Skip to main content

Be First, Build Lasting Relationships

City Commission Discussion Workshop - Golden Gem: June 2026

City of Apopka

1. Appointments of Mayor/Commissioners to Boards (MetroPlan, LANGD, etc.)

City Commission Discussion Workshop - Golden Gem listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

1. Appointments of Mayor/Commissioners to Boards (MetroPlan, LANGD, etc.)

City Commission Discussion Workshop - Golden Gem listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

1. Evaluate the subsurface soils directly beneath the pond bottoms and side slopes to

This item concerns a planned evaluation of subsurface soils for a pond system. The evaluation will focus on the soil directly beneath the pond bottoms and side slopes. The goal is to confirm these soils can properly support a liner system. This work is currently under review. The project will involve geotechnical investigation, including soil testing and analysis. This early stage presents an opportunity for geotechnical engineers, soil testing laboratories, and related environmental consultants. Engaging now allows businesses to be considered as plans develop.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

1. Failures at the liner seams have resulted in leakage.

City Commission Discussion Workshop - Golden Gem listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

1. Golden Gem - Update

The City of Apopka is planning for a future project known as Golden Gem. This project is currently in the early stages, designated for future workshop discussions. While specific details are not yet finalized, the project is expected to involve significant site development. This could include initial site clearing and grading, followed by underground utility work and infrastructure development. Subsequent phases would likely involve construction of new structures, requiring framing, electrical, plumbing, and HVAC services, as well as finishing trades. Finally, landscaping and site improvements would complete the project. Local contractors, trades, suppliers, and service providers are encouraged to engage early to understand the project's direction as it moves through planning and review. Early involvement can provide a competitive advantage as detailed plans and bid opportunities emerge.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

1. Golden Gem - Update

The City of Apopka is planning future workshop discussions regarding the Golden Gem project. This project is currently in the early stages of review and has not yet moved to the bidding or permitting phases. The scope of work is expected to involve site preparation, grading, and potentially underground utility installation, followed by construction and landscaping. Local contractors, trades, suppliers, and service providers are encouraged to monitor this project's progress. Engaging early, before formal plans and bids are finalized, offers an advantage in understanding project needs and potential opportunities.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

1. Separate the West Pond work from the East Pond work.

City Commission Discussion Workshop - Golden Gem listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

2. Pioneering Agreement

City Commission Discussion Workshop - Golden Gem listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

2. Pioneering Agreement

City Commission Discussion Workshop - Golden Gem listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

2. Prioritize returning the smaller West Pond back to service as soon as

The City Commission is discussing a plan to bring the smaller West Pond back into service. This project is currently under review and is planned for action as soon as practical. The scope of work would likely involve site assessment, potential clearing and grading, and the restoration of existing pond infrastructure. This could also include necessary landscaping and environmental services to ensure the pond is functional. Local contractors, trades, suppliers, and service providers should consider reaching out to the city early to understand the project's needs before formal plans and permits are finalized. Early engagement can provide a competitive advantage for potential work.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item
Decision:
City Commission

2. Specify that the liner subgrade must be properly compacted and free of gravel or rock

City Commission Discussion Workshop - Golden Gem listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

2. The liner material shows signs of deterioration.

City Commission Discussion Workshop - Golden Gem listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

3. Design of the West Pond is currently targeted for completion in August

The City of Apopka is planning the design of the West Pond, with design work targeted for completion in August 2026. Following the design phase, the project will move into bidding and then construction. The anticipated completion date for construction is March 2027. This project will involve site preparation, grading, and potentially water management systems. Early engagement with contractors, suppliers, and service providers is advised to understand the project's scope and potential needs as it moves from design to bidding and construction phases. This early involvement can provide a competitive advantage before formal bid processes begin.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

3. Evaluate groundwater conditions to ensure hydrostatic uplift will not adversely affect

City Commission Discussion Workshop - Golden Gem listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

3. Gravel or rock fragments are present in the soils directly beneath the

City Commission Discussion Workshop - Golden Gem listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

3. Transportation (Traffic Signals, Crosswalks, Roundabouts, Planning, etc.)

City Commission Discussion Workshop - Golden Gem listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

3. Transportation (Traffic Signals, Crosswalks, Roundabouts, Planning, etc.)

City Commission Discussion Workshop - Golden Gem listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

4. A schedule for East Pond has not yet been established, as the

City Commission Discussion Workshop - Golden Gem listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

4. Citizen Advisory Committees / Boards

City Commission Discussion Workshop - Golden Gem listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

4. Citizen Advisory Committees / Boards

City Commission Discussion Workshop - Golden Gem listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

4. Isolated clayey deposits may create a perched water table above the

City Commission Discussion Workshop - Golden Gem listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

4. Provide gas release and drainage pathways beneath the liner.

City Commission Discussion Workshop - Golden Gem listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

5. Utility Infrastructure and Planing (water, wastewater, reuse)

The City of Apopka is planning for future utility infrastructure needs, specifically concerning water, wastewater, and reuse systems. This item is currently under review by the City Commission as part of a discussion workshop. The project involves long-term planning and development of essential services. This early stage presents an opportunity for contractors, suppliers, and service providers to engage with the city as plans are formulated. Businesses involved in utility construction, engineering, and material supply should consider reaching out to understand the city's upcoming infrastructure requirements and potential project timelines. Early involvement can provide a competitive advantage as detailed plans and specifications are developed.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

5. Utility Infrastructure and Planing (water, wastewater, reuse)

The City of Apopka is planning a discussion workshop regarding utility infrastructure and planning, specifically focusing on water, wastewater, and reuse systems. This item is currently under review by the City Commission. The project will involve planning and potentially future development of essential water and wastewater systems. This early stage presents an opportunity for contractors, suppliers, and service providers to engage with the city. Businesses involved in utility construction, engineering, and material supply should consider reaching out to understand the city's future needs and potential projects as plans develop.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

5. Utilize a textured 60-mil-thick HPDE geomembrane liner, which is widely used for

City Commission Discussion Workshop - Golden Gem listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

6. Comprehensive Plan

City Commission Discussion Workshop - Golden Gem listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

6. Comprehensive Plan

City Commission Discussion Workshop - Golden Gem listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

6. Provide a protective soil cover above the HDPE liner.

City Commission Discussion Workshop - Golden Gem listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

7. Design/Implementation of Database Software for Commission Votes

City Commission Discussion Workshop - Golden Gem listed this item on its agenda for 2026-06-17 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

7. Design/Implementation of Database Software for Commission Votes

The City of Apopka is planning a multi-phase, multi-year infrastructure project called the Golden Gem Reclaim Water Facility (RWF). This regional initiative aims to meet long-term reclaimed water demand in Northwest Orange County and supports a regional water strategy for local utilities. The project involves recycling 100% of Apopka's wastewater for reuse irrigation, reducing reliance on the Floridian Aquifer, and eliminating raw wastewater discharge. The project is currently under review and is in its early stages, with completed components including East and West Ponds. Future work includes the design and construction of a distribution pump station, with bids advertised and opening in June 2026, and construction starting before September 2026 for an estimated 18 months. Additionally, pond reconstruction is planned, with design for the West Pond expected in late August 2026 and construction starting in September/October 2026. This extensive project will involve site clearing and grading, underground utility work, concrete and paving, mechanical and electrical systems, and final landscaping. Local contractors, trades, suppliers, and service providers are encouraged to engage early to understand the project's scope and potential opportunities before final plans and bids are set.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item
Address:
Northwest Orange County

7. Implement a robust construction quality assurance program to verify that the liners

The City of Apopka is planning a project to address groundwater elevations and potential stormwater pond modifications. This project involves collecting and analyzing historical groundwater data, including rainfall, soil borings, and aquifer levels. It also includes installing piezometers for ongoing data collection to capture wet season conditions. The goal is to refine groundwater characterization and address potential influences on stormwater ponds. This work will likely involve site preparation, installation of monitoring equipment, and potentially construction related to pond liner modifications. Local contractors, suppliers, and service providers in site preparation, utility installation, and construction trades could find opportunities. Early engagement is advised as this project is in the planning and review stages.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_item

Apopka City Commission Discussion Workshop 06/17/26

This document is a workshop agenda for the Apopka City Commission meeting on June 17, 2026. It lists discussion items including an update on 'Golden Gem' presented by Vladimir Simonovski, Public Works Director. Other items for future discussion include pioneering agreements, transportation projects, citizen advisory committees, utility infrastructure and planning, the comprehensive plan, and database software for commission votes. A public comment period is also scheduled. No specific projects with addresses, sizes, or zoning changes are detailed in this agenda.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda

Apopka City Commission Discussion Workshop 06/17/26

The Apopka City Commission held a workshop on June 17, 2026, to discuss the Golden Gem Reclaim Water Facility. This project is a multi-phase, multi-year infrastructure investment supporting Apopka's growth and addressing regional reclaimed water demand and scarcity. It aligns with the regional water strategy, supports environmental goals by reducing nitrogen and eliminating raw wastewater discharge, and recycles 100% of Apopka's wastewater. The project involves a partnership with SJRWMD, which purchased 100 acres for the facility, and includes interlocal agreements with Sunshine Water, Orange County, City of Altamonte Springs, and City of Mount Dora. Completed components include East Pond (2021) and West Pond (2023). Current construction involves a Distribution Pump Station, with bid opening on June 30, 2026, and construction starting before September 1, 2026, for an 18-month duration. Ongoing work includes pond reconstruction, with conceptual design for West Pond released June 5, 2026, and final design expected late August 2026. Next steps include starting design of East Pond in September 2026, starting construction of West Pond in September/October 2026, completing West Pond reconstruction by March 2027, and completing East Pond design by April/May 2027. The East Pond reconstruction completion date is to be determined. The workshop also included a public comment period. Tetra Tech and Ardaman & Associates are involved in the pond reconstruction design, addressing issues like liner seam failures, deterioration, and soil protrusions. Design solutions include specifying liner subgrade requirements, gas release pathways, using a textured HDPE geomembrane liner, and providing protective soil cover. Groundwater level characterization is ongoing to support design modifications.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_packet
Decision:
Workshop discussion (no formal decision stated)
Applicant:
City of Apopka

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.

Create your account