Skip to main content

Be First, Build Lasting Relationships

Tax Increment Fund Advisory Board

City of Palatka

Latest meetings

Agenda

This document is an agenda for the Tax Increment Fund Advisory Board meeting on July 22, 2026. The primary business item is to score and rank eligible applications for the FY 2026-2027 Building Improvement Grant Program. Public comments will be heard before regular business.

Board:
Tax Increment Fund Advisory Board
Date:
2026-07-22
Type:
Agenda

Agenda Packet

The Tax Increment Fund Advisory Board (TIFAC) is scheduled to score and rank eligible applications for the FY 2026-2027 Building Improvement Grant Program. Eleven applications were received. The TIFAC's scoring will be forwarded to the Community Redevelopment Agency (CRA) Board for funding award consideration. The program is reimbursement-based, requires a minimum 25% match, and work cannot begin before written CRA approval. All work must be performed by a licensed contractor, and properties must be within the CRA District. A 3-year recapture provision applies if the property is sold. [105 Morris Street, Palatka, FL] Richard Perallon applied for a Building Improvement Grant for exterior rehabilitation at 105 Morris Street, Palatka, FL. The project involves full professional repainting and restoration following structural siding repairs, with an estimated cost of $58,000. The work is intended to remove visible exterior deterioration, reduce blighting influences, and enhance neighborhood curb appeal. The applicant has secured matching funds and will use licensed contractors. The project is within the South Historic District. [211 St. Johns Avenue, Palatka, FL] Beck/Sloan Properties applied for a Building Improvement Grant for exterior façade renovation at 211 St. Johns Avenue, Palatka, FL. The project includes new commercial-grade double full-glass entrance doors, multiple glass storefront systems, architectural awnings, upgraded exterior lighting, new stucco and brick veneers, exterior paint, new architectural columns, and a new balcony with a protective railing. The estimated project cost is $260,122. The improvements aim to eliminate blighting influences, enhance the downtown corridor, and encourage private investment. Revi Construction provided a proposal for $260,122 for the scope of work. [309-311 St. Johns Ave, Palatka, FL] John Lyon applied for a Building Improvement Grant for exterior repairs and improvements at 309-311 St. Johns Ave. The project involves structural work including demolition and installation of a new structural steel beam, masonry and grout infill, roof repairs and coating, parapet and coping metal work, drainage improvements, and selective masonry repointing and chimney repairs. The estimated project cost is $101,649.83. Tradesman Commercial Project Management and Maintenance Services LLC is the proposed contractor, handling permit application and coordination. This document is part 2 of 2 and discusses recovery actions by the CRA and legal enforcement. It does not contain specific project details for contractors.

Board:
Tax Increment Fund Advisory Board
Date:
2026-07-22
Type:
Agenda_packet
Decision:
scoring and ranking of applications to be forwarded to CRA Board for consideration
Address:
105 Morris Street, Palatka, FL
Applicant:
Richard Perallon

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, free for 7 days. No credit card required.

Start your free trial