July 13, 2026 Planning Board Meeting Agenda packet 2026-07-13
Planning Board · 2026-07-13 · packet
[1919 Tyndall Drive; case CPC-PLN-2026-1278] Case CPC-PLN-2026-1278: Stephanie D Marshall (owner), Tim Clark (applicant) seeks a variance for a carport at 1919 Tyndall Drive. The request is to reduce the front setback from 20 feet to 16 feet for a carport attached to the primary structure in an R-1 zoning district. The property is 0.528 acres. The Planning Board public hearing is July 13, 2026. No City Commission hearing is scheduled. The staff recommendation is to APPROVE. [222 Elm Avenue; case CPC-PLN-2026-1478] Case CPC-PLN-2026-1478: Jeffrey Driggers (owner and applicant) seeks a variance for an accessory structure at 222 Elm Avenue. The request is to allow an accessory structure to exceed the 60% maximum square footage allowance. The property is 0.237 acres. The Planning Board public hearing is July 13, 2026. No City Commission hearing is scheduled. Decision and staff recommendation are not stated. [1023 E 15th Street; case CPC-PLN-2026-1253] Case CPC-PLN-2026-1253: S A RECYCLING LLC (owner), Kurtis Adams (applicant) seeks a rezoning for the property at 1023 E 15th Street. The request is to rezone from Light Industrial (LI) to Heavy Industrial (HI). The property is 4.563 acres. The Planning Board public hearing is July 13, 2026. City Commission hearings are scheduled for August 11, 2026 (First Reading/Public Hearing) and August 25, 2026 (Second and Final Reading/Public Hearing). Decision and staff recommendation are not stated. [2015 W 23rd Ct; case CPC-PLN-2026-1237] Case CPC-PLN-2026-1237: PARK W 23RD CT LLC (owner), Amjad Heidami (applicant) requested a small-scale land use amendment and rezoning from Residential and Residential-1 to General Commercial and General Commercial-2 for the property at 2015 W 23rd Ct. The property is 0.305 acres. The Planning Board public hearing was June 8, 2026. The City Commission public hearings were July 14, 2026 (First Reading/Public Hearing) and July 28, 2026 (Second and Final Reading/Public Hearing). The Planning Board recommended denial. Public participation was none. [Alleyway east of 519 E 6th Street, north of E 6th Street and south of E 7th Street; case CPC-PLN-2026-1326] Case CPC-PLN-2026-1326: John Fifteen Five, LLC (applicant), Jimmy Branch (applicant representative) requested vacation of a right-of-way located east of 519 E 6th Street, north of E 6th Street and south of E 7th Street. The area is 0.13 acres. The Planning Board public hearing was June 8, 2026. The City Commission public hearings were July 14, 2026 (First Reading/Public Hearing) and July 28, 2026 (Second and Final Reading/Public Hearing). The Planning Board recommended approval. Public participation was none. [1919 Tyndall Drive] A variance was requested and approved for a carport to be built 16 feet from the front property line, deviating from the 20-foot minimum setback requirement in the R-1 zoning district. The property is waterfront on the rear, making front placement necessary for accessibility and yard maintenance. The carport will match existing structures on the street and is intended to provide shelter for an elderly mother. Staff recommended approval. [222 Elm Avenue; case CPC-PLN-2026-1478] A variance was requested and approved to allow an accessory structure (boat house/pole barn) to exceed the 60% maximum square footage allowance relative to the primary structure. The proposed 18'x40' (720 sq ft) structure is larger than 60% of the existing 625 sq ft primary structure (ADU). The property owner is not rebuilding the original home destroyed by Hurricane Michael and intends to use the ADU as the primary structure. The boat house will be partially enclosed and located in the side yard, providing weather protection for a boat. The neighborhood has comparable accessory structures. Staff recommended approval. [222 Elm Ave, Panama City, FL; 1023 E 15th Street, Panama City, FL; case CPC-PLN-2026-1253] This document contains two distinct project summaries. The first details a proposed 18'x40' (720 sq ft) partial enclosed pole barn at 222 Elm Ave, Panama City, FL. The applicant, Jeff Driggers, is seeking variances for the accessory structure's placement and size relative to the primary structure. The second project involves a rezoning request for 1023 E 15th Street (Parcel ID: 14450-000-000), where S A Recycling LLC, represented by applicant Kurtis Adams, seeks to rezone from Light Industrial (LI) to Heavy Industrial (HI). The property is 4.563 acres and currently operates as a recycling center, which is a non-conforming use. The rezoning aims to bring the existing use into conformance with zoning regulations. The staff recommendation is to approve the rezoning. Public comment is not stated for either project.
Agenda items
- 1) zoning district of the City of Panama City Unified Land Development Code (ULDC). The applicant is
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- 1) zoning district of the City of Panama City Unified Land Development Code (ULDC). The applicant is
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Engineering & Architecture
- 1. 4:0 0 p.m. Chair Neubauer called the Planning Board meeting to order.
- 1. 4:00 p.m. Chair Neubauer called the Planning Board meeting to order.
- 1. Allow a use that is specifically or by inference prohibited in any zoning district classification,
- 1. Allow a use that is specifically or by inference prohibited in any zoning district classification,
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. Height;
- 1. Height;
- 1. Provide off-street parking as specified in chapter 108.
- 1. Provide off-street parking as specified in chapter 108.
- 1. Single-family detached dwellings on individual parcels;
- 1. Single-family detached dwellings on individual parcels;
- 1. That the requested variance maintains the basic intent and purpose of the subject regulations, particularly as it
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- General Contractor
- Building & Industrial Supply
- 1. That the requested variance maintains the basic intent and purpose of the subject regulations, particularly as it
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Construction (Other)
- Painting & Flooring
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. The impervious surface ratio (ISR) shall be no greater than 0.60 (or 60%) of the total parcel
- 1. The impervious surface ratio (ISR) shall be no greater than 0.60 (or 60%) of the total parcel
- 1. The impervious surface ratio (ISR) shall be no greater than 0.60 (or 60%) of the total parcel area.
- 1. The impervious surface ratio (ISR) shall be no greater than 0.60 (or 60%) of the total parcel area.
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- 1. Transitional community residences.
- 1. Transitional community residences.
- 10. CONCRETE
- Concrete & Masonry
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- 11. FOUNDATION
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Engineering & Architecture
- 12. STEEL
- 13. WOOD
- 14. City Neighborhood Planning Area District Land Use Map Category
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Drywall & Insulation
- Roofing
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 14. City Neighborhood Planning Area District Land Use Map Category
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Plumbing
- Electrical
- HVAC & Climate Control
- Real Estate Development
- Engineering & Architecture
- Building & Industrial Supply
- Landscaping & Lawn Service
- 14. ROOF & WALL SHEATHING
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 2. Apply to any provisions for which the code specifically prohibits waiver or modification.
- 2. Apply to any provisions for which the code specifically prohibits waiver or modification.
- 2. Conform to the landscaping and buffering requirements as specified in chapter 107.
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- 2. Conform to the landscaping and buffering requirements as specified in chapter 107.
- Site Prep, Grading & Hardscape
- General Contractor
- Landscaping & Lawn Service
- 2. DESIGN LOADS:
- 2. Family community residences that comply with the standards specified in section 110-9.A.
- 2. Family community residences that comply with the standards specified in section 110-9.A.
- 2. Family community residences that do not comply with the standards specified in section 110-9.A.
- 2. Family community residences that do not comply with the standards specified in section 110-9.A.
- 2. Have a density no greater than ten dwelling units to the acre.
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- Business Consulting
- Office & Business Support Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- Government Authority
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- Office & Business Support Services
- Media & Publishing
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. That the requested variance is otherwise compatible with the surrounding land uses and would not be
- 2. That the requested variance is otherwise compatible with the surrounding land uses and would not be
- 2. The maximum building footprint per building shall be 4,000 square feet. An exception is made
- General Contractor
- Engineering & Architecture
- Real Estate Development
- Government Authority
- 2. The maximum building footprint per building shall be 4,000 square feet. An exception is made
- General Contractor
- Engineering & Architecture
- Real Estate Development
- 2. Yards;
- 2. Yards;
- 3. All structures shall have a maximum height limitation of 35 feet above base flood elevation (BFE) or crown
- 3. All structures shall have a maximum height limitation of 35 feet above base flood elevation (BFE) or crown
- 3. Announcements – Disclosures (as applicable) : Board Member Cherry disclosed that she made site visits for
- 3. Announcements – Disclosures (as applicable): Board Member Cherry disclosed that she made site visits for
- 3. Height: All structures shall have a maximum height limitation of two stories plus an attic story.
- 3. Off-street parking and loading;
- 3. Off-street parking and loading;
- 3. Public and private schools grades K—12.
- 3. Public and private schools grades K—12.
- 3. That the requested variance is consistent with, and in furtherance of, the goals, objectives and policies of
- 3. That the requested variance is consistent with, and in furtherance of, the goals, objectives and policies of
- 3. WIND DESIGN CRITERIA
- General Contractor
- Concrete & Masonry
- Roofing
- Engineering & Architecture
- 4. Landscaping and buffers;
- 4. Landscaping and buffers;
- 4. Minimum setbacks shall be:
- 4. Minimum setbacks shall be:
- 4. Public or noncommercial private recreation.
- 4. Public or noncommercial private recreation.
- 4. Setbacks:
- 4. THE CONTRACTOR IS RESPONSIBLE FOR LIMITING THE AMOUNT OF CONSTRUCTION LOAD
- 4. That the plight of the petitioner is due to unique circumstances of the property or petitioner which would
- 4. That the plight of the petitioner is due to unique circumstances of the property or petitioner which would
- 5. Accessory uses or structures as set forth in chapter 110.
- 5. Accessory uses or structures as set forth in chapter 110.
- 5. Have a minimum lot size of 5,000 square feet.
- 5. Have a minimum lot size of 5,000 square feet.
- 5. Quasi-judicial Proceedings: Chair Neubauer described the procedures for public hearings as shown on the
- 5. Quasi-judicial Proceedings: Chair Neubauer described the procedures for public hearings as shown on the
- 5. Separation of uses;
- 5. Separation of uses;
- 5. That the variance requested is the minimum variance that is necessary to afford relief to the petitioner, while
- 5. That the variance requested is the minimum variance that is necessary to afford relief to the petitioner, while
- 6. Have a minimum lot frontage of:
- 6. Have a minimum lot frontage of:
- 6. Lot coverage;
- 6. Lot coverage;
- 6. Public utilities customarily found in residential areas;
- 6. Public utilities customarily found in residential areas;
- 6. Requests :
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 6. Requests:
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 6. Residential Future Land Use Map Category
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 6. Residential Future Land Use Map Category
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Drywall & Insulation
- Painting & Flooring
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 7. Family day care homes pursuant to F.S. § 125.0109.
- 7. Family day care homes pursuant to F.S. § 125.0109.
- 7. Non-Action Item(s)
- 7. Non-Action Item(s)
- 7. Such other provisions of the code which do not specifically prohibit such requests.
- 7. Such other provisions of the code which do not specifically prohibit such requests.
- A. Applicability. Variance requests that satisfy the criteria of section 102-42D. are authorized from the
- A. Applicability. Variance requests that satisfy the criteria of section 102-42D. are authorized from the
- A. The following bulk regulations shall apply to property zoned Neighborhood Residential (NR):
- A. The following bulk regulations shall apply to property zoned Neighborhood Residential (NR):
- A. The following bulk regulations shall apply to property zoned as R-1:
- A. The following bulk regulations shall apply to property zoned as R-1:
- B. The city shall not act upon any variance request that would:
- B. The city shall not act upon any variance request that would:
- B. The following uses are allowed in the R-1 zoning district; all other uses are prohibited.
- B. The following uses are allowed in the R-1 zoning district; all other uses are prohibited.
- C. Supplemental application requirements. In addition to the general application requirements, the
- Engineering & Architecture
- Legal Services
- C. Supplemental application requirements. In addition to the general application requirements, the
- Engineering & Architecture
- Legal Services
- C. The following uses are allowed as a conditional use in the R-1 zoning district:
- C. The following uses are allowed as a conditional use in the R-1 zoning district:
- D. Additional requirements:
- D. Additional requirements:
- D. Variance review criteria ; city action. The planning board shall hold its public hearing and, after
- D. Variance review criteria ; city action. The planning board shall hold its public hearing and, after
- E. In granting any variance, the planning board may prescribe conditions and safeguards intended to mitigate
- Legal Services
- Engineering & Architecture
- E. In granting any variance, the planning board may prescribe conditions and safeguards intended to mitigate
- F. No variance shall supersede or abrogate the requirements of flood damage prevention, or the requirements
- F. No variance shall supersede or abrogate the requirements of flood damage prevention, or the requirements
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Building & Industrial Supply
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Legal Services
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- i. 20 feet from the front parcel line
- i. 20 feet from the front parcel line
- i. 20 feet from the front parcel line.
- i. 20 feet from the front parcel line.
- i. Building heights shall exclude habitable attics and below grade parking.
- i. Setbacks shall be as summarized in Table 104-36.3.A.
- i. square or rectangular lot: 50 feet
- i. square or rectangular lot: 50 feet
- ii. 20 feet from the rear parcel line
- ii. 20 feet from the rear parcel line
- ii. 20 feet from the rear parcel line.
- ii. 20 feet from the rear parcel line.
- ii. Porches may extend up to ten feet into setbacks provided they are at least eight feet deep.
- ii. Stories may not exceed 12 feet in height from finished floor to finished ceiling.
- ii. corner: 60 feet
- ii. corner: 60 feet
- iii. 7 feet from the side parcel line.
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- iii. 7 feet from the side parcel line.
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- iii. 7 feet from the side parcel lines
- iii. 7 feet from the side parcel lines
- iii. Heights shall be measured to the eave of the roof or roof deck (if flat).
- iii. cul-de-sac or corner: 20 feet
- iii. cul-de-sac or corner: 20 feet
- iv. 10 feet from road side on corner lots
- iv. 10 feet from road side on corner lots
- iv. The first finished floor in residential buildings shall be raised a minimum of 24" above the
Follow this across meetings
Board
Planning BoardApplicants and firms
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account