Skip to main content

Sé el Primero, Construye Relaciones Duraderas

Indian River County MPO Joint Meeting - CAC and BPAC: junio de 2026

Indian River County

5. Summary Sheet on Roadway Improvement Projects – No Action Required

This item concerns roadway improvement projects within Indian River County that are currently planned or under review. The Indian River County MPO Joint Meeting is gathering information on the status of major road projects. A request was made to provide a summary sheet of these projects, which is an informal and potentially changing document. The primary obstacle for these projects is securing funding. The scope of work for these future projects could involve site clearing and grading, stormwater and underground utility work, road and driveway paving, and final landscaping. Local contractors, trades, suppliers, and service providers should monitor these projects as they progress through the funding acquisition phase. Early engagement before site plans, bids, and permits are finalized could offer a competitive advantage.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item
Address:
SR 512, from Willow to I-95

6. Crash Data System Development and Analysis

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

6. Cumulative 2 -year and 4 -year reduction of on -road mobile source

The Indian River County MPO is reviewing its Transportation Improvement Program (TIP) for Fiscal Years 2027 through 2031. This program outlines planned investments to improve transportation system performance and freight reliability. Key projects include improvements to the Strategic Intermodal System (SIS) with an estimated $20.4 million, congestion relief projects totaling $22.9 million, $2.7 million for bike and pedestrian facilities, and $3.4 million for Transportation Systems Management and Operations (TSMO) projects like signal upgrades. The MPO has agreed to support state targets for travel time reliability and person-miles traveled on the Interstate and non-Interstate National Highway System (NHS). This review process is currently under consideration, with the TIP reflecting priorities established in the 2050 Long Range Transportation Plan. This initiative will likely involve site clearing, grading, utility work, paving, and construction of new infrastructure, followed by landscaping. Local contractors, suppliers, and service providers are encouraged to engage early in this planning phase to understand upcoming project scopes and potential opportunities before final bids and permits are issued.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

6. MPO Public Involvement effort evaluation

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

6. Origin-Destination mapping

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

6. Planning for consistency with MAP-21/FAST Act provisions including

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

6. Presentation on Transportation Technology and Data – No Action Required

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

6. Presentation on Transportation Technology and Data – No Action Required

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

6. Small-area and sub-area model development and calibration

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

6. Status Report of MPO Advisory Committees

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

7. Access Management Classification and Re-classification Study development

The Indian River County MPO is beginning a study to look at how roads manage access. This study will review and potentially change how different roads are classified for access. The project is currently in the planning and review phase. This early stage means that work could eventually involve traffic studies, data collection, and the development of new access management standards. The project will likely require engineering and planning services to define the scope and recommendations. Local contractors, suppliers, and service providers in fields like engineering, planning, and data analysis may find opportunities as the study progresses. Engaging early allows businesses to understand the project's direction before formal plans or bids are established.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

7. Air-quality modeling and analysis

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

7. Land Use and Transportation coordination studies, including vacant land,

Indian River County MPO is undertaking studies focused on land use and transportation coordination. These studies will examine vacant land, population, and development projections, as well as production and attraction balance. The project is currently under review as part of ongoing coordination efforts. This review will likely involve data collection, analysis, and planning phases. Potential work could include consulting services for data analysis, engineering studies, and land use planning. Local businesses in professional services, engineering, and planning could find opportunities by engaging early in this review process before specific plans or bids are finalized.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

7. Status Report of MPO Advisory Committees – No Action Required

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

7. Status Report of MPO Advisory Committees – No Action Required

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

7. Transportation Disadvantaged Analysis

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

7. Visualization and Graphics, including Computer Simulation development

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

8. Design, Permitting, and Environmental Studies

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

8. Other Business

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

8. Other Business

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

8. Public Transportation Agency Safety Plans

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

8. Regional Long Range Planning studies

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

A. Roadway Capacity Projects

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

A. Roadway Capacity Projects ...................................................................................................... A-1

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

A. Short & Long Range Transportation Planning/Corridor Analyses and Sub-area

The Indian River County MPO is considering transportation planning and corridor analyses. This work could involve developing long and short range transportation plans, as well as studies for specific areas. The project is currently under review. The scope of work may include developing plans, conducting analyses, and performing studies. This early stage presents an opportunity for local contractors, suppliers, and service providers to engage. Businesses specializing in engineering, planning, and related professional services could find opportunities as the project progresses through its review phases.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

B. Non-Motorized Transportation Planning– The consultant(s) may be required to

The Indian River County MPO is reviewing non-motorized transportation planning and studies. This item is currently under review. The work could involve planning and studies for non-motorized transportation projects. This early stage offers an opportunity for local contractors, trades, suppliers, and service providers to engage. Reaching out now, before specific project details, bids, and permits are finalized, allows businesses to influence and compete for future work.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

B. TRAFFIC OPERATIONS, MAINTENANCE, AND SAFETY PROJECTS

The Indian River County MPO is planning for traffic operations, maintenance, and safety projects with federal funding allocated across multiple fiscal years. These projects are currently under review as part of the Transportation Improvement Program (TIP) for Fiscal Years 2027 through 2031. The scope of work will involve various transportation improvements, potentially including site preparation, grading, utility work, paving, and other construction activities related to traffic safety and maintenance. Local contractors, suppliers, and service providers are encouraged to monitor this planned work. Engaging early in the process, before final bid and permit stages, offers an advantage for businesses seeking to participate in these upcoming public works projects.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

B. Traffic Operations, Maintenance, and Safety Projects

This item concerns traffic operations, maintenance, and safety projects planned for Indian River County. These projects are currently under review by the Indian River County MPO Joint Meeting, including the CAC and BPAC. The scope of work is expected to involve improvements to traffic flow, upkeep of existing infrastructure, and safety enhancements. Potential phases could include initial assessments, design work, and the implementation of traffic control measures and safety upgrades. Local contractors, trades, suppliers, and service providers are encouraged to engage early in this review process. Understanding the project details as they develop before final plans and permits are issued can provide a competitive advantage for securing future work.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

B. Traffic Operations, Maintenance, and Safety Projects ............................................................ B-1

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

C. TRANSIT AND TRANSPORTATION DISADVANTAGED PROJECTS

Indian River County is reviewing transit and transportation disadvantaged projects for the next five years, starting in 2026-27. The total federal funding planned for these projects is $39,000,000, with an overall total of $48,394,009 planned across the five years. Specific projects include DDR, DIOH, DPTO, DU, FTA, and LF funding. This review stage means that planning and design work may be starting soon. The scope of work could involve various construction and service needs related to transit and transportation. Local contractors, suppliers, and service providers are encouraged to monitor this review process. Early engagement before final plans and permits are set could offer a competitive advantage for securing future work.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

C. Transit Planning - The consultant(s) may be required to perform the following transit

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

C. Transit and Transportation Disadvantaged Projects

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

C. Transit and Transportation Disadvantaged Projects ............................................................... C-1

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

D. BICYCLE, PEDESTRIAN, TRAILS, AND ENHANCEMENT PROJECTS

Indian River County MPO is reviewing bicycle, pedestrian, and trails enhancement projects for the 2027-2031 fiscal years. The total estimated funding for these projects is $2,719,546, with $2,454,141 coming from federal funds. This review stage means that planning and design work is likely underway, with construction phases to follow. The scope of work will likely involve site preparation, grading, pathway construction, and potentially utility work, followed by finishing trades and landscaping. Local contractors, suppliers, and service providers in site prep, grading, concrete, paving, electrical, plumbing, HVAC, and landscaping could find opportunities. Engaging early in this planned project offers a chance to compete for work before bids and permits are finalized.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

D. Bicycle, Pedestrian, Trail, and Enhancement Projects

This item concerns the Indian River County MPO's Transportation Improvement Program (TIP) for Fiscal Years 2027 through 2031. The TIP outlines planned projects for bicycle, pedestrian, and trail enhancements. While specific project details are not yet finalized, the program indicates a future focus on developing and improving infrastructure for non-motorized transportation. This planning stage means that detailed site plans, bids, and permits are still ahead. The work will likely involve phases such as site clearing and grading, underground utility work, paving for trails and pathways, and final landscaping. Local contractors, suppliers, and service providers in construction, engineering, and landscaping can gain an advantage by engaging early in this planning process before formal bid packages are released.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

D. Bicycle, Pedestrian, and Transportation Alternatives Projects ............................................... D-1

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

D. Transportation Planning Model Calibration and Sub-Area Modeling The

The Indian River County MPO is planning to calibrate and update its transportation planning model. This project will involve using the FDOT-adopted Travel Demand Forecasting Model standard platform. The work is currently under review. This effort will likely involve data collection, analysis, and model adjustments. Specific tasks may include updating travel patterns and demographic data to ensure the model accurately reflects current and future travel needs. Contractors specializing in transportation modeling, data analysis, and related software platforms could find opportunities. Engaging early in this planning phase allows businesses to understand the project's scope and potential needs before formal bidding processes begin.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

E. Aviation Projects

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

E. Aviation Projects ...................................................................................................................... E-1

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

E. Traffic Engineering and Operational Studies – Appropriate activities to be performed

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

F. TRANSPORTATION PLANNING/STUDIES

The Indian River County MPO is reviewing its Transportation Improvement Program (TIP) for Fiscal Years 2027 through 2031. This program includes planned projects focused on improving transportation safety, bridge and pavement conditions, and overall system performance. Specific projects under consideration include widening of CR 510 and CR-512, intersection improvements at US 1 @ Aviation Blvd., widening of Aviation Blvd., multi-modal safety improvements on 45th St., and safety improvements at the I-95 interchange @ CR-512. The TIP also includes numerous resurfacing projects on roads like 43rd Avenue, SR 60, SR A1A, and US 1, as well as new road construction for 82nd Avenue and a new I-95 interchange at Oslo Rd. This review and planning stage means that detailed site plans, bidding processes, and permits are still being developed. Local contractors, suppliers, and service providers in construction, engineering, and material supply can gain an advantage by engaging early to understand the scope and timing of these planned infrastructure improvements.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item
Address:
CR 510

F. Transportation Planning/Studies

The Indian River County MPO is planning transportation improvements for Fiscal Years 2027 through 2031. These projects are part of the Transportation Improvement Program (TIP) and include road widening, resurfacing, safety upgrades, and new road construction. Projects range from preliminary engineering and right-of-way acquisition to full construction. Specific projects include widening 45th Street, CR 510, Aviation Boulevard, and US 1, as well as paving sections of 82nd Avenue and resurfacing various roads. This planning stage offers an early opportunity for contractors, suppliers, and service providers to engage with the MPO and related agencies. Understanding the project phases, from planning and design through construction, allows businesses to position themselves for potential work as these projects move forward.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

F. Transportation Planning/Studies ............................................................................................. F-1

The Indian River County Metropolitan Planning Organization (MPO) has approved the Transportation Improvement Program (TIP) for Fiscal Years 2027 through 2031. This program identifies federally and state-funded transportation projects planned for the next five years. The TIP includes capital and non-capital surface transportation projects, such as bicycle facilities, sidewalks, and transportation alternatives, as well as regionally significant projects. It also lists major improvement projects funded by local sources. The approval of this TIP is a step in the planning process for these future transportation projects. The scope of work will involve various phases, including planning, design, and construction of transportation infrastructure. Local contractors, suppliers, and service providers are encouraged to monitor future announcements regarding specific project details, bidding opportunities, and permit applications as these projects move forward. Early engagement can provide an advantage as project plans and funding are finalized.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

I. PURPOSE:

The Indian River County MPO is seeking consultants to provide general transportation planning services. This work will involve assisting MPO staff in creating studies, policy documents, and various plans. The selected consultant(s) will offer technical support, review other studies, and manage projects. Services will be assigned through approved Work Orders, with the MPO deciding which consultant handles specific tasks. The MPO plans to contract with General Planning Consultant(s) for an initial three-year period, with an option to extend for two more years. This early stage offers an opportunity for firms specializing in transportation planning, engineering, and public involvement to engage with the MPO before specific scopes of work and contracts are finalized. Early engagement can help businesses understand the MPO's needs and position themselves for potential future work.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item
Applicant:
Indian River County MPO

II. SCOPE OF SERVICES

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

MPO Bicycle and Pedestrian Advisory Committee Joint Meeting Meeting - 06-02-2026

[1800 27th Street, Vero Beach, FL] The Indian River County MPO's FY 2027-FY 2031 Transportation Improvement Program (TIP) was reviewed and recommended for approval by the Citizens Advisory Committee (CAC) and Bicycle Pedestrian Advisory Committee (BPAC). The TIP outlines state and federally funded transportation projects for the next five years, totaling $254 million, including $121 million in federal funds. Key projects include widening CR 512 to four lanes from Willow Street to I-95 (construction funded in FY 2031), multimodal safety improvements on 45th Street between 58th Avenue and 43rd Avenue (design funded in FY 2027), widening CR 510 to four lanes from 87th Street to 58th Avenue (construction from 87th Street to west of 82nd Avenue funded in FY 2030), and paving 82nd Avenue from 26th Street to 69th Street (ROW acquisition programmed through FY 2029). Public comment included concerns about trail access for emergency vehicles and congestion on SR 510, with a suggestion to coordinate with the school board on traffic flow. A resident also expressed a need for more north-south roads. [26th Street to 69th Street; case 2308793] Project involves new road construction for an approximately 5-mile segment of 82nd Avenue, extending from 26th Street to 69th Street. Right-of-way acquisition is scheduled from FY 2026 to FY 2029, with construction planned for future years. The total project cost is estimated at $13,199,790. [43rd Ave to SR-5/US 1; case 4513681] This project involves widening Aviation Boulevard from 2 lanes to 4 lanes over a 2.1-mile corridor, from 43rd Avenue to SR-5/US 1. Improvements include buffered bike lanes, sidewalks, a shared-use path, and median and drainage enhancements. The Project Development and Environmental (PD&E) study is funded from FY 2028 to FY 2029, with project design funded in FY 2031. The total estimated project cost is $4,364,628. [W OF 82ND AVE to 58TH AVE; case 4056063] This project involves widening CR 510 (85th Street) from 2 lanes to 4 lanes between 82nd Avenue and 58th Avenue, a length of 3.26 miles. Preliminary engineering is ongoing. Right-of-way acquisition is programmed from FY 2025 through FY 2028. The total project cost is estimated at $22,812,798. [CR-512 to W OF 82ND AVE; case 4056064] This project involves widening CR 510 (85th Street) from 2 lanes to 4 lanes between CR-512 and 87th Street, a length of 2.2 miles. Right-of-way funds are programmed for FY 2028. Construction funds are programmed in conjunction with related projects. The total project cost is estimated at $13,963,733. [87TH ST to WEST OF 82ND AVE; case 4056068] This project involves widening CR 510 (85th Street) from 2 lanes to 4 lanes between 87th Street and 82nd Avenue, a length of 0.871 miles. Railroad and utility funds are programmed for FY 2029. Construction funds are programmed for FY 2030 and FY 2031. The total project cost is estimated at $28,646,932. [58TH AVENUE to EAST OF US 1; case 4416921] This project involves widening CR 510 (85th Street) from 2 lanes to 4 lanes between 58th Avenue and US 1 (SR 5), a length of 0.6 miles. Preliminary engineering is ongoing. Right-of-way acquisition is programmed for FY 2031, with construction to be programmed for future years. The total project cost is estimated at $9,201,119. [WILLOW STREET to SR-9/I-95; case 4573171] This project involves widening CR-512 from 2 lanes to 4 lanes between Willow Street and I-95, a length of 2.572 miles. Construction is funded in FY 2031. The total project cost is estimated at $22,957,081. [I-95 to OSLO ROAD; case 4130485] This project involves landscaping in conjunction with FM# 4130482 at the I-95/Oslo Road interchange, covering a length of 1.01 miles. Landscaping is funded in FY 2028 and FY 2030. The total project cost is estimated at $1,734,178. [I-95 to OSLO ROAD; case 4130482] This project involves the construction of a new interchange at I-95 and Oslo Road (9th Street SW), covering a length of 7.379 miles. Construction is currently underway. Additional right-of-way funds are programmed for FY 2028. The total project cost is estimated at $108,215,367. [case 4416931] This project involves intersection improvements at US 1 (SR 5) and Aviation Blvd, covering a length of 1.142 miles. The PD&E study was completed in 2024. Preliminary engineering is programmed for FY 2025 and FY 2026. Right-of-way acquisition is programmed for FY 2027, FY 2028, FY 2030, and FY 2031. The total project cost is estimated at $24,945,608. [5TH STREET SW to 1ST STREET SW; case 4497001] This project involves the resurfacing of 43rd Avenue from 5th Street SW to 1st Street SW, a length of 0.491 miles. Construction is programmed for FY 2030. The total project cost is estimated at $3,167,000. [1ST STREET SW to 6TH STREET; case 4442703] This project involves the resurfacing of 43rd Avenue from 1st Street SW to 6th Street, a length of 0.756 miles. Construction is programmed for FY 2028 and FY 2029. The total project cost is estimated at $4,373,593. [58TH AVENUE to 43RD AVENUE; case 4533271] This project involves multi-modal safety improvements on 45th Street (N Gifford Road) from 58th Avenue to 43rd Avenue, including the addition of bike lanes and sidewalks on both sides. Project design is programmed. [INDIAN RIVER COUNTY to PARTIALLY IN ST LUCIE COUNTY; case 4571781] Project involves guardrail replacement on I-95. The project is managed by FDOT and spans Indian River County and partially into St. Lucie County. Funding is allocated for preliminary engineering and construction phases across multiple fiscal years. [case 4512932] Routine mowing on state and interstate highway systems in Indian River County. Managed by FDOT. Funding is allocated for maintenance phases. [case 4512933] Routine mowing on state and interstate highway systems in Indian River County. Managed by FDOT. Funding is allocated for maintenance phases. [case 2336662] Routine maintenance of state highway bridges in Indian River County. Managed by FDOT. Funding is allocated for maintenance phases. [case 4278044] Maintenance operations on state highways in Indian River County, specifically traffic signals. Managed by Indian River County BOCC. Funding allocated for operations. [case 2336661] Maintenance operations on state highways in Indian River County. Managed by FDOT. Funding allocated for maintenance phases. [case 2342422] Routine maintenance of interstate highway bridges in Indian River County, including in-house bridge inspections. Managed by FDOT. Funding allocated for maintenance phases. [case 2342421] Maintenance operations on interstate highways in Indian River County. Managed by FDOT. Funding allocated for maintenance phases. [FEC RR to US 1; case 4544441] Project involves traffic control devices/systems on SR 510/85th St/Wabasso Road, from FEC RR to US 1. Managed by FDOT. Funding allocated for railroad and utilities, and construction support. [EAST OF I-95 to WEST OF 106TH AVENUE; case 4493321] Widening and resurfacing of SR 512, including interchange modification at I-95/CR 512 (Fellsmere Road) from I-95 to west of 106th Avenue. Managed by FDOT. Construction programmed for FY 2027. [SR-60 TO US-1 to INDIAN RIVER BLVD AND 11 AVE; case 4484431] Resurfacing of State Road 60 from 21st Avenue to Indian River Boulevard, and 11th Avenue from 20th Street to 21st Street. Managed by FDOT. Railroad & Utility funding in FY 2028, construction in FY 2029. [EAST OF FORT DRUM WILDLIFE ENTRANCE to WEST OF CR-512; case 4484441] Resurfacing of State Road 60 from East of Fort Drum Wildlife entrance to CR-512. Project is on the SIS network. Managed by FDOT. Construction programmed for FY 2030 and FY 2031. [case 4456181] Replacement of Bridge# 880005/SR A1A over the Sebastian Inlet. Construction of new bridge began in FY 2026. Contract incentives programmed for 2030, additional ROW funds in FY 2031. Managed by FDOT. Project length is 1.098 miles. [SAND DOLLAR LANE to S OF SEBASTIAN INLET BRIDGE; case 4456182] Resurfacing of SR A1A between the Sebastian Inlet Bridge to Sand Dollar Lane. Construction programmed for FY 2029. Managed by FDOT. Project length 6.51 miles. [INDIAN RIVER COUNTY/ST. LUCIE COUNTY LINE to JASMINE LANE; case 4498181] Resurfacing of SR A1A between the Indian River/St. Lucie County line to Jasmine Lane. Construction programmed for FY 2027. Managed by FDOT. Project length 5.459 miles. [OVER ICWW to OVER ICWW; case 4566461] Bridge repair/rehabilitation over the ICWW on SR-60/Beachland Blvd. Managed by FDOT. Preliminary engineering funding in FY 2028-2029, construction funding in FY 2031. [case 4515841] Maintenance and operation of traffic signals on state highway system roadways in Indian River County. Managed by Indian River County. Funding allocated for maintenance and operations. [N OF 87 ST to S OF SEBASTIAN BLVD; case 4498121] Resurfacing of US 1 (SR 5) between north of 87th Street and south of Sebastian Boulevard (CR 512). Managed by FDOT. Construction programmed for FY 2027. Project length 4.222 miles. [case 4071906] Indian River County receives Florida Department of Transportation (FDOT) Block Grant and Federal Transit Administration (FTA) Section 5307 funds for operating assistance. Managed by Indian River County. [case 4071824] Section 5311 formula funds for rural area transit operations, supporting the GoLine route #10 in Fellsmere. Managed by Indian River County. Funding allocated for operations. [case 4071902] Indian River County receives Federal Transit Administration (FTA) Section 5307 funds for transit capital assistance. Managed by Indian River County. Funding allocated for capital projects. [case 4457281] Indian River County receives Federal Transit Administration (FTA) Section 5339 funds for transit capital assistance. Managed by Indian River County. Funding allocated for capital projects. [32ND AVENUE to US 1; case 4570951] Construction of sidewalks from 32nd Avenue to US 1 in Indian River County. Managed by Indian River County. Funding allocated for preliminary engineering and construction. [45TH STREET to 49TH STREET; case 4529951] Sidewalk construction from 45th Street to 49th Street in Indian River County. Managed by Indian River County. Construction programmed for FY 2027 and FY 2028. Project length 0.503 miles. [SEBASTIAN MUNICIPAL AIRPORT; case 4571381] Sebastian Municipal Airport Aviation Security Project. Funding allocated for capital projects in FY 2028. [SEBASTIAN MUNICIPAL AIRPORT; case 4571461] Sebastian Municipal Airport Aviation Preservation Project. Funding allocated for capital projects in FY 2029. [SEBASTIAN MUNICIPAL AIRPORT - WEST SIDE; case 4533791] Sebastian Municipal Airport - Construct access road and utilities on the west side of the airport. Funding allocated for capital projects in FY 2028 and FY 2029. [SEBASTIAN MUNICIPAL AIRPORT; case 4550111] Sebastian Municipal Airport - Construct Taxiway. Funding allocated for capital projects in FY 2027. [SEBASTIAN MUNICIPAL AIRPORT; case 4549981] Sebastian Municipal Airport - Update Airport Master Plan. Funding allocated for capital projects in FY 2028. [VERO BEACH REGIONAL AIRPORT; case 4515381] Vero Beach Regional Airport - Rehabilitate Airport Drainage System. Funding allocated for capital projects in FY 2028. [VERO BEACH REGIONAL AIRPORT; case 4533831] Vero Beach Regional Airport - Rehabilitate Twy A South of Rwy 12R. Funding allocated for capital projects in FY 2027. [VERO BEACH REGIONAL AIRPORT; case 4548971] Vero Beach Regional Airport - Extend Twy E West of Rwy 4. Funding allocated for capital projects in FY 2029. [VERO BEACH REGIONAL AIRPORT; case 4549011] Vero Beach Regional Airport - Extend Rwy 4/22, Phase 1 Environmental. Funding allocated for capital projects in FY 2028. [case 4393276] Indian River FY2026/2027-2027/2028 UPWP (Unified Planning Work Program). Managed by Indian River County MPO. Funding allocated for planning. [case 4393277] Indian River FY2028/2029-2029/2030 UPWP (Unified Planning Work Program). Managed by Indian River County MPO. Funding allocated for planning. [case 4393278] Indian River FY2030/2031-2031/2032 UPWP (Unified Planning Work Program). Managed by Indian River County MPO. Funding allocated for planning. [1st Street SW at 27th Ave] Project involves the construction of a left turn lane and traffic signal at 1st Street SW and 27th Avenue. Funding from Traffic Impact Fee 2020-District 2. Construction programmed for FY 2027-2028. [4th Street & 29th Avenue] Project involves culvert replacement at 4th Street and 29th Avenue. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [8th Street Road Construction & Realignment from 66th Avenue to 74th Avenue] Project involves road construction and realignment of 8th Street from 66th Avenue to 74th Avenue. Funding from Traffic Impact Fee 2020-District 2 and Optional Sales Tax. Construction programmed for FY 2027-2030. [8th Street Road Construction & Realignment from 74th Avenue to 82nd Avenue] Project involves road construction and realignment of 8th Street from 74th Avenue to 82nd Avenue. Funding from Optional Sales Tax and Traffic Impact Fee 2020-District 2. Construction programmed for FY 2027-2030. [13th Street SW Realignment at 43rd Avenue] Project involves realignment of 13th Street SW at 43rd Avenue. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [20th Avenue Pedestrian Bridge] Project involves construction of a pedestrian bridge at 20th Avenue. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [20th Ave Sidewalk East Side 8th St to 12th St] Project involves sidewalk construction on the east side of 20th Avenue from 8th Street to 12th Street. Funding from Optional Sales Tax. Construction programmed for FY 2029-2030. [25th Street SW Paving 43rd Avenue to Koblegard Road] Project involves paving of 25th Street SW from 43rd Avenue to Koblegard Road. Funding from Traffic Impact Fee 2020-District 2. Construction programmed for FY 2029-2030. [26th Street, 43rd Avenue to 58th Avenue] Project involves two-lane realignment and construction with pedestrian features on 26th Street from 43rd Avenue to 58th Avenue (1 mile). Funding from Traffic Impact Fee 2020-District 2 and Optional Sales Tax. Construction programmed for FY 2027-2030. [26th Street, 58th Avenue to 66th Avenue] Project involves two-lane realignment and construction with pedestrian features on 26th Street from 58th Avenue to 66th Avenue (1 mile). Funding from Traffic Impact Fee 2020-District 2. Construction programmed for FY 2027-2028. [26th Street Sidewalk Crossing at County Building] Project involves sidewalk construction crossing at the County Building on 26th Street. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [27th Avenue at Oslo Road] Project involves right and left turn lane improvements at 27th Avenue and Oslo Road. Funding from Optional Sales Tax. Construction programmed for FY 2028-2029. [28th Court Sidewalk - East Side (47th Street to 49th Street)] Project involves sidewalk construction on the east side of 28th Court from 47th Street to 49th Street. Funding from FDOT and Optional Sales Tax. Construction programmed for FY 2027-2028. [32nd Ave Road Corridor Construction] Project involves road corridor construction on 32nd Avenue. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [33rd Street & 62nd Court Culvert Replacement] Project involves culvert replacement at 33rd Street and 62nd Court. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [37th Street & Indian River Boulevard Intersection Improvements] Project involves intersection improvements at 37th Street and Indian River Boulevard. Funding from Optional Sales Tax. Construction programmed for FY 2028-2030. [US Highway 1 to 37th Street and to 41st Street via McCrystal Drive/11th Drive] Project involves aviation extension from US Highway 1 to 37th Street and to 41st Street via McCrystal Drive/11th Drive. Funding from Traffic Impact Fee 2020-District 2. Construction programmed for FY 2028-2029. [41st Street North Side 32nd Avenue to US Hwy 1] Project involves sidewalk construction on the north side of 41st Street from 32nd Avenue to US Hwy 1. Funding from Optional Sales Tax and FDOT. Construction programmed for FY 2027-2028. [41st Street & US 1 Intersection Improvements / Old Dixie] Project involves intersection improvements at 41st Street and US 1, including Old Dixie. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [41st Street Northbound right turn lane at 58th Avenue] Project involves construction of a northbound right turn lane at 41st Street and 58th Avenue. Funding from Traffic Impact Fee 2020-District 2. Construction programmed for FY 2027-2028. [41st Street Canal H Culvert Replacement] Project involves culvert replacement at 41st Street Canal H. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [43rd Avenue Full Depth Reclamation (26th Street to 41st Street)] Project involves full depth reclamation of 43rd Avenue from 26th Street to 41st Street. Funding from Optional Sales Tax and FDOT. Construction programmed for FY 2027-2030. [43rd Ave Bridge Replacement/Pedestrian Crossing over South Relief Canal 5th st SW to 1st St SW] Project involves bridge replacement and pedestrian crossing over South Relief Canal on 43rd Avenue from 5th Street SW to 1st Street SW. Funding from Optional Sales Tax. Construction programmed for FY 2028-2030. [43rd Ave Pedestrian & Bicycle Access Improvements 5th St SW to 1st St SW] Project involves pedestrian and bicycle access improvements on 43rd Avenue from 5th Street SW to 1st Street SW. Funding from Optional Sales Tax and FDOT. Construction programmed for FY 2027-2028. [43rd Ave Pedestrian & Bicycle Access Improvements 1st St SW to 6th St] Project involves pedestrian and bicycle access improvements on 43rd Avenue from 1st Street SW to 6th Street. Funding from Optional Sales Tax and FDOT. Construction programmed for FY 2027-2030. [43rd Ave Pedestrian & Bicycle Access Improvements 6th St to 12th St] Project involves pedestrian and bicycle access improvements on 43rd Avenue from 6th Street to 12th Street. Funding from Optional Sales Tax and FDOT. Construction programmed for FY 2027-2030. [43rd Ave Pedestrian & Bicycle Access Improvements 12th St to 18th St] Project involves pedestrian and bicycle access improvements on 43rd Avenue from 12th Street to 18th Street. Funding from Optional Sales Tax and FDOT. Construction programmed for FY 2027-2028. [43rd Ave Sidewalks Both Sides 45th Street to 49th Street] Project involves sidewalk construction on both sides of 43rd Avenue from 45th Street to 49th Street. Funding from Optional Sales Tax and FDOT. Construction programmed for FY 2027-2028. [45th Street/Left Turn Lane at US 1] Project involves construction of a left turn lane at 45th Street and US 1. Funding from Traffic Impact Fee 2020-District 2. Construction programmed for FY 2027-2029. [45th Street / 58th Avenue Signalization Replacement] Project involves signalization replacement at 45th Street and 58th Avenue. Funding from Optional Sales Tax. Construction programmed for FY 2028-2029. [49th Street Sidewalk North Side 43rd Ave to Old Dixie Hwy] Project involves sidewalk construction on the north side of 49th Street from 43rd Ave to Old Dixie Hwy. Funding from Optional Sales Tax and FDOT. Construction programmed for FY 2027-2028. [49th Street & US 1 Intersection Improvements] Project involves intersection improvements at 49th Street and US 1. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [53rd Street widening, 58th Avenue to 66th Avenue] Project involves widening of 53rd Street, 58th Avenue to 66th Avenue (600 foot 4-lane segment). Funding from Traffic Impact Fee 2020-District I. Construction programmed for FY 2027-2028. [53rd Street widening, 58th Avenue to 66th Avenue] Project involves widening of 53rd Street, 58th Avenue to 66th Avenue (800 foot 4-lane segment). Funding from Traffic Impact Fee 2020-District I. Construction programmed for FY 2027-2028. [53rd Street widening west of 58th Avenue to 66th Avenue] Project involves widening of 53rd Street, west of 58th Avenue to 66th Avenue (1,000 foot 2-lane segment). Funding from Traffic Impact Fee 2020-District I. Construction programmed for FY 2027-2028. [58th Avenue - 33rd Street Left Turn Lanes] Project involves left turn lanes at 58th Avenue and 33rd Street. Funding from Traffic Impact Fee 2020-District I. Construction programmed for FY 2027-2030. [58th Avenue - 37th Street Left Turn Lanes] Project involves left turn lanes at 58th Avenue and 37th Street. Funding from Traffic Impact Fee 2020-District I. Construction programmed for FY 2027-2028. [58th Ave & 21st SW Culvert] Project involves culvert replacement at 58th Ave & 21st SW. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [66th Avenue SW & 17th Street SW Culvert] Project involves culvert replacement at 66th Avenue SW & 17th Street SW. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [66th Avenue, 69th Street to 85th Street] Project involves four-lane realignment and construction of 66th Avenue from 69th Street to 85th Street (2.0 miles), including side streets and bridges. Funding from Developer Funded Construction, Traffic Impact Fee 2020-District I, Traffic Impact Fees- District 1, and FDOT. Construction programmed for FY 2027-2028. [66th Avenue at CR510] Project involves intersection improvements at 66th Avenue at CR510. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [82nd Ave Bridge Replacement] Project involves bridge replacement at 82nd Ave. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [CR-512, Willow St to I-95] Project involves four-lane widening of CR-512 from Willow St to I-95. Funding from Traffic Impact Fee 2020-District I. Construction programmed for FY 2027-2028. [CR512 Safety Improvements] Project involves safety improvements on CR512. Funding from Optional Sales Tax. Construction programmed for FY 2027-2029. [Ercildoune Heights Drainage Improvements] Project involves drainage improvements in Ercildoune Heights. Funding from Optional Sales Tax. Construction programmed for FY 2027-2029. [Highland Drive Sidewalk] Project involves sidewalk construction on Highland Drive (+/- 4500 LF). Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [Indian River Blvd Pedestrian Bicycle and Access Improvements (17th St. Bridge to U.S. Highway 1)] Project involves pedestrian, bicycle, and access improvements on Indian River Blvd from 17th St. Bridge to US Highway 1. Funding from Gas Tax and FDOT. Construction programmed for FY 2027-2030. [Misc. Right of Way Acquisition] Project involves miscellaneous right of way acquisition. Funding from Optional Sales Tax. Acquisition programmed for FY 2025/26 - FY 2029/30. [Sidewalk Extension - 64th Avenue to Wabasso Park] Project involves sidewalk extension from 64th Avenue to Wabasso Park. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [Traffic Controllers] Project involves traffic controllers. Funding from Gas Tax. Programmed for FY 2025/26 - FY 2029/30. [Traffic Camera Replacement Program] Project involves traffic camera replacement program. Funding from Optional Sales Tax. Programmed for FY 2025/26 - FY 2029/30. [Rain Tree Corners Culvert Replacement] Project involves culvert replacement at Rain Tree Corners. Funding from Assessments. Construction programmed for FY 2027-2028. [Roseland Road Bridge] Project involves bridge replacement at Roseland Road. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [Sidewalks and Designated Bicycle Lanes] Project involves sidewalks and designated bicycle lanes. Funding from Optional Sales Tax. Construction programmed for FY 2025/26 - FY 2029/30. [Various Culvert Replacements] Project involves various culvert replacements. Funding from Optional Sales Tax. Construction programmed for FY 2025/26 - FY 2029/30. [Vero Lake Estates 25% Petition Millings- 104th Ave- 79th to 87th] Project involves millings on 104th Ave from 79th to 87th in Vero Lake Estates. Funding from Gas Tax and Assessments. Construction programmed for FY 2025/26 - FY 2029/30. This document outlines various transportation projects and funding allocations for Indian River County, Florida, for the fiscal years 2027-2031. It details projects such as road widenings, bridge repairs, intersection improvements, sidewalk construction, and airport upgrades. Specific projects include CR 510 widening, SR A1A bridge replacement, I-95/Oslo Road interchange improvements, and various airport development projects at Sebastian Municipal Airport and Vero Beach Regional Airport. The document also covers transit capital assistance and block grants, as well as planning initiatives like the Unified Planning Work Program (UPWP) and the List of Priority Projects (LOPP).

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_packet
Decision:
Recommended for approval by CAC/BPAC, approved by MPO Board
Address:
1800 27th Street, Vero Beach, FL
Applicant:
Indian River County MPO

S. Wimbrow Dr. .50 Sidewalk on one side Sebastian - 17

The Indian River County MPO is planning to solicit new General Planning Consultants (GPCs) to perform transportation planning tasks. These tasks will include public involvement, long- and short- range transportation planning, transit planning, non-motorized transportation planning, and special project planning. The proposed contracts will be for three years, with an option for two additional years. This process is currently under review, with a recommendation to approve the scope of services and begin the selection process this summer. The work will involve developing plans such as a greenways plan update, a Transit Development Plan major update, a Bicycle-Pedestrian Plan update, and the next Long Range Transportation Plan. Local businesses in engineering, architecture, and professional consulting services can benefit by engaging early in this process before final bids and contracts are awarded. This early engagement allows for a better understanding of the MPO's needs and potential for future work orders.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item
Address:
S. Wimbrow Dr.

a) FDOT will collect and maintain data, perform calculations of performance metrics and

This item concerns the collection and maintenance of transportation performance data by the Florida Department of Transportation (FDOT) for Metropolitan Planning Organizations (MPOs). FDOT will calculate statewide targets and provide results for federally required performance measures to each MPO. The MPO planning area and included counties will also receive specific performance measure calculations. This process is currently under review. The work involves data collection, analysis, and reporting related to travel times on the Interstate System and non-Interstate National Highway System. This will likely involve data management systems and analytical services. Local contractors, data analysts, and engineering consultants could find opportunities by engaging early to understand the data needs and reporting requirements as this process is formalized.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

a) FDOT will select and establish a statewide target for each applicable federally required

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

a) Reporting targets generally refers to the process used to report targets, progress

Indian River County MPO Joint Meeting - CAC and BPAC listed this item on its agenda for 2026-06-02. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Indian River County MPO Joint Meeting - CAC and BPAC
Date:
2026-06-02
Type:
Agenda_item

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta