[21 Pine Ridge Trace; case PZ-2026-57] The Board of Adjustment considered a variance request for PZ-2026-57 at 21 Pine Ridge Trace. The applicant, Craig Shultz, sought a reduction in the required 20-foot front setback to 13 feet for a property zoned MDR-V on 0.16 acres. The original subdivision was designed for townhomes with 5-foot setbacks. The applicant proposed adding a bedroom, office, and storage space. Staff recommended denial, citing that the request did not meet all six variance criteria. The applicant argued the lot configuration and cul-de-sac location made expansion impractical and that neighbors did not object. The Board discussed the unusual subdivision layout, existing nonconformities, and potential precedent. The variance was approved 4-2. [35000 Emerald Coast Parkway; case PZ-2026-48] The Board of Adjustment reviewed variance request PZ-2026-48 for First Security Bank Inc. at 35000 Emerald Coast Parkway. The proposal involves demolishing an existing building and constructing a new 3,447 square-foot bank with a drive-through. The applicant seeks relief from the 16' minimum to 26' maximum front setback requirement for the Commercial General (CG) zoning district, as the property fronts two streets (Highway 98 and Crystal Beach Drive). The applicant cited the need for circulation due to the corner lot, one-way access from Highway 98, and fire department access requirements. Staff recommended denial, finding that the desire for a drive-through is common, other corner lots exist, and FDOT access regulations are not unique. Staff also questioned if granting the variance would confer special privileges and if undue hardship was demonstrated. No public comments were received. The document does not state the final decision for this item, only that it was continued from a previous meeting and discussed. [3500 Emerald Coast Parkway, Destin, FL 32541; case PZ-2026-48] ECAE, LLC is seeking a variance for a property located at 3500 Emerald Coast Parkway, Destin, FL 32541, at the southeast intersection of Emerald Coast Parkway (Highway 98) and Crystal Beach Drive. The project involves demolishing an existing two-story office building and rebuilding it as a bank with an attached drive-thru. The variance is requested from the 20-foot maximum setback from the Crystal Beach Drive right-of-way to allow for the drive-thru service area and necessary circulation, as well as to accommodate fire department access around the building. The property is in Section 00, Township 2 South, Range 22 West, Okaloosa County, Florida. The case number is PZ-2026-48. [751 Harbor Boulevard, Destin, FL 32541; case PZ-2026-69] Wagner Property Group, LLC is proposing to redevelop the site at 751 Harbor Boulevard, Destin, FL 32541, by demolishing an existing building and constructing a new 3,333 square-foot bank building with a drive-through facility. The applicant is seeking relief from the front setback requirement of 16' minimum to 26' maximum for properties fronting U.S. Highway 98. The property is approximately 0.97 acres (42,253.2 sq. ft.) and is zoned Town Center Mixed Use (TCMU). The case number is PZ-2026-69. Staff findings indicate that the applicant has not met the six criteria required for a variance, specifically regarding special circumstances peculiar to the land and undue hardship. Public comment has not been received. [751 Harbor Blvd, Destin, FL] This document outlines demolition and erosion control requirements for a project located at 751 Harbor Blvd, Destin, FL. The project involves the demolition of existing structures and infrastructure on a 0.917-acre parcel. Key activities include clearing and grubbing, removal of existing materials (concrete, asphalt, trees, etc.), and the installation of erosion control measures. Specific notes detail dust control methods, land disturbance sequencing, vibration impact mitigation, and perimeter protection. The document emphasizes contractor responsibility for compliance with all applicable codes, regulations, and the specific project plans. No specific project applicant, case number, or decision is stated in this portion of the record; it focuses on the procedural and technical requirements for demolition and site work. [751 Harbor Blvd, Destin, FL 32541] This document details the site plan, grading, drainage, utilities, lighting, and erosion control for a proposed bank with an ATM. The project involves the conversion of a commercial property to a financial institution. The development includes new construction, parking, and associated infrastructure. Specifics on stormwater management, utility connections, and lighting are provided. The project is located at 751 Harbor Blvd, Destin, FL. [751 Harbor Blvd, Destin, FL 32541; case FLD250023.00-0A] This document outlines the Soil Erosion and Sediment Control Plan for a proposed development at 751 Harbor Blvd, Destin, FL. It details construction phases, pollution prevention measures, and maintenance requirements for contractors. Key elements include the use of silt fences, inlet protection, construction entrances, and adherence to NPDES permit requirements. The plan specifies contractor responsibilities for inspections, site stabilization, and managing discharges to prevent off-site impacts. It also includes various construction details for elements such as concrete curbs, sidewalks, pavement, and utility connections.
Agenda items
- 1. ALL PLANTING IN VISIBILITY TRIANGLE MUST ADHERE TO THE CITY OF DESTIN LDC 8.03.06(A).2. NO PLANTING SHALL BE ALLOWED TO GROW IN SUCH A MANNER AS TO MATERIALLY IMPEDE VISION BETWEEN A HEIGHT OF 2' AND 8.5' ABOVE THE GRADE, MEASURED AT THE CENTERLINE OF THE INTERSECTION, AND NO FOLIAGE BETWEEN 2' AND 10' AT MATURITY.3. PRESERVED OR PROTECTED TREES SHALL BE ALLOWED TO REMAIN IN A CLEAR VISIBILITY TRIANGLE PROVIDED ALL BRANCHES AND FOLIAGE IS REMOVED BETWEEN A HEIGHT OF 2' AND 8.5' ABOVE THE GRADE.
- Site Prep, Grading & Hardscape
- Carpentry & Cabinetry
- General Contractor
- Engineering & Architecture
- 1. Link to Strategic Goals /Objectives: N/A
- 1. Link to Strategic Goals /Objectives: N/A
- 1. Proof of Ownership
- 1. Proof of Ownership
- 2. Effect on Budget (EOB): N/A
- 2. Effect on Budget (EOB): N/A
- 2. Letter of Request
- 2. Letter of Request
- 3. Level of Service (LOS): N/A
- 3. Level of Service (LOS): N/A
- 3. Property Posting Affidavit
- 3. Property Posting Affidavit
- 4. AGENDA APPROVAL:
- 4. CURRENT BUSINESS
- 4. CURRENT BUSINESS
- 4. Posting Photo
- 4. Property Posting Photo
- 5. Abutter Notice
- 5. Abutter Notice
- 6. NEW BUSINESS:
- General Contractor
- Carpentry & Cabinetry
- Drywall & Insulation
- Painting & Flooring
- Plumbing
- HVAC & Climate Control
- Electrical
- Lighting & Low-Voltage Systems
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 6. Proposed Site Plan
- 6. Proposed Site Plan
- 7. Agent Affidavit
- 7. Agent Affidavit
- 8. Fire Support Letter
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- A. May 6, 2026 BOA Minutes
- A. May 6, 2026 BOA Minutes
- A. PZ-2026-48 - 35000 Emerald Coast Parkway Variance Request
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- A. PZ-2026-48 - 35000 Emerald Coast Parkway Variance Request
- General Contractor
- Engineering & Architecture
- Real Estate Development
- A. That special conditions or circumstances exist which are peculiar to the
- A. That special conditions or circumstances exist which are peculiar to the land,
- B. PZ-2026-69 - 751 Harbor Blvd. Variance Request
- General Contractor
- Engineering & Architecture
- Real Estate Development
- B. PZ-2026-69 - 751 Harbor Blvd. Variance Request
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Legal Services
- Landscaping & Lawn Service
- B. That special conditions and circumstances do not result from the actions of
- B. That special conditions and circumstances do not result from the actions of
- C. That granting the requested variance will not confer on the Applicant any
- C. That granting the requested variance will not confer on the Applicant any
- Cc: Tina Deater, Community Development Director
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- D. That literal interpretation of the provisions of any zoning ordinance would
- D. That literal interpretation of the provisions of any zoning ordinance would
- E. The variance granted is the minimum variance that will make possible the
- E. The variance granted is the minimum variance that will make possible the
- F. That the granting of the variance will be in harmony with the general
- F. That the granting of the variance will be in harmony with the general
- Legal Services
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- I. BACKGROUND:
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- I. BACKGROUND: First Security Bank Inc. is proposing to redevelop the site at 35000
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- Signage & Printing
- II. DISCUSSION:
- Engineering & Architecture
- Real Estate Development
- General Contractor
- Building & Industrial Supply
- Legal Services
- II. DISCUSSION:
- General Contractor
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- III. RECOMMENDATIONS:
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Waste Management
- III. RECOMMENDATIONS: First Security Bank Inc. is proposing to redevelop the site
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- IV. RECOMMENDED MOTION:
- IV. RECOMMENDED MOTION:
- i. Front setback. For properties that front U.S. Highway 98, 16 feet minimum to 26
- Engineering & Architecture
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Commercial Brokerage
- Commercial & Business Insurance
- Legal Services
- i. Front setback. For properties that front U.S. Highway 98, 16 feet minimum to 26 feet
- o. 321.234.2880
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Accounting & Tax
- Real Estate Development
- Landscaping & Lawn Service
Follow this across meetings
Board
Board of AdjustmentApplicants and firms
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account