Skip to main content

Be First, Build Lasting Relationships

Public Works Public Safety

City of Destin

Latest meetings

August 11, 2026 Public Works Public Safety Committee Agenda

Public Works Public Safety in City of Destin posted this record to its public file. The posted document carries a title and no readable project detail, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official document link above and watch for the fuller record the body posts later.

Board:
Public Works Public Safety
Date:
2026-08-11
Type:
Agenda

Public Works Public Safety

The Public Works Public Safety Committee of the City of Destin met to discuss upcoming plans and safety improvements. Potential local business opportunities include work related to the 2027 Public Works and Public Safety Work Plan. The committee also reviewed plans for new all-way stops at Benning Drive and Maltezos, and at Country Club Drive East, Old Creek Trail, and Indian Bayou. Discussions also touched on stormwater and floodplain questions.

Board:
Public Works Public Safety
Date:
2026-08-11
Type:
Meeting

July 14, 2026 Public Works/Public Safety Meeting Agenda

The Public Works/Safety Committee agenda for July 14, 2026, includes New Business item 5A: Renewal & Replacement - Resurfacing Clipper Cove. Discussion item 7A is Project Updates from Joe. Stormwater/Floodplain questions and public comments are scheduled under item 9. The meeting will be held at Destin City Hall Annex Council Chambers at 5:30 PM.

Board:
Public Works Public Safety
Date:
2026-07-14
Type:
Agenda
Address:
Clipper Cove

July 14, 2026 Public Works/Public Safety Meeting Agenda Packet

The Public Works/Safety Committee met on May 12, 2026, to discuss and recommend approval for a Fiscal Year 2026 paving program. The program includes resurfacing and striping of multiple roadways: Gulf Shore Drive from Sandpiper Cove to the first cul-de-sac; Airport Road eastern section from Airport Curve to U.S. Highway 98; Misty Way; North Lakeside Drive; Driftwood Lane; Driftwood Court; Park Court; Flamingo Drive; Spring Lake Drive and associated cul-de-sacs; Elyse Lane; and Kent Lane. The total projected budget impact is approximately $3.1 million, with about $3.4 million remaining in the paving budget. Construction is expected to begin after August or September 2026. The committee also discussed the Linear Trail project and associated intersection improvements at Airport Road and Commons Drive, with construction anticipated in Fiscal Year 2028 or 2029. Drainage concerns along Airport Road were raised, and the committee noted that additional funds might be used for corrective drainage work if needed. A bid form from H & T Contractors, LLC for Miscellaneous Asphaltic Concrete Continuing Services lists unit prices for various materials and services, including different types of asphalt concrete, milling, aggregate base, concrete work, pipe installation, and sodding. The bid form references FDOT standards and specifications.

Board:
Public Works Public Safety
Date:
2026-07-14
Type:
Agenda_packet
Decision:
Recommended approval to engage the city's continuing services contractors to resurface & stripe the list of roadways and forward to City Council for final approval.
Address:
Gulf Shore Drive from Sandpiper Cove to the first cul-de-sac; Airport Road eastern section from Airport Curve to U.S. Highway 98; Misty Way; North Lakeside Drive; Driftwood Lane; Driftwood Court; Park Court; Flamingo Drive; Spring Lake Drive and associated cul-de-sacs; Elyse Lane; Kent Lane.

July 14, 2026 Public Works/Public Safety Meeting Minutes

The document is the minutes of the Destin City Public Works/Public Safety Committee meeting held on July 14, 2026. The committee recommended City Council approval to add Clipper Cove to the FY-2026 Road Resurfacing Program. The committee also discussed additional streets identified for resurfacing, including Holiday Isle streets, Misty Way, Airport Road (second half), several Keller Gardens streets, and additional Crystal Beach streets. Project updates were provided for Tarpon Street Park, Pickleball Courts, Highway 98 Landscaping, and the Palm Street Traffic Signal Project. A traffic study on Gulf Shore Drive found average vehicle speeds approximately 4 mph below the posted speed limit. The committee discussed a sidewalk request along the west side of Durango Road, noting significant challenges. Annexation of unincorporated Okaloosa County parcels was discussed, with first reading scheduled for July 20, 2026, and second reading for August 3, 2026. The Four Prong Lake Outfall project has approximately $2 million in state funding secured, with a total project estimate of approximately $3.5 million. No public comments were made on stormwater/floodplain items.

Board:
Public Works Public Safety
Date:
2026-07-14
Type:
Minutes
Decision:
Recommended City Council approval to add Clipper Cove to the FY-2026 Road Resurfacing Program; motion passed 6-0.
Address:
Destin City Hall Annex Chambers

1) If more that 10% of the length of any line is less than 5.4 inches wide during daylight

Public Works Public Safety listed this item on its agenda for 2026-04-14 in City of Destin. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Public Works Public Safety
Date:
2026-04-14
Type:
Agenda_item

1. City Projects January

Public Works Public Safety listed this item on its agenda for 2026-04-14 in City of Destin. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Public Works Public Safety
Date:
2026-04-14
Type:
Agenda_item

1. City of Destin - Kelly

Public Works Public Safety listed this item on its agenda for 2026-04-14 in City of Destin. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Public Works Public Safety
Date:
2026-04-14
Type:
Agenda_item

1. Crosstown Connector (Beach to Benning)/PHII in Procurement

The City of Destin is planning the Crosstown Connector (Beach to Benning) Project, Phase II, which is currently in the procurement stage. This project involves the development of a new connector road, likely requiring extensive site clearing and grading, followed by underground utility work and stormwater management systems. Subsequent phases would include road construction and paving, with potential for final landscaping. This early stage in the public process presents an opportunity for local contractors, trades, suppliers, and service providers to engage with the city. Reaching out now, before final bid packages and permits are issued, could provide a competitive advantage for businesses specializing in heavy civil construction, site preparation, utility installation, paving, and related material supply.

Board:
Public Works Public Safety
Date:
2026-04-14
Type:
Agenda_item

1. E-Bike Ordinance

Public Works Public Safety listed this item on its agenda for 2026-04-14 in City of Destin. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Public Works Public Safety
Date:
2026-04-14
Type:
Agenda_item

1. When overtaking and passing another bicycle or vehicle proceeding in the same

Public Works Public Safety listed this item on its agenda for 2026-04-14 in City of Destin. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Public Works Public Safety
Date:
2026-04-14
Type:
Agenda_item

1. When overtaking and passing another bicycle or vehicle proceeding in the same

Public Works Public Safety listed this item on its agenda for 2026-04-14 in City of Destin. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Public Works Public Safety
Date:
2026-04-14
Type:
Agenda_item

10. Utility Undergrounding (Marler Bridge to Airport Road).

The City of Destin is planning a utility undergrounding project. This project is currently under review and will extend from Marler Bridge to Airport Road. The scope of work is expected to involve significant underground utility installation and potentially road modifications. This early stage means that contractors, suppliers, and service providers can engage with the city to understand the project's details as they develop. Early involvement allows businesses to prepare bids and potentially secure work as the project moves through planning, design, and permitting phases. Companies specializing in underground utilities, civil engineering, site preparation, and related trades should consider reaching out.

Board:
Public Works Public Safety
Date:
2026-04-14
Type:
Agenda_item
Address:
Marler Bridge to Airport Road

11. Channel Maintenance Dredging.

Public Works Public Safety listed this item on its agenda for 2026-04-14 in City of Destin. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Public Works Public Safety
Date:
2026-04-14
Type:
Agenda_item

12. Tarpon Street Parking Lot Additions.

Public Works Public Safety listed this item on its agenda for 2026-04-14 in City of Destin. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Public Works Public Safety
Date:
2026-04-14
Type:
Agenda_item

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.

Create your account