[1919 Tyndall Drive; 222 Elm Avenue; 1023 E 15th Street; 2015 W 23rd CT; 519 E 6th Street (for alleyway); case CPC-PLN-2026-1278; CPC-PLN-2026-1478; CPC-PLN-2026-1253; CPC-PLN-2026-1237; CPC-PLN-2026-1326] The document is a Planning Board meeting agenda and staff report for the City of Panama City, Florida, dated July 13, 2026. It lists three quasi-judicial requests: 1) A variance request (CPC-PLN-2026-1278) for a property at 1919 Tyndall Drive (Parcel ID #: 21904-000-000), 0.528 acres, owned by Stephanie Marshall, applicant Tim Clark, to reduce the front setback from 20 feet to 16 feet for an attached carport in the R-1 zoning district. Staff recommendation is APPROVE. 2) A variance request (CPC-PLN-2026-1478) for a property at 222 Elm Avenue (Parcel ID #: 22405-000-000), 0.237 acres, owned and applied by Jeffrey Driggers, to allow an accessory structure to exceed the 60% maximum square footage allowance. 3) A rezoning request (CPC-PLN-2026-1253) for a property at 1023 E 15th Street (Parcel ID #: 14450-000-000), 4.563 acres, owned by S A Recycling LLC, applicant Kurtis Adams, to change from Light Industrial (LI) to Heavy Industrial (HI). The document also includes minutes from the June 8, 2026 meeting, which list two prior requests: a small-scale land use amendment and rezoning (CPC-PLN-2026-1237) at 2015 W 23rd CT (Parcel ID #: 13230-030-000), 0.305 acres, from Residential and Residential-1 to General Commercial and General Commercial-2, which received a motion to recommend denial, and a vacation of right-of-way (CPC-PLN-2026-1326) for an alleyway east of 519 E 6th Street (Parcel ID #: 20220-000-000), 0.13 acres, which received a motion to recommend approval. The document does not state any decisions for the July 13, 2026 items, as it is an agenda. Public comment for the June 8, 2026 items was 'None' for both. The document also includes a staff report for the 1919 Tyndall Drive variance, which includes a staff recommendation of APPROVE. [1919 Tyndall Drive, Panama City, FL 32405; 222 Elm Avenue, Panama City, FL 32401; case Not stated for carport; CPC-PLN-2026-1478 for boat house/pole barn] The document contains two separate variance requests. First, a request for a carport at 1919 Tyndall Drive, Panama City, FL 32405, Parcel ID# 21904-000-000, for Stephanie Marshall. The applicant requests a variance from the 20-foot front setback to 16 feet for a 24' x 24' x 8' carport in the front yard. The property is 0.528 acre. Staff recommends approval. Second, a request for a boat house/pole barn at 222 Elm Avenue, Parcel ID# 22405-000-000, for Jeffrey Driggers. The applicant requests a variance to allow an accessory structure to exceed the 60% maximum square footage allowance. The proposed structure is an 18' x 40' covered boat house/pole barn totaling 720 square feet. The existing primary structure is 625 square feet. The property is 0.237 acres. Staff recommends approval. The document does not state a final decision for either request. [222 Elm Ave, Panama City, FL 32401; 1023 E 15th Street, Panama City, FL 32405-6119; case CPC-PLN-2026-1253 (rezoning); Project #: 450.680 (pole barn)] The document contains two distinct items. First, a set of engineering drawings for a proposed 18'x40'x14' partially enclosed pole barn at 222 Elm Ave, Panama City, FL 32401, dated May 06, 2026, by CEED Civil Engineering, LLC, for Jeff Driggers, project number 450.680. The drawings include exterior elevations, roof framing plan, building section, typical T frame details, and details. The document also includes a variance request narrative for the same property, requesting a variance to allow the accessory structure (pole barn) to be located on the 'side' of the primary structure but exceed the 'front' edge, and to have the accessory structure base square footage exceed 60% of the primary structure square footage. The primary structure is a Studio Home (~650 sq ft). The accessory structure is designed to be 18'x40' (720 sq ft). The document does not state a decision on this variance request. Second, the document contains a staff report for a rezoning request for 1023 E 15th Street (PARCEL ID #: 14450-000-000), case number CPC-PLN-2026-1253, from Light Industrial (LI) to Heavy Industrial (HI). The applicant is Kurtis Adams, the owner is S A Recycling LLC. The property size is 4.563 acres (per Bay County Property Appraiser) or 4.869 acres (per survey). The staff recommendation is APPROVE. The staff report date is July 3, 2026, Planning Board meeting public hearing is July 13, 2026, City Commission first public hearing is August 11, 2026, and second and final public hearing is August 25, 2026. The document also includes an ALTA/NSPS Land Title Survey for SA - 1023 E 15Th St, with a survey date of December 22, 2025, and a revision date of January 8, 2026.
Agenda items
- 1) zoning district of the City of Panama City Unified Land Development Code (ULDC). The applicant is
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- 1) zoning district of the City of Panama City Unified Land Development Code (ULDC). The applicant is
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Engineering & Architecture
- 1. 4:0 0 p.m. Chair Neubauer called the Planning Board meeting to order.
- 1. 4:00 p.m. Chair Neubauer called the Planning Board meeting to order.
- 1. Allow a use that is specifically or by inference prohibited in any zoning district classification,
- 1. Allow a use that is specifically or by inference prohibited in any zoning district classification,
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. Height;
- 1. Height;
- 1. Provide off-street parking as specified in chapter 108.
- 1. Provide off-street parking as specified in chapter 108.
- 1. Single-family detached dwellings on individual parcels;
- 1. Single-family detached dwellings on individual parcels;
- 1. That the requested variance maintains the basic intent and purpose of the subject regulations, particularly as it
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- General Contractor
- Building & Industrial Supply
- 1. That the requested variance maintains the basic intent and purpose of the subject regulations, particularly as it
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Construction (Other)
- Painting & Flooring
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. The impervious surface ratio (ISR) shall be no greater than 0.60 (or 60%) of the total parcel
- 1. The impervious surface ratio (ISR) shall be no greater than 0.60 (or 60%) of the total parcel
- 1. The impervious surface ratio (ISR) shall be no greater than 0.60 (or 60%) of the total parcel area.
- 1. The impervious surface ratio (ISR) shall be no greater than 0.60 (or 60%) of the total parcel area.
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- 1. Transitional community residences.
- 1. Transitional community residences.
- 10. CONCRETE
- Concrete & Masonry
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- 11. FOUNDATION
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Engineering & Architecture
- 12. STEEL
- 13. WOOD
- 14. City Neighborhood Planning Area District Land Use Map Category
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Drywall & Insulation
- Roofing
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 14. City Neighborhood Planning Area District Land Use Map Category
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Plumbing
- Electrical
- HVAC & Climate Control
- Real Estate Development
- Engineering & Architecture
- Building & Industrial Supply
- Landscaping & Lawn Service
- 14. ROOF & WALL SHEATHING
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 2. Apply to any provisions for which the code specifically prohibits waiver or modification.
- 2. Apply to any provisions for which the code specifically prohibits waiver or modification.
- 2. Conform to the landscaping and buffering requirements as specified in chapter 107.
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- 2. Conform to the landscaping and buffering requirements as specified in chapter 107.
- Site Prep, Grading & Hardscape
- General Contractor
- Landscaping & Lawn Service
- 2. DESIGN LOADS:
- 2. Family community residences that comply with the standards specified in section 110-9.A.
- 2. Family community residences that comply with the standards specified in section 110-9.A.
- 2. Family community residences that do not comply with the standards specified in section 110-9.A.
- 2. Family community residences that do not comply with the standards specified in section 110-9.A.
- 2. Have a density no greater than ten dwelling units to the acre.
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- Business Consulting
- Office & Business Support Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- Government Authority
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- Office & Business Support Services
- Media & Publishing
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. That the requested variance is otherwise compatible with the surrounding land uses and would not be
- 2. That the requested variance is otherwise compatible with the surrounding land uses and would not be
- 2. The maximum building footprint per building shall be 4,000 square feet. An exception is made
- General Contractor
- Engineering & Architecture
- Real Estate Development
- Government Authority
- 2. The maximum building footprint per building shall be 4,000 square feet. An exception is made
- General Contractor
- Engineering & Architecture
- Real Estate Development
- 2. Yards;
- 2. Yards;
- 3. All structures shall have a maximum height limitation of 35 feet above base flood elevation (BFE) or crown
- 3. All structures shall have a maximum height limitation of 35 feet above base flood elevation (BFE) or crown
- 3. Announcements – Disclosures (as applicable) : Board Member Cherry disclosed that she made site visits for
- 3. Announcements – Disclosures (as applicable): Board Member Cherry disclosed that she made site visits for
- 3. Height: All structures shall have a maximum height limitation of two stories plus an attic story.
- 3. Off-street parking and loading;
- 3. Off-street parking and loading;
- 3. Public and private schools grades K—12.
- 3. Public and private schools grades K—12.
- 3. That the requested variance is consistent with, and in furtherance of, the goals, objectives and policies of
- 3. That the requested variance is consistent with, and in furtherance of, the goals, objectives and policies of
- 3. WIND DESIGN CRITERIA
- General Contractor
- Concrete & Masonry
- Roofing
- Engineering & Architecture
- 4. Landscaping and buffers;
- 4. Landscaping and buffers;
- 4. Minimum setbacks shall be:
- 4. Minimum setbacks shall be:
- 4. Public or noncommercial private recreation.
- 4. Public or noncommercial private recreation.
- 4. Setbacks:
- 4. THE CONTRACTOR IS RESPONSIBLE FOR LIMITING THE AMOUNT OF CONSTRUCTION LOAD
- 4. That the plight of the petitioner is due to unique circumstances of the property or petitioner which would
- 4. That the plight of the petitioner is due to unique circumstances of the property or petitioner which would
- 5. Accessory uses or structures as set forth in chapter 110.
- 5. Accessory uses or structures as set forth in chapter 110.
- 5. Have a minimum lot size of 5,000 square feet.
- 5. Have a minimum lot size of 5,000 square feet.
- 5. Quasi-judicial Proceedings: Chair Neubauer described the procedures for public hearings as shown on the
- 5. Quasi-judicial Proceedings: Chair Neubauer described the procedures for public hearings as shown on the
- 5. Separation of uses;
- 5. Separation of uses;
- 5. That the variance requested is the minimum variance that is necessary to afford relief to the petitioner, while
- 5. That the variance requested is the minimum variance that is necessary to afford relief to the petitioner, while
- 6. Have a minimum lot frontage of:
- 6. Have a minimum lot frontage of:
- 6. Lot coverage;
- 6. Lot coverage;
- 6. Public utilities customarily found in residential areas;
- 6. Public utilities customarily found in residential areas;
- 6. Requests :
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 6. Requests:
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 6. Residential Future Land Use Map Category
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 6. Residential Future Land Use Map Category
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Drywall & Insulation
- Painting & Flooring
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 7. Family day care homes pursuant to F.S. § 125.0109.
- 7. Family day care homes pursuant to F.S. § 125.0109.
- 7. Non-Action Item(s)
- 7. Non-Action Item(s)
- 7. Such other provisions of the code which do not specifically prohibit such requests.
- 7. Such other provisions of the code which do not specifically prohibit such requests.
- A. Applicability. Variance requests that satisfy the criteria of section 102-42D. are authorized from the
- A. Applicability. Variance requests that satisfy the criteria of section 102-42D. are authorized from the
- A. The following bulk regulations shall apply to property zoned Neighborhood Residential (NR):
- A. The following bulk regulations shall apply to property zoned Neighborhood Residential (NR):
- A. The following bulk regulations shall apply to property zoned as R-1:
- A. The following bulk regulations shall apply to property zoned as R-1:
- B. The city shall not act upon any variance request that would:
- B. The city shall not act upon any variance request that would:
- B. The following uses are allowed in the R-1 zoning district; all other uses are prohibited.
- B. The following uses are allowed in the R-1 zoning district; all other uses are prohibited.
- C. Supplemental application requirements. In addition to the general application requirements, the
- Engineering & Architecture
- Legal Services
- C. Supplemental application requirements. In addition to the general application requirements, the
- Engineering & Architecture
- Legal Services
- C. The following uses are allowed as a conditional use in the R-1 zoning district:
- C. The following uses are allowed as a conditional use in the R-1 zoning district:
- D. Additional requirements:
- D. Additional requirements:
- D. Variance review criteria ; city action. The planning board shall hold its public hearing and, after
- D. Variance review criteria ; city action. The planning board shall hold its public hearing and, after
- E. In granting any variance, the planning board may prescribe conditions and safeguards intended to mitigate
- Legal Services
- Engineering & Architecture
- E. In granting any variance, the planning board may prescribe conditions and safeguards intended to mitigate
- F. No variance shall supersede or abrogate the requirements of flood damage prevention, or the requirements
- F. No variance shall supersede or abrogate the requirements of flood damage prevention, or the requirements
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Building & Industrial Supply
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Legal Services
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- i. 20 feet from the front parcel line
- i. 20 feet from the front parcel line
- i. 20 feet from the front parcel line.
- i. 20 feet from the front parcel line.
- i. Building heights shall exclude habitable attics and below grade parking.
- i. Setbacks shall be as summarized in Table 104-36.3.A.
- i. square or rectangular lot: 50 feet
- i. square or rectangular lot: 50 feet
- ii. 20 feet from the rear parcel line
- ii. 20 feet from the rear parcel line
- ii. 20 feet from the rear parcel line.
- ii. 20 feet from the rear parcel line.
- ii. Porches may extend up to ten feet into setbacks provided they are at least eight feet deep.
- ii. Stories may not exceed 12 feet in height from finished floor to finished ceiling.
- ii. corner: 60 feet
- ii. corner: 60 feet
- iii. 7 feet from the side parcel line.
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- iii. 7 feet from the side parcel line.
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- iii. 7 feet from the side parcel lines
- iii. 7 feet from the side parcel lines
- iii. Heights shall be measured to the eave of the roof or roof deck (if flat).
- iii. cul-de-sac or corner: 20 feet
- iii. cul-de-sac or corner: 20 feet
- iv. 10 feet from road side on corner lots
- iv. 10 feet from road side on corner lots
- iv. The first finished floor in residential buildings shall be raised a minimum of 24" above the
Follow this across meetings
Board
Planning BoardApplicants and firms
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, free for 7 days. No credit card required.
Start your free trial