Atlas Tranquility Park - Improvement Plan 000635 - Waiver to Improvement Plan in Review

Development Review Committee · 2026-06-08 · agenda_item

An improvement plan waiver is under review for Atlas Tranquility Park. This project involves subdivision roads and related infrastructure. The applicant is requesting waivers for dead end road design and roadway centerline radii. Local contractors, trades, suppliers, and service providers such as civil engineers, surveyors, grading crews, concrete and paving companies, and material suppliers may be involved in future phases of this project.

dead end road length limit
1500 feet
hammerhead dead end segment length limit
150 feet
cul-de-sac diameter minimum
120 feet
cul-de-sac pavement radius residential minimum
40 feet
cul-de-sac pavement radius commercial or industrial minimum
45 feet
cul-de-sac grassed island diameter maximum
50 feet
block perimeter maximum
4500 feet
corner radii intersection minimum
25 feet
corner radii pavement minimum residential
40 feet
corner radii pavement minimum commercial or industrial
50 feet
minimum design speed local and minor local roads
30 mph
minimum design speed major local and collector roads
40 mph
minimum design speed arterial roads
45 mph
soil boring depth minimum
10 feet
number of infiltration tests per retention/detention area minimum
2
additional infiltration test per pond bottom area
0.5 acre
additional infiltration test per lineal retention/detention area
250 feet
pond bottom elevation above seasonal high water elevation minimum
1 foot

Attachments

Follow this across meetings

Locations

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, free for 7 days. No credit card required.

Start your free trial