Site Plan Review and Appearance Board
Site Plan Review and Appearance Board · 2026-08-26 · meeting
The Site Plan Review and Appearance Board of the City of Delray Beach met to review upcoming projects. The board considered a master sign program for The Ray Hotel and Shops at The Ray to add signs for Campi Italian. They also reviewed a master sign program for Alexan Delray to add a monument sign. Additionally, the board looked at plans for five new townhomes on SW 3rd Avenue, which may involve work for land clearing, grading, utility contractors, concrete and paving companies, framers, roofers, electricians, plumbers, HVAC installers, and landscapers.
Agenda items
- Alexan Delray - Master Sign Program (PZ-777): Consider the establishment of a Master Sign Program for Alexan Delray to accommodate a monument sign for the front entrance of the development.
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Signage & Printing
- May 27, 2026
- SW 3rd Avenue Townhomes (File No. 2025-116): Consideration of a Level 2 Site Plan application to construct five, two-story fee-simple townhomes, including Architectural Elevations, a Landscape Plan, and an associated waiver from the required street tree location and a reduction in the number of required street trees along SW 3rd Avenue.
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- Landscaping & Lawn Service
- September 24, 2025 (Amended)
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Staff
- The City shall furnish appropriate auxiliary aids and services where necessary to afford an individual with a disability an equal opportunity to participate in and enjoy the benefits of a service, program, or activity conducted by the City. Please contact the Human Resources Department at (561) 243-7125 at least 24 hours prior to the program or activity for the City to reasonably accommodate your request. Adaptive listening devices are available for meetings in the Commission Chambers. If a person decides to appeal any decision made by the Site Plan Review and Appearance Board with respect to any matter considered at this meeting or hearing, such persons will need a record of these proceedings, and for this purpose such persons may need to ensure that a verbatim record of the proceedings is made. Such record includes the testimony and evidence upon which the appeal is to be based. The City does not provide or prepare such record. Two or more City Commissioners may be in attendance.
- The Ray Master Sign Program- Campi Italian (PZ-000566-2026): Consideration of an Amendment of the Master Sign Program for The Ray Hotel and Shops at The Ray to accommodate the addition of two wall signs for a corner tenant, Campi Italian, for a total of five types of wall signs specific to the entire project.
- Lighting & Low-Voltage Systems
- Construction (Other)
- Engineering & Architecture
- Signage & Printing
Follow this across meetings
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, free for 7 days. No credit card required.
Start your free trial