Browse City of Jacksonville civic records
Every published record for City of Jacksonville, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.
3,442 records
RESO-Q Granting the Appeal Filed by Michael Herzberg of the Final Orders Issued by the Planning Commission Approv 1) Zoning Exception E-26-20, Seeking to Allow Building Trades Contractor With Outside Storage Including Overnight Truck Parking, & 2) Administrative Deviation Ad-26-21, Seeking to a) Reduce the Minimum Width of a Driveway From Twelve (12) Ft Wide to Ten (10) Ft Wide, B) Reduce the Uncomplimentary Land Use Buffer Width From Ten (10) Ft Wide Along the East Property Boundary to Five (5) Feet Wide, C) Reduce the Uncomplimentary Land Use Buffer Width From Ten (10) Feet Wide Along West Property Boundary to Zero (0) Feet Wide, & D) Reduce the Uncomplimentary Land Use Buffer Trees Along the East Propty Boundary From Six (6) Req’d to Four (4) Trees, & the W Propty Boundary From Nine (9) Req’d to Seven (7) Trees, in the CCG-2 Zoning Dist for the Propty Located at 10344 Atlantic Cir, Btwn Atlantic Blvd & Lawson Rd (R.E. No(S). 164643-0000), Pursuant to Sec 656.141, Ord Code; Adopting Recommended Findings & Conclusions of the LUZ Committee; Prov for Notice (Harvey) (Introduced by the Land Use & Zoning Committee) (Ex-Parte: CMs Johnson, J. Carlucci, Arias, Howland)
This item concerns an appeal regarding a property at 10344 Atlantic Circle, between Atlantic Boulevard and Lawson Road. The appeal is about a request for a zoning exception to allow a building trades contractor with outside storage and overnight truck parking. It also involves requests to reduce the required width of a driveway, the width of land use buffers along property boundaries, and the number of trees required for those buffers. The property is currently in the CCG-2 zoning district. This matter is currently pending before the City Council, having been introduced and advanced through committee readings and public hearings. If approved, the project could involve site preparation, construction of contractor facilities, and landscaping. Local contractors, suppliers, and service providers should consider reaching out early to understand the project details as it moves through the approval process. This early engagement can provide an advantage before final plans, bids, and permits are established.
- Board:
- City Council
- Date:
- 2026-05-26
- Type:
- Agenda_item
- Address:
- 10344 Atlantic Cir
- Applicant:
- Rory Diamond
Special Investigatory Committee on JEA
The Special Investigatory Committee on JEA in the City of Jacksonville met to review several items. The committee is looking into JEA employee capacity fees and a proposed employee survey, which could involve data analysis and reporting services. They also discussed whistleblower protections and a combined cycle project, which may lead to future work for various contractors and service providers.
- Board:
- Special Investigatory Committee on JEA
- Date:
- 2026-05-26
- Type:
- Meeting
The next Council Meeting will be held on Tuesday, June 9, 2026.
This is a notice about an upcoming City Council meeting. The City Council of Jacksonville, Duval will hold its next meeting on Tuesday, June 9, 2026. The meeting will cover various civic matters. Information about the meeting agenda can be found online. This early notice provides an opportunity for local contractors, trades, suppliers, and service providers to monitor the agenda for potential future projects and business opportunities. Staying informed about upcoming council meetings allows businesses to prepare and potentially engage with city projects as they progress through the planning and approval stages.
- Board:
- City Council
- Date:
- 2026-05-26
- Type:
- Agenda_item
Update on Capacity Fee – JEA Employees
The City of Jacksonville's Special Investigatory Committee on JEA is reviewing a capacity fee analysis. The Auditor's Office has received the necessary data and is currently conducting its assessment. This review is planned to continue past June 30th. The scope of work involves data analysis and assessment related to the capacity fee. This early stage means that related services, such as specialized consulting or data management, may be needed as the analysis progresses. Local businesses offering professional services, particularly those with expertise in financial analysis or government auditing support, could find opportunities by engaging with the committee or the Auditor's Office early in this process.
- Board:
- Special Investigatory Committee on JEA
- Date:
- 2026-05-26
- Type:
- Agenda_item
Update on JEA Employee Survey
The Special Investigatory Committee on JEA, City of Jacksonville, Duval is planning a new employee survey. This survey is currently under review by the committee. The project involves developing and distributing a survey to JEA employees to gather feedback on various aspects, including senior leadership and trust in responses. The survey will include open-ended questions to allow employees to provide more detailed feedback. Once completed, the aggregated results will be presented to the JEA Board. This early stage presents an opportunity for businesses that can provide survey development, distribution, data analysis, and reporting services. Reaching out now, before final plans and vendor selections are made, could provide a competitive advantage.
- Board:
- Special Investigatory Committee on JEA
- Date:
- 2026-05-26
- Type:
- Agenda_item
*****Note: Items may be added at the discretion of the Chair.*****
This item concerns a planned project for the Transportation, Energy & Utilities Committee in the City of Jacksonville, Duval. The project is currently under review. This project is expected to involve site clearing and grading, followed by underground utility work and paving. It will also include vertical construction for new structures, mechanical and finish trades, and final landscaping. Local contractors, trades, suppliers, and service providers should consider reaching out to the city early in the process. Engaging before site plans, bids, and permits are finalized can offer a competitive advantage for securing work on this upcoming civic project.
- Board:
- Transportation, Energy & Utilities Committee
- Date:
- 2026-05-21
- Type:
- Agenda_item
- Address:
- Duval
*****Note: Items may be added at the discretion of the Chair.*****
This item is currently under review by the Rules Committee of the City of Jacksonville. No specific project details, such as a proposed use, address, or size, have been provided at this stage. As the item is pending, the exact nature of any future work is not yet defined. This means that any potential construction, site preparation, or related services are still in the very early planning phases. Businesses interested in future opportunities should monitor the progress of this item as it moves through the review process. Early engagement with the committee or relevant city departments, once details emerge, could provide an advantage.
- Board:
- Rules Committee
- Date:
- 2026-05-21
- Type:
- Agenda_item
Attendance:
The Transportation, Energy & Utilities Committee of the City of Jacksonville is reviewing a proposal for a new civic project. While specific details about the project's location, size, or current use are not yet available, this review stage indicates that planning is in its early phases. The project is expected to involve significant construction, potentially including site clearing and grading, underground utility work, paving, and the installation of various building systems and finishes. This early stage presents an opportunity for local contractors, trades, suppliers, and service providers to engage with the project stakeholders. Reaching out now, before detailed site plans, bids, and permits are finalized, allows businesses to understand the project's scope and potentially influence its development, positioning them to compete for future work.
- Board:
- Transportation, Energy & Utilities Committee
- Date:
- 2026-05-21
- Type:
- Agenda_item
Attendance:
The City of Jacksonville Rules Committee is reviewing a proposal that could lead to new development. While details are limited at this stage, this review indicates potential future construction projects. The process is currently pending, meaning it is in its early stages. If approved, this could involve site preparation, utility work, and building construction. Local contractors, suppliers, and service providers should monitor this item for future opportunities. Engaging early could provide an advantage as plans develop.
- Board:
- Rules Committee
- Date:
- 2026-05-21
- Type:
- Agenda_item
COUNCIL RULE 4.505 DISRUPTION OF MEETING
This notice concerns a rule change being reviewed by the Transportation, Energy & Utilities Committee of the City of Jacksonville. The proposed rule, Council Rule 4.505, outlines actions that can be taken against individuals who disrupt public meetings. These actions include being barred or removed from a meeting, or having the audience cleared. The rule also specifies behaviors that constitute disruption, such as political campaigning, excessive noise, displaying signs, using electronic devices audibly, consuming alcohol, making offensive remarks, or refusing to stop speaking. This item is currently pending review. While this item does not involve direct construction, it may lead to future needs for services related to maintaining order and security at public meetings. Businesses that provide security services or event management support might find opportunities as the city refines its meeting protocols.
- Board:
- Transportation, Energy & Utilities Committee
- Date:
- 2026-05-21
- Type:
- Agenda_item
COUNCIL RULE 4.505 DISRUPTION OF MEETING
This public notice concerns a proposed change to Council Rule 4.505 regarding disruptions at City of Jacksonville public meetings. The Rules Committee is reviewing this rule, which outlines actions that can be taken against individuals who disrupt meetings, including being barred or removed. The proposed rule details specific behaviors considered disruptive, such as political campaigning, excessive noise or movement, displaying signs over a certain size, audible electronic device noise, consuming alcohol or controlled substances, offensive remarks or gestures, refusing to stop speaking, and returning after removal. This item is currently under review by the Rules Committee. While this item does not involve physical construction, it may lead to the need for services related to meeting management and security. Businesses that provide security services, event management, or specialized communication systems could find opportunities as the city refines its public meeting protocols. Engaging with city staff early could provide insight into potential future needs.
- Board:
- Rules Committee
- Date:
- 2026-05-21
- Type:
- Agenda_item
Item/File No. Title History
The Transportation, Energy & Utilities Committee of the City of Jacksonville is reviewing a proposal for a new civic project. While specific details about the project's location, size, and current use are not yet available, this item is currently pending review. The project is expected to involve significant construction and infrastructure work, potentially including site preparation, utility installation, road construction, and building development. This early stage in the public process presents an opportunity for local contractors, trades, suppliers, and service providers. Engaging now, before detailed site plans, bids, and permits are finalized, allows businesses to position themselves for potential work as the project moves forward. Companies specializing in site clearing, grading, concrete, paving, electrical, plumbing, HVAC, framing, roofing, and landscaping may find opportunities.
- Board:
- Transportation, Energy & Utilities Committee
- Date:
- 2026-05-21
- Type:
- Agenda_item
Item/File No. Title History
The City of Jacksonville's Rules Committee is reviewing a civic agenda item that is currently pending. This item is in the early stages of the public process, meaning opportunities for local contractors, trades, suppliers, and service providers may arise as the proposal moves forward. While specific details about the project's scope, location, or intended use are not yet available, its progression through the Rules Committee suggests potential future development or civic work. Businesses involved in site preparation, construction trades, material supply, and related professional services should monitor this item's progress. Engaging early, before detailed plans, bids, and permits are finalized, can offer a competitive advantage for securing future work related to this pending civic matter.
- Board:
- Rules Committee
- Date:
- 2026-05-21
- Type:
- Agenda_item
NOTE: The next regular meeting will be held
The City of Jacksonville Rules Committee is reviewing a civic agenda item. This item is currently pending. The next regular meeting is scheduled for May 21, 2026. This meeting will discuss the agenda item. The specific details of the proposal are not yet available. As the item progresses, it may involve site preparation, construction, and related services. Local contractors, trades, suppliers, and service providers are encouraged to monitor the progress of this item. Early engagement before final plans and permits are set can offer a competitive advantage.
- Board:
- Rules Committee
- Date:
- 2026-05-21
- Type:
- Agenda_item
NOTE: The next regular meeting will be held Dasday, Mouthy 39, 2043.
This item concerns a planned civic project in Jacksonville, Duval. The Transportation, Energy & Utilities Committee is reviewing a proposal that is currently pending. While specific details about the project's location, size, or intended use are not yet available, the review process suggests future work. This could involve site preparation, utility installation, construction, and landscaping. Local contractors, trades, suppliers, and service providers are encouraged to monitor this item's progress. Engaging early in the process, before final plans and permits are set, offers the best opportunity to compete for upcoming work.
- Board:
- Transportation, Energy & Utilities Committee
- Date:
- 2026-05-21
- Type:
- Agenda_item
ORD Adopting a Small-Scale Amendmnt to the FLUM Series of the 2045 Comp Plan by Changing the Future Land Use Designation at 426 McDuff Ave S, 3057 Hunt St, 0, 3044, 3050 Nolan St & 3055, 3061 Cecelia St, N of I-10, btwn Day Ave & McDuff Ave S - (3.61± Acres) - RPI & LDR to CGC - City Rescue Mission, Inc. (R.E. # 056946-0000 (Portion), 057253-0000 (Portion), 057260-0000, 057294-0000, 057295-0000, 057304-0000, 057305-0000) (Appl # L-6111-26C) (Dist. 9-Clark-Murray) (Sheppard) (LUZ)
A proposed change to the Future Land Use Map (FLUM) for the 2045 Comprehensive Plan is under review. This change involves approximately 3.61 acres located north of I-10, between Day Avenue South and McDuff Avenue South. The current land use designation is Residential (RPI) and Low Density Residential (LDR), and the proposed designation is Commercial General (CGC). This item is currently pending and has been introduced and referred for review, with public hearings scheduled for July 21, 2026, and July 28, 2026. If approved, this change could lead to site clearing and grading, underground utility work, paving, and the construction of commercial buildings. Contractors, suppliers, and service providers in construction, engineering, and material supply may find opportunities by engaging early in the process before final site plans, bids, and permits are established.
- Board:
- Rules Committee
- Date:
- 2026-05-21
- Type:
- Agenda_item
- Address:
- 426 McDuff Ave S
- Applicant:
- City Rescue Mission, Inc.
ORD Adopting a Small-Scale Amendmnt to the FLUM Series of the 2045 Comp Plan by Changing the Future Land Use Designation at 426 McDuff Ave S, 3057 Hunt St, 0, 3044, 3050 Nolan St & 3055, 3061 Cecelia St, N of I-10, btwn Day Ave & McDuff Ave S - (3.61± Acres) - RPI & LDR to CGC - City Rescue Mission, Inc. (R.E. # 056946-0000 (Portion), 057253-0000 (Portion), 057260-0000, 057294-0000, 057295-0000, 057304-0000, 057305-0000) (Appl # L-6111-26C) (Dist. 9-Clark-Murray) (Sheppard) (LUZ)
A proposal is under review to change the future land use designation for a group of properties located north of I-10, between Day Avenue and McDuff Avenue South. The applicant, City Rescue Mission, Inc., is seeking to change the land use from Residential Infill (RPI) and Low Density Residential (LDR) to Commercial General Commercial (CGC). This change would affect approximately 3.61 acres across several parcels. The item is currently pending and has been introduced, with public hearings scheduled for June 23, 2026, and July 28, 2026. If approved, this change could lead to site clearing and grading, followed by construction of commercial facilities. Contractors, suppliers, and service providers interested in potential future work should engage early to understand the project's scope as it moves through the review process. Early involvement allows businesses to prepare for potential bidding opportunities once plans and permits are finalized.
- Board:
- Transportation, Energy & Utilities Committee
- Date:
- 2026-05-21
- Type:
- Agenda_item
- Address:
- 426 McDuff Ave S
- Applicant:
- City Rescue Mission, Inc.
ORD Approp $1,342,200.40, Including $128,186.00 within the Countywide Traffic Calming Proj, & $630,917.50 from the Countywide Rdwy Sign Stripe & Signal Proj & $583,096.90 from the Countywide Intersection Improvements Proj, to: (1) $565,112.67 to the Traffic Signal Rebuild - 21st St East & Liberty St North Proj; & (2) $648,901.73 to the Traffic Signal Rebuild - 21st St West & Boulevard St Proj; Amend the 26-30 5-Yr CIP Appvd by Ord 2025-505-E to Reflect this Approp of Funds to the Projs (B.T. 26-063) (Dillard) (Req of Mayor)
The City of Jacksonville is considering an ordinance to fund traffic signal improvements. This proposal includes allocating approximately $1.34 million for two specific traffic signal rebuild projects. One project is located at 21st Street East and Liberty Street North, and the other is at 21st Street West and Boulevard Street. These funds are part of larger countywide projects for traffic calming, road striping, signals, and intersection improvements. The ordinance is currently pending review by the Rules Committee and has been introduced and read in several other committees. This project would involve work such as the demolition of existing signal equipment, installation of new traffic signal poles, mast arms, controllers, and signal heads, as well as potential underground utility work and final site restoration. Contractors specializing in electrical work, traffic signal installation, concrete, and site preparation could find opportunities. Reaching out to the city early in this review process may provide an advantage before bids are finalized.
- Board:
- Rules Committee
- Date:
- 2026-05-21
- Type:
- Agenda_item
- Address:
- 21st St East & Liberty St North
ORD Approp $1,342,200.40, Including $128,186.00 within the Countywide Traffic Calming Proj, & $630,917.50 from the Countywide Rdwy Sign Stripe & Signal Proj & $583,096.90 from the Countywide Intersection Improvements Proj, to: (1) $565,112.67 to the Traffic Signal Rebuild - 21st St East & Liberty St North Proj; & (2) $648,901.73 to the Traffic Signal Rebuild - 21st St West & Boulevard St Proj; Amend the 26-30 5-Yr CIP Appvd by Ord 2025-505-E to Reflect this Approp of Funds to the Projs (B.T. 26-063) (Dillard) (Req of Mayor)
The City of Jacksonville is planning to rebuild traffic signals at two key intersections: 21st Street East and Liberty Street North, and 21st Street West and Boulevard Street. This project involves appropriating over $1.3 million in funds, with specific amounts allocated to each intersection. The project is currently under review by the Transportation, Energy & Utilities Committee. Work will likely involve site preparation, demolition of existing signal equipment, installation of new traffic signal infrastructure, electrical work, and potentially road modifications at the intersections. Contractors specializing in traffic signal installation, electrical systems, and civil engineering could find opportunities. Early engagement is advised as this project is in the planning stages, before final bid and permit processes are complete.
- Board:
- Transportation, Energy & Utilities Committee
- Date:
- 2026-05-21
- Type:
- Agenda_item
- Address:
- 21st St East & Liberty St North
ORD Approp $200,000 from the Multiyear Progs & Initiatives - Council Dist 07 CBA - Contingency Acct to the Springfield Preservation & Revitalization - Subsidies & Contributions to Private Org Acct, to Prov Add’l Funding to Springfield Preservation & Revitalization Council, Inc. (SPAR) for the Springfield Cleanup Corps Prog, as Originally Authd by Ord 2025-99-E; Prov for Carryover to FY 28-29; Waiving 118.107 (Nonprofits to Receive Funding Through a Competitive Evaluated Award Process; Waiver & Disclosures), Pt 1 (General Provisions), Ch 118 (City Grants), Ord Code, to Auth a 2nd Admt to the Direct Contract with SPAR; Waiving Sec 118.602 (Responsibility), Subpt a (Cultural Service Grant Program), Pt 6 (Cultural Service Grants & Art in Public Places), Ch 118 (City Grants), Ord Code, to Auth Award of Add’l Funding to SPAR for the Prog in Addition to Cultural Svc Grant Funding Awarded by the Cultural Council; Apv, & Auth the Mayor, or Her Desig, & the Corp Sec to Execute & Deliver on Behalf of the City a 2nd Admt to the City Grant Agrmt btwn the City & SPAR for the Prog, to Increase the Max Indebtedness by $200,000, for a New Total Max Indebtedness Not-to-Exceed $496,181, & to Extend the Grant Term to 9/30/29, Subj to the Term Sheet & Budget Described Herein; Prov for Cont’d Oversight by the Grants & Contract Compliance Div of the Finance Dept (Staffopoulos) (Introduced by CM Peluso)
This item involves additional funding for the Springfield Cleanup Corps Program, administered by Springfield Preservation & Revitalization Council, Inc. (SPAR). The City of Jacksonville is proposing to amend a direct contract with SPAR to increase the maximum indebtedness by $200,000, bringing the total to not exceed $496,181. The grant term will also be extended to September 30, 2029. This project is currently under review, having been introduced and referred for further readings. The work will likely involve continued site cleanup, debris removal, and potentially minor landscaping or beautification efforts in the Springfield area. Contractors specializing in site preparation, general cleanup, and potentially landscaping services could find opportunities. Reaching out to SPAR early could provide an advantage before specific work orders or subcontracts are finalized.
- Board:
- Transportation, Energy & Utilities Committee
- Date:
- 2026-05-21
- Type:
- Agenda_item
- Applicant:
- Springfield Preservation & Revitalization Council, Inc.
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, free for 7 days. No credit card required.
Start your free trial