5/21/26 PC Agenda Packet
Planning Commission · 2026-05-21 · agenda_packet
[East Side of Shady Hills Road and Approximately 784 Feet North of the Intersection of Shady Hills Road and Floralton Drive; case PDE26-7909] The Planning Commission is considering a Zoning Amendment for R & R Property Investments LLC / R & R Property Shady Hills. The request is to change zoning from A-R Agricultural-Residential District to C-2 General Commercial District for approximately one (1) acre. The site is located on the east side of Shady Hills Road, approximately 784 feet north of the intersection of Shady Hills Road and Floralton Drive. The purpose is for a contractor's office and associated storage. The recommendation is to approve. [On Topsail Trail, Approximately 1.2 Miles West of US Highway 19; case PDE26-2111] The Planning Commission is considering a Variance Request for the Pham Residence Screen Enclosure. The request is to reduce the requirement that structures not be located within fifteen (15) feet of the Mean High-Water Line to five (5) feet. This is in a R-4 High Density Residential District. The property is located on Topsail Trail, approximately 1.2 miles west of US Highway 19, and contains approximately 0.18 acres. The recommendation is Approval with Conditions. [Southwest Quadrant of the Intersection of State Road 54 and Little Road; case PDE26-7897] The Planning Commission is considering a Zoning Amendment Substantial Modification for Mitchell 54 West MPUD. The applicant, M&M ROUTE 54 WEST LLC, seeks to amend the Master Planned Unit Development District to remove Transit Oriented Design and Mixed Use Trip Reduction Measures requirements, reduce non-residential entitlements to 460,000 square feet of commercial, and add 240 hotel rooms and associated infrastructure. The site is approximately 330 acres, located in Southwest Pasco County at the Southwest Quadrant of the Intersection of State Road 54 and Little Road. The recommendation is Approval with Conditions. [1.5 Miles East of the Intersection of Denton Avenue and Little Road; case PDE26-7596] The Planning Commission is considering a Zoning Amendment for Denton Avenue MPUD. The applicant, Denton Ave Project, LLC, requests rezoning from AC Agricultural District to MPUD Master Planned Unit Development District to allow for 832 Single Family Detached Units, 75,000 square feet of Support Commercial, and 440,000 square feet of Light Industrial. The site is approximately 331.6 acres, located in North East Pasco County, 1.5 miles east of the intersection of Denton Avenue and Little Road. The recommendation is Approval with Conditions. [case PDE26-0724] The Planning Commission approved the Annotated Minutes for the Planning Commission Meeting held on December 11, 2025. The file number is PDE26-0724. [case PDE26-0748] The Planning Commission approved the Annotated Minutes for the Planning Commission Meeting held on January 8, 2026. The file number is PDE26-0748. [Intersection of Bell Lake Road and Peaceful Lane; case PDE26-7900] The Planning Commission approved the Zoning Amendment (Consent) for R&S Properties FLA LLC/Bell Haven. The zoning changed from an expired MPUD Master Planned Unit Development District to an R-2 Low Density Residential District. The property is located in South Central Pasco County at the intersection of Bell Lake Road and Peaceful Lane, containing approximately 5.35 acres. The file number is PDE26-7900. Mr. Moody abstained from the vote. [Northeast Corner of the intersection of Old Pasco Road and Overpass Road; case PDE26-0135] The Planning Commission approved a Comprehensive Plan Amendment (Consent) for CPAS24(15) Adrian Phillip. The Future Land Use Map changed from COM (Commercial) to PD (Planned Development) on approximately 32.51 acres. The property is located at the Northeast Corner of the intersection of Old Pasco Road and Overpass Road. This also included a Text Amendment to Subarea POLICY FLU 7.1.60 Adrian Phillip and an Amendment to the Future Land Use Map 2-9. The file number is PDE26-0135. [Northeast corner of Overpass Road and Old Pasco Road; case PDE26-7837] The Planning Commission approved a Zoning Amendment Substantial Modification (Consent) for Adrian Phillip MPUD Master Planned Unit Development. The rezoning is from MPUD Master Planned Unit Development to MPUD Master Planned Unit Development District to allow for 73,500 square feet of Retail/Commercial uses, 74,000 square feet of Office uses, 275 Hotel rooms, 125 Townhome Units, and 325 Multi-Family Apartments or 315,000 square feet of Commercial. The property is approximately 32.51 acres, located at the northeast corner of Overpass Road and Old Pasco Road. The file number is PDE26-7837. [North Side of SR 54 Approximately .3 Miles Southeast of the Intersection Of State Road 54 and Starkey Blvd.; case PDE26-0185] The Planning Commission approved a Comprehensive Plan Amendment (Regular) for CPAS23(26) Blackwell Mixed-Use PD. The Future Land Use Map changed from COM (Commercial) to PD (Planned Development) on approximately 15.36 acres. The property is located on the North Side of SR 54, approximately .3 miles southeast of the intersection of State Road 54 and Starkey Blvd. This also included a Text Amendment creating Subarea Policy FLU 7.1.80 – Blackwell Mixed-Use PD; and a Map Amendment to the Future Land Use Map 2-9. The file number is PDE26-0185. Public comment included concerns about traffic, safety, site distance, and wetlands. [case PDE26-7778] The Planning Commission approved a Zoning Amendment (Regular) for Blackwell MF & Office Complex MPUD Master Planned Unit Development. The rezoning is from A-C Agricultural District to MPUD Master Planned Unit Development District to allow for 290 Multi-Family Units and 50,000 Square Feet of Commercial and Medical Office Uses. The property is approximately 15.36 acres. The file number is PDE26-7778. [Southeastern Pasco County; case PDE26-7666] The Planning Commission approved a Zoning Amendment (Regular) for Murphy Road MPUD. The rezoning is from R-MH Mobile Home District and A-R Agricultural Residential District to MPUD Master Planned Unit Development District to allow for 434 Single Family Detached Units. The property is approximately 118.82 acres, located in Southeastern Pasco County. The file number is PDE26-7666. Public comment included concerns about density, traffic congestion, flooding, environmental consequences, overdevelopment, rural character, and affordability. [case PDE26-0024] The Planning Commission approved a Comprehensive Plan Amendment (Regular) for CPA25(02) North Pasco Resort. This is a Comprehensive Plan Text Amendment to Subarea Policy FLU 7.1.63- North Pasco Resort. The file number is PDE26-0024. Public comment included concerns about trip generations, traffic, RV park use, hotel addition, roadway impacts, water withdrawal, noise, building height, traffic congestion, water demand, wastewater, and compatibility. [case PDE26-7883] The Planning Commission approved a Zoning Amendment (Regular) for North Pasco Resort MPUD Master Planned Unit Development. The rezoning is from MPUD Master Planned Unit Development to MPUD Master Planned Unit Development to amend Conditions of Approval, allowing for Resort/Hotel Use of 250 Units, decreasing RV Space Entitlements from 550 Spaces to 350 Spaces, and amending the MPUD name. The property is approximately 131.68 acres. The file number is PDE26-7883. [North of State Road 52 Approximately .60 Mile East of the Intersection of State Road 52 and US Highway 41; case PDE26-0016] The Planning Commission approved a Comprehensive Plan Amendment (Regular) for CPA24(03) Elite 52 PD. The Future Land Use Map changed from AG (Agricultural) and AG/R (Agricultural/Rural) to PD (Planned Development) on approximately 156 acres. The property is located North of State Road 52, approximately .60 Mile East of the Intersection of State Road 52 and US Highway 41. This also included a Text Amendment creating Subarea Policy FLU 7.1.81 – Elite 52 PD; and a Map Amendment to the Future Land Use Map 2-9. The file number is PDE26-0016. Public comment included concerns about flooding, growth, density, buffer zones, airport noise, and stormwater issues. [Approximately 0.60 Miles East of the Intersection of State Road 52 and US 41; case PDE26-7811] The Planning Commission approved a Zoning Amendment (Regular) for SR 52 Elite. The rezoning is from AR Agricultural Residential District and AC Agricultural District to MPUD Master Planned Unit Development District to allow for a maximum of 108 Single Family Detached Units, 175,000 Square Feet of Commercial/Retail, and 120 Hotel Rooms. The property is approximately 156.2 acres, located in Central Pasco County, approximately 0.60 Miles East of the Intersection of State Road 52 and US 41. The file number is PDE26-7811.
Agenda items
- 1. Declarant is the fee owner of that certain real property more particularly described on
- 1. PDE26-2111 - Order
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 1. PDE26-7897: Visuals
- 1. PDE26-7909 Zoning Visuals
- Legal Services
- Engineering & Architecture
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- 1. Retain one (1) original for the record.
- 1. The PC shall grant a zoning variance request when it finds, based on the application submitted
- 1. The Planning Commission has heard and considered the presentation and evidence of the applicant and
- 1. The proposed change (is, is not) consistent with the existing land use pattern in the area.
- 1. The subject site is currently owned by Loan Thi Kim Pham.
- 1. The subject site, containing approximately 23.03 acres, is currently vacant. The applicant
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Roofing
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. The subject sites are currently undeveloped aside from the existing roadway infrastructure
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 1. The surrounding area is characterized by single-family detached development and town home
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. This variance shall be limited to the lot area as built.
- 1. This variance shall be limited to the lot area as built.
- 1. Timing and Phasing (T&P) and/or Substandard Road Analysis (SSRA): The PDE
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- 10. On April 24, 2024, the final building inspection failed due to the vertical construction is within the
- 10. On May 25, 2010, the Board of County Commissioners (BCC) approved Rezoning Petition No.
- Site Prep, Grading & Hardscape
- General Contractor
- Farming & Crops
- 10. The proposed change ( would, would not ) result in or act as a deterrent to the improvement or
- 11. Building Construction Services Department (BCS) staff identified the building permit issuance
- 11. The property which is the subject of the proposed change ( is, is not) a suitable site or location for the
- 11. The subject application was submitted for review by the Natural Resources Division, and the
- 12. Access to the property is from Shady Hills Road, a County-maintained Collector Roadway with
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Engineering & Architecture
- Building & Industrial Supply
- Government Authority
- 12. Certain portions of the property ( are, are not ) suitable for development under the proposed zoning
- 12. On March 6, 2026, the BCS Development Code Review Supervisor confirmed that they have “no
- 13. Adequate public facilities (are, are not) available to the site, including, but not limited to, water and sewer
- 13. On August 9, 2025, a Timing and Phasing Analysis (T&P-2025-00052) for the proposed
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- 13. The request for approval of this variance is based on the plans that were approved during the
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Construction (Other)
- 14. Shady Hills Road meets County standards pursuant to LDC, Section 901.4, so it is recognized as
- 14. The Applicant interprets that the intent and purpose of this code is to keep structures from
- 14. The property is developable under the zoning classification ( with, without) appropriate public facilities,
- 15. On August 26, 1993, the property to the south (PID 12-26-15-0760-01800-0050), received a
- 15. The LDC, Section 403, requires that owners/applicants submit a preliminary site plan or
- 15. The site proposed for zoning change ( would, would not) be subject to flooding and the effect of such
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Real Estate Development
- 16. On May 22, 2025, the Planning, Development and Economic Growth Department (PDE)
- Engineering & Architecture
- Legal Services
- Site Prep, Grading & Hardscape
- 16. The physical characteristics of the site and the degree of site alteration which ( would, would not) be
- 16. The proposed request is consistent with the LDC, Chapter 400, Permit Types and Applications;
- Legal Services
- Engineering & Architecture
- General Contractor
- Site Prep, Grading & Hardscape
- 17. In accordance with the LDC Section 407.2, Zoning Variances, the intent and purpose of the
- Legal Services
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- 17. The potential need for expansion of public services and facilities to accommodate the proposed
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- 18. The proposed zoning change (would, would not) be consistent with the goals, objectives, policies, and
- 19. The existing zoning classification ( accomplishes, does not accomplish) a legitimate public purpose
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 2. Declarant requested Pasco County, a political subdivision of the State of Florida,
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Legal Services
- Landscaping & Lawn Service
- 2. Electronically to:
- 2. PDE26-2111 - Zoning Visuals
- 2. PDE26-7897: Exhibits A-L (Legal, COA's, Master Plan, Binding Plans, LUEM, etc.)
- 2. PDE26-7909 Deed Restriction
- 2. Pasco County Utilities (PCU): PCU is in agreement with the conditions provided herein.
- 2. Pursuant to the Background Summary/Alternative Analysis, and Findings of Fact (FOF), the Planning
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- Construction (Other)
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 2. The Owner/Applicant shall comply with all other maximum and minimum bulk standards of the
- General Contractor
- Real Estate Development
- Engineering & Architecture
- 2. The Owner/Applicant shall comply with all other maximum and minimum bulk standards of the applicable
- General Contractor
- Real Estate Development
- Engineering & Architecture
- Building & Industrial Supply
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Drywall & Insulation
- Painting & Flooring
- Windows, Doors & Glass
- 2. The proposed change (would, would not) result in the possible creation of an isolated district unrelated
- 2. The subject property is encumbered by a natural gas easement recorded in ORB 8183, Page 751.
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- 2. There are several GoPasco stops around the intersection of SR 54 and Little Road (6 in total),
- 3. As a condition of the Rezoning, Declarant is willing to impose certain Restrictions (as
- Legal Services
- Engineering & Architecture
- Real Estate Development
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- 3. PDE26-2111 - Application
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 3. PDE26-7897: Letter of Opposition
- 3. PDE26-7909 Signature Sheet
- 3. Pasco Sheriff’s Office (PSO): The PSO did not provide comments on this proposal.
- 3. The Owner/Applicant acknowledges that the site is subject to the requirements of the Land
- 3. The Owner/Applicant shall acknowledge that the site is subject to the requirements of the Land
- 3. The applicant has volunteered to record a deed restriction (Attachment 2) to the property
- 3. The applicant will be widening the pedestrian infrastructure on the south side of SR 54 to a ten
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Building & Industrial Supply
- 3. The existing district boundaries ( are, are not) illogically drawn in relation to existing conditions on the
- 3. The subject site is within the River District of the West Market Area, and within the Urban Service
- 4. Changed or changing conditions make passage of the proposed amendment ( necessary,
- 4. Fire: Fire Services issued no comments on this proposal.
- 4. PDE26-2111 - PLAT FLOR-A-MAR C-8 RECD -1971-0825
- 4. PDE26-7897: Public Notice
- 4. PDE26-7909 Timing and Phasing Analysis
- 4. The Owner/Applicant acknowledges that an appeal may be filed against the decision of the PC
- 4. The Owner/Applicant shall acknowledge that an appeal may be filed against the decision of the PC within
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 4. The rezoning shall take effect only after the deed restriction referenced in Finding of Fact Number
- 4. The subject site is zoned R-4 High Density Residential District.
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Carpentry & Cabinetry
- Building & Industrial Supply
- Engineering & Architecture
- Appraisal & Inspection
- Legal Services
- 4. This proposal includes a Binding Concept Plan and Binding Connectivity Plan as a part of the
- 5. Emergency Management: The Emergency Management Department issued no comments on
- 5. PDE26-2111 - Permit Issued (RESADD-2024-000592)
- 5. PDE26-7897: Affidavit of Publication
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- 5. PDE26-7909 Narrative
- 5. The Owners/Applicants are hereby notified that the effective date of this approval shall be the date
- 5. The applicant has provided the following narrative (Attachment 5):
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Engineering & Architecture
- Real Estate Development
- 5. The proposed change (will, will not) adversely affect living conditions in the immediate and surrounding
- 5. The subject site was platted on August 25, 1971, as Lot 3, Block 18 of the Flor-A-Mar Section C-8
- 5. This project has included the standard Live Local provisions.
- 6. PDE25-2111 - Public Notice
- Concrete & Masonry
- General Contractor
- Site Prep, Grading & Hardscape
- 6. PDE26-7909 Exhibit A
- 6. School District: There is no additional residential units being added with this proposal.
- 6. The subject site is located in Flood Zone X and development is subject to the requirements of the
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- 6. The subject site is located within FIRM Flood Zone “AE”. Development on this site is subject to the
- 6. There (is, is not) adequate access from a standard roadway to the site and the proposed change (will,
- 7. PDE26-7909 Proof of Publication
- 7. Parks, Recreation, and Natural Resources (PRNR): The PRNR is in agreement with the
- 7. The immediate surrounding area is characterized by single-family homes, except for the south side
- 7. The proposed change (might, might not) result in the reduction of light and air to adjacent properties or
- 7. The proposed request is consistent with the Pasco County LDC, Chapter 400, Subsection 402.2
- 7. The surrounding area is characterized by residential development with commercial development
- 8. Office of Economic Growth (OEG): OEG is in agreement with the proposed EDA which
- 8. On March 20, 2024, the Applicant initiated the process for obtaining a building permit for a pool
- Concrete & Masonry
- General Contractor
- Carpentry & Cabinetry
- Roofing
- Electrical
- Site Prep, Grading & Hardscape
- 8. PDE26-7909 Affidavit of Posting and Mailed Notice
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 8. The proposed change (might, might not) result in lower property values in adjacent areas.
- 8. The subject area has a Future Land Use (FLU) classification of ROR (Retail/Office/Residential)
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- 9. On March 27, 2024, having reviewed the building permit application, Pasco County issued the
- 9. The property, as rezoned, (could, could not) be developed in a manner which would comply with other
- 9. The subject site is within the North Market Area.
- A. Except as provided below and as may be permitted by Section 1001, no structure shall be
- A. No building or structure on waterfront property shall be located within 15 feet of the mean
- Pool & Spa Construction
- Concrete & Masonry
- General Contractor
- Engineering & Architecture
- Legal Services
- A. Provide standards to protect the waterfront views of property owners.
- All electronic devices must be turned off while in the Board Room.
- C1 Annotated Minutes - Planning Commission Meeting - December 11, 2025
- C2 Annotated Minutes - Planning Commission Meeting - January 8, 2026
- D. Criteria for Approval
- Legal Counsel David Goldstein, Chief Assistant County Attorney
- P5 Zoning Amendment Substantial Modification (Regular) — Mitchell 54 West MPUD
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Legal Services
- Landscaping & Lawn Service
- PC Agenda
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- PC Agenda
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- Utilities (Sub)
- PC Agenda
- PC Agenda
- PC3 Zoning Amendment (Consent) – R & R Property Investments LLC / R & R Property
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- PC4 Variance Request (Consent) – Pham Residence Screen Enclosure – Reduce The
- General Contractor
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- Construction (Other)
- Pasco County
- School Board Representative Chris Williams
- Staff David Allen, Assistant County Administrator, Development Services
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Commercial & Business Insurance
- Waste Management
- Walk-Ons
- West Pasco Government Center
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- Real Estate Development
- Government Authority
- a. If during construction activities any evidence of the presence of State or Federally
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Business Consulting
- Government Authority
- a. The Property will be zoned C-2 General Commercial District (“Commercial”) upon
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- a. The Property will be zoned C-2 General Commercial District (“Commercial”) upon approval
- Engineering & Architecture
- Real Estate Development
- General Contractor
- Building & Industrial Supply
- Site Prep, Grading & Hardscape
- a. The particular physical surroundings, shape, topographical condition, or other physical or
- b. According to the Pasco County Land Development Code (LDC), Section 803.1, a detailed
- Engineering & Architecture
- Business Consulting
- Professional Services (Other)
- b. The variance is not based on any conditions, including financial, occupational, or ability,
- c. The alleged hardship has not been created by any person presently having an interest in
- d. The granting of the variance will not be detrimental to the public welfare or injurious to
- e. The proposed variance will not substantially increase the congestion in the public streets,
- f. The variance granted is the minimum variance that will make possible the reasonable use of
- g. The property cannot be put to a reasonable use which complies fully with the requirements
- h. If applicable, the requested variance satisfies the criteria established in this Code for the
Follow this across meetings
Board
Planning CommissionApplicants and firms
- R & R Property Investments LLC / R & R Property Shady Hills
- Pham Residence
- M&M ROUTE 54 WEST LLC
- Denton Ave Project, LLC
- R&S Properties FLA LLC/Bell Haven
- Adrian Phillip
- Adrian Phillip Overpass, LLC
- 5415 INC
- Oakley Pasco County Property Trust, et al.
- North Pasco Resort
- VCare Consultants, LLC
- JDP Elite Development LLC
Locations
- East Side of Shady Hills Road and Approximately 784 Feet North of the Intersection of Shady Hills Road and Floralton Drive
- On Topsail Trail, Approximately 1.2 Miles West of US Highway 19
- Southwest Quadrant of the Intersection of State Road 54 and Little Road
- 1.5 Miles East of the Intersection of Denton Avenue and Little Road
- Intersection of Bell Lake Road and Peaceful Lane
- Northeast Corner of the intersection of Old Pasco Road and Overpass Road
- Northeast corner of Overpass Road and Old Pasco Road
- North Side of SR 54 Approximately .3 Miles Southeast of the Intersection Of State Road 54 and Starkey Blvd.
- Southeastern Pasco County
- North of State Road 52 Approximately .60 Mile East of the Intersection of State Road 52 and US Highway 41
- Approximately 0.60 Miles East of the Intersection of State Road 52 and US 41
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta