APPROVAL OF MINUTES

This legislative item is a report concerning the approval of the Clerk's summary of minutes for the Infrastructure, Innovation & Technology Committee meetings held on April 15, 2026, May 13, 2026, and June 10, 2026. The item is currently in committee. No specific development project details, applicant, or decision on a project are stated.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-07-15
Type:
Report
Decision:
In Committee

APPROVAL OF MINUTES

This legislative item, File Number 261124, concerns the approval of the Clerk's summary of minutes for the Infrastructure, Innovation & Technology Committee meetings held on April 15, 2026, May 13, 2026, and June 10, 2026. The item was introduced on 6/22/2026 and referred to the Office of Agenda Coordination on 6/22/2026, with a due date of 7/15/2026. The status is 'In Committee'. No specific development project details, applicant, or zoning changes are mentioned.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-07-15
Type:
Report
Decision:
In Committee

APPROVAL OF MINUTES

This legislative item, File Number 261124, concerns the approval of the Clerk's summary of minutes for the Infrastructure, Innovation & Technology Committee meetings held on April 15, 2026, May 13, 2026, and June 10, 2026. The item was introduced on 6/22/2026 and referred to the Office of Agenda Coordination on 6/22/2026 with a due date of 7/15/2026. The status is 'In Committee'. No specific development project details, applicant, or zoning changes are mentioned.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-07-15
Type:
Report
Decision:
In Committee

APPROVAL OF MINUTES

This legislative item, File Number 261124, concerns the approval of the Clerk's summary of minutes for the Infrastructure, Innovation & Technology Committee meetings held on April 15, 2026, May 13, 2026, and June 10, 2026. The item was introduced on 6/22/2026 and referred to the Office of Agenda Coordination on 6/22/2026, with a due date of 7/15/2026. The status is 'In Committee'. No specific development project details, applicant, or zoning changes are mentioned.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-07-15
Type:
Report
Decision:
In Committee

APPROVAL OF MINUTES

This legislative item is a report concerning the approval of the Clerk's summary of minutes for the Infrastructure, Innovation & Technology Committee meetings held on April 15, 2026, May 13, 2026, and June 10, 2026. The item is currently in committee. No specific development project details, applicant, or decision on a project are mentioned.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-07-15
Type:
Report
Decision:
In Committee

APPROVAL OF MINUTES

This legislative item, File Number 261124, concerns the approval of the Clerk's summary of minutes for the Infrastructure, Innovation & Technology Committee meetings held on April 15, 2026, May 13, 2026, and June 10, 2026. The item was introduced on 6/22/2026 and referred to the Office of Agenda Coordination on 6/22/2026, with a due date of 7/15/2026. The status is 'In Committee'. No specific development project details, applicant, or public comment are mentioned.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-07-15
Type:
Report
Decision:
In Committee

AWARD TO ITG COMMUNICATIONS FOR S-20298

Miami-Dade County is awarding Contract No. S-20298 for the Venetian Causeway Water Main and Sewer Force Main Relocation to ITG Communications LLC for $3,096,425.02. The project involves relocating existing water and sewer facilities to accommodate the replacement of Bridge No. 2 on the Venetian Causeway. The work includes approximately 1,500 linear feet of HDPE water main and 2,100 linear feet of HDPE force main to be installed via horizontal direction drill under Biscayne Bay. The contract period is 231 calendar days. The project is necessary due to the age and deterioration of the existing bridge structures and infrastructure, which no longer meet current safety requirements. The relocation must be completed before March 2027 to avoid impacting the bridge replacement schedule. ITG Communications LLC was the lowest responsive and responsible bidder, with a bid approximately 44.43% below the Engineer of Record's estimate. No public comment or stakeholder sentiment is stated in the document.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-07-15
Type:
Resolution
Decision:
Awarded
Address:
1225 Venetian Causeway, Miami Beach, Florida 33139
Applicant:
ITG Communications LLC

AWARD TO ITG COMMUNICATIONS FOR S-20298

Miami-Dade County Board of County Commissioners is set to award Contract No. S-20298 for the Venetian Causeway Water Main and Sewer Force Main Relocation to ITG Communications LLC. The project involves relocating existing water and sewer facilities to accommodate the replacement of Bridge No. 2 on the Venetian Causeway. The work includes approximately 1,500 linear feet of HDPE water main and 2,100 linear feet of HDPE force main to be installed via horizontal direction drill under Biscayne Bay. The contract amount is $3,096,425.02 with a period of 231 calendar days. This project is critical to avoid impacts on the bridge replacement schedule, which must be completed before March 2027. ITG Communications LLC was the lowest responsive and responsible bidder, with their bid being approximately 44.43% below the Engineer of Record's estimate. No public comment or stakeholder sentiment is mentioned in this document.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-07-15
Type:
Resolution
Decision:
Awarded (Resolution)
Address:
1225 Venetian Causeway, Miami Beach, Florida 33139
Applicant:
ITG Communications LLC

AWARD TO ITG COMMUNICATIONS FOR S-20298

Miami-Dade County Board of County Commissioners is set to award Contract No. S-20298 for the Venetian Causeway Water Main and Sewer Force Main Relocation to ITG Communications LLC. The project involves relocating existing water and sewer facilities to accommodate the replacement of Bridge No. 2 on the Venetian Causeway. The work includes approximately 1,500 linear feet of high-density polyethylene (HDPE) water main and 2,100 linear feet of HDPE force main to be installed via horizontal direction drill under Biscayne Bay. The contract amount is $3,096,425.02 with a contract period of 231 calendar days. ITG Communications LLC was the lowest responsive and responsible bidder, with their bid being approximately 44.43% below the Engineer of Record's estimate. No public comment or stakeholder sentiment was noted in the document.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-07-15
Type:
Resolution
Decision:
Awarded
Address:
1225 Venetian Causeway, Miami Beach, Florida 33139
Applicant:
ITG Communications LLC

AWARD TO ITG COMMUNICATIONS FOR S-20298

Miami-Dade County is awarding Contract No. S-20298 for the Venetian Causeway Water Main and Sewer Force Main Relocation to ITG Communications LLC for $3,096,425.02. The project involves relocating existing water and sewer facilities to accommodate the replacement of Bridge No. 2 on the Venetian Causeway. The work includes approximately 1,500 linear feet of HDPE water main and 2,100 linear feet of HDPE force main to be installed via horizontal direction drill under Biscayne Bay. The contract period is 231 calendar days. The project is necessary due to the age and deterioration of the Venetian Causeway, originally constructed in 1926, and to meet current structural and safety requirements. The relocation must be completed before March 2027 to avoid impacting the bridge replacement schedule. ITG Communications LLC was the lowest responsive and responsible bidder, with their bid being approximately 44.43% below the Engineer of Record's estimate. No public comment or stakeholder sentiment is stated in the document.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-07-15
Type:
Resolution
Decision:
Awarded
Address:
1225 Venetian Causeway, Miami Beach, Florida 33139
Applicant:
ITG Communications LLC

AWARD TO ITG COMMUNICATIONS FOR S-20298

Miami-Dade County Board of County Commissioners is set to award Contract No. S-20298 for the Venetian Causeway Water Main and Sewer Force Main Relocation to ITG Communications LLC. The project involves relocating existing water and sewer facilities to accommodate the replacement of Bridge No. 2 on the Venetian Causeway. The work includes installing approximately 1,500 linear feet of HDPE water main and 2,100 linear feet of HDPE force main via horizontal direction drill under Biscayne Bay. The contract amount is $3,096,425.02 with a contract period of 231 calendar days. The project is part of a larger effort to rehabilitate or replace the historic Venetian Causeway, which spans Biscayne Bay connecting Miami to Miami Beach. The relocation is critical to avoid impacting the bridge replacement schedule, with a deadline of March 2027. ITG Communications LLC was the lowest responsive and responsible bidder, with their bid being approximately 44.43% below the Engineer of Record's estimate. No public comment or stakeholder sentiment is stated in the document.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-07-15
Type:
Resolution
Decision:
Awarded (Resolution)
Address:
1225 Venetian Causeway, Miami Beach, Florida 33139
Applicant:
ITG Communications LLC

AWARD TO ITG COMMUNICATIONS FOR S-20298

Miami-Dade County Board of County Commissioners is set to award Contract No. S-20298 for the Venetian Causeway Water Main and Sewer Force Main Relocation to ITG Communications LLC. The project involves relocating existing water and sewer facilities to accommodate the replacement of Bridge No. 2 on the Venetian Causeway. The work includes approximately 1,500 linear feet of HDPE water main and 2,100 linear feet of HDPE force main to be installed via horizontal direction drill under Biscayne Bay. The contract amount is $3,096,425.02 with a period of 231 calendar days. The project supports the restoration of the Venetian Causeway and ensures continued utility service. No public comment or stakeholder sentiment is stated in the document.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-07-15
Type:
Resolution
Decision:
Awarded (pending final action, in committee)
Address:
1225 Venetian Causeway, Miami Beach, Florida 33139
Applicant:
ITG Communications LLC

DEWATERING PREQUAL POOL - MOD

This legislative item concerns a resolution authorizing additional expenditure authority for Prequalification Pool No. EVN0000187, which provides dewatering and tank cleaning services for the Miami-Dade Water and Sewer Department (WASD). The request is for an additional $12,879,707.00, bringing the total modified cumulative pool amount to $18,896,707.00. These services are critical for maintaining water and wastewater treatment plant structures, tanks, and facilities, ensuring operational reliability, regulatory compliance, and environmental protection. The increased utilization is attributed to enhanced preventative maintenance efforts, response to operational emergencies like the Central District Wastewater Treatment Plant's oxygen production system failures, and the need to maintain full production during cleaning activities. The pool was initially established on October 3, 2023, and modified on a later date not specified, with a five-year term. The pool expires on November 30, 2028. The item is currently 'In Committee' with an Agenda Date of 9/1/2026.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-07-15
Type:
Resolution
Decision:
In Committee
Applicant:
Miami-Dade Water and Sewer Department (WASD)

DEWATERING PREQUAL POOL - MOD

This legislative item concerns a resolution authorizing additional expenditure authority for Prequalification Pool No. EVN0000187, which provides dewatering and tank cleaning services for the Miami-Dade Water and Sewer Department (WASD). The request is for an additional $12,879,707.00, bringing the total modified cumulative pool amount to $18,896,707.00. These services are critical for maintaining water and wastewater treatment plant structures, tanks, and facilities, ensuring operational reliability, regulatory compliance, and environmental protection. The increased utilization is attributed to enhanced preventative maintenance, response to operational emergencies (such as a temporary dewatering system at the North District Wastewater Treatment Plant costing over $2 million), and the need to maintain production levels during cleaning activities. The pool was initially established on October 3, 2023, and modified on June 24, 2026. The item is currently 'In Committee' with an Agenda Date of September 1, 2026. The pool expires on November 30, 2028. Prequalified vendors include Envirowaste Services Group, Inc., Flotech Environmental, LLC, Merrell Bros., Inc., Synagro South, LLC, and U.S. Submergent Technologies, LLC.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-07-15
Type:
Resolution
Decision:
In Committee
Applicant:
Miami-Dade Water and Sewer Department (WASD)

DEWATERING PREQUAL POOL - MOD

Miami-Dade County's Infrastructure, Innovation & Technology Committee is considering a resolution to authorize an additional $12,879,707.00 in expenditure authority for Prequalification Pool No. EVN0000187, which provides dewatering and tank cleaning services for the Water and Sewer Department (WASD). This would bring the total modified cumulative pool amount to $18,896,707.00. The additional funds are needed to continue essential services for maintaining water and wastewater treatment plant structures, tanks, clarifiers, containment units, and pipelines, addressing increased utilization due to enhanced preventative maintenance and emergency repairs, such as a temporary dewatering system installed at the North District Wastewater Treatment Plant. The pool was initially established on October 3, 2023, and modified on a previous date not specified. Any contract award under the pool exceeding $5,000,000.00 requires ratification by the Board. The pool expires on November 30, 2028. Prequalified vendors include Envirowaste Services Group, Inc., Flotech Environmental, LLC, Merrell Bros., Inc., Synagro South, LLC, and U.S. Submergent Technologies, LLC.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-07-15
Type:
Resolution
Decision:
In Committee
Applicant:
Miami-Dade Water and Sewer Department (WASD)

DEWATERING PREQUAL POOL - MOD

Miami-Dade County's Infrastructure, Innovation & Technology Committee is considering a resolution to authorize an additional $12,879,707.00 in expenditure authority for Prequalification Pool No. EVN0000187, which provides dewatering and tank cleaning services for the Water and Sewer Department (WASD). This would bring the total modified cumulative pool amount to $18,896,707.00. The additional funds are needed to address WASD's operational needs, including preventative maintenance, emergency repairs, and regulatory compliance, due to higher-than-anticipated utilization. A specific example cited is the need for a temporary dewatering system at the North District Wastewater Treatment Plant, which incurred costs exceeding $2 million. The pool was initially established on October 3, 2023, and modified on a previous date not specified, with a five-year term. Any contract award under this pool exceeding $5,000,000.00 requires ratification by the Board. The scope of this item is countywide. Prequalified vendors include Envirowaste Services Group, Inc., Flotech Environmental, LLC, Merrell Bros., Inc., Synagro South, LLC, and U.S. Submergent Technologies, LLC. Due diligence was conducted, with a past litigation settlement noted for Synagro South, LLC. The User Access Program applies where permitted, and Small Business Enterprise measures will be determined prior to advertising spot market competitions.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-07-15
Type:
Resolution
Decision:
In Committee
Applicant:
Miami-Dade Water and Sewer Department (WASD)

DEWATERING PREQUAL POOL - MOD

Miami-Dade County's Infrastructure, Innovation & Technology Committee is considering a resolution to authorize an additional $12,879,707.00 in expenditure authority for Prequalification Pool No. EVN0000187, which provides dewatering and tank cleaning services for the Water and Sewer Department (WASD). This would bring the total modified cumulative pool amount to $18,896,707.00. The additional funds are needed to address current and anticipated operational needs, including planned maintenance, emergency repairs for aging infrastructure, increased system demand, and regulatory compliance. The pool is utilized by multiple county departments, but this request is specifically for WASD, the largest user. The services are critical for maintaining water and wastewater treatment plant structures, tanks, clarifiers, containment units, pipelines, and other processing facilities. A specific example cited is the need for a temporary dewatering system at the North District Wastewater Treatment Plant due to failures at the Central District Wastewater Treatment Plant, which incurred expenditures exceeding $2 million. The pool was established on October 3, 2023, and modified on a previous date, with a five-year term expiring November 30, 2028. Any contract award under the pool exceeding $5,000,000.00 requires ratification by the Board. The document lists five prequalified vendors: Envirowaste Services Group, Inc., Flotech Environmental, LLC, Merrell Bros., Inc., Synagro South, LLC, and U.S. Submergent Technologies, LLC. Due diligence was conducted, with one vendor, Synagro South, LLC, having a past litigation resolved through a settlement agreement.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-07-15
Type:
Resolution
Decision:
In Committee
Applicant:
Miami-Dade Water and Sewer Department (WASD)

DEWATERING PREQUAL POOL - MOD

This legislative item concerns a resolution authorizing additional expenditure authority for Prequalification Pool No. EVN0000187, which provides dewatering and tank cleaning services for the Miami-Dade Water and Sewer Department (WASD). The request is for an additional $12,879,707.00, bringing the total modified cumulative pool amount to $18,896,707.00. These services are critical for maintaining water and wastewater treatment plant structures, tanks, and facilities, ensuring operational reliability, regulatory compliance, and environmental protection. The increased utilization is attributed to enhanced preventative maintenance, emergency repairs, and increased system demand, including a specific instance at the North District Wastewater Treatment Plant requiring a temporary dewatering system. The pool was initially established on October 3, 2023, and modified on a previous date not specified, with a five-year term. The pool expires on November 30, 2028. The item is currently 'In Committee' with an Agenda Date of 9/1/2026.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-07-15
Type:
Resolution
Decision:
In Committee
Applicant:
Miami-Dade Water and Sewer Department (WASD)

DISCUSSION ITEM REGARDING THE PROPOSED FY 2026-27 BUDGET

This legislative item is a discussion regarding the proposed FY 2026-27 budget, featuring presentations from several departments including Communication, Information and Technology; Solid Waste Management; Miami-Dade Water and Sewer; People and Internal Operations; and Regulatory and Economic Resources. The item is currently in committee. No specific project details, addresses, or zoning changes are mentioned.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-07-15
Type:
Legislation
Decision:
In Committee

DISCUSSION ITEM REGARDING THE PROPOSED FY 2026-27 BUDGET

This is a discussion item regarding the proposed FY 2026-27 budget for Miami-Dade County. Presentations are scheduled from several departments including Communication, Information and Technology; Solid Waste Management; Water and Sewer; People and Internal Operations; and Regulatory and Economic Resources. The item is currently in committee.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-07-15
Type:
Legislation
Decision:
In Committee

DISCUSSION ITEM REGARDING THE PROPOSED FY 2026-27 BUDGET

This legislative item is a discussion regarding the proposed FY 2026-27 budget, featuring presentations from several Miami-Dade County departments including Communication, Information and Technology; Solid Waste Management; Water and Sewer; People and Internal Operations; and Regulatory and Economic Resources. The status is 'In Committee'.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-07-15
Type:
Legislation
Decision:
In Committee

DISCUSSION ITEM REGARDING THE PROPOSED FY 2026-27 BUDGET

This is a discussion item regarding the proposed FY 2026-27 budget for Miami-Dade County. Presentations are scheduled from several departments, including Communication, Information and Technology; Solid Waste Management; Water and Sewer; People and Internal Operations; and Regulatory and Economic Resources. The item is currently in committee. No specific project details, applicant, or decision are stated.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-07-15
Type:
Legislation
Decision:
In Committee

DISCUSSION ITEM REGARDING THE PROPOSED FY 2026-27 BUDGET

This legislative item is a discussion regarding the proposed FY 2026-27 budget. It includes presentations from several departments: Communication, Information and Technology; Solid Waste Management; Miami-Dade Water and Sewer; People and Internal Operations; and Regulatory and Economic Resources. The item is currently in committee.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-07-15
Type:
Legislation
Decision:
In Committee

DISCUSSION ITEM REGARDING THE PROPOSED FY 2026-27 BUDGET

This is a discussion item regarding the proposed FY 2026-27 budget for Miami-Dade County. Presentations are scheduled from several departments, including Communication, Information and Technology; Solid Waste Management; Water and Sewer; People and Internal Operations; and Regulatory and Economic Resources. The item is currently in committee.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-07-15
Type:
Legislation
Decision:
In Committee

Infrastructure, Innovation & Technology Committee - 2026-07-15 agenda PDF

This document is a preliminary meeting agenda for the Infrastructure, Innovation & Technology Committee of Miami-Dade County, scheduled for Wednesday, July 15, 2026, at 12:30 PM in the Commission Chambers. The agenda includes rules on decorum and prime sponsorship, an invocation, roll call, pledge of allegiance, and an opportunity for the public to be heard. A key discussion item (1F1) involves proposed FY 2026-27 budget presentations from several departments, including Communication, Information and Technology; Solid Waste Management; Water and Sewer; People and Internal Operations; and Regulatory and Economic Resources. The agenda also lists two resolutions for consideration: Resolution 261158, authorizing additional expenditure authority for dewatering and tank cleaning services for the Water and Sewer Department, and Resolution 261270, awarding a contract for the Venetian Causeway water main and sewer force main relocation to ITG Communications LLC. The agenda concludes with reports and adjournment.

Board:
Infrastructure, Innovation & Technology Committee
Date:
2026-07-15
Type:
Agenda

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, free for 7 days. No credit card required.

Start your free trial