June 1, 2026 Planning and Zoning Special Master Meeting Agenda packet 2026-06-01
Planning and Zoning Special Master · 2026-06-01 · packet
[9417 SW 17TH WAY; case STU26-000026] Renewal of a medical hardship temporary use permit for a Recreational Vehicle (RV) to remain on parcel N32-038 for three years as a medical care receiver residence. The RV is for Mr. Christopher Burns, who requires continuous medical care from an onsite caregiver. The initial approval was granted on March 28, 2025. No code complaints have been received. The permit is recommended for approval subject to conditions including full-time residency of caregiver and care receiver, a one-year term with potential for two administrative extensions up to a total of three years, and removal of the RV within 90 days of expiration or cessation of need. Public input was not stated. [Southeast corner of E C 476 and C 476B; case ZON26-000016] Rezoning of approximately 263.4 acres from General Agriculture (A10C), Rural Residential Minimum Five Acres (RR5C), and Rural Residential Minimum One Acre (RR1) to Planned Unit Development (PUD) for a Conservation Subdivision. The project includes 84 residential lots, with individual lot sizes ranging from 1.01 to 2.99 acres, and a 10.50-acre tract for Neighborhood Commercial development. The applicant must increase the conservation area to 50% of the total property. Public input included a formal quasi-judicial objection from Hagios Dewet, a resident adjacent to the property, requesting denial or continuance due to alleged failure to demonstrate consistency with the Comprehensive Plan and Land Development Code, and concurrency requirements. The Special Master recommended approval to the Board of County Commissioners (BOCC) with conditions, including increasing the conservation area and adhering to design criteria. The BOCC hearing is scheduled for June 23, 2026. [5723 W C 476, Bushnell, FL; case ZON26-000016] The Board of County Commissioners approved the rezoning of approximately 257.62 acres from General Agriculture and Rural Residential to Planned Unit Development (PUD) for a conservation subdivision. The approval was granted on June 23, 2026, subject to conditions including increasing the reserve area to 50% of the property and recording it in a conservation easement. Public comments expressed strong opposition due to concerns about incompatibility with rural character, overburdened infrastructure, environmental impacts, and loss of quality of life. [Southeast corner of W C 462 and N C 475, Bushnell, FL; case STU26-000030] A Major Special Use Permit was requested for composting organic waste, including biosolids and food waste, as part of a facility producing agricultural products on 135.93 acres. The permit was recommended for approval with conditions by Planning Division Staff on May 29, 2026, and approved by the Board of County Commissioners on June 23, 2026. The proposed site is at the southeast corner of W C 462 and N C 475. Concerns raised included potential odor, traffic, and environmental impacts, with conditions requiring specific buffers and adherence to operating procedures. [Not stated, but described as a portion of land in Sections 28 and 33, Township 18 South, Range 22 East, Sumter County, Florida.] Southeast Soils, LLC is seeking a Special Use Permit for an industrial development at 8G Farms Wildwood Industrial Development. The project involves composting organic waste streams and manufacturing custom blended soils. The facility will utilize a proprietary Modified Static Aerobic Pile (MSAP) composting method with advanced Sustainable Generation® technology, including GORE® Cover, to minimize odors and VOC emissions. The operation will also include offices, a research lab, a greenhouse, parking, a maintenance shop, and a fueling station. The application is currently under review, with anticipated hearings before the Planning and Zoning Special Master on June 15 and the Board of County Commissioners on July 14. The project is expected to support Florida's sustainability initiatives by diverting organic waste from landfills and improving soil health. [C28-013; case STU26-000030] Sumter Board of County Commissioners approved a Special Use Permit for Southeast Soils LLC to compost organic waste, including biosolids and food waste, as part of an agricultural product facility. The permit is specific to the landowner and requires a new permit for property transfer or a change in controlling interest of Southeast Soils LLC. Composting materials allowed include biosolids, food waste, landscape debris, storm debris, vegetative waste, and agricultural residuals. Screening will be installed along the western and northern property lines. Site development must be approved within two years. The permit was approved on June 23, 2026.
Agenda items
- 038) for up to one year as a medical caregiver residence with the following conditions:
- 1) Applicants shall be required to participate in a pre-application meeting with county staff
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- 1. Allows a Recreational Vehicle(RV) on property during the construction of new
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. Authorized Agent Form executed by the applicant and property owner providing authority
- 1. Based on competent substantial evidence presented and considered during a
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. Before building a heap, inspect the open SG Bunker to confirm aeration openings are clean and
- 1. Deny the application; or
- 1. Failure to Demonstrate Consistency with the Comprehensive Plan
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- 1. GORE® Cover Technology : This technology significantly reduces volatile organic
- 1. Site Plan Application.
- 1. Stormwater ponds. Designed, permitted, and located to the east and south of the site.
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- 1. The caregiver and care receiver must reside on the property on a full-time basis
- 1. The caregiver and care receiver must reside on the property on a full-time basis during
- 1. The plan of development shall adhere to the General Design Criteria laid out in
- 1. The plan of development shall adhere to the General Design Criteria laid out in Exhibit A
- 1. This special use permit is issued to Chase Animal Rescue and Sanctuary Inc. and Nina Plail.
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- Other Services (Misc)
- 1. This special use permit is issued to Southeast Soils LLC. This approval is specific to the
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- 1. Tip incoming biosolids into a prepared bed of bulking agent inside a three-sided material bunker.
- Site Prep, Grading & Hardscape
- Waste Management
- Building & Industrial Supply
- 10. Zoning Map with aerial overlay of subject property;
- 11. Vesting Deeds (2) concerning the subject property;
- 12. Department of State Detail (x2) for 8G Farms, LLC and Southeast Soils, LLC.
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- Waste Management
- Utilities (Sub)
- 2) Conservation subdivisions shall be processed through the planned unit development
- Engineering & Architecture
- Landscaping & Lawn Service
- Building & Industrial Supply
- Site Prep, Grading & Hardscape
- 2. Authorized Agent form
- 2. Collection inlets and pipes. Convey water from impervious areas not part of active operations.
- 2. Concept Plan for the project depicting areas within which specified uses will occur;
- 2. Continue the hearing until the applicant submits competent substantial evidence addressing traffic,
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 2. Further development for this use shall continue to follow the site and building permitting
- 2. Immediately after unloading, place additional bulking agent on top of the biosolids to bring the mix up
- 2. Modular and Scalable Systems: The composting systems are designed to be modular and
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Construction (Other)
- Building & Industrial Supply
- Waste Management
- Engineering & Architecture
- 2. Open the water trap lid and check that water is at the proper level so the aeration system can establish
- 2. STU26-000026 is hereby renewed for a one-year term, expiring on June 1,
- Legal Services
- Business Consulting
- 2. STU26-000026 is hereby renewed for a one-year term, expiring on June 1, 2027. The
- Legal Services
- Engineering & Architecture
- Office & Business Support Services
- 2. The RV shall be occupied only by the residents of the principal structure under
- 2. The final site development plan shall follow the layout presented in Exhibit B
- 2. The final site development plan shall follow the layout presented in Exhibit B with the
- 2. This special use permit allows for composting of the following materials:
- Site Prep, Grading & Hardscape
- Waste Management
- Utilities (Sub)
- Engineering & Architecture
- Building & Industrial Supply
- 2. Traffic Impacts and Failure to Demonstrate Concurrency Compliance
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Construction (Other)
- Utilities (Sub)
- 3. Composting shall take place on the section of the concept plan labeled “Compost Soils”
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Legal Services
- Landscaping & Lawn Service
- 3. County personnel shall be allowed to access the site during normal business hours to perform
- 3. Drainage, Stormwater, and Floodplain Impacts
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Engineering & Architecture
- 3. Minimal adjustments to the conceptual plan may be approved by the County
- 3. Minimal adjustments to the conceptual plan may be approved by the County
- 3. Place a base layer of clean, dry Overs directly over the aeration trenches. This reduces clogging risk and
- 3. Property Card Print out (Parcel ID) & Current deed
- 3. Rapid Composting Process: The treatment time for composting is notably short, typically
- 3. STU26-000024 shall expire on May 18, 2027.
- 3. Settling swales. Capture runoff from impervious areas that are part of active operations.
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Building & Industrial Supply
- 3. Sketch and legal description of the property to be purchased by Southeast Soils, a portion
- 3. The Recreational Vehicle must be disconnected from utilities and removed
- 3. The Recreational Vehicle must be disconnected from utilities and removed within ninety
- 3. Using a front-end loader, mix by rolling and folding the materials together. Mix thoroughly. Care and
- 4. All permits required for this use must be obtained and in good standing in
- Legal Services
- 4. All permits required for this use must be obtained and in good standing in accordance
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 4. Apply Harvest Quest (HQ) Inoculum directly on top of the Overs base layer, distributed at intervals
- 4. Approval is concurrent with an active, unexpired building permit for the new
- 4. Environmental Compliance: Sustainable Generation's composting solutions meet various
- 4. Legal in Word
- 4. Suspension, expiration, or revocation of any other Sumter County permit shall result in the
- 4. The Compost Soils operation shall generally follow the description of the operation and
- 4. The reserve area shall be recorded in a conservation easement prior to final plat
- 4. The reserve area shall be recorded in a conservation easement prior to final plat approval
- 4. Wildlife Habitat Impacts and Failure to Comply with Conservation Requirements
- 4. Word version of the foregoing legal description for staff’s use as needed;
- 5. Boundary & Topographic Survey of the 8G Farms Wildwood Industrial Development
- Engineering & Architecture
- Real Estate Development
- 5. Cumulative Impacts and Compatibility
- 5. Notwithstanding the previous expiration conditions, this special use permit may be suspended
- General Contractor
- Engineering & Architecture
- Real Estate Development
- 5. Odor and Emission Control: The systems are designed to achieve over 95% reduction
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Painting & Flooring
- Roofing
- Electrical
- HVAC & Climate Control
- Plumbing
- Building & Industrial Supply
- Landscaping & Lawn Service
- Engineering & Architecture
- Real Estate Development
- Utilities (Sub)
- 5. Survey
- 5. The RV shall be disconnected from utilities and removed within thirty (30) days of
- Site Prep, Grading & Hardscape
- Construction (Other)
- 5. This project must receive site development approval within a period of two (2)
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- General Contractor
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 5. This project must receive site development approval within a period of two (2) years per
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Carpentry & Cabinetry
- Windows, Doors & Glass
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 5. Type D screening shall be provided along the Western property line and Type C
- Site Prep, Grading & Hardscape
- Landscaping & Lawn Service
- 6. Development for this use shall follow the site and building permitting processes. A site
- 6. General Design Criteria
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 6. Southwest Florida Water Management District documentation concerning the approval of
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Engineering & Architecture
- Building & Industrial Supply
- General Contractor
- 7. County personnel shall be allowed to access the site during normal business hours to
- 7. Sumter County Property Appraiser Property Record Cards for Parcel Nos. C28 -013 and
- 8. Sumter County Property Appraiser Aerial Maps of Parcel Nos. C28-013 and C33-001;
- 8. Suspension, expiration, or revocation of any other Sumter County permit shall result in
- 9. Future Land Use Map with aerial overlay of subject property;
- 9. Notwithstanding the previous expiration conditions, this special use permit may be
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Plumbing
- Electrical
- HVAC & Climate Control
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- FLAG SALUTE
- Legal Services
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- MEETING IS CALLED TO ORDER BY SPECIAL MASTER
- a) A land preservation plan with conservation easement language, showing all
- Engineering & Architecture
- Landscaping & Lawn Service
- Site Prep, Grading & Hardscape
- a) Change of conditions, or absence of changed conditions.
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Drywall & Insulation
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- a) The use must be in harmony with the purpose and intent of this chapter
- a) The use must not be detrimental to the neighborhood environment or unduly
- a. Neighborhood commercial may be allowed within the Residential and Agricultural future
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Windows, Doors & Glass
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- a. Neighborhood commercial uses may be permitted in residential and agricultural areas
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- Legal Services
- a. The reserve area must be increased to 50% of the subject property via
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Real Estate Development
- a. The reserve area must be increased to 50% of the subject property via reduced lot
- Site Prep, Grading & Hardscape
- General Contractor
- Real Estate Development
- a. The use must be in harmony with the purpose and intent of this chapter.
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- a. The use must not be detrimental to the neighborhood environment or unduly infringe on
- a. Type A buffers shall be provided along adjacent property lines within
- a. Type A buffers shall be provided along adjacent property lines within Tract “1”
- b) A geographic features and land use map of all land within five hundred (500)
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- b) A vehicular parking or traffic problem must not be created, and the vehicular
- b) Community need, or lack of community need.
- b) The use must be compatible with surrounding existing and anticipated uses.
- b. A vehicular parking or traffic problem must not be created, and the vehicular average
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Painting & Flooring
- b. Neighborhood commercial shall be defined as a shopping facility comprising no more
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Engineering & Architecture
- Legal Services
- Landscaping & Lawn Service
- b. Parcels zoned CN shall front on a road designated as arterial or collector on
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- b. The use must be compatible with surrounding existing and anticipated uses.
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- b. Type B screening shall be provided along the Southern property line of the
- b. Type B screening shall be provided along the Southern property line of the Tract
- c) Screening and buffering sufficient to minimize interference with the enjoyment of
- c) The use must not adversely affect the public interest. Adequate traffic circulation,
- c) Whether the entire range of permitted uses in the requested zoning district is more
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Legal Services
- Appraisal & Inspection
- c. Manufactured homes are prohibited in the development area per LDC Sec.
- c. Manufactured homes are prohibited in the development area per LDC Sec. 13
- c. Screening and buffering sufficient to minimize interference with the enjoyment of
- Site Prep, Grading & Hardscape
- Landscaping & Lawn Service
- Engineering & Architecture
- Building & Industrial Supply
- Construction (Other)
- c. The commercial facility shall front on an arterial or collector road, or be no more than
- c. The use must not adversely affect the public interest. Adequate traffic circulation,
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- d) The rights of the applicant are balanced with the impact of the proposed changes on the
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Landscaping & Lawn Service
- d) The site must be suitable for the proposed use, considering flood hazard, drainage,
- d. The site must be suitable for the proposed use, considering flood hazard, drainage,
- d. Uses allowed shall be limited to retail uses, which maintain and preserve the
- e. Neighborhood commercial uses outside the General Commercial Future Land Use
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- e. The development of the use shall have no more than a minimal adverse effect on the
- f. Proposed improvements and the level of cooperation by the developer shall be
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- g. Unless specifically provided otherwise, the use shall comply with this code.
- h. The rights of the applicant are balanced with the impact of the proposed changes on the
Follow this across meetings
Applicants and firms
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta