scope and prepare for potential procurements as plans develop.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
- Applicant:
- Pasco County MPO
B. Transportation Improvement Program (TIP)
The Pasco MPO is planning to develop and maintain its Transportation Improvement Program (TIP) document from July 2026 through June 2028. This process involves coordinating with FDOT, local governments, and citizens to prioritize transportation projects. Activities include reviewing funding priorities, revising evaluation methods, ensuring TIP consistency with long-range plans, and coordinating with FDOT on work programs. The MPO will also provide guidelines for transportation alternatives and safe routes to school programs, and research TIP software platforms. This ongoing planning and development phase will set the stage for future project implementation. Local contractors, suppliers, and service providers in areas like engineering, software, and administrative support can find opportunities by engaging early with the MPO and its partners before specific project bids and permits are finalized.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
C. Approval of New Alternate Member of the Technical Advisory Committee (TAC) - T.
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
C. Bicycle and Pedestrian Planning
Pasco County MPO is planning to develop a network of bicycle and pedestrian facilities, focusing on user safety. This initiative includes finalizing an Active Transportation Plan and continuing non-motorized counts. The plan, expected to be finalized between July 2026 and June 2028, will guide implementation from July 2027 to June 2028. Work will involve evaluating trail crossings, coordinating regional projects, and identifying hazardous walking conditions near schools and high-crash corridors. Additionally, a pilot study will document non-motorized infrastructure and safety within a two-mile radius of selected middle schools. This project will likely involve planning, design, and potentially some construction or improvement work related to trails and pedestrian access. Local contractors, suppliers, and service providers in areas like site preparation, grading, paving, and landscaping could find opportunities. Reaching out to the Pasco MPO and FDOT early could provide an advantage before specific bids and permits are finalized.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
- Applicant:
- Pasco County MPO
C. Unified Planning Work Program (UPWP)
The MPO Technical Advisory Committee is reviewing the Unified Planning Work Program (UPWP) for Fiscal Years 2027 and 2028. This program outlines transportation planning studies and potential projects for Pasco County. The MPO is coordinating with various agencies and private organizations to develop and adopt the updated UPWP. This process involves preparing presentations, executive summaries, financial tables, and work program task sheets. The review ensures consistency with federal and state transportation planning requirements. This early stage in the planning process presents an opportunity for local contractors, suppliers, and service providers to engage with the MPO and understand future transportation initiatives. Early outreach can help businesses align their services with upcoming project needs before formal bidding begins.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
D. DRAFT MPO 2026 List of Project Priorities (LOPP)
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
E. Draft MPO FY 2027-2031 Transportation Improvement Program
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
E. Performance Management, Systems Planning & Analysis
The MPO Technical Advisory Committee (TAC) is reviewing performance management initiatives for Pasco County's transportation system. This review includes developing and analyzing land use data, collecting and monitoring transportation system data, and updating inventories of sidewalks and non-motorized facilities. The process also involves preparing maps and reports on traffic counts, crashes, and trends, as well as conducting traffic signal retiming studies and analyzing TSMO strategies. Additionally, an emerging mobility plan will be created to assess electric vehicles, charging infrastructure, and golf cart usage. These activities are planned to occur between July 2026 and June 2028. This review sets the stage for potential work in data analysis, system planning, and infrastructure inventory updates. Local contractors, suppliers, and service providers in areas like data management, engineering, surveying, and construction support could find opportunities. Engaging early, before detailed plans and permits are finalized, offers the best chance to compete for future work.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
F. Amendment to the FY2026-2030 Transportation Improvement Program - Project
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
G. Pasco County Metropolitan Planning Organization - Final Unified Planning Work
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
H. Consolidated Planning Grant (CPG) Fiscal Years 2027 and 2028
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
I. FY 2027 – 2031 TIP Highway Capacity Improvement Projects Map 102
The MPO Technical Advisory Committee (TAC) is reviewing a map for the FY 2027, 2031 Transportation Improvement Program (TIP) which includes highway capacity improvement projects. This item is currently under review. The project scope involves planning and potential future construction of highway capacity improvements. This could include site clearing, grading, utility work, paving, and other construction activities as specific projects are identified and funded. Local contractors, trades, suppliers, and service providers should monitor this review process. Early engagement before detailed plans and permits are finalized offers the best opportunity to compete for future work.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
I. Florida DOT - Joint Certification Review Report – Updated
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
II. FY 2027 – 2031 TIP Safety Improvement Projects Map 103
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
III. FY 2027 – 2031 TIP Bicycle and Pedestrian Improvement Projects Map 104
The MPO Technical Advisory Committee is reviewing potential bicycle and pedestrian improvement projects for Fiscal Years 2027 through 2031. This review includes Project Map 104, which outlines planned improvements. The projects are currently under review, indicating an early stage in the planning process. This initiative will likely involve site clearing and grading, followed by the installation of new pathways and related infrastructure. Subsequent phases could include paving, lighting, and final landscaping. Local contractors, suppliers, and service providers in construction, engineering, and landscaping could find opportunities as these projects move forward. Engaging early, before final plans and permits are set, offers the best chance to compete for this future work.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
IV. FY 2027 – 2031 TIP Highway Maintenance (Preservation) Improvement Projects Map 105
The MPO Technical Advisory Committee (TAC) is reviewing the FY 2027-2031 TIP Highway Maintenance (Preservation) Improvement Projects. This item is currently under review. The project involves planning for highway maintenance and preservation activities across Pasco County for the fiscal years 2027 through 2031. This planning effort will likely lead to future projects focused on maintaining and preserving existing roadways. Potential work could include tasks such as pavement repair, resurfacing, and other preservation efforts. Local contractors, trades, suppliers, and service providers are encouraged to monitor this review process. Early engagement before final project selection and bidding could provide a competitive advantage.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
IV. REPORT ON MPO BOARD ACTIONS – ACTIONS – MEETING OF March 12, 2026
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
J. Active Transportation Letter — FDOT
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
K. Pasco County Safety Action Plan – Update
This item concerns an update to the Pasco County Safety Action Plan. The plan was presented to the MPO Technical Advisory Committee (TAC) by Ms. Angel Avila of Pasco County MPO and Ms. Kathrin Tellez of Fehr and Peers. The committee has unanimously approved the plan. This approval means the plan is moving forward, likely involving the implementation of safety improvements. The scope of work could include traffic studies, design of safety features, and construction of related infrastructure. Local contractors, suppliers, and service providers are encouraged to engage early to understand the specific needs of the approved plan as it progresses through its implementation phases. Early engagement allows businesses to prepare for potential bidding opportunities as detailed project plans and permits are developed.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
L. Transportation Resiliency Improvement Plan Update
The Pasco County MPO is updating its Transportation Resiliency Improvement Plan. This plan focuses on making transportation systems more resistant to disruptions. The update was presented to the MPO Technical Advisory Committee by Ms. Angel Avila of the Pasco County MPO and Ms. Kathrin Tellez of Fehr and Peers. This item is currently under review as part of an ongoing planning process. The work will involve assessing current infrastructure, identifying vulnerabilities, and developing strategies for future improvements. This could lead to projects related to road maintenance, bridge upgrades, and public transit enhancements. Local contractors, suppliers, and service providers in construction, engineering, and material supply may find opportunities as the plan moves forward. Engaging early in this planning stage can provide insight into future needs before specific projects are put out for bid.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
M. Freight Plan Update
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
N. Active Transportation Plan Update
The Pasco County Metropolitan Planning Organization (MPO) is updating its Active Transportation Plan. This plan focuses on improving infrastructure for walking and biking throughout the county. The update is currently under review by the MPO Technical Advisory Committee (TAC). The project will likely involve planning and design phases for new pedestrian and bicycle facilities. This could lead to future work in areas such as site clearing, grading, paving, and the installation of related amenities. Local contractors, suppliers, and service providers are encouraged to monitor the progress of this plan update. Engaging early, before specific projects are finalized, offers an advantage in understanding future needs and potential opportunities.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
O. Tampa Bay MPO Regional Merger Update
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
P. Technical Advisory Committee (TAC) – Meeting Reminder- June 3, 2026
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
Pasco MPO Technical Advisory Committee (TAC) Meeting Agenda - June 3, 2026
This document is the agenda for the Pasco County Metropolitan Planning Organization Technical Advisory Committee meeting on June 3, 2026. It includes approval of minutes from May 6, 2026 (File Number MPO26-0173), a report from the MPO Board Meeting on May 21, 2026 (File Number MPO26-0171, Presentation Only, No Action Required), and action items for the FINAL MPO 2026 List of Project Priorities (File Number MPO26-0167, Approve), FINAL MPO FY 2027-2031 Transportation Improvement Program (File Number MPO26-0168, Approve), and the Final Unified Planning Work Program (UPWP) for Fiscal Years 2026-2027 and 2027-2028 (File Number MPO26-0138, Approve). Status reports include a Freight Plan Update (File Number MPO26-0172, Presentation Only, No Action Required). A meeting reminder for August 5, 2026, is also listed (File Number MPO26-0164, No Action Required). Public comment is invited.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda
- Decision:
- Approve (for LOPP, TIP, UPWP); No Action Required (for MPO Board Report, Freight Plan Update, Meeting Reminder); Approval of Minutes (for May 6, 2026 meeting)
- Address:
- 12118 Lake Blanche Drive, Odessa, FL 33556
Pasco MPO Technical Advisory Committee (TAC) Meeting Agenda Packet - June 3, 2026
[12118 Lake Blanche Drive, Odessa, FL 33556; case MPO26-0173, MPO26-0171, MPO26-0167, MPO26-0168, MPO26-0172, MPO26-0164] This document outlines the Pasco County Metropolitan Planning Organization (MPO) Technical Advisory Committee (TAC) agenda for June 3, 2026. It includes approval of minutes from the May 6, 2026 meeting (File Number MPO26-0173), a report on the May 21, 2026 MPO Board meeting (File Number MPO26-0171) with a recommendation for no action required, and action items for the approval of the FINAL MPO 2026 List of Project Priorities (LOPP) (File Number MPO26-0167) and the FINAL MPO FY 2027-2031 Transportation Improvement Program (TIP) (File Number MPO26-0168). It also includes a presentation on the Freight Plan Update (File Number MPO26-0172) and a reminder for the August 5, 2026 TAC meeting (File Number MPO26-0164). The document also details the Pasco MPO 2026 List of Project Priorities (LOPP) and the FY 2027-2031 Transportation Improvement Program (TIP), which include numerous transportation projects across Pasco County, such as road widenings, intersection reconfigurations, pedestrian overpasses, multi-use paths, and sidewalk improvements. The LOPP lists specific projects with their funding phases, responsible agencies, and estimated completion timelines. The TIP provides a broader overview of planned transportation improvements for the next five fiscal years. Public comment was solicited but none was provided for the May 6, 2026 meeting minutes approval. A 30-day public comment period was provided for the TIP. This document outlines the Pasco County Metropolitan Planning Organization's (MPO) Transportation Improvement Program (TIP) for Fiscal Years 2027-2031, detailing project priorities, funding, and selection processes. It includes a list of specific roadway and multi-use path projects with their locations, descriptions, responsible agencies, funded phases, and anticipated funding years. The document also details public involvement opportunities and the criteria used for project selection, emphasizing alignment with federal requirements and local transportation plans. Several projects are listed with specific locations and descriptions, such as widening and reconstruction of SR 52/Schrader Hwy, intersection realignments, pedestrian overpasses, and multi-use path construction. Public comment periods and meetings are scheduled throughout the TIP development process. [SR 52/Schrader Hwy from E of Schrader Rd to E of Ehren Cutoff] Project involves adding lanes and reconstructing SR 52 from East of Schrader Highway to East of Ehren Cutoff in Pasco County. The project length is 3.018 miles, with plans to expand from 2 to 4 lanes with provisions for future expansion to 6 lanes and a pedestrian path. Funding is allocated across multiple sources including Advance Construction, Protect Grant Program, District Dedicated Revenue, State Primary Highways, Local Funds, and Transportation Regional Incentive Program. The project is managed by FDOT. [CR 578/County Line Rd from E of Mariner Blvd/Shady Hills Rd to W of Suncoast] Project involves adding lanes and reconstructing CR 578/County Line Road from East of Mariner Boulevard/Shady Hills Road to West of Suncoast in Pasco County. The project length is 0.000 miles. Funding includes Advance Construction, Safe Routes to School, Local Funds, and Transportation Regional Incentive Program. The project is managed by FDOT. [US 301/SR 41/Gall from S of SR 56 to S of SR 39/Paul Buchman] Project involves adding lanes and reconstructing US 301/SR 41/Gall from South of SR 56 to South of SR 39/Paul Buchman in Pasco County. The project length is 1.763 miles, involving widening from 2 to 4 lanes. Funding is sourced from Advance Construction, District Dedicated Revenue, State Primary Highways, STP (Any Area), and STP (Urban Areas > 200K). The project is managed by FDOT. [SR 45 (US 41) at SR 54 from W of Wilson Rd to E of Osprey Ln] Project involves constructing a new interchange at SR 45 (US 41) at SR 54, from West of Wilson Road to East of Osprey Lane in Pasco County. The project length is 3.817 miles and includes widening from 6 to 8 lanes with a new interchange. Funding is provided by District Dedicated Revenue, State Primary Highways, Advance Construction, Turnpike bonds, State - SW Interstate/Intrastate Highway, and Statewide ITS. The project is managed by FDOT. [CR 52 at Meridian Ave/21st St/Suwanee Way/St. Joe Rd] Project involves intersection improvement at CR 52 at Meridian Avenue/21st Street/Suwanee Way/St. Joe Road in Pasco County. The project length is 0.162 miles. This is a FY 2023 State Member Earmark Project. Funding includes State Primary Highways, GAA Earmarks FY2023, GAA Earmarks FY 2025, Advance Construction, STP (Urban Areas > 200K), Local Funds, and Local Funds Interest Earned. The project is managed by FDOT. [US 41 from Hillsborough County Line to Hernando County Line] Project involves Arterial Traffic Management (ATMS) along US 41 from Hillsborough County Line to Hernando County Line in Pasco County. The project length is 19.799 miles and includes adding cameras, travel time readers, fiber, detectors, and signal controller upgrades along the corridor. Funding is from District Dedicated Revenue and State In-House Product Support. The project is managed by FDOT. [SR 52 from Hicks Rd/Indian Dr to US 41] Project involves Arterial Traffic Management (ATMS) along SR 52 from Hicks Road/Indian Drive to US 41 in Pasco County. The project length is 9.410 miles and includes adding cameras, travel time readers, fiber, detectors, and signal controller upgrades along the corridor. Funding is from District Dedicated Revenue and State In-House Product Support. The project is managed by FDOT. [US 98/SR 35/SR 700 from Polk Co Line/CR 54 to US 301/SR 35/SR 39/SR 700] Project involves adding lanes and reconstructing US 98/SR 35/SR 700 from Polk County Line/CR 54 to US 301/SR 35/SR 39/SR 700 in Pasco County. The project length is 8.183 miles, involving widening from 2 to 4 lanes. Funding includes American Rescue Plan Act, District Dedicated Revenue, Environmental Mitigation, State In-House Product Support, State Primary Highways, GFSTPBG Any Area, STP (Any Area), Turnpike bonds, State - SW Interstate/Intrastate Highway, and Local Funds. The project is managed by FDOT. [US 19/SR 55 from N of Flora Ave to S of Fivay Rd] Project involves drainage improvements of a specific storm sewer system along US 19/SR 55 from North of Flora Avenue to South of Fivay Road in Pasco County. The project length is 13.746 miles. Funding is provided by Advance Construction, Protect Grant Program, District Dedicated Revenue, State In-House Product Support, and State Primary Highways. The project is managed by FDOT. [US 19/SR 55 from Phoenix Dr to SR 52] Project involves corridor study along US 19/SR 55 from Phoenix Drive to SR 52 in Pasco County. The project length is 11.486 miles. Funding is from Advance Construction and State In-House Product Support. The project is managed by FDOT. [Old Pasco Rd from CR 54/Wesley Chapel Blvd to N of Sonny Dr] Project involves widening Old Pasco Road from CR 54/Wesley Chapel Boulevard to North of Sonny Drive in Pasco County. The project length is 2.261 miles, widening from 2 to 4 lanes. Funding is from County Incentive Grant Program, Local Funds for Participating, and Local Funds. The project is managed by Pasco County Board of County Commissioners. [US 19/SR 55 from S of Tudor Ln to N of Tudor Ln] Project involves pedestrian safety improvements along US 19/SR 55 from South of Tudor Lane to North of Tudor Lane in Pasco County. The project length is 0.189 miles. Funding is from Advance Construction (SS, HSP), District Dedicated Revenue, and State In-House Product Support. The project is managed by FDOT. [Zimmerman Rd from Ranch Rd to SR 52] Project involves constructing a 6 ft sidewalk along Zimmerman Road from Ranch Road to SR 52 in Pasco County, associated with Gulf Highlands Elementary. The project length is 0.991 miles. Funding is from Local Funds and Safe Routes - Transfer. The project is managed by FDOT. [US 41/SR 45 from Washington Ln to S of County Line Rd] Project involves resurfacing US 41/SR 45 from Washington Lane to South of County Line Road in Pasco County. The project length is 7.913 miles, for 2 lanes. Funding includes District Dedicated Revenue, State In-House Product Support, State Primary Highways, STP (Any Area), Advance Construction, and State Bridge Repair & Rehab. The project is managed by FDOT. [Leonard Rd from US 41/SR 45/Land O Lakes Blvd to Henley Rd] Project involves constructing new sidewalk along Leonard Road from US 41/SR 45/Land O Lakes Boulevard to Henley Road in Pasco County. The project length is 1.215 miles. Funding is from Local Funds, Transportation Alts (<200K), and Transportation Alts (Any Area). The project is managed by Pasco County Board of County Commissioners. [I-275/I-75 from Hillsborough County Line to CR 54] Project involves resurfacing I-275/I-75 from Hillsborough County Line to CR 54 in Pasco County. The project length is 9.803 miles. Funding includes Advance Construction NHPP, District Dedicated Revenue, State In-House Product Support, State Primary Highways, and State Bridge Repair & Rehab. The project is managed by FDOT. [US 41/SR 45 from Bell Lake Rd to N of Ehren Cutoff] Project involves milling and resurfacing US 41/SR 45 from Bell Lake Road to North of Ehren Cutoff in Pasco County. The project length is 1.600 miles. Funding includes District Dedicated Revenue, State In-House Product Support, State Primary Highways, and Advance Construction. The project is managed by FDOT. [ALT US 19/SR 595 from Pinellas County Line to US 19] Project involves milling and resurfacing ALT US 19/SR 595 from Pinellas County Line to US 19 in Pasco County. The project length is 0.859 miles. Funding includes District Dedicated Revenue, State In-House Product Support, State Primary Highways, and Advance Construction. The project is managed by FDOT. [US 98/SR 35/SR 700 from S of Prairie Dr to US 301] Project involves milling and resurfacing two lanes of US 98/SR 35/SR 700 from South of Prairie Drive to US 301 in Pasco County. The project length is 1.015 miles. Funding includes District Dedicated Revenue, State In-House Product Support, State Primary Highways, and Advance Construction. The project is managed by FDOT. [SR 52 from E of Hicks Rd to W of Moon Lake Rd] Project involves milling and resurfacing 6 lanes of SR 52 from East of Hicks Road to West of Moon Lake Road in Pasco County. The project length is 2.927 miles. Funding includes Advance Construction, Advance Construction (SS, HSP), District Dedicated Revenue, State In-House Product Support, State Primary Highways, and State Bridge Repair & Rehab. The project is managed by FDOT. [CR 54 from CR 581/Bruce B Downs Blvd to E of Curley Rd] Project involves milling and resurfacing CR 54 from CR 581/Bruce B Downs Boulevard to East of Curley Road in Pasco County. The project length is 2.823 miles. Funding includes District Dedicated Revenue, State In-House Product Support, State Primary Highways, STP (Any Area), and Advance Construction. The project is managed by FDOT. [Pasco County] Project involves sidewalk gap design in Pasco County. The project length is 0.000 miles. Funding includes District Dedicated Revenue, State In-House Product Support, State Primary Highways, and Advance Construction. The project is managed by FDOT. [Pasco County Sidewalk Gaps - Various Locations - Phase II] Project involves Pasco County Sidewalk Gaps - Various Locations - Phase II. The project length is 0.000 miles. Funding includes Advance Construction (SA), State In-House Product Support, and Advance Construction. The project is managed by FDOT. [Pasco County Sidewalk Gaps - Various Locations - Phase III] Project involves Pasco County Sidewalk Gaps - Various Locations - Phase III. The project length is 0.000 miles. Funding includes Advance Construction (SU) and State In-House Product Support. The project is managed by FDOT. [Pasco County Sidewalk Gaps - Various Locations - Phase IV] Project involves Pasco County Sidewalk Gaps - Various Locations - Phase IV. The project length is 0.000 miles. Funding includes Advance Construction (SA), State In-House Product Support, and Advance Construction. The project is managed by FDOT. [Pasco County Sidewalk Gaps - Various Locations - Phase V] Project involves Pasco County Sidewalk Gaps - Various Locations - Phase V. The project length is 0.000 miles. Funding includes State In-House Product Support, Transportation Alts (>200K), and Transportation Alts (Any Area). The project is managed by FDOT. [US 98/US 301/SR 35/SR 700 from N of Long Ave to S of US 98] Project involves milling and resurfacing US 98/US 301/SR 35/SR 700 from North of Long Avenue to South of US 98 in Pasco County. The project length is 4.997 miles. Funding includes District Dedicated Revenue, State In-House Product Support, State Primary Highways, Advance Construction, and State Bridge Repair & Rehab. The project is managed by FDOT. [SR 54 from E of Crossing Blvd to E of Aventura Blvd] Project involves pavement resurfacing (flex) along SR 54 from East of Crossing Boulevard to East of Aventura Boulevard in Pasco County. The project length is 0.917 miles. Funding includes District Dedicated Revenue, State In-House Product Support, Advance Construction, and State Primary Highways. The project is managed by FDOT. [US 98 from US 301 to Hernando County Line] Project involves milling and resurfacing US 98 from US 301 to Hernando County Line in Pasco County. The project length is 1.774 miles. Funding includes District Dedicated Revenue, State In-House Product Support, Advance Construction NHPP, Advance Construction (SA), and State Primary Highways. The project is managed by FDOT. [Perrine Ranch Rd from E of Grand Blvd to Mountain Ash Way] Project involves constructing a 10' multi-use path along Perrine Ranch Road from East of Grand Boulevard to Mountain Ash Way in Pasco County. The project length is 0.646 miles. Funding is from Local Funds and Transportation Alts (>200K). The project is managed by Pasco County Board of County Commissioners. [I-75 (SR 93) from SR 54 to S end of Overpass Rd SB On Ramp] Project involves landscaping along I-75 (SR 93) from South of Overpass Road SB On Ramp to SR 54 in Pasco County. The project length is 2.519 miles. Funding includes District Dedicated Revenue, State In-House Product Support, and Advance Construction. The project is managed by FDOT. [US 19 at Louis Ave, Eastwood Ln/Beacon Sqr. Dr, Charlene Ln, Tudor Ln] Project involves pedestrian safety improvements at US 19 at Louis Avenue, Eastwood Lane/Beacon Square Drive, Charlene Lane, and Tudor Lane in Pasco County. The project length is 10.206 miles. Funding includes Advance Construction (SL), District Dedicated Revenue, State In-House Product Support, and Advance Construction. The project is managed by FDOT. [I-75 (SR 93) from N of SR 52 to Hernando County Line] Project involves resurfacing I-75 (SR 93) from North of SR 52 to Hernando County Line in Pasco County. The project length is 7.874 miles. Funding includes Advance Construction NHPP, District Dedicated Revenue, State In-House Product Support, and State Primary Highways. The project is managed by FDOT. [US 41 from County Line Rd to SR 54 & SR 597 from County Line Rd to US 41] Project involves ITS communication system along US 41 from County Line Road to SR 54 & SR 597 from County Line Road to US 41 in Pasco County. The project length is 2.439 miles. Funding includes State In-House Product Support, Statewide ITS - State 100%, and Advance Construction. The project is managed by FDOT. [SR 52/Schrader Hwy from W of Suncoast Pkwy to E of US 41/SR 45] Project involves landscaping along SR 52/Schrader Highway from West of Suncoast Parkway to East of US 41/SR 45 in Pasco County. The project length is 4.643 miles. Funding includes District Dedicated Revenue, State In-House Product Support, and Advance Construction. The project is managed by FDOT. [US 98/US 301/SR 35/SR 700 from N of Countryside Pl to Sunset Ave] Project involves milling and resurfacing US 98/US 301/SR 35/SR 700 from North of Countryside Place to Sunset Avenue in Pasco County. The project length is 0.373 miles. Funding includes Advance Construction (SA), State In-House Product Support, Advance Construction NHPP, and Advance Construction (SA). The project is managed by FDOT. [FC-5 Maintenance Contract in Pasco County] Project involves FC-5 maintenance contract in Pasco County. The project length is 0.000 miles. Funding is from FC5 - Open Grade Friction Course FC5. The project is managed by FDOT. [I-75 Pasco SB - Rest Area Aesthetics] Project involves I-75 Pasco SB Rest Area Aesthetics in Pasco County. The project length is 0.000 miles. Funding is from State In-House Product Support and Rest Areas - State 100%. The project is managed by FDOT. [I-75 Pasco NB - Rest Area Aesthetics] Project involves I-75 Pasco NB Rest Area Aesthetics in Pasco County. The project length is 0.000 miles. Funding is from State In-House Product Support and Rest Areas - State 100%. The project is managed by FDOT. [I-75 Pasco SB Drainage Improvements] Project involves I-75 Pasco SB Drainage Improvements in Pasco County. The project length is 0.000 miles. Funding is from State In-House Product Support and Rest Areas - State 100%. The project is managed by FDOT. [Suncoast Pkwy (SR 589), County Line to SR 54] Project involves widening Suncoast Parkway (SR 589) from County Line to SR 54 in Pasco County. The project length is 1.270 miles. Funding is from Turnpike Improvement, Turnpike Indirect Costs, Turnpike Master Bond Fund, and Turnpike Improvement. The project is managed by FDOT. [SR-589 Suncoast Parkway SR-54 SB Off-Ramp Improvements (MP 19)] Project involves TSM&O Suncoast Parkway SR-54 SB Off-Ramp Improvements (MP 19) in Pasco County. The project length is 0.345 miles. Funding is from Turnpike Improvement and Turnpike Indirect Costs. The project is managed by FDOT. [Pasco County FY 2026/2027-2027/2028 UPWP] Project involves Pasco County FY 2026/2027-2027/2028 UPWP (Unified Planning Work Program) for Transportation Planning. Funding is from Advance Construction Planning and State In-House Product Support. Managed by Pasco County MPO. [Pasco County FY 2028/2029-2029/2030 UPWP] Project involves Pasco County FY 2028/2029-2029/2030 UPWP (Unified Planning Work Program) for Transportation Planning. Funding is from Advance Construction Planning and State In-House Product Support. Managed by Responsible Agency Not Available. [Pasco County FY 2030/2031-2031/2032 UPWP] Project involves Pasco County FY 2030/2031-2031/2032 UPWP (Unified Planning Work Program) for Transportation Planning. Funding is from Advance Construction Planning, Advance Construction (SU), and State In-House Product Support. Managed by Responsible Agency Not Available. [Pasco Co (14)] Routine Maintenance project in Pasco County (14). Funding from Unrestricted State Primary and State In-House Product Support. [Pasco Co (14)] Routine Maintenance project in Pasco County (14). Funding from Unrestricted State Primary and State In-House Product Support. [FC-5 Maintenance Contract in Pasco County] FC-5 Maintenance Contract in Pasco County. Funding from FC5 - Open Grade Friction Course FC5 and State In-House Product Support. [Zephyrhills Airport - Master Plan Update] Zephyrhills Airport Master Plan Update. Project length is 0.000 miles. Funding from District Dedicated Revenue, State - PTO, FAA - Federal Aviation Admin, and Local Funds. Managed by FDOT. [Pasco Board of County Commissioners - FTA Section 5307] Pasco Board of County Commissioners - FTA Section 5307 Capital Assistance for Fixed Route. Funding from Federal Transit Administration. Managed by Pasco. [PCCT Public Transit Block Grant Program - Operating] PCCT Public Transit Block Grant Program - Operating Assistance. Funding from District Dedicated Revenue, State - PTO, State Primary Highways, and Local Funds. Managed by FDOT. [US 19; case 408319 1] Project PCPT PUBLIC TRANSIT CORRIDOR PROGRAM-ROUTE 19 OPERATING involves inter-county service between Pasco and Pinellas on US 19. The total estimated cost is $10,688,302, with funding allocated across multiple fiscal years. The project is managed by the Pasco County Board of County Commissioners. [case 422314 1] Project PASCO BOARD OF COUNTY COMMISSIONERS - FTA SECTION 5311 involves capital equipment for non-prioritized service. The total estimated cost is $16,039,182, with funding allocated across multiple fiscal years. The project is managed by Pasco County. [SR 54; case 429940 1] Project PASCO BOARD OF COUNTY COMMISSIONERS - TRANSIT CORRIDOR PROGRAM involves urban corridor improvements for the Pasco Intracoounty SR 54 Connector (54X). The total estimated cost is $9,747,305, with funding allocated across multiple fiscal years. The project is managed by Pasco County. [case 443414 1] Project PCPT SECTION 5339 SMALL URBAN involves capital purchases for buses and bus facilities. The total estimated cost is $1,690,529, with funding allocated across multiple fiscal years. The project is managed by Pasco County. [case 446911 1] Project PASCO COUNTY BOCC SECTION 5307 involves the purchase of vehicles and equipment. The total estimated cost is $20,825,602, with funding allocated across multiple fiscal years. The project is managed by Pasco County. [case 452993 1] Project GOPASCO-FTA SECTION 5339 involves transit improvements. The total estimated cost is $2,134,000, with funding allocated across multiple fiscal years. The project is managed by Pasco County. [case 455278 1] Project GOPASCO - BUS REPLACEMENTS involves the purchase of vehicles and equipment. The total estimated cost is $3,073,500, with funding allocated across multiple fiscal years. The project is managed by Pasco County. [case 455304 1] Project GOPASCO - ADA BUS STOP IMPROVEMENTS involves public transportation shelters. The total estimated cost is $1,485,525, with funding allocated across multiple fiscal years. The project is managed by Pasco County. [case 456118 1] Project 5310 CAPTIAL - PASCO COUNTY BOARD OF COUNTY COMMISSIONERS involves the purchase of vehicles and equipment. The total estimated cost is $357,718, with funding allocated across multiple fiscal years. The project is managed by Pasco County Board of County Commissioners. [case 456118 2] Project 5310 CAPITAL - TAMPA/ST PETERSBURG UZA - PASCO COUNTY BOCC involves capital projects for large urban areas. The total estimated cost is $1,410,044, with funding allocated across multiple fiscal years. The project is managed by Pasco County Board of County Commissioners. [US 19; case 457608 1] Project US 19 MULTIMODAL TRANSFER CENTER involves transit improvements. The total estimated cost is $3,036,750, with funding allocated across multiple fiscal years. The project is managed by Pasco County. [SR 52; case 457908 1] Project SR52 CROSS BAR RANCH WATER LINE RELOCATION involves relocating utility systems. The total estimated cost is $2,537,050, with funding allocated across multiple fiscal years. The project is managed by FDOT. [US 301/SR 41/GALL FROM S OF SR 56 TO S OF SR 39/PAUL BUCHMAN; case 416564-2] Project 416564-2: US 301/SR 41/GALL FROM S OF SR 56 TO S OF SR 39/PAUL BUCHMAN involves adding lanes and reconstruction. Right of Way acquisition is planned for 2029. [SR 52/SCHRADER HWY FM EHREN CUTOFF TO W OF CR 581/BELLAMY BROTHERS BLVD; case 256334-3] Project 256334-3: SR 52/SCHRADER HWY FM EHREN CUTOFF TO W OF CR 581/BELLAMY BROTHERS BLVD involves adding lanes and reconstruction. Construction is planned for 2028, and Right of Way Utilization is planned for 2028. [US 98/SR 35/ SR700 FROM POLK COUNTY LINE/CR54 TO US 301/SR 35/SR 39/SR 700; case 443368-3] Project 443368-3: US 98/SR 35/ SR700 FROM POLK COUNTY LINE/CR54 TO US 301/SR 35/SR 39/SR 700 involves adding lanes and reconstruction. Right of Way acquisition is planned for 2027. [OLD PASCO RD FROM CR 54/WESLEY CHAPEL BLVD TO N OF SONNY DR; case 445653-2] Project 445653-2: OLD PASCO RD FROM CR 54/WESLEY CHAPEL BLVD TO N OF SONNY DR involves adding lanes and pavement rehabilitation. Right of Way acquisition is planned for 2026, and Construction is planned for 2028. [SR 52/SCHRADER HWY FROM E OF US 41 (SR 45) TO EHREN CUTOFF; case 256334-1] Project 256334-1: SR 52/SCHRADER HWY FROM E OF US 41 (SR 45) TO EHREN CUTOFF involves adding lanes and reconstruction. Environmental review is planned for 2025, Construction is planned for 2027, and Right of Way Utilization is planned for 2027. [US 41(SR45) AT SR54 FROM W OF WILSON RD TO E OF OSPREY LN; case 419182-2] Project 419182-2: US 41(SR45) AT SR54 FROM W OF WILSON RD TO E OF OSPREY LN involves the construction of a new interchange. Right of Way acquisition is planned for 2028. [SR 52/MERIDIAN AVENUE/ 21ST STREET/SUWANNEE WAY/ST. JOE ROAD; case 439832-5] Project 439832-5: SR 52/MERIDIAN AVENUE/ 21ST STREET/SUWANNEE WAY/ST. JOE ROAD involves intersection improvement. Construction is planned for 2026 and 2027. [US19/SR55 FROM SOUTH OF TUDOR LN TO NORTH OF TUDOR LANE; case 447522-2] Project 447522-2: US19/SR55 FROM SOUTH OF TUDOR LN TO NORTH OF TUDOR LANE involves pedestrian safety improvement. Construction is planned for 2027. [US 19/SR 55 FROM PHOENIX DR TO SR 52; case 444055-1] Project 444055-1: US 19/SR 55 FROM PHOENIX DR TO SR 52 involves corridor/subarea planning. Planning is scheduled for 2031. [US19 AT LOUIS AVE, EASTWOOD LN/BEACON SQR. DR, CHARLENE LN, TUDOR LN; case 454098-1] Project 454098-1: US19 AT LOUIS AVE, EASTWOOD LN/BEACON SQR. DR, CHARLENE LN, TUDOR LN involves pedestrian safety improvement. Construction is planned for 2029. [LEONARD RD FROM US 41/SR 45/LAND O LAKES BLVD TO HENLEY RD; case 449032-1] Project 449032-1: LEONARD RD FROM US 41/SR 45/LAND O LAKES BLVD TO HENLEY RD involves sidewalk construction. Planning is scheduled for 2025, and Construction is planned for 2027. [GULF HIGHLANDS ELEMENTERY - ZIMMERMAN RD FROM RANCH RD TO SR 52; case 447530-1] Project 447530-1: GULF HIGHLANDS ELEMENTERY - ZIMMERMAN RD FROM RANCH RD TO SR 52 involves sidewalk construction. Construction is planned for 2028. [PERRINE RANCH RD FROM GRAND BLVD TO MOUNTAIN ASH WAY; case 452900-1] Project 452900-1: PERRINE RANCH RD FROM GRAND BLVD TO MOUNTAIN ASH WAY involves sidewalk construction. Construction is planned for 2029. [SR 54 FROM SR 581/BRUCE B DOWNS BLVD TO CURLEY ROAD; case 449400-1] Project 449400-1: SR 54 FROM SR 581/BRUCE B DOWNS BLVD TO CURLEY ROAD involves resurfacing. Construction is planned for 2027. [ALT US 19 FROM PINELLAS COUNTY LINE TO US 19; case 449166-1] Project 449166-1: ALT US 19 FROM PINELLAS COUNTY LINE TO US 19 involves resurfacing. Planning is scheduled for 2025, and Construction is planned for 2027. [US 41 /SR 45 FROM WASHINGTON LANE TO COUNTY LINE ROAD; case 447936-1] Project 447936-1: US 41 /SR 45 FROM WASHINGTON LANE TO COUNTY LINE ROAD involves resurfacing. Construction is planned for 2027. [US41 FROM BELL LAKE RD to EHREN CUTOFF; case 449165-1] Project 449165-1: US41 FROM BELL LAKE RD to EHREN CUTOFF involves resurfacing. Planning is scheduled for 2025, and Construction is planned for 2027. [US41/SR45 FROM WASHINGTON LANE TO S OF COUNTY LINE ROAD; case 452004-1] Project 452004-1: US41/SR45 FROM WASHINGTON LANE TO S OF COUNTY LINE ROAD involves signing and pavement markings. Construction is planned for 2027. [US98/US301/SR35/SR700 FR N OF COUNTRYSIDE PL TO SUNSET AVE; case 455356-1] Project 455356-1: US98/US301/SR35/SR700 FR N OF COUNTRYSIDE PL TO SUNSET AVE involves resurfacing. Construction is planned for 2029. [SR 52 FROM E OF HICKS ROAD TO MOON LAKE ROAD; case 449173-1] Project 449173-1: SR 52 FROM E OF HICKS ROAD TO MOON LAKE ROAD involves resurfacing. Construction is planned for 2026. [US 98/US 301 FROM LONG AVE TO US 98; case 451236-1] Project 451236-1: US 98/US 301 FROM LONG AVE TO US 98 involves resurfacing. Planning is scheduled for 2025, and Construction is planned for 2027. [I275/I75 FROM HILLSBOROUGH COUNTY LINE TO CR54; case 449142-1] Project 449142-1: I275/I75 FROM HILLSBOROUGH COUNTY LINE TO CR54 involves resurfacing. Construction is planned for 2027. [I75 FROM N OF SR52 TO HERNANDO COUNTY LINE; case 454499-1] Project 454499-1: I75 FROM N OF SR52 TO HERNANDO COUNTY LINE involves resurfacing. Construction is planned for 2029. [US 98 FR US 301 TO HERNANDO COUNTY LINE; case 452005-1] Project 452005-1: US 98 FR US 301 TO HERNANDO COUNTY LINE involves resurfacing. Construction is planned for 2029. [US98/SR35/SR700 FROM S OF PRAIRE DR TO US301; case 449168-1] Project 449168-1: US98/SR35/SR700 FROM S OF PRAIRE DR TO US301 involves resurfacing. Construction is planned for 2028. [US19/SR55 FROM N OF FLORA AVE TO S OF FIVAY RD; case 443707-1] Project 443707-1: US19/SR55 FROM N OF FLORA AVE TO S OF FIVAY RD involves drainage improvements. Planning is scheduled for 2026, and Construction is planned for 2028. [I75/SR93 FROM SR54 TO S END OF OVERPASS ROAD SB ON RAMP; case 454038-1] Project 454038-1: I75/SR93 FROM SR54 TO S END OF OVERPASS ROAD SB ON RAMP involves landscaping. Construction is planned for 2027. [SR52/SCHRADER HWY FR W OF SUNCOAST PKWY TO E OF US41/SR45; case 455329 -1] Project 455329 -1: SR52/SCHRADER HWY FR W OF SUNCOAST PKWY TO E OF US41/SR45 involves landscaping. Construction is planned for 2027. [US 41 FROM HILLSBOROGH COUNTY LINE TO HERNANDO COUNTY LINE; case 441936-1] Project 441936-1: US 41 FROM HILLSBOROGH COUNTY LINE TO HERNANDO COUNTY LINE involves ATMS - Arterial Traffic Management. Design is planned for 2029. [SR 52 FROM HICKS RD TO US 41; case 441937-1] Project 441937-1: SR 52 FROM HICKS RD TO US 41 involves ATMS - Arterial Traffic Management. Design is planned for 2029. [US 41 FR COUNTY LINE RD TO SR 54 & SR 597 FR COUNTY LINE RD TO US 41; case 454837-1] Project 454837-1: US 41 FR COUNTY LINE RD TO SR 54 & SR 597 FR COUNTY LINE RD TO US 41 involves an ITS Communication System. Design is planned for 2031. [SR 52 (SCHRADER HWY) FROM W OF SUNCOAST PKWY TO E OF US 41 (SR 45); case 256323 1] Project 256323 1: SR 52 (SCHRADER HWY) FROM W OF SUNCOAST PKWY TO E OF US 41 (SR 45) *NON-SIS* involves adding lanes and reconstruction. The total obligation for 2025 is $799,731. [US 41 (SR 45) FROM N OF CONNERTON BLVD TO S OF SR 52; case 256324 2] Project 256324 2: US 41 (SR 45) FROM N OF CONNERTON BLVD TO S OF SR 52 involves adding lanes and reconstruction. The total obligation for 2025 is $181,030. [SR52/SCHRADER HWY FROM E OF EHREN CUTOFF TO CR581; case 256334 1] Project 256334 1: SR52/SCHRADER HWY FROM E OF EHREN CUTOFF TO CR581 involves adding lanes and reconstruction. The total obligation for 2025 is $1,936,096. [SR52/SCHRADER HWY FM E OF US41 TO W OF CR581/BELLAMY BR; case 256334 4] Project 256334 4: SR52/SCHRADER HWY FM E OF US41 TO W OF CR581/BELLAMY BR involves right of way acquisition. The total obligation for 2025 is $2,420,842. [US301 (SR41/GALL) FROM SR39 TO S OF CR54; case 256422 2] Project 256422 2: US301 (SR41/GALL) FROM SR39 TO S OF CR54 involves adding lanes and reconstruction. The total obligation for 2025 is $46,900. [US301 (SR39) FM S OF CR54/EILAND BLVD TO N OF KOSSIK RD; case 408075 2] Project 408075 2: US301 (SR39) FM S OF CR54/EILAND BLVD TO N OF KOSSIK RD involves adding lanes and reconstruction. The total obligation for 2025 is $-1,086,822. [SR 54 FROM CR 577/CURLEY RD TO CR 579/MORRIS BRIDGE RD; case 416561 2] Project 416561 2: SR 54 FROM CR 577/CURLEY RD TO CR 579/MORRIS BRIDGE RD involves adding lanes and pavement rehabilitation. The total obligation for 2025 is $90,004. [SR45 (US41) @ SR54 FROM S OF INTERSECTION TO N OF INTERSECTION; case 419182 1] Project 419182 1: SR45 (US41) @ SR54 FROM S OF INTERSECTION TO N OF INTERSECTION involves a PD&E/EMO study. The total obligation for 2025 is $36,385. [I75/SR 56 INTERCHANGE FM E OF CR 54 TO W OF CYPRESS RIDGE BL(PHASE I); case 430573 1] Project 430573 1: I75/SR 56 INTERCHANGE FM E OF CR 54 TO W OF CYPRESS RIDGE BL(PHASE I) involves adding lanes to an interchange. The total obligation for 2025 is $42,611. [CR 52/MERIDIAN AVE FROM W OF STORCH LN TO US 98/US 301/SR 533; case 439832 1] Project 439832 1: CR 52/MERIDIAN AVE FROM W OF STORCH LN TO US 98/US 301/SR 533 involves resurfacing. The total obligation for 2025 is $1,009,268. [CR 52 AT COLLEGE AVE/POMPANIC ST; case 439832 3] Project 439832 3: CR 52 AT COLLEGE AVE/POMPANIC ST involves roundabout construction. The total obligation for 2025 is $-27,686. [CR52 AT MERIDIAN AVENUE/21ST STREET/SUWANEE WAY/ST. JOE ROAD; case 439832 5] Project 439832 5: CR52 AT MERIDIAN AVENUE/21ST STREET/SUWANEE WAY/ST. JOE ROAD involves intersection improvement. The total obligation for 2025 is $4,606,499. [US 301/SR 41/GALL BLVD FROM HILLSBOROUGH CO LINE TO S OF SR 39; case 440063 1] Project 440063 1: US 301/SR 41/GALL BLVD FROM HILLSBOROUGH CO LINE TO S OF SR 39 involves resurfacing. The total obligation for 2025 is $-88,555. [OLD CR 54 FROM SR 54 TO W OF LITTLE RD; case 441094 1] Project 441094 1: OLD CR 54 FROM SR 54 TO W OF LITTLE RD involves sidewalk construction. The total obligation for 2025 is $-115,501. [SR 581 (BRUCE B DOWNS BLVD) FROM S OF EAGLESTON BLVD TO SR 54; case 441099 1] Project 441099 1: SR 581 (BRUCE B DOWNS BLVD) FROM S OF EAGLESTON BLVD TO SR 54 involves intersection improvement. The total obligation for 2025 is $-1,724. [SR 56/54 FROM GUNN HWY TO CR 581; case 441320 1] Project 441320 1: SR 56/54 FROM GUNN HWY TO CR 581 involves ATMS - Arterial Traffic Management. The total obligation for 2025 is $-320,345. [US 41/SR 45 FROM N OF COUNTY LINE/WILLOW BEND PARKWAY TO BELL LAKE RD; case 441659 1] Project 441659 1: US 41/SR 45 FROM N OF COUNTY LINE/WILLOW BEND PARKWAY TO BELL LAKE RD involves resurfacing. The total obligation for 2025 is $489,269. [SR 54 FROM E OF LITTLE RD INTERSECTION TO MARATHON DR; case 443784 1] Project 443784 1: SR 54 FROM E OF LITTLE RD INTERSECTION TO MARATHON DR involves resurfacing. The total obligation for 2025 is $2,079,468. [BEXLEY ELEMENTARY - BALLANTRAE BLVD FROM N OF STRATON PL TO TOWER RD; case 445502 1] Project 445502 1: BEXLEY ELEMENTARY - BALLANTRAE BLVD FROM N OF STRATON PL TO TOWER RD involves sidewalk construction. The total obligation for 2025 is $-123,531. [PASCO ELEMENTARY - FORT KING RD FROM HESTER TO N OF COLEMAN AVE; case 445503 1] Project 445503 1: PASCO ELEMENTARY - FORT KING RD FROM HESTER TO N OF COLEMAN AVE involves sidewalk construction. The total obligation for 2025 is $3,000. [MITCHELL BLVD FROM CHURCHILL PKWY TO TRINITY OAKS BLVD.; case 445664 2] Project 445664 2: MITCHELL BLVD FROM CHURCHILL PKWY TO TRINITY OAKS BLVD. involves bike path/trail construction. The total obligation for 2025 is $3,078,558. [JASMINE BLVD FROM US19/SR55 TO CR 1/LITTLE RD; case 447372 1] Project 447372 1: JASMINE BLVD FROM US19/SR55 TO CR 1/LITTLE RD involves bike path/trail construction. The total obligation for 2025 is $2,407,701. [SCHOOL ROAD FROM COMMUNITY CENTER RD TO US41/LAND O LAKES BLVD; case 447373 1] Project 447373 1: SCHOOL ROAD FROM COMMUNITY CENTER RD TO US41/LAND O LAKES BLVD involves bike path/trail construction. The total obligation for 2025 is $6,835. [US 19/SR 55 FROM JASMINE BLVD TO PALATINE DR; case 447522 1] Project 447522 1: US 19/SR 55 FROM JASMINE BLVD TO PALATINE DR involves traffic signals. The total obligation for 2025 is $2,499,669. [US41/SR45 FROM WASHINGTON LANE TO S OF COUNTY LINE ROAD; case 447936 1] Project 447936 1: US41/SR45 FROM WASHINGTON LANE TO S OF COUNTY LINE ROAD involves resurfacing. The total obligation for 2025 is $101,110. [SR39 FROM N OF CENTRAL AVE TO US301/GALL BLVD; case 447951 1] Project 447951 1: SR39 FROM N OF CENTRAL AVE TO US301/GALL BLVD involves resurfacing. The total obligation for 2025 is $2,958,710. [SR 54 FROM E OF GUNN HWY TO E OF CROSSING BLVD; SR 54A BLACK LAKE RD; case 447953 1] Project 447953 1: SR 54 FROM E OF GUNN HWY TO E OF CROSSING BLVD; SR 54A BLACK LAKE RD involves resurfacing. The total obligation for 2025 is $2,412,797. [CR581/BRUCE B DOWNS BLVD FROM SR56 TO SR54; case 449170 1] Project 449170 1: CR581/BRUCE B DOWNS BLVD FROM SR56 TO SR54 involves resurfacing. The total obligation for 2025 is $-98,212. [PASCO COUNTY SIDEWALK GAPS - VARIOUS LOCATIONS; case 450970 1] Project 450970 1: PASCO COUNTY SIDEWALK GAPS - VARIOUS LOCATIONS involves sidewalk construction. The total obligation for 2025 is $897,232. [RUMBLE STRIP INITIATIVE PASCO COUNTY; case 452487 1] Project 452487 1: RUMBLE STRIP INITIATIVE PASCO COUNTY involves signing and pavement markings. The total obligation for 2025 is $85,307. [US301/GALL BLVD S OF WIRE RD TO N OF WIRE RD; case 455145 1] Project 455145 1: US301/GALL BLVD S OF WIRE RD TO N OF WIRE RD involves traffic signals. The total obligation for 2025 is $2,055,080. [case 439337 4] Project 439337 4: PASCO COUNTY FY 2022/2023-2023/2024 UPWP involves transportation planning. The total obligation for 2025 is $-285,468. [case 439337 5] Project 439337 5: PASCO COUNTY FY 2024/2025-2025/2026 UPWP involves transportation planning. The total obligation for 2025 is $1,846,066. [case FL-2024-002-00] Project FL-2024-002-00: Pasco County Public Transportation 5307 involves capital and operating assistance for fixed route and paratransit service. Total Federal Funds in TIP: $5,103,741. [case FL-2023-082-00] Project FL-2023-082-00: Pasco County Public Transportation 5339 involves capital assistance for fixed route and paratransit service. Total Federal Funds in TIP: $862,256. [8731 Citizens Drive, Suite 320, New Port Richey, FL 34645; case MPO26-0138] This document outlines the Pasco County Metropolitan Planning Organization's (MPO) Unified Planning Work Program (UPWP) for State Fiscal Years 2027-2028 (July 1, 2026 - June 30, 2028). The UPWP details transportation planning activities, funding sources, and coordination efforts with various stakeholders. It includes the development and maintenance of the Long-Range Transportation Plan (LRTP) and the Transportation Improvement Program (TIP). The MPO will also focus on integrating freight, safety, security, accessibility, environmental, connectivity, efficient management, preservation, resilience, and travel/tourism factors into its planning. Public participation is a key component, with opportunities for input throughout the planning process. The document also addresses transit asset management and safety performance measures for GoPasco. The MPO's office is located at 8731 Citizens Drive, Suite 320, New Port Richey, FL 34645. This document outlines the Pasco MPO's Unified Planning Work Program (UPWP) for Fiscal Years 2027-2028, detailing planned transportation planning activities, studies, and coordination efforts. It covers a wide range of tasks including performance management, safety planning, freight and transit planning, bicycle and pedestrian infrastructure development, and regional coordination. The document also details the budget allocation for these activities, with significant funding from FHWA, FTA, and local Pasco County sources. Consultants may assist with various tasks. The UPWP is designed to support comprehensive, programmed, long-range transportation initiatives throughout Pasco County and the Tampa Bay region. This document details the review and revision process for the Pasco MPO UPWP (Unified Planning Work Program) for FY27-FY28. It includes correspondence between the Pasco MPO and the Florida Department of Transportation (FDOT) District 7, as well as comments from the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA). The document outlines numerous corrections and updates required for the UPWP, covering general corrections, agreement sections, task pages, budget tables, and appendices. Key areas of discussion include the update of CFDA numbers, federal aid project numbers, planning factors, travel policies, grant agreements, staff service agreements, soft match calculations, job titles, environmental justice language, DBE program language, and the inclusion of specific grants like SS4A. The document also addresses the need for clarity on intergovernmental agreements and the inclusion of specific funding amounts and footnotes. The review process spanned from March to May 2026, with finalization pending MPO Board approval. [case MPO26-0172] The Pasco MPO Technical Advisory Committee (TAC) agenda memorandum MPO26-0172 concerns an informational presentation on the Pasco County Freight Plan Update. The plan aims to analyze the county's freight transportation system, focusing on roadways, and will be developed in partnership with local economic development and planning organizations, and the regional freight industry. Recommendations are categorized into Policy & Systemwide and Infrastructure & Operational. The document outlines potential actions such as evaluating freight access for developments, managing construction logistics, considering truck lane restrictions, identifying a Designated Freight Network, monitoring truck counts and rail crossings, assessing the state of repair for the freight network, and exploring truck parking solutions. Implementation will be aligned with FDOT's Work Program, the MPO's Transportation Improvement Plan, and local Capital Improvement Programs, categorized by cost and timeframe. Specific infrastructure recommendations include potential improvements at the SR 52 and I-75 interchange and freight signal priority along the SR 54 corridor. [19420 Central Boulevard, Land O' Lakes, FL 34637 (for TAC meeting); case MPO26-0164] The Pasco MPO Technical Advisory Committee (TAC) agenda memorandum MPO26-0164 serves as a meeting reminder for the TAC meeting scheduled for August 5, 2026, at 1:30 PM in the Anclote and Cotee Conference Room at the Pasco County Utilities Administration Building, 19420 Central Boulevard, Land O' Lakes, FL 34637. The meeting is informational, with no action required. The document also includes a 2026 Meeting Schedule for various Pasco MPO Board and Committees, detailing dates, times, and locations for MPO Board, TAC, BPAC, and CAC meetings throughout the year.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_packet
- Decision:
- Approve (for LOPP and TIP), No Action Required (for MPO Board Report and Freight Plan Update), Review and Approve (for TAC Minutes)
- Address:
- 12118 Lake Blanche Drive, Odessa, FL 33556
- Applicant:
- Pasco County Metropolitan Planning Organization
T. Odierna was not available for the meeting. This item was skipped.
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
V. FY 2027 – 2031 TIP TSM&O Improvement Projects Map 106
The MPO Technical Advisory Committee is reviewing potential transportation improvement projects for the Fiscal Year 2027-2031 Transportation Improvement Program (TIP). This review includes a map of TSM&O (Transportation Systems Management and Operations) projects. The projects are currently under review as part of the TIP development process. This early stage means that planning for site clearing, grading, utility work, paving, and construction of new transportation systems is anticipated. Contractors, suppliers, and service providers in construction, engineering, and material supply should monitor this review. Engaging early in this planning phase offers an advantage before final plans, bids, and permits are established.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
VI. Pasco County Transportation Capital Improvement Projects Map 2026 – 2030 107
The Pasco County Metropolitan Planning Organization (MPO) has adopted its Fiscal Years 2027 - 2031 Transportation Improvement Program (TIP). This program outlines planned transportation projects for the next five years. The TIP includes federal discretionary grant awards, projects for the transportation disadvantaged population, and federally obligated highway, bicycle, pedestrian, and transit projects. The adoption of this program means that projects within it are planned and moving forward in the public process. This program will set in motion a wide range of construction activities, including potential site clearing and grading, underground utility work, road and pathway paving, and potentially vertical construction for transit facilities. Contractors, suppliers, and service providers in civil construction, heavy equipment, materials supply, and related trades should reach out to the MPO and relevant county departments now. Engaging early, before specific project plans, bids, and permits are finalized, offers the best opportunity to compete for upcoming work.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
- Applicant:
- Pasco County Metropolitan Planning Organization
VI. STATUS REPORTS/PRESENTATIONS
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
VII. OTHER BUSINESS - MEETINGS HELD / SCHEDULED / ITEMS OF NOTE / ROUNDTABLE
MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-06-03 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-06-03
- Type:
- Agenda_item
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta