Skip to main content

Be First, Build Lasting Relationships

Browse City of DeLand civic records

Every published record for City of DeLand, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.

1,878 records

537. 1 PFAS Compounds, UCMR

This item concerns a report of laboratory analysis for PFAS compounds, specifically NEtFOSAA and NMeFOSAA, with reported values and limits. The analysis was conducted by Pace Analytical Services, LLC, located in Ormond Beach, FL. This is a report of findings, not a project proposal or construction plan. Therefore, there is no direct construction work, site development, or related trades indicated at this time. The opportunity for local contractors, trades, suppliers, and service providers is limited as this is a reporting and review phase. Further information regarding any future actions or projects related to these findings would be needed to identify specific business opportunities.

Board:
City Commission Regular Meeting
Date:
2026-07-20
Type:
Agenda_item
Address:
8 East Tower Circle, Ormond Beach, FL 32174

537. 1 PFOA Compounds, UCMR

The City of DeLand is reviewing information related to PFOA compounds, specifically under the Unregulated Contaminant Monitoring Rule (UCMR). Pace Analytical Services in Ormond Beach is conducting laboratory analysis for this item. The review involves testing water samples for various perfluorinated compounds. This process is currently under review by the City Commission. The work involves laboratory testing and data analysis, with potential future phases related to regulatory compliance or infrastructure adjustments based on the findings. Local contractors, suppliers, and service providers in fields such as environmental testing, consulting, and potentially water treatment services could find opportunities. Engaging early before final decisions are made may provide an advantage in understanding future needs.

Board:
City Commission Regular Meeting
Date:
2026-07-20
Type:
Agenda_item
Address:
8 East Tower Circle, Ormond Beach, FL 32174

553. 14, F.S.) in all new construction or renovations. Also, the City

City Commission Regular Meeting listed this item on its agenda for 2026-07-20 in City of DeLand. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Regular Meeting
Date:
2026-07-20
Type:
Agenda_item

6. Approval of Resolution 2026-34: Surplus Equipment

City Commission Regular Meeting listed this item on its agenda for 2026-07-20 in City of DeLand. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Regular Meeting
Date:
2026-07-20
Type:
Agenda_item

6. Approval of Resolution 2026-34: Surplus Equipment

City Commission Regular Meeting listed this item on its agenda for 2026-07-20 in City of DeLand. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Regular Meeting
Date:
2026-07-20
Type:
Agenda_item

7. Consideration, Change Order No. 1 to the Westside Interceptor ARV Replacements Project, Bid

The City of DeLand is considering Change Order No. 1 for the Westside Interceptor ARV Replacements Project. This project involves replacing ARVs (Air Release Valves) on the Westside Interceptor. The proposed change order is for an additional $31,196.00. This item is currently under review by the City Commission. Work related to this change order could include specialized plumbing, mechanical services, and potentially concrete or asphalt repair depending on the location of the valves. Contractors and suppliers who can provide these services or materials may find opportunities as this project moves forward. Early engagement could be beneficial before final bids and permits are issued.

Board:
City Commission Regular Meeting
Date:
2026-07-20
Type:
Agenda_item

7. Consideration, Change Order No. 1 to the Westside Interceptor ARV Replacements Project, Bid

The City of DeLand is considering Change Order No. 1 for the Westside Interceptor ARV Replacements Project. This project involves work on the Westside Interceptor system. The proposed change order is for an additional $31,196.00. This item is currently under review by the City Commission. The work associated with this change order could involve specialized equipment and materials related to the interceptor system. Contractors and suppliers with experience in utility infrastructure and related services may find opportunities. Early engagement before final approvals could provide an advantage.

Board:
City Commission Regular Meeting
Date:
2026-07-20
Type:
Agenda_item

8. Consideration, Award of Bid, Reclaim Water Main Expansion Phase 6

The City of DeLand is planning to award a contract for the Reclaim Water Main Expansion Phase 6. This project involves the construction of water main expansion infrastructure. The city staff recommends awarding the bid to Treasure Coast Infrastructure for a total of $890,253.00. This project is currently in the award of bid stage, indicating it is nearing the construction phase. The work will likely involve site preparation, excavation, installation of underground piping, and restoration of the work area. Contractors specializing in utility construction, site preparation, and heavy equipment operation may find opportunities. Early engagement before final contract details are settled could provide an advantage.

Board:
City Commission Regular Meeting
Date:
2026-07-20
Type:
Agenda_item

8. Consideration, Award of Bid, Reclaim Water Main Expansion Phase 6

The City of DeLand is considering awarding a bid for the Reclaim Water Main Expansion Phase 6 project. This project involves the construction of a reclaim water main expansion. The City Commission is expected to consider awarding a contract to the lowest bidder, Treasure Coast Infrastructure of Stuart, Florida (WCDEL, LLC.), for a total of $890,253.00. This item is currently under review, with a recommendation for award. The work will likely involve underground utility installation, including water mains, and potentially site preparation and restoration. Contractors specializing in utility construction, site work, and related trades could find opportunities as this project moves forward. Early engagement before final bid and permit processes are settled may offer an advantage.

Board:
City Commission Regular Meeting
Date:
2026-07-20
Type:
Agenda_item

8. The City is required to achieve compliance with current EPAPFASregulations by April 26, 2029.

The City of DeLand is planning to implement Per- and Polyuoroalkyl Substances (PFAS) treatment at six of its water treatment plants (WTPs 1, 2, 3, 5, 6, and 8) to meet new EPA regulations by April 2029. The preferred technology is PFAS-selective Ion Exchange (IX). This project will involve site improvements, process piping, instrumentation, controls, electrical modifications, and potential provisions for future expansion at these locations. The city is seeking low-interest financing through the Florida State Revolving Fund Program. This initiative is currently in the planning and review stage, with preliminary design criteria and cost estimates developed. The project scope includes the installation of new treatment systems, which will likely involve site clearing, grading, utility work, installation of process equipment, electrical and control system integration, and final landscaping. Local contractors, suppliers, and service providers are encouraged to engage early to understand the project's needs and potential involvement before final bids and permits are issued.

Board:
City Commission Regular Meeting
Date:
2026-07-20
Type:
Agenda_item
Address:
339 N Spring Garden Ave
Applicant:
City of DeLand

9. Consideration, Award of Bid, East Regional Force Main Part B-1

The City of DeLand is considering awarding a contract for the East Regional Force Main Part B-1 project. This project involves the construction of a force main, which is a type of sewer pipeline. The City Commission is expected to review and potentially award a bid for this work. This project is currently under review, with staff recommending an award to the lowest bidder. The work will likely involve site preparation, excavation, pipe installation, and connection to existing infrastructure. Contractors specializing in utility construction, heavy civil work, and related material suppliers could find opportunities as this project moves forward. Engaging early before final bids and permits are set could provide a competitive advantage.

Board:
City Commission Regular Meeting
Date:
2026-07-20
Type:
Agenda_item

9. Consideration, Award of Bid, East Regional Force Main Part B-1

The City of DeLand is planning to award a contract for the construction of the East Regional Force Main Part B-1. This project is currently under review by the City Commission. The proposed work involves the construction of a force main, which is a type of sewer pipeline. This project is early in the public process, with a contract award recommendation pending. The scope of work will likely include site preparation, excavation, pipe laying, and utility connections. Contractors specializing in heavy civil construction, utility work, and site preparation may find opportunities. Suppliers of construction materials and equipment could also be involved. Reaching out to the city early, before final bids and permits are settled, could provide an advantage for interested businesses.

Board:
City Commission Regular Meeting
Date:
2026-07-20
Type:
Agenda_item

IX) is available and more appropriate.

The City of DeLand is planning to install PFAS-selective ion exchange (IX) systems at multiple water treatment plants. This project involves adding new equipment to existing facilities and consolidating three sites into a new central treatment facility. The work will include site modifications, installation of pressure vessels, piping, valves, and control panels. It will also involve relocating existing chemical treatment systems and potentially installing new ones at the consolidated site. The project is currently in the planning and design phase, with a recommendation to proceed with PFAS-selective ion exchange. This will create opportunities for contractors involved in site preparation, underground utilities, concrete work, mechanical and electrical installations, and specialized water treatment equipment. Early engagement is advised as detailed site plans, bids, and permits are still being developed.

Board:
City Commission Regular Meeting
Date:
2026-07-20
Type:
Agenda_item

Spring Hill CRA Agenda Cover Sheet

This document is the agenda for the July 20, 2026, Spring Hill Community Redevelopment Agency meeting. It lists two items related to sewer connection assistance at specific addresses, an update on partnership discussions, and an item regarding Spring Hill Sewer Infrastructure. The agenda also includes standard meeting procedures like call to order, consent agenda, unfinished business, new business, staff updates, board member comments, public petitions, and adjournment. No decisions on these items are stated in the agenda itself.

Board:
Spring Hill CRA Meeting
Date:
2026-07-20
Type:
Agenda
Address:
120 South Florida Avenue (City Hall, Commission Chambers), 324 Chipola Avenue, 344 Napoleon Drive
Applicant:
Applicant for Sewer Connection Assistance (for 324 Chipola Ave and 344 Napoleon Dr)

Spring Hill CRA Agenda Packet

[120 South Florida Avenue] The Spring Hill Community Redevelopment Agency (CRA) met on July 20, 2026. Two sewer connection assistance applications were considered: one for 324 Chipola Avenue and another for 344 Napoleon Drive. Both were recommended for approval. The agency also discussed potential partnerships and program enhancements with various organizations, and received an update on sewer infrastructure needs, with cost estimates for phased projects ranging from $2.8 million to $12.8 million. [324 Chipola Avenue] Consideration for sewer connection assistance for Kevin Givens at 324 Chipola Avenue. The utilities department confirmed sewer service availability. The low acceptable quote for labor was $4,000, with a prior connection project on the same road totaling just over $11,000. The Spring Hill CRA has $28,812.36 remaining in its $40,000 budget for connection assistance this fiscal year. [344 Napoleon Drive] Consideration for sewer connection assistance for Terrance Morris at 344 Napoleon Drive. The utilities department confirmed sewer service availability. The low acceptable quote was $10,635, which includes connection fees. The Spring Hill CRA has $28,812.36 remaining in its $40,000 budget for connection assistance this fiscal year. Update on partnership and program discussions. Staff met with Volusia County Community Assistance, CareerSource, AdventHealth, The House Next Door, and The DeLand & Greater West Volusia Chamber of Commerce. Proposals include a workshop series covering workforce readiness, financial resources, and economic self-sufficiency, and health and wellness initiatives including health insurance enrollment assistance and mental health referrals. Other potential programs explored include first-time homebuyer assistance, rent/homeowner stabilization, and TIF rebates for affordable housing projects. Staff is seeking general direction from the Board. Discussion on Spring Hill Sewer Infrastructure. The CRA area has had sewer installed over two decades, but some areas still lack gravity sewer. A utility consultant, Mead & Hunt, provided cost estimates for a phased approach. Phase 1 (lowest cost) is estimated at $2.8 million, Phase 2 at $6.5 million, and Phase 3 at $12.8 million. The total for all phases is over $22 million. The CRA has $1.5 million in reserves, with an anticipated $500,000 rollover, totaling approximately $2 million available. Staff is seeking direction on moving forward with a phase or establishing a reserve account. If a phase is chosen, design and bidding will follow. [910 S. Adelle Avenue] Discussion regarding the parcel at 910 S. Adelle Avenue. The lot is currently zoned municipal and is impervious due to overflow issues. Public comment included urging the CRA to sell or lease the land to a church for overflow parking. The board favored continued City/CRA ownership for overflow parking for the church and other area businesses, including the Dr. Joyce M. Cusack Resource Center, with minimal cost.

Board:
Spring Hill CRA Meeting
Date:
2026-07-20
Type:
Agenda_packet
Decision:
Recommended for approval for sewer connection assistance
Address:
120 South Florida Avenue
Applicant:
Kevin Givens

a) A determination of overriding public interest

City Commission Regular Meeting listed this item on its agenda for 2026-07-20 in City of DeLand. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Regular Meeting
Date:
2026-07-20
Type:
Agenda_item

a) Air

City Commission Regular Meeting listed this item on its agenda for 2026-07-20 in City of DeLand. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Regular Meeting
Date:
2026-07-20
Type:
Agenda_item

a) Criteria and stipulations for protecting wetlands and managing the

City Commission Regular Meeting listed this item on its agenda for 2026-07-20 in City of DeLand. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Regular Meeting
Date:
2026-07-20
Type:
Agenda_item

a) overriding public interest, i. e., the proposed activity is essential to

City Commission Regular Meeting listed this item on its agenda for 2026-07-20 in City of DeLand. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
City Commission Regular Meeting
Date:
2026-07-20
Type:
Agenda_item

a. All new residential subdivisions as well as multiple family and

The City of DeLand is reviewing requirements for new residential subdivisions and multiple-family and nonresidential developments. Any new development within the city that will use the City of DeLand's wastewater collection and disposal system, if existing or planned for future expansion, must connect to this public system. This review is currently under consideration by the City Commission. This policy review could lead to future construction projects involving site preparation, utility connections, and building construction. Contractors, suppliers, and service providers in site preparation, utility work, and general construction may find opportunities as these requirements are finalized and projects move forward. Early engagement before final plans and permits are issued could provide a competitive advantage.

Board:
City Commission Regular Meeting
Date:
2026-07-20
Type:
Agenda_item

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.

Create your account