5/7/26 PC Addendum Agenda Packet
Planning Commission · 2026-05-07 · agenda_packet
[South East Pasco County, on the north and south side of State Road 56 from Morris Bridge Road to Gall Boulevard; case PDE26-0437] The Planning Commission is considering a Comprehensive Plan Amendment (Continuance) for Two Rivers PD, File Number PDE26-0437. The proposed amendment to Subarea Policy FLU 7.1.11 aims to increase single-family residential entitlements from 3,875 to 4,047, increase multifamily residential entitlements from 1,400 to 2,500 (with 767 new units), remove age-restricted unit entitlements, increase retail use square footage from 630,000 to 1,335,000, add 300 assisted living facility beds, add 480 hotel rooms, and add a 35-acre recreation facility/water park. The project is located in South East Pasco County, on the north and south side of State Road 56 from Morris Bridge Road to Gall Boulevard. The applicant is Pasco Hills, LLC and EPG Two Rivers Development, LLC. The recommendation is for a continuance requested. [South East Pasco County, on the North and South Side of State Road 56 from Morris Bridge Road to Gall Boulevard; case PDE26-7856] The Planning Commission is considering a Zoning Amendment- Substantial Modification (Continuance) for Two Rivers MPUD Master Planned Unit Development, File Number PDE26-7856. The rezoning petition is from MPUD Master Planned Unit Development District to MPUD Master Planned Unit Development to allow for the maximum development of 4,047 Single-Family Detached Units, 2,500 Multi-Family Units, 1,335,000 Square Feet of Office/Target Industry, 1,335,000 Square Feet of Industrial, 1,335,000 Square Feet of Retail, 300 beds for an Assisted Living Facility, 480 Hotel Rooms, and a 35-Acre Recreational Water Park on 3,396.5 Acres. The project is located in South East Pasco County, on the North and South Side of State Road 56 from Morris Bridge Road to Gall Boulevard. The applicant is EPG Two Rivers Development LLC et al. The recommendation is for a continuance requested. [case PDE26-0356] The Planning Commission is considering a Comprehensive Plan Amendment (Consent) for Revilo Ranch, File Number PDE26-0356. The amendment provides for a Comprehensive Plan Text Amendment to Goal FLU 6 Pasadena Hills to Amend Tables PH-2: VOPH Residential Conversion Chart and PH-3: VOPH Residential Conversion Chart; and a Text Amendment to Goal FLU 6, Land Use Classifications: Village Mixed Use – 2. The recommendation is to Approve. [case PDE26-0033] The Planning Commission is considering a Comprehensive Plan Amendment (Consent) for Palmetto Ridge PD, File Number PDE26-0033. The amendment provides for a Comprehensive Plan Text Amendment to Subarea Policy FLU 7.1.34 - Palmetto Ridge PD. The recommendation is to Approve. [Villages of Pasadena Hills; case PDE25-0193] The Planning Commission is considering a Development Agreement (Consent) for Highland Homes and Clayton Properties Group Inc, File Number PDE25-0193. The agreement is to Design, Permit, and Construct a Portion of Hidden Creek Boulevard in exchange for Transportation Development Fee Credits in the Villages of Pasadena Hills. The recommendation is to Approve. [Pasco County; case PDE26-0025] The Planning Commission is considering an Ordinance amending the Pasco County Land Development Code, File Number PDE26-0025. The ordinance amends various sections including Public Notice Requirements, Conditional Uses, Zoning Variances, Alternative Relief, Alternative Standards, Agricultural Districts (A-C, AC-1, A-R, AR-1, AR-5, AR-5MH), Estate-Residential Districts (E-R, ER-2), Mobile Home Districts (R-MH, R-1MH, R-2MH), Rural Density Residential Districts (R-1, R-2), Low Density Residential Districts (R-1, R-2), Medium Density Residential Districts (R-3), High Density Residential Districts (R-4), Multiple-Family Districts (MF-1, MF-2, MF-3), creates Section 408 Reasonable Accommodations, and Section 530.26 Standards For Community Residential Homes (Large), Appendix A Definitions, and other sections for internal consistency. The recommendation is to Approve. [North Central Pasco County on the North Side of State Road 52 approximately .5 miles East of the Intersection of State Road 52 and Ehren Cutoff; case PDE26-7877] The Planning Commission is considering a Zoning Amendment Substantial Modification (Consent) for Palmetto Ridge MPUD, File Number PDE26-7877. The rezoning request is from an MPUD Master Planned Unit Development District to MPUD Master Planned Unit Development District to allow for the development of 2,800 Residential Dwelling Units and 100,0000 Square Feet of Commercial Uses and Associated Infrastructure on approximately 3,536 Acres. The project is located in North Central Pasco County on the North Side of State Road 52 approximately .5 miles East of the Intersection of State Road 52 and Ehren Cutoff. The applicant is Palmetto Ridge Cattle Company LLC and EPG Palmetto Ridge Holding LLC. The recommendation is Approval with Conditions.
Agenda items
- 1. AN ORDINANCE AMENDING THE PASCO COUNTY
- Engineering & Architecture
- Real Estate Development
- General Contractor
- Building & Industrial Supply
- Legal Services
- 1. Add 50,000 square feet of non-residential entitlements to Village B through text revisions to
- General Contractor
- Real Estate Development
- Engineering & Architecture
- Building & Industrial Supply
- 1. Consistency of Proposed Change with the Goals, Objectives, and Policies. The Planning,
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Legal Services
- Accounting & Tax
- 1. Consistency of Proposed Change with the Goals, Objectives, and Policies. The Planning,
- 1. Future Land Us e Classification Requires Concept Plan and Rezoning: Comprehens ive
- Engineering & Architecture
- Real Estate Development
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- 1. PDE25-0193: Highland Homes Development Agreement
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. PDE26-0033 Palmetto Ridge Parcel List
- 1. PDE26-0356: Proposed Ordinance
- 1. PDE26-0437: Parcel ID Table
- 1. PDE26-7856: Proof of Publication
- 1. Site Characteristics. The subject property is located in the North Market Area within the Rural
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Engineering & Architecture
- Real Estate Development
- 1. Transportation Needs Assessment (TNA). On 12/16/2025, the PDE Transportation Planner
- Engineering & Architecture
- Business Consulting
- 1. Transportation Needs Assessment (TNA). On January 14, 2026, the Transportation Planner
- 1. WHEREAS CLAUSES
- 10. Active Transportation Planning. On 2/9/2026, Active Transportation, reviewed the proposal and
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Building & Industrial Supply
- General Contractor
- Landscaping & Lawn Service
- 10. PDE26-0033 Proof of Publication
- 11. PDE26-0033 Applicant Affidavit of Publication
- 11. Solid Waste. On 2/14/2025, Solid Waste reviewed the proposal and provided a status of “No
- 12. Stormwater. On 2/11/2025, Stormwater reviewed the proposal and had the following comments:
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Utilities (Sub)
- General Contractor
- 2) Thi
- 2. AN ORDINANCE AMENDING THE PASCO COUNTY
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- Government Authority
- 2. AND PROVIDING FOR ADDITIONAL TEXT AMENDMENTS AS NECESSARY FOR
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 2. Additional Amendments Recommended. No further amendments are necessary in
- 2. Additional Amendments Recommended. There is an accompanying rezoning petition in the
- Real Estate Development
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Legal Services
- 2. Archaeological Sites. The subject property has multiple historic sites. A Cultural Resources
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- Real Estate Development
- 2. Conservation and Open Space: Planned developments are required to provide
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Real Estate Development
- Landscaping & Lawn Service
- 2. PDE25-0193: VOPH Master Roadway Plan: 60AA typical
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- General Contractor
- Engineering & Architecture
- 2. PDE26-0033 Maps
- 2. PDE26-0356: Transportation Needs Assessment
- 2. PDE26-0437: Proof of Publication
- 2. PDE26-7856: Affidavit of Notice
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 2. PURPOSE
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- General Contractor
- Building & Industrial Supply
- 2. Pasco County Utilities (PCU). On August 22, 2025, PCU provided no comments on the proposed
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- 2. Pasco County Utilities (PCU). PCU reviewed the proposal on 2/19/2025 and provided the
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- 3) Thi
- 3. Analysis of the Capital Costs, Service Requirements, and Benefits. Pasco County shall
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 3. Analysis of the Capital Costs, Service Requirements, and Benefits. Pasco County shall collect
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Utilities (Sub)
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 3. GENERAL REQUIREMENTS
- 3. Minimum Open Space: Open space areas sh all be designated as appropriate to meet
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- 3. PDE25-0193: Affidavit of Notice
- 3. PDE26-0033 Palmetto Ridge Subarea Policy
- Real Estate Development
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- 3. PDE26-0356: Proof of Publication
- 3. Pasco Sheriff’s Office (PSO). On 2/4/2025, the proposal was distributed and a response was not
- 3. Pasco Sheriff’s Office (PSO). The application was distributed to PSO on August 4, 2025, for review
- Legal Services
- Engineering & Architecture
- 3. Right-of-Way (ROW). This project is located along State Road (SR) 52, a two-lane, 100-foot
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Construction (Other)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- 4) The t
- 4. Compatibility with Adjacent Uses: Due to the ability to cluster units and provide for a
- Site Prep, Grading & Hardscape
- Real Estate Development
- Engineering & Architecture
- 4. FINANCE AND CONSTRUCTION OF ROADWAY IMPROVEMENTS
- 4. Fire. On 3/11/2025, Fire responded, “No Comments”.
- 4. Fire. On August 5, 2026, Fire provided no comments on the proposed comprehensive plan
- 4. Live Local Provision. The applicant has agreed to MPUD Conditions of Approval (COA) on the
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 4. PDE25-0193: Proof of Publication
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 4. PDE26-0033 Proposed Ordinance
- 4. PDE26-0356: Public Notice
- Engineering & Architecture
- Real Estate Development
- General Contractor
- 4. Trails. Currently, there are no trails in the surrounding area. As part of FDOT’s SR 52 widening
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Building & Industrial Supply
- 5) D
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 5) FROM RES-1 (RESIDENTIAL-1 DU/GA), RES-3
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Roofing
- Drywall & Insulation
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Accounting & Tax
- Legal Services
- 5. Bus Stops. There are no bus stops or bus service to this area of the County.
- 5. Emergency Management. On 2/14/2025, Emergency Management responded, “No Comments”.
- 5. Emergency Management. On January 9, 2026, the Emergency Management department provided
- 5. Nonresidential-Use Locations: Commercial and other nonresidential uses within
- 5. PDE26-0033 PD Concept Plan
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Drywall & Insulation
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- 5. ROADWAY IMPROVEMENTS DESIGN, PERMITTING, AND RIGHT -OF-WAY
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- Real Estate Development
- Government Authority
- 581. The project will expand the existing two-lane road to a four-lane facility and include a 12-foot
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- 6) The total maximum entitlements for Villages L & M shall be
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- 6. BIDDING AND CONSTRUCTION
- 6. Minimum Size: Mixed-use planned developmen ts are required to be the size necessary
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 6. PDE26-0033 2025 FLU Designation - PD Planned Development
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- 6. Parks, Recreation, and Natural Resources (PRNR). On August 7, 2025, PRNR identified no
- Real Estate Development
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- 6. School District. On 12/17/2024, the Pasco County School District provided the attached School
- 7. PDE26-0033 School Impact Analysis
- 7. Parks, Recreation, and Natural Resources (PRNR). On 9/11/2025, Natural Resources commented,
- Site Prep, Grading & Hardscape
- Landscaping & Lawn Service
- Engineering & Architecture
- 7. TRANSPORTATION DEVELOPMENT FEES, CREDITS AND REIMBURSEMENTS
- 8. Office of Economic Growth (OEG). On 3/27/2025, OEG responded, “No Comments.”
- 8. PDE26-0033 Transportation Needs Analysis
- 8. PERFORMANCE , PAYMENT AND DEFECT GUARANTEES
- 9. INDEMNIFICATION AND INSURANCE
- 9. Metropolitan Planning Organization (MPO). On 7/7/2025, MPO responded, “No Comments.”
- 9. PDE26-0033 Residential Trend Analysis
- APC7 Zoning Amendment Substantial Modification (Consent) - Palmetto Ridge MPUD
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- Addendum
- All electronic devices must be turned off while in the Board Room.
- Historic Pasco County Courthouse
- Legal Counsel David Goldstein, Chief Assistant County Attorney
- P6 An Ordinance By The Pasco County Board Of County Commissioners Amending
- Legal Services
- Engineering & Architecture
- PC Addendum Agenda
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- PC Addendum Agenda
- PC Addendum Agenda
- PC Addendum Agenda
- PC1 Comprehensive Plan Amendment (Continuance) — CPA24(07) CPAL Two
- Engineering & Architecture
- Legal Services
- Business Consulting
- Real Estate Development
- PC2 Zoning Amendment- Substantial Modification (Continuance)- Two Rivers MPUD
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- Government Authority
- PC3 Comprehensive Plan Amendment (Consent) – CPAS25(13) Revilo Ranch
- Legal Services
- Engineering & Architecture
- Real Estate Development
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- PC4 Comprehensive Plan Amendment (Consent) - CPA25(01) Palmetto Ridge PD
- Engineering & Architecture
- Real Estate Development
- PC5 Development Agreement (Consent) – Highland Homes, Clayton Properties
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Pasco County
- School Board Representative Chris Williams
- Staff David Allen, Assistant County Administrator, Development Services
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- T: 26 R: 21
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Roofing
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- Utilities (Sub)
- T: 26 R: 21
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- Utilities (Sub)
- T: 26 R: 21
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Legal Services
- Landscaping & Lawn Service
- Walk-Ons
- a. Competitive Selection of Contractors : With respect to construction of the
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- a. Creditable Roadway Improvements
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- Landscaping & Lawn Service
- a. Design, Permitting, Right -of-Way Dedication, and Construction Requirements :
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- Construction (Other)
- Engineering & Architecture
- Building & Industrial Supply
- General Contractor
- a. Indemnification: Developer shall indemnify and hold harmless the County and its
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Legal Services
- a. Legal Description: The land subject to this DA is identified in Exhibit “A”.
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Legal Services
- a. Performance and Payment Guarantees: Prior to commencing construction of the
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Commercial & Business Insurance
- a. The Project shall be assessed TDFs in accordance with the Enabling Documents
- b. Defect Guarantees: Upon completion of the portion of the portion of the Roadway
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Utilities (Sub)
- Engineering & Architecture
- b. Duration and Effective Date: This DA shall be for the earlier of either the duration
- b. Roadway Drainage Facilities : A community development district owns and
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Engineering & Architecture
- b. Roadway Improvements Construction: Developer shall proceed and complete the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- Construction (Other)
- General Contractor
- b. Upon the effective date of this DA , County agrees to post , in a separate TDF
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- c. Development Uses of Land: The Project is currently zoned MPUD Master Planned
- c. Tender of Improvement Area: Upon the issuance of the Notice to Proceed by the
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- c. Upon completion of design of the Roadway Improvements, Developer shall be
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- c. Wetland and Floodplain Mitigation: In the event that the permitted floodplain
- Site Prep, Grading & Hardscape
- Government Authority
- d. County Observation: The County's personnel and authorized representatives
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- General Contractor
- Building & Industrial Supply
- d. County Review and Approval of Design : Developer has or shall complete and
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- Real Estate Development
- d. Public Facilities: Adequate transportation facilities are available for the Project
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Engineering & Architecture
- d. Simultaneously with the first two requests for credit issuance, Developer may apply
- Accounting & Tax
- Legal Services
- e. Developer may sell and assign TDF Credits against the TDF (excluding the
- Legal Services
- Finance (Other)
- Office & Business Support Services
- e. Permitting Requirements: Developer and/or its contractor shall obtain any and all
- Legal Services
- Engineering & Architecture
- General Contractor
- Utilities (Sub)
- e. Reservations or Dedications for Public Purpose: All reservations and dedications
- e. Right-of-Way: Prior to the County 's acceptance of the Roadway Improvements,
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- f. Construction Requirements : During the construction phases of the Roadway
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Electrical
- Plumbing
- HVAC & Climate Control
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Accounting & Tax
- Waste Management
- f. County Cooperation: The County shall, upon Developer's request, cooperate with
- Site Prep, Grading & Hardscape
- General Contractor
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- f. Local Development Permits Needed: Prior to the construction of the Roadway
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Utilities (Sub)
- f. The County reserves the right to pay out annually, the cash value of any unused,
- g. County Review: Developer agrees and recognizes that the County shall not be
- g. Findings: The County has found that the Project, as permitted and proposed, is
- h. Requirements Necessary for the Public Health, Safety, and Welfare : The
- h. Utilities Relocation : Developer shall coordinate the relocation of any utilities
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- i. Compliance with Legal Requirements and Permitting: The failure of this DA to
- i. Right-of-Way Acquisition: Developer warrants and represents to the County that
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
Follow this across meetings
Board
Planning CommissionApplicants and firms
Locations
- South East Pasco County, on the north and south side of State Road 56 from Morris Bridge Road to Gall Boulevard
- South East Pasco County, on the North and South Side of State Road 56 from Morris Bridge Road to Gall Boulevard
- Villages of Pasadena Hills
- Pasco County
- North Central Pasco County on the North Side of State Road 52 approximately .5 miles East of the Intersection of State Road 52 and Ehren Cutoff
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta