C. The City acknowledges and confirms that the Offsite Wastewater Improvements for
City Commission Meetings · 2026-04-14 · agenda_item
The City of Panama City is planning offsite wastewater improvements to support future development. These improvements include activating 13.5 miles of existing 16-inch dry line sewer main and connecting gaps from John Pitts Road to PS-61. Additionally, a proposed 9,500-foot 18-inch sewer force main will be installed from PS-61 to PS-41, along with a new wet well structure and related improvements at PS-41. This project is currently under review and is planned to accommodate an additional 1,450 equivalent residential connections. The scope of work will involve significant underground utility construction, including trenching, pipe laying, and the construction of new wet well facilities. Contractors specializing in heavy civil construction, underground utilities, and concrete work are likely to be involved. Reaching out to the city or its engineering consultants early in the review process could provide valuable insight into the project's timeline and specific requirements before formal bidding begins.
- existing dry line sewer main
- 13.5 mi
- dry line sewer main diameter
- 16 "
- proposed sewer force main
- 9,500 ft
- proposed sewer force main diameter
- 18 "
- equivalent residential connections
- 1,450
- agreement term
- 3 years
- renewal term
- 3 years
Industries that could win this work
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Engineering & Architecture
Follow this across meetings
Applicants and firms
Locations
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account