Planning and Development Commission Packet 4/16/26
CANCELLED Planning and Development Commission · 2026-04-16 · agenda_packet
[7355 N. Citrus Ave., Crystal River, Florida; case CPA/AA/PUD-2026-00001] The Planning and Development Commission (PDC) is scheduled to review and make a recommendation on application CPA/AA/PUD-2026-00001 by Anderson Columbia, Inc. The application requests to amend the Future Land Use Map from General Commercial (GNC) to Industrial (IND) and the Land Development Code Atlas Map from GNC to Heavy Industrial (IND) with a Planned Unit Development for an asphalt plant. The property is approximately 22.6 acres, located in Sections 26 and 27, Township 17 South, Range 18 East, with the address 7355 N. Citrus Ave., Crystal River, Florida. Staff recommends denial due to non-compliance with comprehensive plan objectives and policies regarding land use conflicts, environmental impacts, wastewater, and adjacent property rights. Public sentiment is strongly against the proposal, evidenced by over 2,800 signatures on a Change.org petition citing concerns about air emissions, truck traffic, noise, and property value depreciation. [7355 North Citrus Avenue; case CPA-AA-PUD-2026-00001] Anderson Columbia Co., Inc. is seeking a Comprehensive Plan Amendment, Atlas Amendment, and Planned Unit Development (PUD) Master Plan approval to develop a modern asphalt production facility. The proposed change is from GNC (General Neighborhood Commercial) to IND (Industrial) zoning. The project is located at 7355 North Citrus Avenue and encompasses 22.62 acres. The applicant, Anderson Columbia Co., Inc., states the facility will support local road projects, create jobs, reduce costs, and utilize rail service for aggregate delivery. They have incorporated enhanced design standards and buffering to ensure compatibility with surrounding uses. The application was received on January 19, 2026. The document also includes extensive data on the negative impact of asphalt plants on property values, traffic statistics for Citrus Avenue showing it is near capacity and experiencing degradation, an increase in traffic accidents on Citrus Avenue, and a note on the limited economic benefit of typical asphalt plants in terms of employment and pay. It also references a 2006 rezoning of 18.88 acres to the south for warehouses, not heavy industrial, and notes that the staff report at that time stated adjacent land uses provided transitioning. The document concludes with a recommendation to deny the application based on several deficiencies related to the County Comp Plan policies and potential contract zoning. [case CPA/AA/PUD-2026-00001] This document is a tree inventory for the Anderson Columbia project, case number CPA/AA/PUD-2026-00001, received on 1/19/26. It details the species, diameter at breast height (DBH), and status (keep or remove) of 3,705 trees on the site. The project involves mitigation calculations for trees planned for removal, with a total calculated fee of $33,500. Reforestation credits of $51,250 are expected from planting trees in buffer areas. The document does not state the specific address, size, zoning change, applicant, or decision date. [case CPA/AA/PUD-2026-00001] This document is a list of tree removals and preservations associated with case number CPA/AA/PUD-2026-00001, received on 1.19.26 for Land Development. It details specific trees by ID, common name, scientific name, diameter at breast height (DBH), and status (remove or keep). No specific project location, size, zoning change, applicant, decision, or public comment is provided in this excerpt. [case CPA/AA/PUD-2026-00001] This document is a list of tree removals and some additions for a project identified by case number CPA/AA/PUD-2026-00001, received on 1.19.26 for Land Development. It details specific trees by common name, scientific name, and diameter at breast height (DBH), along with their status (remove or keep). No specific address, project size, zoning change, applicant, decision, or public comment is provided in this excerpt. [case CPA/AA/PUD-2026-00001] This document details a land development case, CPA/AA/PUD-2026-00001, submitted by Anderson Columbia, Inc. The proposed land use is Single Family Residence, changing from an existing Industrial (IND) land use. The subject property is 1.9 acres and is located near the Suncoast Parkway and the City of Crystal River. The document lists numerous tree removals, with a few trees marked for retention. Public comment and stakeholder sentiment are not stated in this portion of the document. The case was received on January 19, 2026, and April 10, 2026, for Land Development.
Agenda items
- 000. Zip code average $360,000.
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 000. Zip code average $360,000.
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Restoration & Waterproofing
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- Utilities (Sub)
- 1. 4.16 Agenda, Directions & Map rev.
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 1. Comprehensive Plan and Land Development Code Amendment Application;
- 1. Doe
- 1. Intervenor Application - Ivory
- 1. P
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 10. Property Record Card – AK 2698209;
- 10. Tree Plans
- 11. Directions from Lecanto Government Complex to the Subject Property;
- 11. Planner's PowerPoint
- 12. Boundary Survey of the Property;
- 12. PDC Staff Report & map
- 13. Proposed PUD Master Plan;
- 14. Tree Mitigation Plan;
- 15. Tree Report;
- 16. Tree Report Explanation;
- 17. Flood Zone Designation with Base Flood Elevation; and
- 18. Comprehensive Plan Analysis analyzing the project’s consistency with the goals,
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- 2. COMPREHENSIVE PLAN AMENDMENT
- 2. Intervenor Applicant powerpoint
- 2. Land Development Code Planned Unit Development Application;
- 2. The
- 2. Z
- 3. Citrus County Application Filing Requirements Checklist;
- 3. L
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Real Estate Development
- Legal Services
- 3. PDC coordinator powerpoint
- 3. The
- 4. Appr
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 4. Authorized Agent Forms;
- 5. Applicant's PowerPoint
- 5. Vesting Deed;
- 6. Citrus County Future Land Use Map;
- 7. Citrus County Zoning Map;
- 7. Cover letter, application, appeal, auth. , & deeds
- 700. Zip code average was $274,888.
- 700. Zip code average was $274,888.
- 8. Applicant Comp Plan Analysis
- 8. Signed Appeal Notices;
- 9. Applicant Maps
- 9. Property Record Card – AK 1046122;
- B. CHAIRMAN TO READ THE APPEAL PROCESS AND MEETING PROCEDURES
- B. CHAIRMAN TO READ THE APPEAL PROCESS AND MEETING PROCEDURES
- E. CHAIRMAN TO READ THE APPEAL PROCESS AND MEETING PROCEDURES
- E: March 25 2026
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- F. OPEN TO THE PUBLIC – Receive comments from the public
- G. APPLICATIONS
- General Contractor
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Legal Services
- Accounting & Tax
- G. APPLICATIONS
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- G. APPROVE MINUTES – Approval of available minutes
- O: Members of the Planning and Development Commission
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- W. JAMES GOODING III
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- W. JAMES GOODING III
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- Construction (Other)
- General Contractor
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- a) Advanced traffic management system (ATMS) on key corridors in Citrus County.
- a) the reduction of congestion, accidents or maintenance, and
- a. CPA/AA/PUD-2026-00001 Anderson Columbia, Inc.
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Legal Services
- a. CU-2026-00003 Mary Solik for Dallas and Aimee Owens - RESCHEDULED
- b) Funding for dynamic/variable message signs to warn motorists of downstream queues and
- Lighting & Low-Voltage Systems
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- Waste Management
- Government Authority
- b) the improvement of roadway LOS to provide adequate facilities, and meet the standards of
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Government Authority
- c) Signalized intersection improvements, including operational/design enhancements, lane
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Lighting & Low-Voltage Systems
- Utilities (Sub)
- Engineering & Architecture
- Landscaping & Lawn Service
- Building & Industrial Supply
- d) Improve transit services and facilities (increase headways, better accessibility to transit,
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Construction (Other)
- Building & Industrial Supply
- Landscaping & Lawn Service
- Rideshare & Delivery
- Engineering & Architecture
- Government Authority
- e) Construct new sidewalk and bicycle projects, increasing sidewalk connectivity to
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Painting & Flooring
- Lighting & Low-Voltage Systems
- Electrical
- Plumbing
- HVAC & Climate Control
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
Follow this across meetings
Applicants and firms
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account