BOA Signed Minutes May 5 2026
Board of Adjustment · 2026-05-05 · minutes
The City of Jacksonville Beach Board of Adjustment approved a variance for BOA#26-100026 for a single-family home at 1812 Ocean Dr. The variance allows for a front yard setback of 18 feet (instead of 20 feet), a rear yard setback of 12 feet (instead of 20 feet), and a maximum lot coverage of 48% (instead of 45%). The hardship cited was a nonconforming lot. The motion was moved by Mr. Metz and seconded by Mr. Hawkett, passing 5-1. The next meeting is scheduled for May 19, 2026.
Agenda items
- 1. 26-100026pics
- 1. There are conditions or circumstances that exist which prevent compliance with site design
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Accounting & Tax
- Legal Services
- Landscaping & Lawn Service
- 2. BOA#26-100026 Application
- 2. The conditions or circumstances do not result from actions of the application and would
- 3. There would be no special privileges afforded to the applicant by granting a variance that
- 4. Strict interpretation and enforcement of the code would deprive the applicant of rights
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- 5. The variance(s) requested, if granted, will make possible a reasonable use of the parcel of
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 6. The variance(s) request, if granted, will not result in the creation of a public nuisance.
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Legal Services
- A. Board of Adjustment Meeting held on April 21 2026
- A. Board of Adjustment Meeting held on April 21 2026
- A. Case Number(s): BOA#26-100026
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- A. Case Number(s): BOA#26-100026
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- A. Case Number: BOA#26-100022
- Pool & Spa Construction
- Concrete & Masonry
- Plumbing
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- B. Case Number: BOA#26-100023
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Accounting & Tax
- Legal Services
- Landscaping & Lawn Service
- cc: City Manager; City Attorney
Follow this across meetings
Board
Board of AdjustmentApplicants and firms
Locations
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account