Skip to main content

Be First, Build Lasting Relationships

3. Project manager meetings are calculated in each discipline sheet and brought forward to Column D, except for Photogrammetry.

City Commission · 2026-05-05 · agenda_item

The City of Kissimmee is reviewing plans for alley paving in the Connect Kissimmee area. This project involves designing pavement for alleys, including pavement type selection, master design files, cross-slope correction, and traffic control analysis. The scope includes checking utility conflicts and grading, with potential for selective clearing and grubbing. The project is currently under review, indicating an early stage in the public process. This design phase will lead to future construction work, which could involve site preparation, utility adjustments, paving, and related infrastructure. Local contractors, suppliers, and service providers in site prep, grading, concrete, paving, utility work, and material supply should consider reaching out now to understand the project's needs before bids and permits are finalized.

Industries that could win this work

  • Site Prep, Grading & Hardscape
  • Concrete & Masonry
  • Construction (Other)
  • General Contractor
  • Utilities (Sub)
  • Building & Industrial Supply
  • Engineering & Architecture

Follow this across meetings

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.

Create your account