[1800 27th Street, Vero Beach, FL] The Indian River County MPO's FY 2027-FY 2031 Transportation Improvement Program (TIP) was reviewed and recommended for approval by the Citizens Advisory Committee (CAC) and Bicycle Pedestrian Advisory Committee (BPAC). The TIP outlines state and federally funded transportation projects for the next five years, totaling $254 million, including $121 million in federal funds. Key projects include widening CR 512 to four lanes from Willow Street to I-95 (construction funded in FY 2031), multimodal safety improvements on 45th Street between 58th Avenue and 43rd Avenue (design funded in FY 2027), widening CR 510 to four lanes from 87th Street to 58th Avenue (construction from 87th Street to west of 82nd Avenue funded in FY 2030), and paving 82nd Avenue from 26th Street to 69th Street (ROW acquisition programmed through FY 2029). Public comment included concerns about trail access for emergency vehicles and congestion on SR 510, with a suggestion to coordinate with the school board on traffic flow. A resident also expressed a need for more north-south roads. [26th Street to 69th Street; case 2308793] Project involves new road construction for an approximately 5-mile segment of 82nd Avenue, extending from 26th Street to 69th Street. Right-of-way acquisition is scheduled from FY 2026 to FY 2029, with construction planned for future years. The total project cost is estimated at $13,199,790. [43rd Ave to SR-5/US 1; case 4513681] This project involves widening Aviation Boulevard from 2 lanes to 4 lanes over a 2.1-mile corridor, from 43rd Avenue to SR-5/US 1. Improvements include buffered bike lanes, sidewalks, a shared-use path, and median and drainage enhancements. The Project Development and Environmental (PD&E) study is funded from FY 2028 to FY 2029, with project design funded in FY 2031. The total estimated project cost is $4,364,628. [W OF 82ND AVE to 58TH AVE; case 4056063] This project involves widening CR 510 (85th Street) from 2 lanes to 4 lanes between 82nd Avenue and 58th Avenue, a length of 3.26 miles. Preliminary engineering is ongoing. Right-of-way acquisition is programmed from FY 2025 through FY 2028. The total project cost is estimated at $22,812,798. [CR-512 to W OF 82ND AVE; case 4056064] This project involves widening CR 510 (85th Street) from 2 lanes to 4 lanes between CR-512 and 87th Street, a length of 2.2 miles. Right-of-way funds are programmed for FY 2028. Construction funds are programmed in conjunction with related projects. The total project cost is estimated at $13,963,733. [87TH ST to WEST OF 82ND AVE; case 4056068] This project involves widening CR 510 (85th Street) from 2 lanes to 4 lanes between 87th Street and 82nd Avenue, a length of 0.871 miles. Railroad and utility funds are programmed for FY 2029. Construction funds are programmed for FY 2030 and FY 2031. The total project cost is estimated at $28,646,932. [58TH AVENUE to EAST OF US 1; case 4416921] This project involves widening CR 510 (85th Street) from 2 lanes to 4 lanes between 58th Avenue and US 1 (SR 5), a length of 0.6 miles. Preliminary engineering is ongoing. Right-of-way acquisition is programmed for FY 2031, with construction to be programmed for future years. The total project cost is estimated at $9,201,119. [WILLOW STREET to SR-9/I-95; case 4573171] This project involves widening CR-512 from 2 lanes to 4 lanes between Willow Street and I-95, a length of 2.572 miles. Construction is funded in FY 2031. The total project cost is estimated at $22,957,081. [I-95 to OSLO ROAD; case 4130485] This project involves landscaping in conjunction with FM# 4130482 at the I-95/Oslo Road interchange, covering a length of 1.01 miles. Landscaping is funded in FY 2028 and FY 2030. The total project cost is estimated at $1,734,178. [I-95 to OSLO ROAD; case 4130482] This project involves the construction of a new interchange at I-95 and Oslo Road (9th Street SW), covering a length of 7.379 miles. Construction is currently underway. Additional right-of-way funds are programmed for FY 2028. The total project cost is estimated at $108,215,367. [case 4416931] This project involves intersection improvements at US 1 (SR 5) and Aviation Blvd, covering a length of 1.142 miles. The PD&E study was completed in 2024. Preliminary engineering is programmed for FY 2025 and FY 2026. Right-of-way acquisition is programmed for FY 2027, FY 2028, FY 2030, and FY 2031. The total project cost is estimated at $24,945,608. [5TH STREET SW to 1ST STREET SW; case 4497001] This project involves the resurfacing of 43rd Avenue from 5th Street SW to 1st Street SW, a length of 0.491 miles. Construction is programmed for FY 2030. The total project cost is estimated at $3,167,000. [1ST STREET SW to 6TH STREET; case 4442703] This project involves the resurfacing of 43rd Avenue from 1st Street SW to 6th Street, a length of 0.756 miles. Construction is programmed for FY 2028 and FY 2029. The total project cost is estimated at $4,373,593. [58TH AVENUE to 43RD AVENUE; case 4533271] This project involves multi-modal safety improvements on 45th Street (N Gifford Road) from 58th Avenue to 43rd Avenue, including the addition of bike lanes and sidewalks on both sides. Project design is programmed. [INDIAN RIVER COUNTY to PARTIALLY IN ST LUCIE COUNTY; case 4571781] Project involves guardrail replacement on I-95. The project is managed by FDOT and spans Indian River County and partially into St. Lucie County. Funding is allocated for preliminary engineering and construction phases across multiple fiscal years. [case 4512932] Routine mowing on state and interstate highway systems in Indian River County. Managed by FDOT. Funding is allocated for maintenance phases. [case 4512933] Routine mowing on state and interstate highway systems in Indian River County. Managed by FDOT. Funding is allocated for maintenance phases. [case 2336662] Routine maintenance of state highway bridges in Indian River County. Managed by FDOT. Funding is allocated for maintenance phases. [case 4278044] Maintenance operations on state highways in Indian River County, specifically traffic signals. Managed by Indian River County BOCC. Funding allocated for operations. [case 2336661] Maintenance operations on state highways in Indian River County. Managed by FDOT. Funding allocated for maintenance phases. [case 2342422] Routine maintenance of interstate highway bridges in Indian River County, including in-house bridge inspections. Managed by FDOT. Funding allocated for maintenance phases. [case 2342421] Maintenance operations on interstate highways in Indian River County. Managed by FDOT. Funding allocated for maintenance phases. [FEC RR to US 1; case 4544441] Project involves traffic control devices/systems on SR 510/85th St/Wabasso Road, from FEC RR to US 1. Managed by FDOT. Funding allocated for railroad and utilities, and construction support. [EAST OF I-95 to WEST OF 106TH AVENUE; case 4493321] Widening and resurfacing of SR 512, including interchange modification at I-95/CR 512 (Fellsmere Road) from I-95 to west of 106th Avenue. Managed by FDOT. Construction programmed for FY 2027. [SR-60 TO US-1 to INDIAN RIVER BLVD AND 11 AVE; case 4484431] Resurfacing of State Road 60 from 21st Avenue to Indian River Boulevard, and 11th Avenue from 20th Street to 21st Street. Managed by FDOT. Railroad & Utility funding in FY 2028, construction in FY 2029. [EAST OF FORT DRUM WILDLIFE ENTRANCE to WEST OF CR-512; case 4484441] Resurfacing of State Road 60 from East of Fort Drum Wildlife entrance to CR-512. Project is on the SIS network. Managed by FDOT. Construction programmed for FY 2030 and FY 2031. [case 4456181] Replacement of Bridge# 880005/SR A1A over the Sebastian Inlet. Construction of new bridge began in FY 2026. Contract incentives programmed for 2030, additional ROW funds in FY 2031. Managed by FDOT. Project length is 1.098 miles. [SAND DOLLAR LANE to S OF SEBASTIAN INLET BRIDGE; case 4456182] Resurfacing of SR A1A between the Sebastian Inlet Bridge to Sand Dollar Lane. Construction programmed for FY 2029. Managed by FDOT. Project length 6.51 miles. [INDIAN RIVER COUNTY/ST. LUCIE COUNTY LINE to JASMINE LANE; case 4498181] Resurfacing of SR A1A between the Indian River/St. Lucie County line to Jasmine Lane. Construction programmed for FY 2027. Managed by FDOT. Project length 5.459 miles. [OVER ICWW to OVER ICWW; case 4566461] Bridge repair/rehabilitation over the ICWW on SR-60/Beachland Blvd. Managed by FDOT. Preliminary engineering funding in FY 2028-2029, construction funding in FY 2031. [case 4515841] Maintenance and operation of traffic signals on state highway system roadways in Indian River County. Managed by Indian River County. Funding allocated for maintenance and operations. [N OF 87 ST to S OF SEBASTIAN BLVD; case 4498121] Resurfacing of US 1 (SR 5) between north of 87th Street and south of Sebastian Boulevard (CR 512). Managed by FDOT. Construction programmed for FY 2027. Project length 4.222 miles. [case 4071906] Indian River County receives Florida Department of Transportation (FDOT) Block Grant and Federal Transit Administration (FTA) Section 5307 funds for operating assistance. Managed by Indian River County. [case 4071824] Section 5311 formula funds for rural area transit operations, supporting the GoLine route #10 in Fellsmere. Managed by Indian River County. Funding allocated for operations. [case 4071902] Indian River County receives Federal Transit Administration (FTA) Section 5307 funds for transit capital assistance. Managed by Indian River County. Funding allocated for capital projects. [case 4457281] Indian River County receives Federal Transit Administration (FTA) Section 5339 funds for transit capital assistance. Managed by Indian River County. Funding allocated for capital projects. [32ND AVENUE to US 1; case 4570951] Construction of sidewalks from 32nd Avenue to US 1 in Indian River County. Managed by Indian River County. Funding allocated for preliminary engineering and construction. [45TH STREET to 49TH STREET; case 4529951] Sidewalk construction from 45th Street to 49th Street in Indian River County. Managed by Indian River County. Construction programmed for FY 2027 and FY 2028. Project length 0.503 miles. [SEBASTIAN MUNICIPAL AIRPORT; case 4571381] Sebastian Municipal Airport Aviation Security Project. Funding allocated for capital projects in FY 2028. [SEBASTIAN MUNICIPAL AIRPORT; case 4571461] Sebastian Municipal Airport Aviation Preservation Project. Funding allocated for capital projects in FY 2029. [SEBASTIAN MUNICIPAL AIRPORT - WEST SIDE; case 4533791] Sebastian Municipal Airport - Construct access road and utilities on the west side of the airport. Funding allocated for capital projects in FY 2028 and FY 2029. [SEBASTIAN MUNICIPAL AIRPORT; case 4550111] Sebastian Municipal Airport - Construct Taxiway. Funding allocated for capital projects in FY 2027. [SEBASTIAN MUNICIPAL AIRPORT; case 4549981] Sebastian Municipal Airport - Update Airport Master Plan. Funding allocated for capital projects in FY 2028. [VERO BEACH REGIONAL AIRPORT; case 4515381] Vero Beach Regional Airport - Rehabilitate Airport Drainage System. Funding allocated for capital projects in FY 2028. [VERO BEACH REGIONAL AIRPORT; case 4533831] Vero Beach Regional Airport - Rehabilitate Twy A South of Rwy 12R. Funding allocated for capital projects in FY 2027. [VERO BEACH REGIONAL AIRPORT; case 4548971] Vero Beach Regional Airport - Extend Twy E West of Rwy 4. Funding allocated for capital projects in FY 2029. [VERO BEACH REGIONAL AIRPORT; case 4549011] Vero Beach Regional Airport - Extend Rwy 4/22, Phase 1 Environmental. Funding allocated for capital projects in FY 2028. [case 4393276] Indian River FY2026/2027-2027/2028 UPWP (Unified Planning Work Program). Managed by Indian River County MPO. Funding allocated for planning. [case 4393277] Indian River FY2028/2029-2029/2030 UPWP (Unified Planning Work Program). Managed by Indian River County MPO. Funding allocated for planning. [case 4393278] Indian River FY2030/2031-2031/2032 UPWP (Unified Planning Work Program). Managed by Indian River County MPO. Funding allocated for planning. [1st Street SW at 27th Ave] Project involves the construction of a left turn lane and traffic signal at 1st Street SW and 27th Avenue. Funding from Traffic Impact Fee 2020-District 2. Construction programmed for FY 2027-2028. [4th Street & 29th Avenue] Project involves culvert replacement at 4th Street and 29th Avenue. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [8th Street Road Construction & Realignment from 66th Avenue to 74th Avenue] Project involves road construction and realignment of 8th Street from 66th Avenue to 74th Avenue. Funding from Traffic Impact Fee 2020-District 2 and Optional Sales Tax. Construction programmed for FY 2027-2030. [8th Street Road Construction & Realignment from 74th Avenue to 82nd Avenue] Project involves road construction and realignment of 8th Street from 74th Avenue to 82nd Avenue. Funding from Optional Sales Tax and Traffic Impact Fee 2020-District 2. Construction programmed for FY 2027-2030. [13th Street SW Realignment at 43rd Avenue] Project involves realignment of 13th Street SW at 43rd Avenue. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [20th Avenue Pedestrian Bridge] Project involves construction of a pedestrian bridge at 20th Avenue. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [20th Ave Sidewalk East Side 8th St to 12th St] Project involves sidewalk construction on the east side of 20th Avenue from 8th Street to 12th Street. Funding from Optional Sales Tax. Construction programmed for FY 2029-2030. [25th Street SW Paving 43rd Avenue to Koblegard Road] Project involves paving of 25th Street SW from 43rd Avenue to Koblegard Road. Funding from Traffic Impact Fee 2020-District 2. Construction programmed for FY 2029-2030. [26th Street, 43rd Avenue to 58th Avenue] Project involves two-lane realignment and construction with pedestrian features on 26th Street from 43rd Avenue to 58th Avenue (1 mile). Funding from Traffic Impact Fee 2020-District 2 and Optional Sales Tax. Construction programmed for FY 2027-2030. [26th Street, 58th Avenue to 66th Avenue] Project involves two-lane realignment and construction with pedestrian features on 26th Street from 58th Avenue to 66th Avenue (1 mile). Funding from Traffic Impact Fee 2020-District 2. Construction programmed for FY 2027-2028. [26th Street Sidewalk Crossing at County Building] Project involves sidewalk construction crossing at the County Building on 26th Street. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [27th Avenue at Oslo Road] Project involves right and left turn lane improvements at 27th Avenue and Oslo Road. Funding from Optional Sales Tax. Construction programmed for FY 2028-2029. [28th Court Sidewalk - East Side (47th Street to 49th Street)] Project involves sidewalk construction on the east side of 28th Court from 47th Street to 49th Street. Funding from FDOT and Optional Sales Tax. Construction programmed for FY 2027-2028. [32nd Ave Road Corridor Construction] Project involves road corridor construction on 32nd Avenue. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [33rd Street & 62nd Court Culvert Replacement] Project involves culvert replacement at 33rd Street and 62nd Court. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [37th Street & Indian River Boulevard Intersection Improvements] Project involves intersection improvements at 37th Street and Indian River Boulevard. Funding from Optional Sales Tax. Construction programmed for FY 2028-2030. [US Highway 1 to 37th Street and to 41st Street via McCrystal Drive/11th Drive] Project involves aviation extension from US Highway 1 to 37th Street and to 41st Street via McCrystal Drive/11th Drive. Funding from Traffic Impact Fee 2020-District 2. Construction programmed for FY 2028-2029. [41st Street North Side 32nd Avenue to US Hwy 1] Project involves sidewalk construction on the north side of 41st Street from 32nd Avenue to US Hwy 1. Funding from Optional Sales Tax and FDOT. Construction programmed for FY 2027-2028. [41st Street & US 1 Intersection Improvements / Old Dixie] Project involves intersection improvements at 41st Street and US 1, including Old Dixie. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [41st Street Northbound right turn lane at 58th Avenue] Project involves construction of a northbound right turn lane at 41st Street and 58th Avenue. Funding from Traffic Impact Fee 2020-District 2. Construction programmed for FY 2027-2028. [41st Street Canal H Culvert Replacement] Project involves culvert replacement at 41st Street Canal H. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [43rd Avenue Full Depth Reclamation (26th Street to 41st Street)] Project involves full depth reclamation of 43rd Avenue from 26th Street to 41st Street. Funding from Optional Sales Tax and FDOT. Construction programmed for FY 2027-2030. [43rd Ave Bridge Replacement/Pedestrian Crossing over South Relief Canal 5th st SW to 1st St SW] Project involves bridge replacement and pedestrian crossing over South Relief Canal on 43rd Avenue from 5th Street SW to 1st Street SW. Funding from Optional Sales Tax. Construction programmed for FY 2028-2030. [43rd Ave Pedestrian & Bicycle Access Improvements 5th St SW to 1st St SW] Project involves pedestrian and bicycle access improvements on 43rd Avenue from 5th Street SW to 1st Street SW. Funding from Optional Sales Tax and FDOT. Construction programmed for FY 2027-2028. [43rd Ave Pedestrian & Bicycle Access Improvements 1st St SW to 6th St] Project involves pedestrian and bicycle access improvements on 43rd Avenue from 1st Street SW to 6th Street. Funding from Optional Sales Tax and FDOT. Construction programmed for FY 2027-2030. [43rd Ave Pedestrian & Bicycle Access Improvements 6th St to 12th St] Project involves pedestrian and bicycle access improvements on 43rd Avenue from 6th Street to 12th Street. Funding from Optional Sales Tax and FDOT. Construction programmed for FY 2027-2030. [43rd Ave Pedestrian & Bicycle Access Improvements 12th St to 18th St] Project involves pedestrian and bicycle access improvements on 43rd Avenue from 12th Street to 18th Street. Funding from Optional Sales Tax and FDOT. Construction programmed for FY 2027-2028. [43rd Ave Sidewalks Both Sides 45th Street to 49th Street] Project involves sidewalk construction on both sides of 43rd Avenue from 45th Street to 49th Street. Funding from Optional Sales Tax and FDOT. Construction programmed for FY 2027-2028. [45th Street/Left Turn Lane at US 1] Project involves construction of a left turn lane at 45th Street and US 1. Funding from Traffic Impact Fee 2020-District 2. Construction programmed for FY 2027-2029. [45th Street / 58th Avenue Signalization Replacement] Project involves signalization replacement at 45th Street and 58th Avenue. Funding from Optional Sales Tax. Construction programmed for FY 2028-2029. [49th Street Sidewalk North Side 43rd Ave to Old Dixie Hwy] Project involves sidewalk construction on the north side of 49th Street from 43rd Ave to Old Dixie Hwy. Funding from Optional Sales Tax and FDOT. Construction programmed for FY 2027-2028. [49th Street & US 1 Intersection Improvements] Project involves intersection improvements at 49th Street and US 1. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [53rd Street widening, 58th Avenue to 66th Avenue] Project involves widening of 53rd Street, 58th Avenue to 66th Avenue (600 foot 4-lane segment). Funding from Traffic Impact Fee 2020-District I. Construction programmed for FY 2027-2028. [53rd Street widening, 58th Avenue to 66th Avenue] Project involves widening of 53rd Street, 58th Avenue to 66th Avenue (800 foot 4-lane segment). Funding from Traffic Impact Fee 2020-District I. Construction programmed for FY 2027-2028. [53rd Street widening west of 58th Avenue to 66th Avenue] Project involves widening of 53rd Street, west of 58th Avenue to 66th Avenue (1,000 foot 2-lane segment). Funding from Traffic Impact Fee 2020-District I. Construction programmed for FY 2027-2028. [58th Avenue - 33rd Street Left Turn Lanes] Project involves left turn lanes at 58th Avenue and 33rd Street. Funding from Traffic Impact Fee 2020-District I. Construction programmed for FY 2027-2030. [58th Avenue - 37th Street Left Turn Lanes] Project involves left turn lanes at 58th Avenue and 37th Street. Funding from Traffic Impact Fee 2020-District I. Construction programmed for FY 2027-2028. [58th Ave & 21st SW Culvert] Project involves culvert replacement at 58th Ave & 21st SW. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [66th Avenue SW & 17th Street SW Culvert] Project involves culvert replacement at 66th Avenue SW & 17th Street SW. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [66th Avenue, 69th Street to 85th Street] Project involves four-lane realignment and construction of 66th Avenue from 69th Street to 85th Street (2.0 miles), including side streets and bridges. Funding from Developer Funded Construction, Traffic Impact Fee 2020-District I, Traffic Impact Fees- District 1, and FDOT. Construction programmed for FY 2027-2028. [66th Avenue at CR510] Project involves intersection improvements at 66th Avenue at CR510. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [82nd Ave Bridge Replacement] Project involves bridge replacement at 82nd Ave. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [CR-512, Willow St to I-95] Project involves four-lane widening of CR-512 from Willow St to I-95. Funding from Traffic Impact Fee 2020-District I. Construction programmed for FY 2027-2028. [CR512 Safety Improvements] Project involves safety improvements on CR512. Funding from Optional Sales Tax. Construction programmed for FY 2027-2029. [Ercildoune Heights Drainage Improvements] Project involves drainage improvements in Ercildoune Heights. Funding from Optional Sales Tax. Construction programmed for FY 2027-2029. [Highland Drive Sidewalk] Project involves sidewalk construction on Highland Drive (+/- 4500 LF). Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [Indian River Blvd Pedestrian Bicycle and Access Improvements (17th St. Bridge to U.S. Highway 1)] Project involves pedestrian, bicycle, and access improvements on Indian River Blvd from 17th St. Bridge to US Highway 1. Funding from Gas Tax and FDOT. Construction programmed for FY 2027-2030. [Misc. Right of Way Acquisition] Project involves miscellaneous right of way acquisition. Funding from Optional Sales Tax. Acquisition programmed for FY 2025/26 - FY 2029/30. [Sidewalk Extension - 64th Avenue to Wabasso Park] Project involves sidewalk extension from 64th Avenue to Wabasso Park. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [Traffic Controllers] Project involves traffic controllers. Funding from Gas Tax. Programmed for FY 2025/26 - FY 2029/30. [Traffic Camera Replacement Program] Project involves traffic camera replacement program. Funding from Optional Sales Tax. Programmed for FY 2025/26 - FY 2029/30. [Rain Tree Corners Culvert Replacement] Project involves culvert replacement at Rain Tree Corners. Funding from Assessments. Construction programmed for FY 2027-2028. [Roseland Road Bridge] Project involves bridge replacement at Roseland Road. Funding from Optional Sales Tax. Construction programmed for FY 2027-2028. [Sidewalks and Designated Bicycle Lanes] Project involves sidewalks and designated bicycle lanes. Funding from Optional Sales Tax. Construction programmed for FY 2025/26 - FY 2029/30. [Various Culvert Replacements] Project involves various culvert replacements. Funding from Optional Sales Tax. Construction programmed for FY 2025/26 - FY 2029/30. [Vero Lake Estates 25% Petition Millings- 104th Ave- 79th to 87th] Project involves millings on 104th Ave from 79th to 87th in Vero Lake Estates. Funding from Gas Tax and Assessments. Construction programmed for FY 2025/26 - FY 2029/30. This document outlines various transportation projects and funding allocations for Indian River County, Florida, for the fiscal years 2027-2031. It details projects such as road widenings, bridge repairs, intersection improvements, sidewalk construction, and airport upgrades. Specific projects include CR 510 widening, SR A1A bridge replacement, I-95/Oslo Road interchange improvements, and various airport development projects at Sebastian Municipal Airport and Vero Beach Regional Airport. The document also covers transit capital assistance and block grants, as well as planning initiatives like the Unified Planning Work Program (UPWP) and the List of Priority Projects (LOPP).
Agenda items
- 1. Bicycle, Pedestrian and Greenways Plans and Studies
- 1. Data collection, GIS database development, and existing conditions analysis
- 1. General Planning Consultant Proposed Scope of Services
- Engineering & Architecture
- Business Consulting
- 1. Indian River County MPO 2026 List of Priority Projects
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- General Contractor
- Painting & Flooring
- Plumbing
- HVAC & Climate Control
- Lighting & Low-Voltage Systems
- Engineering & Architecture
- Building & Industrial Supply
- Real Estate Development
- Title & Settlement Services
- Landscaping & Lawn Service
- Government Authority
- 1. Indian River County MPO FY 2027 – FY 2031 TIP
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Utilities (Sub)
- 1. Initial network and model development and validation activities
- 1. Major and Minor TDP Updates
- 1. Percent of person -miles on the Interstate system that are reliable, also
- 1. Signal Timing study development
- 1. Transportation performance data:
- 1. Website development and maintenance
- 141) that authorizes federal-aid highway and transit programs. MAP-21 sets forth funding and associated requirements for the
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Drywall & Insulation
- Windows, Doors & Glass
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 2. Automated Bicycle and Pedestrian AADT Collection studies
- 2. Deficiency identification and strategy development
- 2. Network changes, background data, and zonal boundary changes
- 2. Newsletter, fact sheet, direct mail, PSA, brochure, and advertisement design
- 2. Percent of person -miles on the non -Interstate NHS that are reliable
- 2. Selection of performance targets:
- Engineering & Architecture
- Business Consulting
- Office & Business Support Services
- 2. Traffic Count, Vehicle Classification, or Delay study development
- 2. Transit Quality of Service Report Development
- 3. Consideration of the FY 2027 – FY 2031 Transportation Improvement Program
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Painting & Flooring
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Drywall & Insulation
- Windows, Doors & Glass
- Utilities (Sub)
- Trucking & Freight
- Real Estate Development
- 3. FY 2026/27–FY 2027/28 Unified Planning Work Program (UPWP)
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- General Contractor
- Utilities (Sub)
- 3. FY 2026/27–FY 2027/28 Unified Planning Work Program (UPWP) – Action
- Engineering & Architecture
- Legal Services
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- 3. Future condition forecasts
- 3. MPO Database development and maintenance
- 3. Model calibration and adjustment
- 3. Pedestrian Safety Action Plans
- 3. Reporting performance targets:
- 3. System Condition Inventory development
- 3. Transit Route and Segment Evaluation
- 3. Truck Travel Time Reliability index (TTTR); Congestion Mitigation and Air
- Engineering & Architecture
- Business Consulting
- Accounting & Tax
- 4. 2026 Title VI Program Update – Action Required
- Legal Services
- Business Consulting
- Engineering & Architecture
- 4. 2026 Title VI Program Update – Action Required
- Legal Services
- Engineering & Architecture
- Government Authority
- 4. Annual hours of peak hour excessive delay per capita (PHED);
- 4. Consideration of the 2026 List of Priority Projects
- 4. Impact assessment of proposed improvements on neighborhoods and adjacent
- Engineering & Architecture
- Business Consulting
- Professional Services (Other)
- 4. Incorporating Autonomous, Connected, Electric, and Shared (ACES) Vehicle
- 4. Multi-Modal Quality and Level of Service (MMQLOS) Analysis
- 4. Public workshop or small group meeting preparation and staffing
- 4. Socio-economic data development
- 4. Transit network development and mode-choice modeling
- 5. Bicycle and Pedestrian Facility Inventory and Database Management
- 5. Consideration of the General Planning Consultant (GPC) Scope of Services
- Engineering & Architecture
- Business Consulting
- 5. Level of Service determination
- 5. Long Range Transportation Plan development
- Engineering & Architecture
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Building & Industrial Supply
- 5. Percent of non-single occupant vehicle travel (Non-SOV); and
- 5. Public Opinion Poll and Survey design
- 5. Ridership and Operator Surveys
- 5. Scenario modeling for major new developments, proposed land use changes,
- 5. Summary Sheet on Roadway Improvement Projects – No Action Required
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Utilities (Sub)
- 5. Summary Sheet on Roadway Improvement Projects – No Action Required
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Government Authority
- 6. Crash Data System Development and Analysis
- 6. Cumulative 2 -year and 4 -year reduction of on -road mobile source
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- Government Authority
- 6. MPO Public Involvement effort evaluation
- 6. Origin-Destination mapping
- 6. Planning for consistency with MAP-21/FAST Act provisions including
- 6. Presentation on Transportation Technology and Data – No Action Required
- 6. Presentation on Transportation Technology and Data – No Action Required
- 6. Small-area and sub-area model development and calibration
- 6. Status Report of MPO Advisory Committees
- 7. Access Management Classification and Re-classification Study development
- Engineering & Architecture
- Business Consulting
- Professional Services (Other)
- 7. Air-quality modeling and analysis
- 7. Land Use and Transportation coordination studies, including vacant land,
- Engineering & Architecture
- Business Consulting
- Real Estate Development
- 7. Status Report of MPO Advisory Committees – No Action Required
- 7. Status Report of MPO Advisory Committees – No Action Required
- 7. Transportation Disadvantaged Analysis
- 7. Visualization and Graphics, including Computer Simulation development
- 8. Design, Permitting, and Environmental Studies
- 8. Other Business
- 8. Other Business
- 8. Public Transportation Agency Safety Plans
- 8. Regional Long Range Planning studies
- A. Roadway Capacity Projects
- A. Roadway Capacity Projects ...................................................................................................... A-1
- A. Short & Long Range Transportation Planning/Corridor Analyses and Sub-area
- Engineering & Architecture
- Business Consulting
- B. Non-Motorized Transportation Planning– The consultant(s) may be required to
- Engineering & Architecture
- Business Consulting
- Legal Services
- Landscaping & Lawn Service
- B. TRAFFIC OPERATIONS, MAINTENANCE, AND SAFETY PROJECTS
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Construction (Other)
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Government Authority
- B. Traffic Operations, Maintenance, and Safety Projects
- Site Prep, Grading & Hardscape
- General Contractor
- Lighting & Low-Voltage Systems
- Utilities (Sub)
- Engineering & Architecture
- Building & Industrial Supply
- Landscaping & Lawn Service
- B. Traffic Operations, Maintenance, and Safety Projects ............................................................ B-1
- C. TRANSIT AND TRANSPORTATION DISADVANTAGED PROJECTS
- Utilities (Sub)
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Logistics & Warehousing
- Engineering & Architecture
- Real Estate Development
- Waste Management
- Government Authority
- C. Transit Planning - The consultant(s) may be required to perform the following transit
- C. Transit and Transportation Disadvantaged Projects
- C. Transit and Transportation Disadvantaged Projects ............................................................... C-1
- D. BICYCLE, PEDESTRIAN, TRAILS, AND ENHANCEMENT PROJECTS
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- D. Bicycle, Pedestrian, Trail, and Enhancement Projects
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Painting & Flooring
- Lighting & Low-Voltage Systems
- Engineering & Architecture
- Landscaping & Lawn Service
- D. Bicycle, Pedestrian, and Transportation Alternatives Projects ............................................... D-1
- D. Transportation Planning Model Calibration and Sub-Area Modeling The
- Engineering & Architecture
- Business Consulting
- IT Services & Cybersecurity
- E. Aviation Projects
- E. Aviation Projects ...................................................................................................................... E-1
- E. Traffic Engineering and Operational Studies – Appropriate activities to be performed
- F. TRANSPORTATION PLANNING/STUDIES
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Painting & Flooring
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Drywall & Insulation
- Windows, Doors & Glass
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- Utilities (Sub)
- F. Transportation Planning/Studies
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Painting & Flooring
- Electrical
- Plumbing
- HVAC & Climate Control
- Engineering & Architecture
- Building & Industrial Supply
- Real Estate Development
- Title & Settlement Services
- Government Authority
- F. Transportation Planning/Studies ............................................................................................. F-1
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Windows, Doors & Glass
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Government Authority
- I. PURPOSE:
- Engineering & Architecture
- Business Consulting
- Legal Services
- Office & Business Support Services
- II. SCOPE OF SERVICES
- S. Wimbrow Dr. .50 Sidewalk on one side Sebastian - 17
- Engineering & Architecture
- Business Consulting
- Legal Services
- Office & Business Support Services
- a) FDOT will collect and maintain data, perform calculations of performance metrics and
- Engineering & Architecture
- Business Consulting
- Office & Business Support Services
- a) FDOT will select and establish a statewide target for each applicable federally required
- a) Reporting targets generally refers to the process used to report targets, progress
- b) Each MPO will report its final performance targets as mandated by federal requirements
- b) Each MPO will select and establish a target for each applicable federally required
- b) Each MPO will share with FDOT any locally generated data that pertains to the federally
- c) Each provider of public transportation is responsible for collecting performance data in
- Business Consulting
- Engineering & Architecture
- c) The providers of public transportation in MPO planning areas will select and establish
- Government Authority
- i. Choosing to support the statewide target established by FDOT, and providing
- i. Each MPO will include in future updates or amendments of its metropolitan long
- General Contractor
- Site Prep, Grading & Hardscape
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Concrete & Masonry
- Engineering & Architecture
- Building & Industrial Supply
- Real Estate Development
- Government Authority
- Utilities (Sub)
- i. FDOT will include in future updates or amendments of the statewide long-range
- i. The Tier I providers of public transportation will establish performance targets to
- Engineering & Architecture
- Business Consulting
- Government Authority
- i. To the maximum extent practicable, FDOT will share proposed statewide targets
- Engineering & Architecture
- Legal Services
- Government Authority
- ii. Choosing to establish its own target, using a quantifiable methodology for its
- Engineering & Architecture
- Legal Services
- Government Authority
- ii. FDOT is the sponsor of a Group Transit Asset Management plan for subrecipients
- Government Authority
- Business Consulting
- Engineering & Architecture
- Legal Services
- Accounting & Tax
- ii. FDOT will include in future updates or amendments of the statewide
- ii. FDOT will provide written notice to the MPOAC and individual MPOs within
- Engineering & Architecture
- Business Consulting
- Accounting & Tax
- Legal Services
- Government Authority
- iii. FDOT will draft and certify a Public Transportation Agency Safety Plan for any
- iii. FDOT will report targets and performance data for each applicable highway
- iv. All other public transportation service providers that receive funding under 49
- v. If the MPO chooses to support the asset management and safety targets
Follow this across meetings
Applicants and firms
- Indian River County MPO
- MANAGED BY FDOT
- MANAGED BY INDIAN RIVER COUNTY
- FDOT
- INDIAN RIVER COUNTY BOCC
- INDIAN RIVER COUNTY
- RESPONSIBLE AGENCY NOT AVAILABLE
- FDOT / Optional Sales Tax
- Optional Sales Tax / FDOT
- Developer Funded Construction / Traffic Impact Fee 2020-District I / Traffic Impact Fees- District 1 / FDOT
- Gas Tax / FDOT
- Gas Tax / Assessments
Locations
- 1800 27th Street, Vero Beach, FL
- 26th Street to 69th Street
- 43rd Ave to SR-5/US 1
- W OF 82ND AVE to 58TH AVE
- CR-512 to W OF 82ND AVE
- 87TH ST to WEST OF 82ND AVE
- 58TH AVENUE to EAST OF US 1
- WILLOW STREET to SR-9/I-95
- I-95 to OSLO ROAD
- 5TH STREET SW to 1ST STREET SW
- 1ST STREET SW to 6TH STREET
- 58TH AVENUE to 43RD AVENUE
- INDIAN RIVER COUNTY to PARTIALLY IN ST LUCIE COUNTY
- FEC RR to US 1
- EAST OF I-95 to WEST OF 106TH AVENUE
- SR-60 TO US-1 to INDIAN RIVER BLVD AND 11 AVE
- EAST OF FORT DRUM WILDLIFE ENTRANCE to WEST OF CR-512
- SAND DOLLAR LANE to S OF SEBASTIAN INLET BRIDGE
- INDIAN RIVER COUNTY/ST. LUCIE COUNTY LINE to JASMINE LANE
- OVER ICWW to OVER ICWW
- N OF 87 ST to S OF SEBASTIAN BLVD
- 32ND AVENUE to US 1
- 45TH STREET to 49TH STREET
- SEBASTIAN MUNICIPAL AIRPORT
- SEBASTIAN MUNICIPAL AIRPORT - WEST SIDE
- VERO BEACH REGIONAL AIRPORT
- 1st Street SW at 27th Ave
- 4th Street & 29th Avenue
- 8th Street Road Construction & Realignment from 66th Avenue to 74th Avenue
- 8th Street Road Construction & Realignment from 74th Avenue to 82nd Avenue
- 13th Street SW Realignment at 43rd Avenue
- 20th Avenue Pedestrian Bridge
- 20th Ave Sidewalk East Side 8th St to 12th St
- 25th Street SW Paving 43rd Avenue to Koblegard Road
- 26th Street, 43rd Avenue to 58th Avenue
- 26th Street, 58th Avenue to 66th Avenue
- 26th Street Sidewalk Crossing at County Building
- 27th Avenue at Oslo Road
- 28th Court Sidewalk - East Side (47th Street to 49th Street)
- 32nd Ave Road Corridor Construction
- 33rd Street & 62nd Court Culvert Replacement
- 37th Street & Indian River Boulevard Intersection Improvements
- US Highway 1 to 37th Street and to 41st Street via McCrystal Drive/11th Drive
- 41st Street North Side 32nd Avenue to US Hwy 1
- 41st Street & US 1 Intersection Improvements / Old Dixie
- 41st Street Northbound right turn lane at 58th Avenue
- 41st Street Canal H Culvert Replacement
- 43rd Avenue Full Depth Reclamation (26th Street to 41st Street)
- 43rd Ave Bridge Replacement/Pedestrian Crossing over South Relief Canal 5th st SW to 1st St SW
- 43rd Ave Pedestrian & Bicycle Access Improvements 5th St SW to 1st St SW
- 43rd Ave Pedestrian & Bicycle Access Improvements 1st St SW to 6th St
- 43rd Ave Pedestrian & Bicycle Access Improvements 6th St to 12th St
- 43rd Ave Pedestrian & Bicycle Access Improvements 12th St to 18th St
- 43rd Ave Sidewalks Both Sides 45th Street to 49th Street
- 45th Street/Left Turn Lane at US 1
- 45th Street / 58th Avenue Signalization Replacement
- 49th Street Sidewalk North Side 43rd Ave to Old Dixie Hwy
- 49th Street & US 1 Intersection Improvements
- 53rd Street widening, 58th Avenue to 66th Avenue
- 53rd Street widening west of 58th Avenue to 66th Avenue
- 58th Avenue - 33rd Street Left Turn Lanes
- 58th Avenue - 37th Street Left Turn Lanes
- 58th Ave & 21st SW Culvert
- 66th Avenue SW & 17th Street SW Culvert
- 66th Avenue, 69th Street to 85th Street
- 66th Avenue at CR510
- 82nd Ave Bridge Replacement
- CR-512, Willow St to I-95
- CR512 Safety Improvements
- Ercildoune Heights Drainage Improvements
- Highland Drive Sidewalk
- Indian River Blvd Pedestrian Bicycle and Access Improvements (17th St. Bridge to U.S. Highway 1)
- Misc. Right of Way Acquisition
- Sidewalk Extension - 64th Avenue to Wabasso Park
- Traffic Controllers
- Traffic Camera Replacement Program
- Rain Tree Corners Culvert Replacement
- Roseland Road Bridge
- Sidewalks and Designated Bicycle Lanes
- Various Culvert Replacements
- Vero Lake Estates 25% Petition Millings- 104th Ave- 79th to 87th
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta